Evaluation Method of Value Engineering Projects

Embed Size (px)

Citation preview

  • 8/18/2019 Evaluation Method of Value Engineering Projects

    1/15

    Guided By:

    Prof. R. I.

    Product Design And Value Engg.

    Sub.  Evaluation Method of

    Value Engineering Projects

    Govt. Engg. College Dahod

    (09018011903

    4)

    (090180119037)

    (090180119033)

    1.

    Pancabai!a Soel ".

    #. $osiDru% D.

    3. Set&eet D.

  • 8/18/2019 Evaluation Method of Value Engineering Projects

    2/15

    P'ASE # n*or+ation Pase

    P'ASE 3 ,unction Anal!sisPase

    P'ASE 4 -reation Pase

    P'ASE E%aluation Pase

    P'ASE / n%estigationPase

    P'ASE 7 eco++endation

    alue Analysis jo !lan

    P'ASE 1 eneral Pase

  • 8/18/2019 Evaluation Method of Value Engineering Projects

    3/15

    Value anal!sis 2ob lan

  • 8/18/2019 Evaluation Method of Value Engineering Projects

    4/15

    • Evaluation is a Step in the valueanalysis job plan

    •  This phase is a feasibility and costanalysis phase.

    •  The alternative ideas suggestedduring the "reative !hase wererened and analyzed with a view that

    whether they could achieve the

    E%aluation

  • 8/18/2019 Evaluation Method of Value Engineering Projects

    5/15

    • #his is carried out in t$o stages:• 1. All suggestions were studied and those

    which could not be adopted because of%uality , reliaility  or other asicreasons were eliminated, and the others

    were shortlisted.• #. The ideas shortlisted after the rst

    evaluation were critically  studied and

    discussed with the concerned personnel,for feasibility and practibility ofproduction. Thus the ideas were further

    shortlisted and assigned for feasibilityranin matri!.

  • 8/18/2019 Evaluation Method of Value Engineering Projects

    6/15

    ,unctionisting

    ,inalSelection

    E%aluate

    -o+arean5 

    6estValidate

    -ec5 i*Satises-riteria

    S!ntesiseSolutionasicEssential Secondar!

    Suort

    ,unction

    ,indAlternati%esAll ,unctions

    :ue est

    ;!=

    ,orcedeld=

    -ausedE?ectAnal!sis

    -allenges

    s itnecessar!@

    * noteli+inate

    -reati%edeation stes*or E%aluation

  • 8/18/2019 Evaluation Method of Value Engineering Projects

    7/15

    E%aluation &etods

    an5ing &etod

    •  This method decides that " is better than

     # $ % # is better than &. 'n this basis list ofpriorities are set out in the order o*i+ortance.

    •  This method selects one criterion as the 

    do+inant one and treat the other as constraints. The raning is done then.

    • (or e!ample , the criteria may be caitalcost would be the do+inant criterion,the selection may be made on the lo$est

  • 8/18/2019 Evaluation Method of Value Engineering Projects

    8/15

    i+lied idea rating

    • )t is a *uic and e+ective means to boil downthe many ideas that are generated during the"reation !hase to a more manageable few in

    number for further development.• Scoring categories are decided by the team.

    asically two inputs are chosen, each with a -point spread.

     This process taes appro!imately hours toevaluate /00 ideas.

  • 8/18/2019 Evaluation Method of Value Engineering Projects

    9/15

    Scoringbusiness ideas

    :uestions   BI1 BI2 BI31oes the business meet yourinvestmentgoals2

    1oes the business generate su3cientprots2

    )s the ris factor acceptable2

    1oes this business t your

    professionalsills2

    dea ating 6able

  • 8/18/2019 Evaluation Method of Value Engineering Projects

    10/15

     This step is better than raning.• )t is done by assigning relative weights to each

    criterion• Each of these design criteria was given a

    weightage factor.

    . ;eigting +etod

    'or E(a&!le 4To choose a machine on the basis of ve factors

    5e decide that 6apacity of the machine is mostimportant, and give it /0 points.

    ;eigtage ,actor articular >eigt

    B 6otal >eigt

  • 8/18/2019 Evaluation Method of Value Engineering Projects

    11/15

      &acine 1 &acine # &acine 3

    -riteria  ;eig

    t

    ,acto

    r

    ;eig

    t

    a>

    Sco

    re

    ;eigte

    d

    Score

    a>

    scor

    e

    ;eigt

    ed

    Score

    a>

    scor

    e

    ;eigte

    d

    Score

    -aacit! /0 0.888 9 .000 : 8.000 ; /.88

    i*e < 0.88 < /.98/ - /./9- < /.98/-aital

    cost

    9 0.00 < /.;00 - /.000 /0 .000

    unning

    cost

    ; 0./88 : /.00 = /.09- /0 /.880

    A%ailabil

    it!

    C*

    sares

    8 0./00 = 0.=00 /0 /.000 9 0.900

    6otal 80 /.000 8<

  • 8/18/2019 Evaluation Method of Value Engineering Projects

    12/15

    ;eigtage anal!sis Points

    >ajor di+erence 8

    >edium di+erence

    >inor 1i+erence /

    • Each of the above criteria was compared withother, and depending on their relativeimportance, three catagories were formed4

    ,or 2udging te ideas= te *ollo>ingdesigns >ere generall! considered

    • A. ,unction• . -ost• -. &aintainabilit!• D. :ualit! eliabilit!•

    E. Sace

  • 8/18/2019 Evaluation Method of Value Engineering Projects

    13/15

    Ea+le  -'C-E C, PC;ES"S6E&S

    FE" -6EA ;E'6

    A -AP6A -CS6

    EA6" 7

    - ADAP66" 3

    D CPEA6G -CS6 9

    E AVAA6" 14

    , A--EP6A6" #

    Scale

    Ecellent 4ood 3

    ,air #

    Poor 1

  • 8/18/2019 Evaluation Method of Value Engineering Projects

    14/15

    Ans

  • 8/18/2019 Evaluation Method of Value Engineering Projects

    15/15

     6  a n 5   ! o u...

    An! :uestions @