Value of Flexibility in Irrigation Projects. Anjuli Jain Figueroa DEC 7, 2010 Esd . 710. Outline. Big Picture AP6 Scope and Assumptions Deterministic Accounting For Uncertainty Incorporating Flexibility. Nile Basin- . The Big Picture. - PowerPoint PPT Presentation
Citation preview
ANJULI JAIN FIGUEROADEC 7, 2010
ESD. 710
Value of Flexibility in Irrigation Projects
1
Outline
Big PictureAP6 Scope and AssumptionsDeterministicAccounting For UncertaintyIncorporating Flexibility
2
The Big Picture
• Nile Basin Initiative: 10 countries disputing Nile waters
• Ethiopia vs. Egypt
• Ethiopian Irrigation Drainage Project -feasibility study for an 80,000ha irrigation plan
Goal: mutually beneficial solution >> food security, drought prevention, agricultural productivity
3Nile Basin-
http://www.ess.co.at/WATERWARE/NILE/background.html
Project Scope4
Variable/Stochastic
Water Flow
Crop Yield
Crop Price
Reservoir
Irrigation Plot
Key
Flexible
20,000 ha x4
Inflexible
80,000 ha
Deterministic
80,000 ha
Compare big and small irrigations projects on basis of ENPV, P(<0), range, 5% and 95% and B/C ratio
Simplifying Assumptions5
Irrigation Project CostsLand Lease $8.15/haFixed Irrigation System Cost $419.90/haO&M Irrigation System $30.88/haCost of Crop Production $40/ha
Crop CornTime horizon 20 yearsDiscount rate 12%
*If the average change in water level in the past 2 years is negative then thecorn yield will decrease at a rate of 0.9% for every 1% decrease in water level
*Uncertainties sampled from historical data’s fitted distributions
6
Deterministic
80,000 ha
Deterministic InputsAverage corn price $116/MT
Average demand1558 MT/ha
Average flow4805 MCM
Average corn production 1.4 MT/haDeterministic OutputNPV $19.92 MillionP(<=0) 0
Deterministic
Accounting For Uncertainty-Forecasting by Sampling
Distributions-7
WATER INPUT
CROP PRICE
CORN DEMAND
CORN YIELD
INFLEXIBLE DESIGN
8
Water Input
42
00
44
00
46
00
48
00
50
00
52
00
54
00
56
00
58
00
60
00
62
00
64
00
0.0000
0.0005
0.0010
0.0015
0.0020
0.0025
0.0030
0.0035Nile Average Mehr (Feb-Jun) Seasonal Flow
@RISK Student VersionFor Academic Use Only
3500
3700
3900
4100
4300
4500
4700
4900
5100
5300
Figure 13: Average Historical Flow for Mehr (Feb-Jun) Crop
Season and two Scenario Sample Predictions
"Historical Prediction
Mill
ion
Cub
ic M
eter
s
Mean 4806
St Dev. 142
Sample from Log logistic Distribution
9
Sample from Log logistic Distribution
Mean 116St Dev. 27.8
5010
015
020
025
030
035
040
045
050
0
0.000
0.005
0.010
0.015
0.020
0.025Yearly Average Corn Price
@RISK Student VersionFor Academic Use Only
1980 1990 2000 2010 2020 20300
50
100
150
200
250
Average Yearly Historical Corn Price
"historical""prediction" prediction2
US
Dol
lars
Crop Price
10
Mean 1558St Dev. 882
1960 1970 1980 1990 2000 2010 2020 20300
500000
1000000
1500000
2000000
2500000
3000000
3500000
4000000
Demand for Ethiopian Corn Histor-ical & Example Prediction
Historical Prediction
1000
MT
Corn
Corn Demand 01
23
45
67
8
Values in Thousands
0.0000
0.0002
0.0004
0.0006
0.0008
0.0010
0.0012Corn Demand
@RISK Student VersionFor Academic Use Only
Sample from Exponential Distribution
* Ignored trend
11
Corn Production Yield
-0.5
0.0
0.5
1.0
1.5
2.0
2.5
3.0
0.000.050.100.150.200.250.300.350.40
Production Yield
@RISK Student VersionFor Academic Use Only
1960 1970 1980 1990 2000 2010 2020 20300
0.5
1
1.5
2
2.5
3
Figure 11: Corn Yield Historical andTwo Scenario Sample Predictions
Historical Prediction prediction2
MT
Cor/
ha
Sample from Uniform Distribution
Mean 1.4St Dev. 0.8
12
1877959.3419
766497.8517
-0.2
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
Cash Flow / 1Values in Millions
Yearly Average Corn Price
Production Yield
Cash Flow / 1-FlexRegression - Mapped Values
@RISK Student VersionFor Academic Use Only
7511848.0653
3065991.4068
-10
12
34
56
78
Cash Flow/1 InflexValues in Millions
Yearly Average Corn Price
Production Yield
Regression - Mapped Values
@RISK Student VersionFor Academic Use Only
Input SensitivityWhen the input changes by +1 standard deviation, the output will change by the X-axis value associated with the length of the bar
St Dev. Price $/MT 27.8
St Dev. Yield MT/ha
0.8
13
Inflexible
80,000 ha
Inflexible OutputENPV $20.12 MillionP(<=0) 10.54%Min $-31.14 MillionMax $125.65 Million
10,000 sims
Inflexible
Incorporating Flexibility
14
EXPANSION RULES
FLEXIBLE DESIGN
COMPARISONS
VALUE OF FLEXIBILITY
Expansion Rules15
Start with 20,000 ha instead of 80,000 ha*Assume no additional upfront cost or cost to exercise flexibility
IF:1. Price of corn is greater than $63 and,
(in deterministic model this price gives NPV of 0)
2. Demand this year is greater than last year and,(increasing demand)
3. Change in water level in last two years is greater than 0, and (increasing water level)
4. Land size has not reached capacity of 80,000 ha
THEN:Expand by 20,000 ha
16
Flexible OutputENPV $16.76 MillionP(<=0) 1%Min $-9.28 MillionMax $74.38 Million
10,000 sims
Flexible
20,000 ha x4
Flexible
Comparisons
17
ENPV
PROBABILITY OF LOSING MONEY
RANGE
5 T H AND 95 T H PERCENTILES
B/C RATIO
18
-60
-40
-20
020
4060
8010
012
0
Values in Millions ($)
0.0
0.2
0.4
0.6
0.8
1.0Comparing ENPV
@RISK Student VersionFor Academic Use Only
ENPV P(<=0) Min Max 5% 95%
Det. ---- $19.92M - - - - -Inflex
. ---- $20.12M 10.54% $-
31.14M$125.65
M $-6.3M $47.62M
Flex. ---- $16.76M 1% $-9.28M $74.38M $2.79M $33.88M
ENPV Comparisons
19
5.0% 90.0% 5.0%31.7% 68.3% 0.0%
1.35 5.10
-20
24
68
10
12
14
0.0
0.2
0.4
0.6
0.8
1.0
B/C (profitability index) Comparison
B/C (profitability index) Flex / 1
Minimum 0.2868Maximum12.7217Mean 2.9826Std Dev 1.1564Values 10000
B/C (profitability index) Inflex / 1
Minimum-0.0256Maximum 5.1184Mean 1.5969Std Dev 0.4882Values 10000
B/C det / 1
Minimum 1.5929Maximum 1.5929Mean 1.5929Std Dev 0.0000Values 10000
@RISK Student VersionFor Academic Use Only
B/C Comparisons
No “all-time” best
“Best Project” depends on the evaluation metric used and risk tolerance of project manager.
If a plan is made on a deterministic basis, there may be a lot of surprises.
Conclusions20
Inflexible FlexibleENPV X
P(<=0) XMin XMax X 5% X95% X B/C X
http://www.google.com/imgres?imgurl=http://agricultureguide.org...
QUESTIONS?21