47
Evaluating the Impact of Erosion on Our Natural Riverbanks James Blatz, Ph.D., P.Eng. Department of Civil Engineering University of Manitoba

Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Embed Size (px)

Citation preview

Page 1: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Evaluating the Impact of Erosion on Our Natural Riverbanks

James Blatz, Ph.D., P.Eng.Department of Civil Engineering

University of Manitoba

Page 2: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Acknowledgments

• Don Kingerski, P.Eng.Waterways Engineer, City of Winnipeg

• Riverbank Management CommitteeCity of Winnipeg

• Leanne Fernando, M.Sc., P.Eng.Dam Safety Engineer, Manitoba Hydro

Page 3: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

What’s the Problem?

• There are 240 km of waterfront property inside the City of Winnipeg.

• 45% is owned by the City of the Winnipeg, much of which is in designated parks.

• The City is losing on average over a million dollars (2000$) worth of riverbank property on an annual basis.

• The estimated total cost to stabilize the 49 city owned riverbanks identified in the 2000 Riverbank Characterization study report is in the range of $80 million (2000$)

Page 4: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

What Does this Mean to Us?

Page 5: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

C MY K

EPSF file: Page b1r.epsWidth: 13.04" Height: 24.12" Bounding box: [0.0 0.0 939.0 1737.0] Scale factor: 100%

1. Henry Kalen’s Winnipeg, Henry Kalen. RegionalInterest/Photography. $21.95

2. The Da Vinci Code: Special Illustrated Edition,Dan Brown. Fiction. $48.00 (Our Price $33.60)

3. The Undomestic Goddess, Sophie Kinsella.Fiction. $33.00 (Our Price $21.70)

4. The Time In Between, David Bergen. CanadianFiction. $34.99

5. Angels and Demons: Special IllustratedEdition, Dan Brown. Fiction. $48.00 (Our Price$33.60)

6. The Time of the Uprooted, Elie Wiesel. Fiction.$35.00

7. New Rules, Bill Maher. Issues & Politics. $32.958. The Collapse of Globalism, John Ralston Saul.

Issues & Politics. $36.009. Blink, Malcolm Gladwell. Psychology. $37.95

10. Hitching Rides with Buddha, Will Ferguson.Canadian Memoir. $32.95

1. Adultery, Richard B. Wright. Canadian Fiction.$19.95

2. The Kite Runner, Khaled Hosseini. Fiction.$21.00

3. A Complicated Kindness, Miriam Toews.Canadian Fiction. $22.00

4. Small Island, Andrea Levy. Fiction. $14.955. How Soccer Explains the World, Franklin Foer.

Issues & Politics. $19.956. Obituaries, Anthony Connolly. Fiction. $19.957. At Knit’s End, Stephanie Pearl-McPhee.

Inspiration. $13.958. The Curious Incident of the Dog in the

Night-Time, Mark Haddon. Fiction. $19.959. The Exception to the Rulers, Amy Goodman.

Issues & Politics $18.9510. Snow, Orhan Pamuk. Fiction. $21.00

1. Harry Potter & the Half Blood Prince, J.K.Rowling. Fantasy. $41.00 (Our Price $28.97)

2. Eldest, Christopher Paolini. Teen Fantasy. $27.953. Love You Forever, Robert Munsch. Canadian

Picturebook. $4.954. The Second Summer of the Sisterhood,

Ann Brashares. Teen Fiction. $12.955. The Sisterhood of the Traveling Pants, Ann

Brashares. Teen Fiction. $10.996. Empress Emi-Poo, Karmel Schreyer. Picturebook.

$8.957. Skybreaker, Kenneth Oppel. Canadian Teen Fiction.

$22.998. Charlie & the Chocolate Factory, Roald Dahl.

Fiction (ages 8-12) $9.999. Away Laughing on a Fast Camel, Louise

Rennison. Teen Fiction. $9.9910. If You’re Not from the Prairies, David Bouchard.

Canadian Picturebook. $19.95

M FOR YOUNG PEOPLE E SPECIAL EVENTHARDCOVER TRADE PAPER

Grant Park 475-0483Portage Place 943-8376

mcnallyrobinson.com

Manitoba author. Prices valid to September 3, 2005

THEATREDORKS

Wednesday, August 31, 8 pm. Grant Park.

Performances of Everyman: A Matter of Life and Death.

Two different casts will each perform a 15-minute contemporary interpretation of theancient morality play. The cast members are

part of MYTP's Summer Teen Intensive programand are directed by Dahlia Kurtz.

b1C M Y K

By Patti Edgar

BERYL and Brian Turn-bull recall summernights when they would

eat dinner in a glassed-in gaze-bo in their riverfront backyard,reluctantly walking back totheir home at midnight.

This month, six metres oftheir yard tumbled into the RedRiver, on top of the sevenmetres they lost in the 1997flood. Now buried in the siltbelow their home are a birdbath, a flagpole, an elm, aspruce and a rock garden.

The gazebo survived thanks to a tautrope and pilings, but it’s now danglingprecariously over the newly createdcliff. The Turnbulls plan to take itapart and rebuild it closer to the house.

“It’s just devastating. We lost quite alot of property in ’97 but it didn’t reallyaffect our lifestyle,” said Beryl. “I’veaccepted it now, but I was too upset togo down there for awhile.”

Four months of higher-than-normalriver levels this spring and summercaused riverbank damage within thecity limits as bad — if not worse —than the 1997 flood, says the city’sexpert on the topic.

“This is something that was unprece-dented,” said riverbank engineer DonKingerski.

“The ’97 flood was very, very toughon our riverbanks, but we didn’t haveas long of a sustained flooding as wedid this time around and maybe that’sentered into it. From my observation,it’s not unlike the ’97 flood event interms of damage.”

The water started rising in earlyApril this year, peaked on July 5 at 6.4metres above normal summer levels,then dropped back to a normal height(two metres above winter freezing lev-els) on Aug. 9.

Kingerski can’t estimate the damagefrom this year’s flood yet, but hopes tohire an engineering student this fall tohelp him survey the destruction. On anaverage year, tumbling riverbanks eatup an estimated $1 million of realestate and hundred of elms.

The riverbank expert has receivedmore phone calls this summer aboutdamage to private property than hehas during his 20 years with the city.

Documenting the damageEarlier this week, Free Press pho-

tographer Boris Minkevich andreporter Patti Edgar boated up the RedRiver from the floodgates near thePerimeter Highway to North Perime-ter Park to document the damage,especially in the hard-hit southwest ofthe city.

The Assiniboine River also flooded,with land slipping away upstream nearHeadingley, where Kingerski neverexpected to see drops.

Along the banks of the Red River,backyards have washed down theriver, while gazebos and sun porchesare just a few steps away from the

edge. Parkland slumped into the rivers,

taking along trees and leaving benchesprecariously close to steep cliffs.

An untold number of riverbank treeshave vanished, while others are threat-ening to tumble because fast water hascarved their roots out of the soil.

Tree experts fear the unusually longflood could be felt for years to come onthe elms left standing. Submergedroots don’t get the oxygen they needduring the summer, putting stress onthe trees that could eventually killthem.

Some of the worst damage to privateproperty is through Fort Garry and St.Vital, where the river narrows andbends, undercutting the soft river-banks. North of The Forks, the damageis less severe, but if it hadn’t been forlast winter’s $1.2 million of work alongthe shoreline of the Elmwood Ceme-tery, Kingerski said gravestones couldhave washed away.

Too much water, too longLike a heavy, wet sponge, the banks

of Winnipeg’s rivers were saturated byrain this spring.

High, fast-running water scrapedaway at soft, unsupported banks likethose in Crescent Park. When the riverlevels dropped, the support on thoseheavy wet banks disappeared, sendingsoil tumbling.

Homeowners are responsible fortackling their own riverbank prob-lems, ranging in cost from $500 permetre of waterfront to $5,000.

St. Norbert Coun. Justin Swandel,who lives on the Red River, says thehuge price tag is keeping homeownersfrom doing the needed work, eventhough they can lose metres of proper-ty in one flood. At city hall this spring,he proposed offering a tax credit asencouragement.

“We are losing land all the time — aone-acre lot is all of a sudden a three-quarter lot. That could affect theassessment base.”

Others argue city hall can’t afford tohelp. The city owns riverbank that col-lectively needs $80 million worth ofstabilization work and staff have draft-ed a list of 11 critical stabilization pro-jects in city parks worth $1 millioneach.

However, once again there’s only$200,000 in the budget this year forslumping riverbanks. Longtime river-bank champion Coun. HarryLazarenko had to fight his fellow coun-cillors to get any money at all.

With no tax incentives on the hori-zon, Riverside Drive homeowner JimFlood will have to share with his neigh-bour the estimated $50,000 cost ofrepairing their backyards from a mas-sive slide earlier this month that wastriggered by flooding.

But the boating enthusiast tries tofocus on the bigger loss to the city.

Trees and parkland slip into therivers, while fluctuating water levelsmake this city’s natural asset lessaccessible for businesses and resi-dents.

“It’s a nice gift for the city to havethat we aren’t even using,” said Flood.“Stabilize it, reduce erosion and makethe river more economically viable fortourism, recreation and sightseeing.”

[email protected]

High river levels have caused unprecedented damage and loss of land

to private property and parks along the Red

PERSPECTIVE B1Editor, Boris Hrybinsky [email protected]

SUNDAY, AUGUST 28, 2005

winnipegfreepress.com

THE RIVER’S TOLL

The damage, in photographs / B4,5

Riverside Driveresident Jim Floodnow has to use aladder to getdown to thewaterfront afterriverbank erosionate away part ofhis property.

BrianTurnbulllooks outover hisproperty,which israpidlycrumblinginto theriver.

BORIS MINKEVICH / WINNIPEG FREE PRESS

BORIS MINKEVICH / WINNIPEG FREE PRESS

Page 6: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

What Do We Do?• Engineering study to examine how to

best remediate specific sections of riverbank.

• Often examine combinations of ground reinforcement and erosion protection.

• Analysis is based on existing and proposed remediated geometry.

• We ignore erosion quantitatively

Page 7: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Analysis Gives Static F.S.

Page 8: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

What About Erosion?

• Erosion is very difficult to characterize quantitatively either theoretically or empirically.

• This study is directed to quantify erosion and how it dictates river morphology.

• If we can quantify erosion and its effect on the morphology of the riverbank, we can examine the transient Factor of Safety.

Page 9: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Key Questions

1. What is the annual reduction in Factor of Safety for typical inside, outside and transition riverbanks?

2. We know floods impact erosion rates but by how much?

3. Is the magnitude or duration of the flood more important?

4. How effective are remediation alternatives in comparison to natural conditions?

Page 10: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

C MY K

EPSF file: Page b4 Page b5.epsWidth: 25.00" Height: 22.50" Bounding box: [0.0 0.0 1800.0 1620.0] Scale factor: 100%

CYAN PLATEYELLOW PLATEMAGENTA PLATEBLACK PLATE

NORTH

SOUTH

B5WINNIPEG FREE PRESS, SUNDAY, AUGUST 28, 2005B4

TOP 11 RIVERBANK STABILIZATION PROJECTS ON CITY LAND:! St. Vital Park! Lyndale Drive Park! St. John's Park! King's Park! Churchill Park! Red River at Bunn's Creek! Fort Rouge Park! Crescent Drive Park! King's Park! Evans Avenue at Cusson Street! Granite Curling Club/Mostyn Park

Shooters Family Golf CentreFrom the river, golfers at Shooters Family Golf Centre appear to be swing-ing out of a sand trap, but owner Guido Cersani laid the sand on four river-side holes that had been submerged in the flood to cover the mud.For a month, the back nine was closed and the water caused $150,000 indamage not covered by insurance. The entire course is open now andCersani bills it as more challenging thanks to the sand.

North of St. John’s Park While St. John’s Park is on the priority list for shoreline stabilization, a nearby homeowner says properties further north rarely experience erosion. But this summer a swirling undercurrent collapsed at least a metre of yard.

Kildonan DriveA faded wood fence danglesover the Red River at thesouth end of Kildonan Drive,revealing how much land hasslipped into the Red River.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

25242322212019181716151413121110

9876543210

APRIL1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

AUGUST1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

JUNE1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

MAY1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

JULY

252423222120191817161514131211109876543210

‘This is something that was unprecedented’— Riverbank engineer Don Kingerski.

RIVER ELEVATIONS 2005

FeetaboveJamesAvenue“datam”

FeetaboveJames

Avenue“datam”

Crescent Drive homeThe flood waters sliced under a modest rental home on Crescent

Drive, buckling a massive balcony this month.“This house is in danger of going in. This isn’t a gradual drop, it’s

like a cliff,” said Eric Matthies, a longtime next-door neighbour. Hishome isn’t threatened by the slump - yet. “I’m concerned the cliff

will do a right turn.”

Off a private road in St. NorbertA curve in the Red River creeps closer each year to this rural rental home. Thewater is now just a few steps away from the sunroom. The bulk of the damage

happened in 1997, but this summer two more trees were swept away.

Riverside DriveA ladder is propped up against a slumped riverbank so BarryMcMillian can reach his boat.McMillan and neighbour Jim Flood spent $14,000 two years agoshoring up the bank in front of both homes with limestone. ThisAugust, four metres of their backyards tumbled into the Red River,burying the project and yanking out trees and lawn along fourproperties.A heartbroken Floodpoints to ominouscracks along the soilthat show where thegrass will slump next,taking along at least onemore tree. He estimatesrepairs could cost$50,000 for both prop-erties. “My story isn’tunique. Perhaps themoney we put inreduced the amount ofland we lost.”

JubileeAvenue

Six metres ofBeryl and BrianTurnbull’s yard

tumbled into theRed River this

summer, on topof the seven

metres they lostin 1997.

A bird bath, aflagpole, an elm,

a spruce and arock garden areburied in the silt

below. The gazebo sur-vived thanks toa taut rope andpilings, but it’snow dangling

precariouslyover a cliff. The

Turnbulls plan totake it apart andrebuild it closer

to the house.

Crescent Drive Park, St. Vital Park, Kildonan Park, Bunn’s Creek,

Lyndale Drive ParkAll five parks are on the list of 11 slumping city parks each needing about

$1 million worth of stabilization work. City-owned riverbank collectively needs $80million worth of stabilization.

In these parks this summer, high water swept off with tress and scraped away atsoft banks, some of which collapsed when the river level dropped. At Churchill

Park, part of a pathway was swept down the river.

Main St.

Main St.Main St.

Osborne St.

Jubilee Ave.

St. Mary’s Rd. St. Mary’s Rd.

Pembina Hwy.

Pembina Hwy.

Pembina Hwy.

Fermor Ave.

Bishop Grandin Blvd.

South Perimeter Hwy.

St. Anne’s Rd.

Porta

ge A

ve.

North

Per

imete

r Hwy.

Notre

Dam

e Av

e.

Redw

ood

Ave.

Henderson Hwy.

Henderson Hwy.

Lord AvenueThis $1.5-million wall wascompleted in 2003 to protecta handful of homes alongLord Avenue. The flood-reduction project was one ofabout two dozen in the citypaid for out of a $12-millionpot from all three levels ofgovernment. Residents willpay 10 per cent of the costsback through fees added totheir city tax bills.

Kildonan ParkThe park is a little bit smaller now, thanks to riverbank erosion.

Lyndale Drive The banksalong here

have fallen inthe river.

Norwood BridgeA large log-jam gathers on the southwest side of the bridge.

Scotia StreetHopefully, no one was in the dog-house when it tumbled toward theriver.

Mager DriveRiverbank erosion threatens a

home just south of St. Mary’s andSt. Anne’s roads.

Kildonan ParkIf you’ve ever wondered

what a tree’s roots look likeexposed, now you know. St. Mary’s Road

People check out the damage along theriverbank that collapsed near the south

perimeter.

Crescent Drive ParkThis tree appears tobe sliding toward theriver, roots and all.

Lord AvenueHomes are protected

from erosion.

Kilkenny DriveTrees along the encroaching

banks have fallen into the river.

St. Vital ParkFree Press reporter Patti Edgar

surveys the massive loss of river-bank.

St. CrossStreet

A glassed-ingazebo

belonging to ahouse near St.John’s Park is

dangerouslyclose to the

banks.

Bunn’s CreekNoticeable riverbank erosion is occurring to thenorth of the creek.

Scotia StreetA homeowner takes abreak as more and more ofthe property disappears.

University of ManitobaErosion is visiblearound the firstbend on thesouth side of theuniversity.

St. Norbert Heritage ParkSigns in the park are now dangerously close to the banks.

McNulty CrescentContractor Walter Goshulak prepares to make repairs from unusually high river levels that tore away a deck and stairs, tossed over a picnictable and swamped a garden.

Crescent Drive Park There’s not much room left for visitors to sit and enjoy the viewon this wooden bench along the river.

St. Mary’s Road An apartment block near theintersection with St. Anne’s

Road edges closer to the river.

Riverside DriveJim Flood’s backyard suffered massive erosion.

Jubilee AvenueThis gazebo, at home nearthe Bridge Drive-In, isholding on.

Boul. Provencher

King’s Park

MapleGrovePark

St. VitalPark

Crescent Dr.Park

Churchill Dr.Park

KildonanPark

St. John’sPark

The Forks

Page 11: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

The Research Plan Establish the Theoretical Basis for

Erosion of Cohesive Soil

Determine Necessary Material Parameters with Laboratory Testing

Predict Erosion and therefore Change in Riverbank Stability Using Analysis

Verify Predictions with Field Evidence

Page 12: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Calculating Soil Erosion

• To calculate erosion, three primary parameters are required:

• Fluid shear stress (Pa)

• Critical shear stress (Pa)

• Erosion rate (mm/hr)

Page 13: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Calculating Shear StressWS = τ·P·dxϒ∀S = τ·P·dx

ϒ·A·dx·S = τ·P·dxR = A/P

τ = ϒ·RS

τ = ν·(dv⁄dy)

Page 14: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Shear Stress Distribution• Shear stress exerted by flow on riverbank

(Olsen and Florey 1952)

Page 15: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Critical Shear Stress

Represents the minimum shear stress required in order for erosion to take place

Theoretical and experimental methods available

Method selected was proposed by Briaud et al. (2001) Erosion Function Apparatus (EFA)

Page 16: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Critical Shear Stress

Page 17: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Critical Shear Stress

!

!

!!

!!

"#$%!&!'!()*+*$,-.)/!*0!+)1!2,*/#*3!"435+#*3!6..-,-+4/!7-8!9131,-:!;#1<!7=8!>:*/1'4.!*0!

+)1!?1/+!@15+#*3!

7-8

7=8!

Page 18: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Critical Shear Stress

Page 19: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Erosion Rate Represents the amount of soil eroded in a

unit of time (e.g. mm/hr) Erosion Rate is multiplied by the amount

of time over which the fluid shear stress is above the critical shear stress to determine the quantity of erosion in a time increment

Sum up the quantity as a function of position and time and we can determine the change in riverbank profile.

Page 20: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

River Hydrographs

Page 21: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

How do we Verify?

• Obtain historical cross-sections at a given location along the Red River

• Distance between the toe (for a given reference water surface elevation) represents the erosion between those two consecutive cross-sections

• Limitation: few historically surveyed cross-sections and air photos for interpretation

Page 22: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc
Page 23: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Kingston Row Section• Historical surveys limited to 1912,

1951 and 2001

Page 24: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Kingston Row Section• Historical surveys limited to 1912,

1951 and 2001

Page 25: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc
Page 26: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Compare Analysis with Field

• Compare field measurements based on historical surveys and aerial photographs with theoretical / laboratory based analysis.

• Of course theory matches practice and we now have a flawless method for assessing erosion rates!

• Not quite...

Page 27: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Comparison of Results

Page 28: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Comparison of Results

Page 29: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Common Sense

• There is no way riverbanks would erode at the rate shown or to the geometry shown.

• Calculated erosion rates are extremely sensitive to the critical shear stress measured in the EFA analysis.

• The precision of the measures and the eroding fluid are two major issues with the EFA measurements.

• Not all is lost. We can calibrate erodibility curves to field measurements.

Page 30: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Calibration• By shifting the erosion rate curves until the

erosion rates match the difference between those measured at two different times, we can establish a more meaningful result.

• We can then apply the historic river hydrograph to see the impact of the varying past river conditions.

Page 31: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc
Page 32: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Results From 1951 - 2005

Page 33: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Percent Decrease in FS

Page 34: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc
Page 35: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Results

•Appears to be a compelling linkage between flood magnitude and duration in terms of impacts on stability.

•Question as to which factor has more impact, duration or magnitude?

Page 36: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Sensitivity to Magnitude

Page 37: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Sensitivity to Duration

Page 38: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Results

• The link between flood events and increasing erosion is clear.

• Need better methods to measure erosion rates of specific materials to begin to examine the various bank conditions and materials.

• Need better data regarding the transient erosion from the field.

• Enter the GeoBlimp....

Page 39: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

The GeoBlimp

Page 40: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

From the Air - Single

Page 41: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

From the Air - Group

Page 42: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

From the Air - Cropped

Page 43: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Discussion

• Blimp can be deployed in a matter of 1 hour and can get high resolution photos back within 2 hours.

• Photos are georeferenced to a measured datum.

• Provide the ability to photograph banks during optimal times with respect to river level and immediately following failures.

Page 44: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Path Forward

• Riverbank Asset Management System that will aid in priorization of remediation planning for the City of Winnipeg.

• Project is funded by the Riverbank Management Committee under the direction of the Waterways Engineer.

• Results will provide relative probability of failure measures along with consequence of failure measures to assess risk spatially along the river.

Page 45: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc
Page 46: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Conclusion• A study has been conducted that has

quantitatively demonstrated potential impacts of flood events on erosion.

• Considerable challenges to physically measure erodibility of riverbank sediments still exist.

• Raises questions regarding public policy regarding river level control that may impact erosion and therefore riverbank failure

Page 47: Evaluating the Impact of Erosion on Our Natural Riverbanks · Evaluating the Impact of Erosion on Our Natural Riverbanks ... are just a few steps aw ay from the ... tho s einC rc

Thank you