3
EU Developments

EU Developments

  • Upload
    nevaeh

  • View
    27

  • Download
    1

Embed Size (px)

DESCRIPTION

EU Developments. August Update. European Network Code Workshop held 15 th July Slides have been published on JO website Draft Vision European Gas Target Model Council of European Energy Regulators (CEER) Public Consultation launched 5 th July Consultation deadline: 20 th September 2011 - PowerPoint PPT Presentation

Citation preview

Page 1: EU Developments

EU Developments

Page 2: EU Developments

August Update

European Network Code Workshop held 15th July

Slides have been published on JO website

Draft Vision European Gas Target Model

Council of European Energy Regulators (CEER) Public Consultation launched 5th July

Consultation deadline: 20th September 2011

Ofgem Workshop planned 1st September 2011

ACER Framework Guidelines on interoperability rules

Scoping consultation to be published 4th August 2011

Consultation deadline: 15th September 2011

Page 3: EU Developments

Moffat Physical Reverse Flow (PRF): Market Assessment

EU Regulation 994/2010 to ‘Safeguard Security of Gas Supply’ includes an infrastructure obligation, that states that all European cross border points should have bi-directional flow capability, or for an exemption to be granted

As part of the process to either gain an exemption or agree a viable proposal for PRF at Moffat, National Grid, along with Gaslink and Mutual Energy are undertaking a Market Assessment to assess the market demand for PRF at Moffat

The Market Assessment includes a supply and demand outlook, a high level technical feasibility study, along with a questionnaire that allows market participants to express their interest in a non-binding manner

The Market Assessment is expected to be published imminently, and will be available for a 2 month window on both the National Grid and Gaslink websites