100 Climate Solutions Project Campaign ~ 2016 Waste Management REGIONS OF CLIMATE ACTION Summary Mandating Authority : Expected project CAPEX : Main stakeholders Social and environmental impact Location and population Creating direct and indirect jobs Reduced volumes of waste transferred to landfills or landfill Improving the quality of the environ- ment Partnership with recycling companies The town of Sidi Bou Said is a town in the northern suburbs of the capital, located 17 km northeast of Tunis. Sidi Bou Said is an exceptional natural site recognized as having panoramic views of the most beautiful in the world which is registered in the UNESCO list of World Heritage. The main indicators characterizing the city and related to waste management are: 7000 inhabitants (1 800 households) / The number of visitors per year is estimated at one to two million / 80 commercial facilities: Restaurants, Coffee, Hotels / 3 major institutions of higher education (2400 students): IPEST, ENAU, IHET. / Establishments in primary and secondary education: Loghmani institution (private) and 2 elementary schools / The topography of the city is characterized by a relatively high road slope (> 16%), narrow alleys and dead ends. After developing its Municipal Plan for Waste Management (PCGD), the city of Sidi Bou Said has set a goal of zero waste in 2021. Commune of Sidi Bou Said 163’000 € Municipality of Sidi Bou Said / La coopéra- tion Allemande (GIZ) / l’Agence Nationale de Gestion des Déchets (ANGED) / l’Association Tunisie Recyclage (les chifonniers) Establishment of a waste facility Sidi Bou Said, Tunisia 7000 inh.

Establishment of a waste facility...Management (PCGD), the city of Sidi Bou Said has set a goal of zero waste in 2021. Commune of Sidi Bou Said 163’000 € Municipality of Sidi Bou

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Establishment of a waste facility...Management (PCGD), the city of Sidi Bou Said has set a goal of zero waste in 2021. Commune of Sidi Bou Said 163’000 € Municipality of Sidi Bou

100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016

Waste M

anagement

REGIONS OFCLIMATE ACTION

Summary

Mandating Authority :

Expected project CAPEX :

Main stakeholders

Social and environmental impact

Location and population

Creating direct and indirect jobs Reduced volumes of waste transferred to landfills or landfill Improving the quality of the environ-ment Partnership with recycling companies

The town of Sidi Bou Said is a town in the northern suburbs of the capital, located 17 km northeast of Tunis. Sidi Bou Said is an exceptional natural site recognized as having panoramic views of the most beautiful in the world which is registered in the UNESCO list of World Heritage. The main indicators characterizing the city and related to waste management are: 7000 inhabitants (1 800 households) / The number of visitors per year is estimated at one to two million / 80 commercial facilities: Restaurants, Coffee, Hotels / 3 major institutions of higher education (2400 students): IPEST, ENAU, IHET. / Establishments in primary and secondary education: Loghmani institution (private) and 2 elementary schools / The topography of the city is characterized by a relatively high road slope (> 16%), narrow alleys and dead ends. After developing its Municipal Plan for Waste Management (PCGD), the city of Sidi Bou Said has set a goal of zero waste in 2021.

Commune of Sidi Bou Said

163’000 €

Municipality of Sidi Bou Said / La coopéra-tion Allemande (GIZ) / l’Agence Nationale de Gestion des Déchets (ANGED) / l’Association Tunisie Recyclage (les chifonniers)

Establishment of a waste facility

Sidi Bou Said, Tunisia7000 inh.

Page 2: Establishment of a waste facility...Management (PCGD), the city of Sidi Bou Said has set a goal of zero waste in 2021. Commune of Sidi Bou Said 163’000 € Municipality of Sidi Bou

100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016

Project maturity ( IFC / World Bank Categories )

Amount of waste generated

Waste type

Current recycling rate

Existing waste management plan

Final disposal today

Amount of waste currently collected

CommentsGlassMetal

PaperPlasticOrganic

Infrastructure Stage Short description Expected Capex Expected Capacity

Improving collection

Transfer stations

Sorting Centre

Composting facilities

Recyclables processing facilities

Waste to Energy facilities

Sanitary landfill

STAGE 1 : Concept Development, Site identification

STAGE 2 : Pre-Feasibility Studies

STAGE 3 : Feasibility Studies

STAGE 4 : Permitting / Financing / Contracts

STAGE 5 : Engineering/Construction/Commercial Operation

1 waste collection 163 000 EUR 500 tons/y

3000 tons

yes

10%

YES

66% 11% 4%

2% 4%