14
Energy cooperation between the EU, the littoral States of the Black & Caspian Seas and their Neighbouring Countries European Commission, Directorate General EuropeAid Project funded by the European Union Project implemented by SOFRECO in consortium with AF Consult, SEVEn and SODRUZHESTVO ESIB Main Goals and Achievements Sustainable Energy Week in Ukraine 27 June 2013 Roberto Lo Cicero Vaina, Team Leader

ESIB Main Goals and Achievements ESIB SEW_EN.pdfJun 27, 2013  · ESIB Project duration: January 2010 - January 2014 Legislative and regulatory activity: legal analysis of the existing

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ESIB Main Goals and Achievements ESIB SEW_EN.pdfJun 27, 2013  · ESIB Project duration: January 2010 - January 2014 Legislative and regulatory activity: legal analysis of the existing

Energy cooperation between the EU, the littoral States of the Black &

Caspian Seas and their Neighbouring Countries

European Commission, Directorate General EuropeAid

Project funded by

the European Union

Project implemented by SOFRECO

in consortium with AF Consult,

SEVEn and SODRUZHESTVO

ESIB Main Goals and Achievements Sustainable Energy Week in Ukraine

27 June 2013 Roberto Lo Cicero Vaina, Team Leader

Page 2: ESIB Main Goals and Achievements ESIB SEW_EN.pdfJun 27, 2013  · ESIB Project duration: January 2010 - January 2014 Legislative and regulatory activity: legal analysis of the existing

ESIB Project objective is to show

how to use energy saving potential

with the help of case studies

demonstrating ecological and

economic viability of energy efficiency

in construction and maintenance of

buildings enabling sustainable energy

development.

ESIB Project is implemented within the framework of the Programme promoting

international cooperation in the energy sector between the European Union and

INOGATE partner countries (http://www.inogate.org/).

ESIB Project duration: January 2010 - January 2014

Page 3: ESIB Main Goals and Achievements ESIB SEW_EN.pdfJun 27, 2013  · ESIB Project duration: January 2010 - January 2014 Legislative and regulatory activity: legal analysis of the existing

Legislative and regulatory activity: legal analysis of the existing legislation in the

field of energy efficiency, comparative analysis with EU legislation and

standards, development of recommendations to eliminate ‘bottlenecks’.

Financing activities: development of financial plans and financial models for

investment in the housing sector, negotiations with financial institutions to obtain

investment for energy efficiency in buildings.

Technical activities: conducting energy audits for buildings, selection and

technical support for pilot projects to improve energy efficiency in buildings,

monitoring results.

Increased awareness and dissemination of information about energy efficiency:

training workshops on energy efficiency, energy labelling and certification,

participation in national and international public events, preparation and

distribution of manuals and teaching materials, conducting online training

ESIB project objectives

Page 4: ESIB Main Goals and Achievements ESIB SEW_EN.pdfJun 27, 2013  · ESIB Project duration: January 2010 - January 2014 Legislative and regulatory activity: legal analysis of the existing

ESIB awareness raising activities in CIS (ten countries)

• Website www.inogate-ee.org

• Webinars are conducted regularly

• Awareness events in schools and universities

• Training for students about energy efficiency

• Competitions for journalists

• Competitions for students

• Production of booklet

• Handbook for homeowners associations

• Handbook for bankers

• Fairs, exhibitions

Page 5: ESIB Main Goals and Achievements ESIB SEW_EN.pdfJun 27, 2013  · ESIB Project duration: January 2010 - January 2014 Legislative and regulatory activity: legal analysis of the existing

Training and capacity building

More than 300 engineers and architects have been trained in ten

countries

Energy Auditors

Technical staff and decision makers of municipalities

Bankers of commercial banks

Journalists

Page 6: ESIB Main Goals and Achievements ESIB SEW_EN.pdfJun 27, 2013  · ESIB Project duration: January 2010 - January 2014 Legislative and regulatory activity: legal analysis of the existing

ESIB in Ukraine

• Contribution to the law about Energy Efficiency in Buildings

• Cooperation with the European Delegation for the realisation of

Energy Efficiency measures in public buildings in ten small

Ukrainian cities

• Energy audits of public and private buildings (Burshtyn, Gola

Prystan, Crimea)

• Analysis of the energy efficiency potential in hotels in Crimea

• Public events in schools and fairs

Page 7: ESIB Main Goals and Achievements ESIB SEW_EN.pdfJun 27, 2013  · ESIB Project duration: January 2010 - January 2014 Legislative and regulatory activity: legal analysis of the existing

ESIB main concern - heat losses from the building envelope

Ventilation - 15%

Windows & outer doors - 35%

Floor and basement - 15%

Exterior wall - 20%

Roof - 15%

Page 8: ESIB Main Goals and Achievements ESIB SEW_EN.pdfJun 27, 2013  · ESIB Project duration: January 2010 - January 2014 Legislative and regulatory activity: legal analysis of the existing

Suggested Energy Efficiency Measures in buildings

Windows

•3rd pane in cold climates

•Additional pane

•Draft preventers

Roof insulation

•Erect new sloped roof

•Add flats roof on existing flat roof

•Add insulation on attic

Wall insulation

• Inside/outside the walls

•Repair the entrance door

HS insulation

•Add insulation to HS-pipes in cellars

•Add insulation to HS-pipes in attics

HS supply control

•Modern substation & heat exchanger

•Build shunt group

•Balancing valves at risers

•Thermostat & bypass pipe

Electric energy

• Lighting, appliances

•Change light bulbs to low energy light sources (CFL &LED)

•Purchase appliances with high energy performance (A-class )

Page 9: ESIB Main Goals and Achievements ESIB SEW_EN.pdfJun 27, 2013  · ESIB Project duration: January 2010 - January 2014 Legislative and regulatory activity: legal analysis of the existing

Energy efficiency potential of a typical residential building (9-storied panel building)

62

74

76

80

130

146

0 20 40 60 80 100 120 140 160

Установка ИТП

Изоляция труб подвалов

Утепление кровли

Утепление стен

Замена окон

Исходная ситуация Initial state

Replacement of windows

Heat insulation of walls

Heat insulation of roof

Insulation of basement

pipes

Installation of individual

heating substation

Reduction of heat consumption – example of a 9-storied panel building

Overall thermal modernization Modernization of engineering systems and regulation

Technical energy saving potential

67% 25%

Page 10: ESIB Main Goals and Achievements ESIB SEW_EN.pdfJun 27, 2013  · ESIB Project duration: January 2010 - January 2014 Legislative and regulatory activity: legal analysis of the existing

10

Thermal modernization of a 9-storied panel building in Ukraine

Payback – 16 years – problem with attraction of credits The amount of contribution per one apartment UAH 18,654 is not in line with the solvency of inhabitants

The way out is an overall financing!

Examples of energy efficient projects

Calculation of capital costs Calculation of the payback

Envelope structures

Surface of insulated compo-

nent Specific cost

of works

Cost of works

Annual saving Payback (simple)

Total Per 1 m2

of apt. surface

Per apt.

m2

UAH/m2 of the

component UAH UAH/m2 UAH Gcal UAH years

Windows of apartments and balcony doors (20% discount for wholesale orders) 664 596 395,879 101.76 5,088

54 14,950 26

Windows of staircases 88 393 34,571 8.89 444 Walls behind balconies and recessed balconies 471 77 36,245 9.32 466 168 46,795 16

Other walls 2,467 280 690,642 177.53 8,876

Heat insulation of roof 640 350 224,032 57.59 2,879 13 3,588 62 Replacement of insulation of pipes in the basement 15,000 3.86 193 5,5 1,532 10

Individual heating substation 55,000 14.14 707 76 21,146 2,6

Total 1,451,370 373 18,654 315 88,012 16

Page 11: ESIB Main Goals and Achievements ESIB SEW_EN.pdfJun 27, 2013  · ESIB Project duration: January 2010 - January 2014 Legislative and regulatory activity: legal analysis of the existing

AZ– 0.011 €/kWh

UA – 0.026 €/kWh

Heat Tariff

KZ – 0.013 €/kWh

KG - 0.010 €/kWh

Page 12: ESIB Main Goals and Achievements ESIB SEW_EN.pdfJun 27, 2013  · ESIB Project duration: January 2010 - January 2014 Legislative and regulatory activity: legal analysis of the existing

Energy saving potential Energy saving Investment Payback

kWh/year €/year € year

1 Heat insulation of walls

357 105/92% 19 284 70 880 3.8

2 Replacement of windows

27 457/8% 1 480 16 300 12.6

Total 384 562 20 764 87 180 4.3

Residential building in Kyrgyzstan

The real cost of energy has been used in this case.

With a subsidized tariff (20% of the real cost) the

payback is >40 years

Page 13: ESIB Main Goals and Achievements ESIB SEW_EN.pdfJun 27, 2013  · ESIB Project duration: January 2010 - January 2014 Legislative and regulatory activity: legal analysis of the existing

Analysis of the financial performance of EE

investments indicates that:

1. Subsidized energy tariffs are used

2. Cost for EE construction materials is not discounted

3. No tax reductions (VAT and other taxes)

4. Banks impose payback time < five years

5. Interest rates of the loans do not encourage private initiative

6. Condominiums are not eligible for loans

7. Homeowners do not want to risk their property

Page 14: ESIB Main Goals and Achievements ESIB SEW_EN.pdfJun 27, 2013  · ESIB Project duration: January 2010 - January 2014 Legislative and regulatory activity: legal analysis of the existing

Why does ESIB Project work?

Let’s save energy for a comfortable future!

Children drawing contest in Rustavi city (Georgia), 2011 This is the future that children want to have!