ESA UNCLASSIFIED - For Official Use

ESA TRP and GSTP Technology Programmes – Polish Involvement

TEC-T ESA/ESTEC

27th September 2016

Page 2: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 2 ESA UNCLASSIFIED - For Official Use

Content

• TRP and GSTP Technology Programme Overview: • POLISH Participation within TRP activities and some achievements • POLISH Participation within GSTP activities and some achievements • POLISH companies involved in TRP/GSTP activities within ESA • How to do business with ESA? – Best Practices • Opportunities for Polish Industry (ITI and StarTiger)

• Supporting Slides

Page 3: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 3 ESA UNCLASSIFIED - For Official Use

Space Technology Budget in Europe

European Space Institutional Technology R&D average yearly budget of over 640M€ (figures from ESTMP 12th edition - 2015)

~ 380 M€ ESA funding/year in ESA technology development lines help prepare over 4B€ of investments in missions / launchers / space infrastructures developments and for European industry’s competitiveness

Page 4: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 4 ESA UNCLASSIFIED - For Official Use

1 2 3 4 5 6 7 8 9

basic principle observed and reported

Concept Technology concept formulated

Experimental critical function and /or proof of concept

Component and/or breadboard validation in laboratory

Component and/or breadboard validation in relevant environment

system/ subsystem model or prototype demonstration in a relevant environment

System prototype demonstration in a space environment

Actual system completed and "Flight Qualified through test and demonstration

Actual system completed and "Flight Proven" through successful mission operations

TRP

CTP

GSTP

EOEP

EGEP

FLPP

ELIPS

MREP/ETP

ARTES AT

ARTES C&G

ARTES ATLAS

man

dato

ry

Opt

iona

l

Generic / multi-domain

Generic / multi-domain, except Telecom

Science

EO

Navigation

Exploration

Launchers

Exploration

Telecom

Telecom

Telecom

ESA Technology Programme Landscape

Page 5: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 5 ESA UNCLASSIFIED - For Official Use

Basic Technology Research Programme (TRP) • Part of ESA Mandatory Programmes • Covering all technology disciplines & applications • Based on two-year Work Plans, with yearly updates • About 50 M€ in industrial contracts placed in 2015

General Support Technology Programme (GSTP) • It is an optional Programme • Each member state decides upon:

• The amount of its participation • The technological activities to support • Covering general purpose technology developments • Three-year cycle with regular updates • Regular AOs and Techno Demos are part of GSTP • About 70 M€ in industrial contracts placed in 2015.

TRP and GSTP Programme Overview

Page 6: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 6 ESA UNCLASSIFIED - For Official Use

TRP - OVERVIEW

• Part of ESA’s Mandatory Basic Activities • All technology disciplines & applications • Based on two year Work plans, with yearly updates • About 52 M€ in industrial contracts per Year • About 150 contracts per year • Appropriate technological preparation is a significant cost

saver for future missions • Mature technologies significantly reduce project risks

(performance, time, costs) • One of the main contributors to scientific & engineering

excellence • One of the main sources of new ideas within the Agency

The TRP is the backbone of ESA’s innovation effort covering up to proof-of-concept TRL 3

Page 7: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 7 ESA UNCLASSIFIED - For Official Use

POLAND Participation within TRP activities Start Title Company Company Budget

(Activity budget & %) Remarks Partners

2013 StarTiger - Dropship offers safe landings for Mars rovers Un. Poznan 152K€ (19%) Subcontractor

ADS (DE) DFKI (DE)

Spin Works (PT)

2013 TRP - Net Parametric Characterisation and Parabolic Test

SKA Polska 178k€ (52%) Prime STAM (IT)

Optinav 91K€ (26%) Subcontractor

2013 SPACEMAN, A SpaceWire Network Management Tool ITTI Sp 149K€ (75%) Prime PL Taskforce TELETEL (GR)

2014 Docking Impender

ABM SE 314K€ (39%) Prime EPAR (DE) SSBV 93K€ (12%) Subcontractor New Idea (IR)

New Safety Technology 215K€ (27%) Subcontractor

2015 TRP - Assessment of the key aerothermodynamic elements for the realization of a RAM-EP Concept QuinteScience 30K€ (13%) Subcontractor Sitael Aerospace (IT)

2015 StarTiger - On Ground Validation of a Rigid Combo System

PAN Research Institute 220K€ (28%) Subcontractor

GMV (ES) Techno System

Development (IT)

2016 Development of high reliability lasers at 461nm and 689nm (Sr Lattice) and 422nm (single trapped Sr ion) Topgan 115K€ (19%) Subcontractor

FHG (UK) Un. Dusseldorf (DE)

CNR (IT)

2016 End to End data Dissemination simulation Tool GMV 99K€ (51%) Subcontractor GMV (ES)

2016 Deployment of PUS-C standard in projects supported by an automatic generation toolset N7M 96K€ (32%) Subcontractor

Spacebel (BE) Evolving Szstems (CZ)

1,751K€ Procurement Policy: C: Open Competitive Tender; C(1): Activities in open competition limited to the non-Large-System Integrators. DN/S: Direct Negotiation/Specialisation

9 activities (2 closed, 7 running)

Page 8: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 8 ESA UNCLASSIFIED - For Official Use

POLAND Participation within TRP activities

Page 9: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 9 ESA UNCLASSIFIED - For Official Use

POLAND PARTNERS within TRP activities

Page 10: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 10 ESA UNCLASSIFIED - For Official Use

Intended TRP activities

• Intended TRP activities in Technology Domains already addressed by Polish companies:

• Intended TRP activities in the areas of interest of the participating Polish companies in this meeting:

• Overview of all intended TRP activities: Split between D/OPS (red) and other ESA directorates (blue) in terms of number of activities (outer circle) and proposed budget (inner circle)

TD Title Proposed budget Number of activities

Space System Software, Space System Control, RF Payload Systems, Automation/Telepresence/Robotics, Mechanisms, Opto-Electroncis,

Aerothermodynamics K€ 11,620 25

TD Title Proposed budget Number of activities

Mission Operation/Ground Data System, Space Debris, Ground Station Systems/Networks, Navigation, Clean Space K€ 6,900 21

Page 11: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 11 ESA UNCLASSIFIED - For Official Use

Net Parametric Characterization and Parabolic Test

Objectives: Under the Clean Space initiative, to develop theoretical & experimental knowledge on throw-nets for grasping orbital debris. To provide a validated simulator for throw-nets in ADR capture operations and to validate the system in representative environmental conditions (0G)

Timeline: Oct. 2013 – May 2015 Contractor: Prime: SKA Polska (PL) Subcontractor : Optinav (PL) Budget : 300K€

Tasks: 1) Elaborate detailed system requirements for the net system, including validation. 2) Develop a mathematical model with system design parameters interdependence (e.g. cable dynamic parameters, size of flying masses, …), and on orbit environmental parameters (e.g. speed of throw). 3) Realise a parametric simulator of the capture operation. 4) Identify and characterise materials and assembly technology 5) Design a parabolic flight test campaign, related test equipment and measurement instrumentation/techniques. 6) Procure/manufacture integrate and validate test equipment on ground. 7) Perform the test with a representative sample of net and launcher specimens to cover the principal design parameters and validate the mathematical model. 8) Perform a mathematically rigorous validation of the model against the test results.

Page 12: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 12 ESA UNCLASSIFIED - For Official Use

SpaceMan - A SpaceWire Network Management Tool

Objectives: Ambitious for new space industry ! The objective of the Spaceman activity is to provide a tool taking advantage of the SpaceWire Network Discovery & Configuration Protocols (SpW-NDCP). The tool should be able to identify the devices connected to the network (topology), perform drawings, manage configuration, etc. Achievements: Very Good ! - The user requirement specification phase lasted much longer

than planned because ITTI are completely new to space business and space technology and therefore had to be extensively (but informally) trained.

- ITTI reacted very well to this training and produced at the end of 2014 a nice User Requirement Document, including the specification of a demonstrator that will indeed demonstrate all the features of SpW-NDCP.

- Development of tool, with the functionality of graph and tree representations of SpaceWire networks as well as basic connections to the PVS

Timeline: Kick-off Jan. 2014 – End June 2015 Contractor: Prime: ITTI Sp. z o.o. (PL) Subcontractor: Teletel S.A. (GR)

Budget: 200K€

Page 13: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 13 ESA UNCLASSIFIED - For Official Use

Docking Impender

Objectives: The docking Impender is an Docking system using EPAR technology which is based on the Lagiewka Effect. The EPAR module transforms the kinetic energy of linear motion into kinetic energy of rotating mass, in order to reduce forces on contacting objects, rebound, displacement while increasing stablity. Mechanical energy from the impact will be converted into electrical energy. Startiger’s “Docking Impender” project was tasked with developping a demonstrator compatible with the Cubesat Standard. Tasks: - Feasibility study - Requirement definition - EM of EDS demonstrator Development - Test campaign in relevant environment (TRL 5)

Timeline: Kick-off 09/2014 – End 07/2015 Contractor: Prime: ABM SE (PL) Subcontractor : SSBV (PL), New Safety Technology (PL), EPAR (DE), New Idea (IR) Budget : 800K€

Page 14: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 14 ESA UNCLASSIFIED - For Official Use

GSTP Overview • Part of ESA’s Optional Programmes. • Covering all technology disciplines and applications except

Telecommunications (covered by the ARTES programmes). • From TRL 3 to 7-8 • 5-year Work Plan, with yearly updates, and multiyear activities. • Started in 1993, currently in 6th period (2013-2017) • Budget envelope ~ 600 M€.

The GSTP ensures the right technology with the right maturity are available at the right time

This image cannot currently be displayed.

Page 15: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 15 ESA UNCLASSIFIED - For Official Use

GSTP – STRUCTURE FOR PERIOD 6

Development of technologies and products for projects and industry, from low TRL to qualification Platform, Payload, Ground Segment and Engineering tools Spin-in, joint R&D with other sectors Preparatory activities for small technology breakthrough missions

GSTP-6

Element 6.1 Support

Technology for Projects & Industry

Flight opportunities for new technologies in commercial and institutional missions Database of technology needs and flight opportunities

Element 6.3 Technology Flight

Opportunities

Element 6.2 Competitiveness

Announcement of Opportunity (AOs) Revised co-funding (50%, 75%, 100%) Thematic AO reminders (GaN, REACH)

Precise Formation Flying Demonstration Element 6.4: Phase C/D/E Proba-3

Page 16: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 16 ESA UNCLASSIFIED - For Official Use

POLAND Participation within GSTP activities

• The Gross Contribution of Poland in GSTP activities is 13.8K€. • From 2014, 15 supported activities:

- 7 awarded contracts for a total of 2.3M€; - 5 activities in procurement process; - 3 GSTP activities that were supported by POLSA were not

awarded to entities from Poland (Open Competition).

• In addition, Poland is supporting the Proba-3 activity with a total amount of 6.8M€.

• The remaining balance of Poland in GSTP is 1M€ (August 2016).

Page 17: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 17 ESA UNCLASSIFIED - For Official Use

Start Element Prog. Ref. Title Company GSTP Amount Supplier (K€) Collaboration

2014

E1

G613-002HS ASIM PSU Technology Support Prime: Creotech Instruments S.A. 250

Sub: Space Research Centre Polish Academy 50

2016 G613-029HS Phase B+ of Hammering Mechanism for ProsEED (PROSPECT Excavation and Extraction Drill) Sub: Astronika 356 ISS Exploitation Programme:

8,000

2014 G619-002IL Lunar Drill Development Sub: Astronika 170 GSP:330; CH:MAXON MOTOR AG:100

2015 G61C-026SYp E.Deorbit Mission Phase B1 Sub: Space Research Centre Polish Academy 30

DE:OHB SYSTEM AG:125, OHB Systems:158, DLR:56; SE:OHB SWEDEN AB:148; IT:TAS-I:256;

CA:MDA:27

2015 G61C-026SYq E.Deorbit Mission Phase B1 Sub: GMV Innovating Solutions Sp. z o.o. 35 DE:Airbus:350, DLR:50;

BE:QinetiQ Space nv:220; PT:GMVIS:100 Sub: SENER SP ZOO 45

2016 G61C-005MP Hydrogen Peroxide Storability/Compatibility Verification

Prime: Jakusz Sp. z o.o. 460

Sub: Institute of Aviation 47

Sub: Institute of Industrial Organic Chemistry 8

Sub: Air Force Institute of Technology 51

Sub: Institute of Non-Ferrous Metals Light Metal Division 116

Sub: Institute of Metallurgy and Materials Science of Polish Academy of Science 22

Sub: Spark Lab Sp. z o.o. 22

Sub: ChemIn Dorota Piałkowska Pietras 0.4

Sub: Institute for Engineering of Polymer Materials and Dyes, Division of Elastomers and Rubber

Technology 8

Sub: Institute for New Chemical Syntheses Inorganic Chemistry Division 16

Total Budget of E1 Contract Awarded: 1686.4

2015 E3 G637-002HS OPS-SAT Phase B2CDE

Common Procurement Cost 76 AT: Graz U: 503, Unitel IT: 366, Magna Steyr: 31, Berlin Space

Technologies: 380, MEW Aerospace: 100, DK:

GOMSPACE: 242; Common cost:183

Sub: GMV Innovating Solutions Sp. z o.o. 345

Sub: Space Research Centre Polish Academy 215

Total Budget of E3 Contract Awarded: 635.6

POLAND Participation to GSTP activities • Contracts Awarded to Polish companies

Page 18: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 18 ESA UNCLASSIFIED - For Official Use

POLAND Participation to GSTP activities

Element GSTP. Ref. Title IPC

Budget (k€)

GSTP Supported

Budget (k€)

Status Planned

Commitment Date

E1

G611-034SW Model Library for Earth Observation (EO) End-2-End Simulators (E2ES) 670 670 BR Signed CC 30/09/2016 G617-196GI DASTA - Ground Data System Software Test tools and Automation 300 300 Preparation 01/10/2016

G61A-005MS Integrated Optical Fibres in Launcher and Spacecraft Composite Structures 500 500 BI Planned 11/05/2017 G617-218MP Pre-Qualification of Aluminium free solid propellant 300 300 TEB nominated 14/04/2017

Total Budget E1 Activities Supported: 1,770

E3 G637-002HS2 OPS-SAT Phase B2CDE - launch 220 64 Total Budget E3 Activities Supported: 64

• Activities currently supported by Poland (ITT issued)

Page 19: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 19 ESA UNCLASSIFIED - For Official Use

POLAND Participation to GSTP activities

Page 20: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 20 ESA UNCLASSIFIED - For Official Use

POLAND PARTNERS within GSTP activities

Page 21: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 21 ESA UNCLASSIFIED - For Official Use

Example of GSTP Activities:

OPS-SAT IOD Mission

• New Space-Ground interfaces and standards

• High speed uplink (256 kbps – 1 Mbps), CCSDS Mission Operations services, CCSDS File Delivery Protocol

• Delay Tolerant Networks, Adaptive Channel Coding Schemes, Housekeeping Telemetry Compression

• Innovative Mission Operations Concepts

• Advanced Mission Planning (ground and on-board), File Based Operations, On-board Autonomy

• Ground Segment Automation, Remote & Direct Experimenter Access to Payloads, Data diagnostics, Rapid on-board software update handling

International Collaboration: Austria, Germany, Denmark

and Poland

Industrial Poland Team: GMV,

SRC Poland

GMV Poland: On-board software, core ADCS software, Software Development Facility

SRC Poland/CREOTECH: CCSDS compatible TM/TC encoder/decoder including software

Page 22: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 22 ESA UNCLASSIFIED - For Official Use

Example of GSTP Activities:

ASIM PSU Technology Support • ASIM Project (Atmospheric Space Interactions Monitor) is the

experiment aimed to examine optical emissions and terrestrial gamma flashes created from stratosphere and mesosphere interactions with space radiation.

• Instruments of this experiment will be placed on external experiment platform CEPA on COLUMBUS module on International Space Station.

• Creotech is responsible for assembly of power supply unit of Gamma and X-Ray monitor.

Industrial Team: Creotech Instruments (PL)

Poland Space Research Centre PAS (PL)

Page 23: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 23 ESA UNCLASSIFIED - For Official Use

Polish involvement in PROSPECT (via GSTP and other programmes)

PROSPECT • Drilling and sample analysis package for the Moon. • Developed for launch on board Luna-27 mission, in

cooperation with ROSCOSMOS in 2021. • Uses rotation and hammering to access samples

in lunar poles, to investigate water ice. • Polish Contribution

• Development of hammer mechanism. • Led by Astronika, Jerzy Grygorczuk.

• Status • Phase A Prototype testing complete (TRP/GSTP). • Phase B+ contract starting (D-HRE & GSTP). • Phase C/D/E implementation will be put to CMin2016.

ANSWERING THE QUESTIONS: - Is there water ice at the lunar poles

- Where is it - Can we use it in future human exploration

Presenter
Presentation Notes
Phase A: 600k€ (HRE, GSTP, GSP) + 300k€ (TRP) Phase B+: 8,400k€ (HRE + GSTP); 400k€ Polish involvement via GSTP Other applications: Sampling on lunar rover platforms Sampling for sample return Sampling on other planetary bodies (Mars, asteroids)
Page 24: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 24 ESA UNCLASSIFIED - For Official Use

Mapping Activities from the TRP and GSTP: Participating Polish companies (Non-exhaustive)

Company On-going / Completed TRP activities On-going / Completed GSTP activities

Adaptronica Sp. z o.o. (**)

Asseco SA

Creotech Instruments ASIM PSU Technology Support

GMV Poland End to End data Dissemination simulation Tool

E.Deorbit Mission Phase B1 OPS-SAT Phase B2CDE

Hertz Systems SA

ITTI Sp. z o.o. SPACEMAN, A SpaceWire Network Management Tool

Mobica Poland Sp. z o.o.

Newind Sp. z o.o.

N7 Mobile Sp. z o.o. Deployment of PUS-C standard in projects

supported by an automatic generation toolset

Orange Polska SA (*)

Page 25: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 25 ESA UNCLASSIFIED - For Official Use

How can Polish companies participate in ESA activities? – Best Practices: R&D in general: • build up, strengthen and maintain your professional network with colleagues in industry,

research entities and agencies, • get to know the main players and potential consortium members • participate in conferences / workshops (for ground-related technos: Spaceops, TTC,

Space Debris Conference etc…) for TRP: • look at the published TRP work plans, identify interesting activities and think about

potential contributions and consortia • Consider the ESA Innovation Triangle Initiative (ITI) for Novel ideas (see next slides) • follow EMITS (ITTs and intended ITTs, express interest, start early to set-up / participate

in potential bidding teams) For GSTP: • understand ESA needs, have a look at the GSTP "compendium of activities“ • use your networks to formulate new ideas and exchange ideas with your national

agency to obtain support, • consult EMITS and ESA technology website • consider co-funding for AO-type activities (GSTP6E2) to prepare products and services

http://emits.sso.esa.int/emits/owa/emits.main

http://www.esa.int/Our_Activities/Space_Engineering_Technology/About_Directorate_Technology_Programmes

Page 26: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 26 ESA UNCLASSIFIED - For Official Use

Three types of activities aimed at the different elements of the triangle: (A) Proof of Concept (for INVENTORS): fast validation of new ideas (B) Demonstration of Feasibility and Use (for DEVELOPERS): component

and/or breadboard development up to validation in the laboratory (C) Technology Adoption (for CUSTOMERS): development up to

validation in a relevant environment,

ITI is based on the “Innovation Triangle” concept requiring the collaboration of 3 different entities: an INVENTOR, a DEVELOPER and a CUSTOMER.

Wireless sensors, SSTL Pressure sensor, Oxensis

TRP: The Innovation Triangle Initiative

Page 27: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 27 ESA UNCLASSIFIED - For Official Use

ITI: The objectives

The objective of ITI is to create a dynamic environment where disruptive innovations can be easily validated, developed and put to use in industry, thus contributing to a more competitive European

Space Industry.

The main characteristics of ITI are: Aims specifically at “disruptive technology innovations”:

Novel technologies or at least ‘novel to space’ Call for ideas with a standing Tender Evaluation Board meeting periodically Short “time to contract” based on simple proposal templates and a fast track

procedure for contract award Financed by the Technology Research Programme (~2M€ /year)

ITI gives industry the opportunity to submit unsolicited and innovative R&D proposals and to rapidly receive the funding needed,

if the activity is approved by the TEB.

The External ITI WEB site is accessible through: https://iti.esa.int/iti/index.jsp

Page 28: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 28 ESA UNCLASSIFIED - For Official Use

TRP: STARTIGER

Objective: STARTIGER is a ESA initiative within the Technology Research Program (TRP) aiming at facilitating innovative and breakthrough research. Mechanism (Skunk Works Approach): - Intensive period of research, focused on a specific technical goal - Small cross discipline team - Co-located in a distraction free, resource rich environment - Enthusiastic approach to problem solving - Priority technical support from ESA Spin-offs: Breeding ground for innovative thinking! Previous Activities: - STARTIGER Pilot Activity at RAL (UK) in 2002 - Docking Impender 2014 ABM SE (PL) - On Ground Validation of a Rigid Combo System (PAN Research Institute (PL)) - Ongoing Status: - Regular feature of the TRP programme (1 activity per year)

Page 29: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA UNCLASSIFIED - For Official Use

Supporting Slides

Page 30: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 30 ESA UNCLASSIFIED - For Official Use

TRP Work Plans - Breakdown Multiyear Work Plans (2008-2010, 2011-2013, 2014-2015, 2016-2017), 100 activities/years, 45M€ of industrial cost Supporting all Areas of Space Activity Adresses all Technology Domains (TD) or Competence Domains (CDs)

Science Telecom. Exploration Earth Observation Launchers Navigation Technology

01 On-board Data Systems 14 Life & Physical Sciences Instrumentation

02 Space System Software 15 Mechanisms

03 Spacecraft Power 16 Optics 04 Spacecraft Environment &

Effects 17 Opto-Electronics

05 Space System Control 18 Aerothermodynamics

06 RF Payload Systems 19 Propulsion

07 Electromagnetics Technology

20 Structures & Pyrotechnics

08 System Design & Verification

21 Thermal

09 Mission operation and Ground Data Systems

22 Environmental Control Life Support

10 Flight Dynamics and GNSS 23 Components

11 Space Debris 24 Materials & Processes

12 Ground Station Systems and Networks

25 Quality, Dependability and Safety

13 Automation, Telepresence & Robotics

26 Others

1. EEE/Components/photonics/MEMS 2. Structures, mechanisms, materials,thermal, 3. Avionic Architect./DHS/OnBoardS/W/ FDIR

/GNC/end-to-end TT&C 4. Electric Architect./power generation/EMC 5. End-to-end RF and Optical systems and

products for nav, com & EO 6. Life / Physical Science Payloads/ Life

Support/Robotics and Automation 7. Propulsion, space transportation and re-entry

vehicles 8. Ground stations/mission control 9. Information Technology, data fusion and

analytics 10.Astrodynamics/debris/Space Environment

Page 31: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 31 ESA UNCLASSIFIED - For Official Use

TRP Work Plan 2016-2017

TRP is organized by Domains

Page 32: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 32 ESA UNCLASSIFIED - For Official Use

Repartition per type & service domain for TRP - POLAND

• Nearby three quarters of the TRP budget contracted to Polish companies is claimed by SMEs

• Polish companies have a high level of participation within the TRP Startiger initiative.

• ESA’s service domain ‘Generic technologies (SD07)’ is well represented by Polish companies

Page 33: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 33 ESA UNCLASSIFIED - For Official Use

Drop-Ship offers safe landings for Mars rovers

Objectives: StarTiger’s Dropter project was tasked with developing and demonstrating a European precision-landing capability for Mars and other targets. Achievements: During the eight-month project, the Dropter team was challenged to produce vision-based navigation and hazard detection and avoidance for the dropship. It has to identify a safe landing site and height before winching down its passenger rover on a set of cables. Flight testing took place at Airbus Defence and Space’s Trauen test site in northern Germany. This demonstration proved the concept allowing the dropship approach to be followed for follow-on developments by planetary missions to come.

Timeline: Kick-off Oct. 2013 – End May 2014 Contractor: Prime: ADS (DE) Sub : DFKI (DE), Spin Works (PT), University of POZNAN (PL)

Budget : 800K€

Page 34: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 34 ESA UNCLASSIFIED - For Official Use

POLAND Participation to GSTP activities Repartition by Service Domain

• Most of the Poland GSTP contribution currently supports Clean Space activities in the Generic Technologies Service Domain

Page 35: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 35 ESA UNCLASSIFIED - For Official Use

ITI Current Status: Proposals received from ESA Member State and their status (2004- May 2016)

ESA Member States On-going ITI activities Completed ITI activities Number of ITI Proposals received

Austria 2 4 19 Belgium 3 2 14 Czech Republic 1 0 1 Denmark 0 0 6 Finland 0 6 14 France 7 21 83 Germany 5 33 107 Greece 1 1 18 Ireland 0 7 17 Italy 8 31 214 Luxemburg 0 2 4 Netherlands 3 17 66 Norway 0 3 11 Poland 0 0 0 Portugal 3 20 70 Romania 0 0 0 Spain 6 14 115 Sweden 1 2 8 Switzerland 1 7 36 United Kingdom 2 30 126

TOTAL 43 200 929

Page 36: ESA TRP and GSTP Technology Programmes – Polish Involvement · 2018-08-16 · ESA UNCLASSIFIED - For Official Use ESA TRP and GSTP Technology Programmes – Polish Involvement TEC-T

ESA | 20/09/2016 | Slide 36 ESA UNCLASSIFIED - For Official Use

ITI: Support to SMEs and R&D institutions

Total

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

LSI

Other Firm

R&D Institute

SME

• Most of the contracts placed within ITI support R&D institutes (36%) and SMEs (32%)

• Large System Integrators (LSIs) are involved only in 8% of ITI activities

• LSI’s are mostly involved as the customer of an ITI activity

LSI Other Firm R&D Institute SME Type of Entity (SME, R&D Institute, LSI, Other Firm) 8% 22% 36% 32%