ERP Status OverviewERP Status Overview
Steve GigliottiSteve Gigliotti
Chief, Division of SafetyChief, Division of Safety
Coal Mine Safety & HealthCoal Mine Safety & Health
OverviewOverview
Number of approved ERPsNumber of approved ERPs Number of installed systemsNumber of installed systems
Dist 01 Dist 02 Dist 03 Dist 04 Dist 05 Dist 06 Dist 07 Dist 08 Dist 09 Dist 10 Dist 11 National
9 33 27 117 46 67 60 19 18 12 7 415
0 3 2 31 10 16 8 1 5 0 0 76
9 36 29 148 56 83 68 20 23 12 7 491
9 36 29 148 56 83 68 20 23 12 7 491
3 35 27 123 45 81 63 8 9 12 6 412
0 0 0 0 0 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 1
10 5 11 152 19 0 69 13 24 12 7 322
0 0 0 0 0 6 1 0 0 0 0 7
6 1 2 25 11 2 5 12 14 0 1 79
1 0 1 11 1 29 20 0 1 0 0 64
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
Emergency Response Plans -- National Summary Sheet
No. of Active Underground Mines Req to Have C&TNo. of Nonproducing UG Mines Req. to Have Electrical C&T
No. of ERPs Approved
No. of Pending ERPs
Please note that many B status (non-producing) mines do not have miners working underground and do not require a communication and tracking system at this time. The table was updated July 20th to only include mines where communication and tracking is required, other non-producing mines are not reflected in this table.
Total mines requiring ERPs
No. of submitted ERPs
ER
Ps
Dis
app
rove
d For deficiencies related to COMMUNICATIONS For deficiencies related to TRACKINGdeficiencies related to BOTH communications & trackingdeficiencies NOT related to communications or tracking
03/05/2010Date Updated:
Vio
lati
on
s Is
su
ed For failure to Submit ERP by
6/15/2009
For ERPs w/ purchase orders, but no confirmed delivery dates
For ERPs with no purchase orders.
Dist 01 Dist 02 Dist 03 Dist 04 Dist 05 Dist 06 Dist 07 Dist 08 Dist 09 Dist 10 Dist 11 NationalHow many mines with tracking and communications equipment installed and operational?
0 0 3 20 0 2 10 1 0 10 0 46
How many mines in your district have a system completely installed and operational?
0 0 3 20 0 2 8 1 0 0 0 34
How many mines in your district have the areas installed and operational outby the tailpiece?
0 0 2 66 3 1 10 4 0 6 0 92
How many mines in your district are in the process of installing a system?
0 14 16 46 11 9 13 2 5 10 2 128
ERPs with Updated Communication and Tracking Systems
C&T Inspection ProceduresC&T Inspection ProceduresPIL being draftedPIL being drafted
•Compliance with ERPCompliance with ERP•PPL P09-V-01PPL P09-V-01•Qs & AsQs & As•System components Part 23 approvedSystem components Part 23 approved•Verify C&T system is operational by Verify C&T system is operational by
randomly communicating during randomly communicating during inspection and comparing route of travel inspection and comparing route of travel with electronic records on the surfacewith electronic records on the surface
C&T Inspection ProceduresC&T Inspection Procedures• Responsible person on surface to monitor Responsible person on surface to monitor
location of miners underground (75.1600-1)location of miners underground (75.1600-1)• Two way communication inside RA (75.1600-3)Two way communication inside RA (75.1600-3)• Identifying number on miner’s brass tag worn Identifying number on miner’s brass tag worn
on belt matches identifying number in system on belt matches identifying number in system (75.1715)(75.1715)
• Minimum safe distance to prevent interference Minimum safe distance to prevent interference with blasting circuits (75.1323(a))with blasting circuits (75.1323(a))
• C&T systems shall remain operational during C&T systems shall remain operational during fan stoppages or a mine power outage (75.313) fan stoppages or a mine power outage (75.313)
OverviewOverview
- Consolidate Q&A documents for next round of ERPs
QUESTIONS?