UNIT BISNIS PEMBANGKITAN KAMOJANG
PDM EQUIPMENT CONDITION INDICATORS KAMOJANG UNIT - 1
PERIODE : APRIL S/D JUNI 2013
NO EQP-ID NAMA PERALATAN
1 KJ01PAC02AP001-001 CIRCULATING WATER PUMPS B UNIT 12 KJ01BAT01GT001-001 MAIN TRANSFORMER T1 UNIT 13 KJ01BAC01GT001-001 GENERATOR CIRCUIT BREAKER (52 G1) UNIT 1
4 KJ01MAC34HA101-001 TURBIN UNIT 1
5 KJ01MKA33HA001-001 GENERATOR UNIT 16 KJ01PAC01AP001-001 CIRCULATING WATER PUMPS A UNIT 1
7 KJ01BBT01GT001-001 AUXILIARY TRANSFORMER T2 UNIT 1
8 KJ01BFT01GT001-001 UNIT SERVICE TRANSFORMER T3 UNIT 1
9 KJ01AEA01GQ001-001 BREAKER 150 KV (52 T1) UNIT 110 KJ00BCT02GT001-001 AUXILIARY TRANSFORMER (TRAFO COMMON 20 KV TO 6,3 KV-T4) UNIT 1
11 KJ00BHT01GT001-001 AUXILIARY TRANSFORMER A(TRAFO COMMON 6,3 KV TO 380 V-T5) UNIT 1
12 KJ00BHT02GT001-001 AUXILIARY TRANSFORMER B(TRAFO COMMON 6,3 KV TO 380 V-T6) UNIT 113 KJ00BCT01GT001-001 AUXILIARY TRANSFORMER (TRAFO COMMON 150 KV TO 6,3 KV-T8) UNIT 114 KJ01MAV34AH010-001 MAIN OIL TANK UNIT 1
15 KJ01BCA10GD001-001 FEEDER FOR ELECTRICAL INSTRUMENTS AND CONTROL (6,3 kV Station) UNIT 116 KJ01BFA10GE001-001 FEEDER FOR ELEC. INSTRUMENTS AND CONTROL (380 V Unit Running A & B) UNIT 1
17 KJ01BTM01GR001-001 RECTIFIER UNIT 1
18 KJ01URA01AC001-001 COOLING TOWER CELL A UNIT 1
19 KJ01URA02AC001-001 COOLING TOWER CELL B UNIT 120 KJ01URA03AC001-001 COOLING TOWER CELL C UNIT 1
21 KJ01PCC01AP001-001 PRIMARY COOLING WATER PUMPS A UNIT 1
22 KJ01PCC02AP001-001 PRIMARY COOLING WATER PUMPS B UNIT 1
23 KJ01PGC01AP001-001 SECONDARY INTERCOOLER PUMPS A UNIT 1
24 KJ01PGC02AP001-001 SECONDARY INTERCOOLER PUMPS B UNIT 1
25 KJ01QFA01HA001-001 COMPRESSOR A UNIT 1
26 KJ01QFA02HA001-001 COMPRESSOR B UNIT 1
Catatan:
PDM EQUIPMENT CONDITION INDICATORS KAMOJANG UNIT - 1
PERIODE : APRIL S/D JUNI 2013
APLIKASI TEKNOLOGI PDM KONDISI LAIN
s/d 29 Mei Update 5 Juni VIB IRT OIL PD DGA PM - Rutin PM - OH
10-04-2013 02-05-2013 14-02-2013 14-02-2013
15-05-2013 13-02-2013 15-05-2013 14-05-2013 15-04-2013
13-02-2013 14-02-2013
10-04-2013 02-05-2013 13-02-2013 14-02-2013
10-04-2013 02-05-2013 13-02-2013 14-02-2013
10-04-2013 02-05-2013 14-02-2013
20-02-2013 13-02-2013 19-12-2012
29-05-2013 04-06-2013 13-02-2013 23-05-2013 23-05-2013
20-02-2013 13-02-2013
20-02-2013 13-02-2013 23-05-2013 23-05-2013
20-02-2013 13-02-2013 20-12-2012
20-02-2013 13-02-2013 20-12-2012
20-02-2013 13-02-2013 19-12-2012
14-02-2013 30-04-2013
10-04-2013 02-05-2013 14-02-2013 21-02-2013
10-04-2013 02-05-2013 14-02-2013 21-02-2013
10-04-2013 02-05-2013 14-02-2013 21-02-2013
02-05-2013 Standby
10-04-2013 19-03-2013 14-02-2013
13-02-2013 02-05-2013 Standby
10-04-2013 19-03-2013 14-02-2013
20-02-2013 21-02-2013 Standby 21-02-2013
10-04-2013 02-05-2013 14-02-2013
Kamojang, 4 Juni 2013
Yusuf Janwar
SO Equipment Condition Report
SpS Condition Based Maintenance
Jml % VIB IRT OILHijau 19 86.36Kuning 2 9.09 3Merah 1 4.55 1 1
PDM EQUIPMENT CONDITION INDICATORS KAMOJANG UNIT - 1
PERIODE : APRIL S/D JUNI 2013
KONDISI LAIN ACUAN STANDARTKeterangan
Opr. Info Lain PROCD.NO. PROCED. SUMMARY
Kontaktor PIP-B sudah dilakukan perbaikan tapi statusnya masih merah karena temperatur masih tinggi di 112,5 °C dengan ΔT fasa
PD DGA
2
UNIT BISNIS PEMBANGKITAN KAMOJANG
PDM EQUIPMENT CONDITION INDICATORS KAMOJANG UNIT - 2
PERIODE : APRIL S/D JUNI 2013
NO EQP-ID NAMA PERALATAN
KJ02BAT01GT001-001 MAIN TRANSFORMER T21 UNIT 2
KJ02MAC34HA101-001 TURBIN UNIT 2
KJ02MKA33HA001-001 GENERATOR UNIT 2
KJ02BBT01GT001-001 AUXILIARY TRANSFORMER T22 UNIT 2
KJ02BFT01GT001-001 UNIT SERVICE TRANSFORMER T23 UNIT 2
KJ02MAV34AH010-001 MAIN OIL TANK UNIT 2
KJ02PAC01AP001-001 CIRCULATING WATER PUMPS A UNIT 2
KJ01PAC02AP001-001 CIRCULATING WATER PUMPS B UNIT 2
KJ02AEA01GQ001-001 BREAKER 150 KV (52 T21) UNIT 2
KJ02BCA10GD001-001 FEEDER FOR ELECTRICAL INSTRUMENTS AND CONTROL (6,3 kV Station) UNIT 2
KJ02BFA10GE001-001 FEEDER FOR ELECTRICAL INSTRUMENTS AND CONTROL (380 V Unit Running A & B) UNIT 2
KJ02BTM01GR001-001 RECTIFIER UNIT 2
KJ02URA01AC001-001 COOLING TOWER CELL A UNIT 2
KJ02URA02AC001-001 COOLING TOWER CELL B UNIT 2
KJ02URA03AC001-001 COOLING TOWER CELL C UNIT 2
KJ02URA04AC001-001 COOLING TOWER CELL D UNIT 2
KJ02URA05AC001-001 COOLING TOWER CELL E UNIT 2
KJ02PGC01AP001-001 SECONDARY INTERCOOLER PUMPS A UNIT 2
KJ02PGC02AP001-001 SECONDARY INTERCOOLER PUMPS B UNIT 2
KJ02PCC01AP001-001 PRIMARY COOLING WATER PUMPS A UNIT 2
KJ02PCC02AP001-001 PRIMARY COOLING WATER PUMPS B UNIT 2
Catatan:
PDM EQUIPMENT CONDITION INDICATORS KAMOJANG UNIT - 2
PERIODE : APRIL S/D JUNI 2013
APLIKASI TEKNOLOGI PDM KONDISI LAIN
s/d 29 Mei Update 5 Juni VIB IRT OIL PD DGA PM - Rutin PM - OH
20-02-2013 13-02-2013 27-11-2012 14-02-2013
10-04-2013 02-05-2013 13-02-2013 14-02-2013
10-04-2013 02-05-2013 13-02-2013 14-02-2013
20-02-2013 13-02-2013 20-12-2012 14-02-2013
20-02-2013 13-02-2013 20-12-2012 14-02-2013
20-02-2013 14-02-2013
10-04-2013 02-05-2013 14-02-2013 14-02-2013
10-04-2013 02-05-2013 14-02-2013 14-02-2013
20-02-2013 14-02-2013
14-02-2013
30-04-2013 30-04-2013 14-02-2013
10-04-2013 02-05-2013 14-02-2013 21-02-2013
10-04-2013 02-05-2013 14-02-2013 21-02-2013
10-04-2013 02-05-2013 14-02-2013 21-02-2013
10-04-2013 02-05-2013 14-02-2013 21-02-2013
10-04-2013 02-05-2013 14-02-2013 21-02-2013
13-02-2013 22-01-2013 Standby 14-02-2013
10-04-2013 02-05-2013 14-02-2013 14-02-2013
13-02-2013 02-05-2013 Standby 14-02-2013
10-04-2013 19-03-2013 14-02-2013 14-02-2013
Kamojang, 4 Juni 2013
Yusuf Janwar
SpS Condition Based Maintenance
Jml % VIB IRT OILHijau 17 89.47Kuning 1 5.26Merah 1 5.26 1
SO Equipment Condition Report
PDM EQUIPMENT CONDITION INDICATORS KAMOJANG UNIT - 2
PERIODE : APRIL S/D JUNI 2013
KONDISI LAIN ACUAN STANDART
Opr. Info Lain PROCD.NO. PROCED. SUMMARY
21-03-2013
11-03-2013 18-03-2013
PD DGA
UNIT BISNIS PEMBANGKITAN KAMOJANG
PDM EQUIPMENT CONDITION INDICATORS KAMOJANG UNIT - 3
PERIODE : APRIL S/D JUNI 2013
NO EQP-ID NAMA PERALATAN
1 KJ03BAT01GT001-001 MAIN TRANSFORMER T31 UNIT 32 KJ03MKA33HA001-001 GENERATOR UNIT 33 KJ03MAC34HA101-001 TURBIN UNIT 3
4 KJ03BBT01GT001-001 AUXILIARY TRANSFORMER T32 UNIT 3
5 KJ03BFT01GT001-001 UNIT SERVICE TRANSFORMER T33 UNIT 36 KJ03AEA01GQ001-001 BREAKER 150 KV (52 T31) UNIT 3
7 KJ03PAC01AP001-001 CIRCULATING WATER PUMPS A UNIT 3
8 KJ03PAC02AP001-001 CIRCULATING WATER PUMPS B UNIT 3
9 KJ03MAV34AH010-001 MAIN OIL TANK UNIT 310 KJ03URA01AC001-001 COOLING TOWER CELL A UNIT 3
11 KJ03URA02AC001-001 COOLING TOWER CELL B UNIT 3
12 KJ03URA03AC001-001 COOLING TOWER CELL C UNIT 313 KJ03URA04AC001-001 COOLING TOWER CELL D UNIT 314 KJ03URA05AC001-001 COOLING TOWER CELL E UNIT 3
15 KJ03BCA10GD001-001 FEEDER FOR ELECTRICAL INSTRUMENTS AND CONTROL (6,3 kV Station) UNIT 316 KJ03BFA10GE001-001 FEEDER FOR ELECTRICAL INSTRUMENTS AND CONTROL (380 V Unit Running A & B) UNIT 317 KJ03PGC01AP001-001 SECONDARY INTERCOOLER PUMPS A UNIT 3
18 KJ03PGC02AP001-001 SECONDARY INTERCOOLER PUMPS B UNIT 3
19 KJ03QFA01HA001-001 COMPRESSOR A UNIT 320 KJ03QFA02HA001-001 COMPRESSOR B UNIT 3
21 KJ03PCC01AP001-001 PRIMARY COOLING WATER PUMPS A UNIT 3
22 KJ03PCC02AP001-001 PRIMARY COOLING WATER PUMPS B UNIT 3
Catatan:
PDM EQUIPMENT CONDITION INDICATORS KAMOJANG UNIT - 3
PERIODE : APRIL S/D JUNI 2013
APLIKASI TEKNOLOGI PDM KONDISI LAIN
s/d 29 Mei Update 5 Juni VIB IRT OIL PD DGA PM - Rutin PM - OH Opr.
20-02-2013 13-02-2013 11-12-2012 14-02-2013
10-04-2013 02-05-2013 13-02-2013 14-02-2013
10-04-2013 02-05-2013 13-02-2013 14-02-2013
20-02-2013 13-02-2013 20-12-2012 14-02-2013
20-02-2013 13-02-2013 11-12-2012 14-02-2013
20-02-2013 14-02-2013
10-04-2013 19-03-2013 14-02-2013
10-04-2013 19-03-2013 14-02-2013
10-04-2013 02-05-2013 14-02-2013 21-02-2013
10-04-2013 02-05-2013 14-02-2013 21-02-2013
10-04-2013 02-05-2013 14-02-2013 21-02-2013
10-04-2013 02-05-2013 14-02-2013 21-02-2013
10-04-2013 02-05-2013 14-02-2013 21-02-2013
30-04-2013 14-02-2013
13-02-2013 21-01-2013 Standby
10-04-2013 02-05-2013 14-02-2013
10-04-2013 19-03-2013 14-02-2013
13-02-2013 21-01-2013 Standby
10-04-2013 19-03-2013 Standby
20-02-2013 02-05-2013 14-02-2013
Kamojang, 4 Juni 2013
Yusuf Janwar
SpS Condition Based Maintenance
Jml % VIB IRT OIL PDHijau 16 80.00Kuning 3 15.00 2Merah 1 5.00 1 1
SO Equipment Condition Report
PDM EQUIPMENT CONDITION INDICATORS KAMOJANG UNIT - 3
PERIODE : APRIL S/D JUNI 2013
KONDISI LAIN ACUAN STANDART
Info Lain PROCD.NO. PROCED. SUMMARY
Pengukuran vibrasi belum dilakukan karena kandungan H2S di area CWP sangat tinggi
Pengukuran vibrasi belum dilakukan karena kandungan H2S di area CWP sangat tinggi
DGA
STATUS MAXIMO
UNIT BISNIS PEMBANGKITAN KAMOJANG
PDM EQUIPMENT CONDITION INDICATORS DARAJAT UNIT - 1
PERIODE : APRIL S/D JUNI 2013
NO EQP-ID NAMA PERALATAN
1 DR01MAJ50AP001-001 LIQUID RING VACUUM PUMPS-A UNIT 12 DR01BAT01GT001-001 MAIN TRANSFORMER(T11) UNIT 13 DR01BBT01GT001-001 AUXILIARY TRANSFORMER(T12) UNIT 1
4 DR01BFT01GT001-001 UNIT SERVICE TRANSFORMER(T13) UNIT 1
5 DR01PAC01AP001-001 CIRCULATING WATER PUMPS A UNIT 16 DR01PAC02AP001-001 CIRCULATING WATER PUMPS B UNIT 1
7 DR01AEA01GQ001-001 CIRCUIT BREAKER 150 KV(52T11) UNIT 1
8 DR01URA01AC001-001 COOLING TOWER CELL A UNIT 1
9 DR01URA02AC001-001 COOLING TOWER CELL B UNIT 110 DR01URA03AC001-001 COOLING TOWER CELL C UNIT 1
11 DR01URA04AC001-001 COOLING TOWER CELL D UNIT 1
12 DR01MAJ60AP002-001 LIQUID RING VACUUM PUMPS-B UNIT 113 DR01QFA01HA001-001 COMPRESSOR A UNIT 114 DR01QFA02HA001-001 COMPRESSOR B UNIT 1
15 DR01BFA10GE001-001 FEEDER FOR ELECTRICAL INSTRUMENTS AND CONTROL (380V MAIN DISTRIBUTION BOARD UN
16DR01BRU01GU001-001
INVERTER UNIT 1
17 DR01MAC34HA101-001 TURBINE UNIT 118 DR01MKA33HA001-001 GENERATOR UNIT 119 DR01PGC01AP001-001 SECONDARY INTERCOOLER PUMPS A UNIT 1
20 DR01PGC02AP001-001 SECONDARY INTERCOOLER PUMPS B UNIT 1
21 DR01PCC01AP001-001 PRIMARY COOLING WATER PUMPS A UNIT 122 DR01PCC02AP001-001 PRIMARY COOLING WATER PUMPS B UNIT 123 DR01BAC01GT001-001 GENERATOR CIRCUIT BREAKER UNIT 1
24 DR01BBA10GD001-001 FEEDER FOR ELECTRICAL INSTRUMENTS AND CONTROL (6,3 KV UNIT SERVICE SWITCHBOARD)25 DR01BTM01GR001-001 RECTIFIER UNIT 126 DR01MAV34AH010-001 MAIN OIL TANK UNIT 1
27 DR00BHT01GT001-001 STATION SERVICE TRANSFORMER(TRAFO COMMON 6,3 KV TO 380 V-T3) UNIT 1
Catatan:
PDM EQUIPMENT CONDITION INDICATORS DARAJAT UNIT - 1
PERIODE : APRIL S/D JUNI 2013
APLIKASI TEKNOLOGI PDM KONDISI LAIN
s/d 29 Mei Update 5 Juni VIB IRT OIL PD DGA PM - Rutin PM - OH
10-04-2013 06-05-2013 15-02-2013
13-03-2013 15-02-2013 04-01-2013
13-03-2013 15-02-2013 04-01-2013
13-03-2013 15-02-2013 04-01-2013
10-04-2013 06-05-2013 15-02-2013
10-04-2013 06-05-2013 15-02-2013
13-03-2013 15-02-2013
10-04-2013 06-05-2013 15-02-2013
10-04-2013 06-05-2013 15-02-2013
10-04-2013 06-05-2013 15-02-2013
10-04-2013 06-05-2013 15-02-2013
10-04-2013 06-05-2013 15-02-2013
10-04-2013 18-02-2013 15-02-2013
10-04-2013 06-05-2013 15-02-2013
10-04-2013 05-04-2013
08-05-2013 07-05-2013
10-04-2013 06-05-2013 15-02-2013
10-04-2013 06-05-2013 15-02-2013 04-01-2013
10-04-2013 18-02-2013 15-02-2013
10-04-2013 06-05-2013 15-02-2013
10-04-2013 18-02-2013 15-02-2013
10-04-2013 06-05-2013 15-02-2013
13-03-2013 15-02-2013
13-03-2013 15-02-2013
13-03-2013 15-02-2013
13-03-2013 15-02-2013
Kamojang, 4 Juni 2013
SO Equipment Condition Report
Yusuf Janwar
SpS Condition Based Maintenance
Jml % VIB IRT OILHijau 24 92.31Kuning 2 7.69 1Merah 0 0.00 1
PDM EQUIPMENT CONDITION INDICATORS DARAJAT UNIT - 1
PERIODE : APRIL S/D JUNI 2013
KONDISI LAIN ACUAN STANDARTKeterangan
Opr. Info Lain PROCD.NO. PROCED. SUMMARY
15-02-2013
15-02-2013
15-02-2013
15-02-2013
Kondisi temperatur sudah dilakukan pengukuran ulang tanggal 07 Mei 2013
PD DGA
UNIT BISNIS PEMBANGKITAN KAMOJANG
PDM EQUIPMENT CONDITION INDICATORS GUNUNG SALAK UNIT - 1PERIODE : APRIL S/D JUNI 2013
NO EQP-ID NAMA PERALATAN
1 GS01MKA33HA001-001 GENERATOR UNIT 12 GS01PAC01AP001-001 CIRCULATING WATER PUMPS A UNIT 13 GS01PAC02AP001-001 CIRCULATING WATER PUMPS B UNIT 1
4 GS01BFT01GT001-001 AUXILIARY TRANSFORMER(1BFT01) UNIT 1
5 GS01BRU01GU001-001 INVERTER UNIT 16 GS01URA01AC001-001 COOLING TOWER CELL A UNIT 1
7 GS01URA02AC001-001 COOLING TOWER CELL B UNIT 1
8 GS01URA03AC001-001 COOLING TOWER CELL C UNIT 1
9 GS01URA04AC001-001 COOLING TOWER CELL D UNIT 110 GS01URA05AC001-001 COOLING TOWER CELL E UNIT 1
11 GS01BFA10GE001-001 FEEDER FOR ELECTRICAL INSTRUMENTS AND CONTROL UNIT 1
12 GS01BAT01GT001-001 MAIN TRANSFORMER(1BAT01) UNIT 113 GS01BAC01GT001-001 GAS CIRCUIT BREAKER UNIT 114 GS01MAC34HA101-001 TURBINE UNIT 1
15 GS01BBT01GT001-001 AUXILIARY TRANSFORMER(1BBT01) UNIT 116 GS01PCC01AP001-001 PRIMARY COOLING WATER PUMPS A UNIT 117 GS01PCC02AP001-001 PRIMARY COOLING WATER PUMPS B UNIT 1
18 GS01MAX11AP001-001 EHC PUMP NO.1 UNIT 1
19 GS01MAX11AP002-001 EHC PUMP NO.2 UNIT 120 GS01BCA10GD001-001 FEEDER FOR ELECTRICAL INSTRUMENTS AND CONTROL UNIT 1
21 GS01PGC01AP001-001 SECONDARY INTERCOOLER PUMPS A UNIT 1
22 GS01PGC02AP001-001 SECONDARY INTERCOOLER PUMPS B UNIT 1
23 GS01MAV34AH010-001 MAIN OIL TANK UNIT 1
Catatan:
PDM EQUIPMENT CONDITION INDICATORS GUNUNG SALAK UNIT - 1PERIODE : APRIL S/D JUNI 2013
APLIKASI TEKNOLOGI PDM KONDISI LAIN
s/d 29 Mei Update 5 Juni VIB IRT OIL PD DGA PM - Rutin PM - OH
01-05-2013 18-04-2013 27-02-2013
01-05-2013 19-04-2013 27-02-2013
01-05-2013 19-04-2013 27-02-2013
20-03-2013 17-01-2013 25-02-2013
20-03-2013 27-02-2013 22-05-2012
01-05-2013 19-04-2013 27-02-2013
01-05-2013 19-04-2013 27-02-2013
01-05-2013 19-04-2013 27-02-2013
01-05-2013 19-04-2013 27-02-2013
20-03-2013 27-02-2013 31-01-2013
20-03-2013 27-02-2013
10-04-2013 17-01-2013 25-02-2013 22-05-2012
20-03-2013 27-02-2013
01-05-2013 18-04-2013 27-02-2013
20-03-2013 17-01-2013 25-02-2013
01-05-2013 19-04-2013 27-02-2013
10-04-2013 20-03-2013 Standby
01-05-2013 19-04-2013 27-02-2013
10-04-2013 20-03-2013 Standby
01-05-2013 19-04-2013 27-02-2013
10-04-2013 19-03-2013 Standby
Kamojang, 4 Juni 2013
SO Equipment Condition Report
Yusuf Janwar
SpS Condition Based Maintenance
Jml % VIB IRT OILHijau 18 85.71Kuning 1 4.76 1Merah 2 9.52 1
PDM EQUIPMENT CONDITION INDICATORS GUNUNG SALAK UNIT - 1PERIODE : APRIL S/D JUNI 2013
KONDISI LAIN ACUAN STANDART
Opr. Info Lain PROCD.NO. PROCED. SUMMARY
PD DGA
UNIT BISNIS PEMBANGKITAN KAMOJANG
PDM EQUIPMENT CONDITION INDICATORS GUNUNG SALAK UNIT - 2PERIODE : APRIL S/D JUNI 2013
NO EQP-ID NAMA PERALATAN
s/d 29 Mei
1 GS02MKA33HA001-001 GENERATOR UNIT 2 01-05-20132 GS02BRU01GU001-001 INVERTER UNIT 2 20-03-2013
3 GS02PAC01AP001-001 CIRCULATING WATER PUMPS A UNIT 2 01-05-2013
4 GS02PAC02AP001-001 CIRCULATING WATER PUMPS B UNIT 2 01-05-2013
5 GS02BFA10GE001-001 FEEDER FOR ELECTRICAL INSTRUMENTS AND CONTROL UNIT 2 20-03-2013
6 GS02PCC01AP001-001 PRIMARY COOLING WATER PUMPS A UNIT 2 01-05-2013
7 GS02PCC02AP001-001 PRIMARY COOLING WATER PUMPS B UNIT 2 10-04-2013
8 GS02BAT01GT001-001 MAIN TRANSFORMER(2BAT01) UNIT 2 20-03-2013
9 GS02URA01AC001-001 COOLING TOWER CELL A UNIT 2 01-05-2013
10 GS02URA02AC001-001 COOLING TOWER CELL B UNIT 2 01-05-2013
11 GS02URA03AC001-001 COOLING TOWER CELL C UNIT 2 01-05-2013
12 GS02URA04AC001-001 COOLING TOWER CELL D UNIT 2 01-05-2013
13 GS02URA05AC001-001 COOLING TOWER CELL E UNIT 2 01-05-2013
14 GS02BAC01GT001-001 GAS CIRCUIT BREAKER UNIT 2 20-03-2013
15 GS02MAC34HA101-001 TURBINE UNIT 2 01-05-2013
16 GS02BBT01GT001-001 AUXILIARY TRANSFORMER(2BBT01) UNIT 2 20-03-2013
17 GS02BFT01GT001-001 AUXILIARY TRANSFORMER(2BFT01) UNIT 2 20-03-2013
18 GS02PGC01AP001-001 SECONDARY INTERCOOLER PUMPS A UNIT 2 01-05-2013
19 GS02PGC02AP001-001 SECONDARY INTERCOOLER PUMPS B UNIT 2 10-04-2013
20 GS02MAX11AP001-001 EHAC PUMP NO.1 UNIT 2 01-05-2013
21 GS02MAX11AP002-001 EHAC PUMP NO.2 UNIT 2 20-03-2013
22 GS02BCA10GD001-001 FEEDER FOR ELECTRICAL INSTRUMENTS AND CONTROL UNIT 2
23 GS02MAV34AH010-001 MAIN OIL TANK UNIT 2
Catatan:
SO Equipment Condition Report
PDM EQUIPMENT CONDITION INDICATORS GUNUNG SALAK UNIT - 2PERIODE : APRIL S/D JUNI 2013
APLIKASI TEKNOLOGI PDM KONDISI LAIN
Update 5 Juni VIB IRT OIL PD DGA PM - Rutin PM - OH Opr.
18-04-2013 27-02-2013
27-02-2013 22-05-2012
19-04-2013 27-02-2013
19-04-2013 27-02-2013
27-02-2013
19-04-2013 27-02-2013
20-03-2013 Standby
17-01-2013 26-02-2013 22-05-2012
19-04-2013 27-02-2013 22-05-2012
19-04-2013 27-02-2013 22-05-2012
19-04-2013 27-02-2013 22-05-2012
19-04-2013 27-02-2013 22-05-2012
19-04-2013 27-02-2013 22-05-2012
27-02-2013
18-04-2013 27-02-2013
17-01-2013 26-02-2013
17-01-2013 26-02-2013
19-04-2013 27-02-2013
19-03-2013 Standby
19-04-2013 Standby
21-02-2013 27-02-2013
Kamojang, 4 Juni 2013
Yusuf Janwar
SpS Condition Based Maintenance
Jml % VIB IRT OIL PDHijau 14 66.67Kuning 6 28.57Merah 1 4.76
PDM EQUIPMENT CONDITION INDICATORS GUNUNG SALAK UNIT - 2PERIODE : APRIL S/D JUNI 2013
KONDISI LAIN ACUAN STANDART
Info Lain PROCD.NO. PROCED. SUMMARY
DGA
UNIT BISNIS PEMBANGKITAN KAMOJANG
PDM EQUIPMENT CONDITION INDICATORS GUNUNG SALAK UNIT - 3PERIODE : APRIL S/D JUNI 2013
NO EQP-ID NAMA PERALATAN
s/d 29 Mei
1 GS03MKA33HA001-001 GENERATOR UNIT 3 01-05-20132 GS03PAC01AP001-001 CIRCULATING WATER PUMPS A UNIT 3 01-05-20133 GS03PAC02AP001-001 CIRCULATING WATER PUMPS B UNIT 3 01-05-2013
4 GS03BRU01GU001-001 INVERTER UNIT 3 20-03-2013
5 GS03PCC01AP001-001 PRIMARY COOLING WATER PUMPS A UNIT 3 01-05-20136 GS03PCC02AP001-001 PRIMARY COOLING WATER PUMPS B UNIT 3 10-04-2013
7 GS03BAT01GT001-001 MAIN TRANSFORMER (3BAT01) UNIT 3 20-03-2013
8 GS03URA01AC001-001 COOLING TOWER CELL A UNIT 3 01-05-2013
9 GS03URA02AC001-001 COOLING TOWER CELL B UNIT 3 01-05-2013
10 GS03URA03AC001-001 COOLING TOWER CELL C UNIT 3 01-05-2013
11 GS03URA04AC001-001 COOLING TOWER CELL D UNIT 3 01-05-2013
12 GS03BAC01GT001-001 GAS CIRCUIT BREAKER UNIT 3 20-03-2013
13 GS03MAC34HA101-001 TURBINE UNIT 3 01-05-2013
14 GS03BBT01GT001-001 AUXILIARY TRANSFORMER (3BBT01) UNIT 3 20-03-2013
15 GS03BFT01GT001-001 AUXILIARY TRANSFORMER (3BFT01) UNIT 3 20-03-2013
16 GS03BTD01GR001-001 BATTERIES UNIT 3
17 GS03PGC01AP001-001 SECONDARY INTERCOOLER PUMPS A UNIT 3 01-05-2013
18 GS03PGC02AP001-001 SECONDARY INTERCOOLER PUMPS B UNIT 3 10-04-2013
19 GS03MAX11AP001-001 EHAC PUMP NO.1 UNIT 3 01-05-2013
20 GS03MAX11AP002-001 EHAC PUMP NO.2 UNIT 3 10-04-2013
21 GS03BCA10GD001-001 FEEDER FOR ELECTRICAL INSTRUMENTS AND CONTROL UNIT 3 20-03-2013
22 GS03BFA10GE001-001 FEEDER FOR ELECTRICAL INSTRUMENTS AND CONTROL UNIT 3
23 GS03MAV34AH010-001 MAIN OIL TANK UNIT 3
Catatan:
SO Equipment Condition Report
PDM EQUIPMENT CONDITION INDICATORS GUNUNG SALAK UNIT - 3PERIODE : APRIL S/D JUNI 2013
APLIKASI TEKNOLOGI PDM KONDISI LAIN
Update 5 Juni VIB IRT OIL PD DGA PM - Rutin PM - OH Opr. Info Lain
18-04-2013 27-02-2013
19-04-2013 27-02-2013 13-03-2013
19-04-2013 27-02-2013 13-03-2013
27-02-2013 25-02-2013
19-04-2013 27-02-2013
20-03-2013 Standby
17-01-2013 17-01-2013
19-04-2013 27-02-2013
19-04-2013 27-02-2013
19-04-2013 27-02-2013
19-04-2013 27-02-2013
27-02-2013
18-04-2013 27-02-2013
17-01-2013 17-01-2013
17-01-2013 06-09-2012
19-04-2013 27-02-2013
19-03-2013 Standby
19-04-2013 27-02-2013
20-03-2013 Standby
27-02-2013
Kamojang, 4 Juni 2013
Yusuf Janwar
SpS Condition Based Maintenance
St.Eq. Jml % VIB IRT OIL PD DGAHijau 15 75.00
Kuning 5 25.00 3Merah 0 0.00
PDM EQUIPMENT CONDITION INDICATORS GUNUNG SALAK UNIT - 3PERIODE : APRIL S/D JUNI 2013
ACUAN STANDART
PROCD.NO. PROCED. SUMMARY
Unit 1-3 KMJ UBP KMJStatus Eqipment Jumlah Prosentase (%) Status EqipmentHijau 52 85.25 HijauKuning 6 9.84 KuningMerah 3 4.92 Merah
Total
Unit 1 DRJStatus Eqipment Jumlah Prosentase (%)Hijau 24 92.31Kuning 2 7.69Merah 0 0.00
Unit 1-3 GSLStatus Eqipment Jumlah Prosentase (%)Hijau 47 75.81Kuning 12 19.35Merah 3 4.84
VIB IRT OIL PD DGA
6 1 3 0 23 4 0 0 0
Total 9 5 3 0 2
82.55%
13.42%4.03%
Prosentase Status Equipment UBP KMJBerdasarkan CBM
Jumlah Prosentase (%)123 82.55
20 13.426 4.03
149 100.00
82.55%
13.42%4.03%
Prosentase Status Equipment UBP KMJBerdasarkan CBM
VIB IRT OIL PD DGA0
1
2
3
4
5
6
6
1
3
0
2
3
4
0 0 0
Status Equipment (Kuning & Merah) Berdasarkan Teknologi PdM
VIB IRT OIL PD DGA0
1
2
3
4
5
6
6
1
3
0
2
3
4
0 0 0
Status Equipment (Kuning & Merah) Berdasarkan Teknologi PdM