Date : Ti 14 Oct 2014 Rev. No. 0 PEC LTD. 21 Shipyard Road, Sin URL: http:// www.pece E Customer - Description Cooling T Manufacturer - Motor - Serviced By PEC-MCY 0 14/10/14 Rev Date itle Doc N PUMP & EQUIPMENT SERVICE COMPLETION REPORT CT-4 (Cooling Tower Fan) Job N Page N ngapore 628144. Tel: 6268 9788 Fax: 6268 9488 eng.com Equipment No.: CT-4 Date Tower Fan Size/ Model Product/ Service Capacity Work Type New MWN Description Prepared No: MCY-SR-ROT-0032 No: - No: 1 of 11 14.10.2014 18” Diameter Fan ce - - Site Removal/Install WTA SST Checked Approved Date : Ti 14 Oct 2014 Rev. No. 0 PEC LTD. 21 Shipyard Road, Sin URL: http:// www.pece 4. EQUIPMENT SERVICES 4.1 Dismantling PEC Ltd (MCY) was car hub according to PEC dismantle job, measur reference. 4.2 Installation PEC Ltd (MCY) was ca center hub according to a. PEC Safe Work P b. 4000 Series Hub 4.3 Check Alignment PEC Ltd (MCY) was ca unwanted sound and future reference and re 4.4 Measure Blade Angle After completeion of t fan blade pitch angle adjustment for all blad 5. FINAL TEST After final measurement was blades and necessary prep termination and check for co When everything is ready, operating speed. During the cooling tower was continue 6. ALIGNMENT RESULT Final alignment result for co itle Doc N PUMP & EQUIPMENT SERVICE COMPLETION REPORT CT-4 (Cooling Tower Fan) Job N Page N ngapore 628144. Tel: 6268 9788 Fax: 6268 9488 eng.com rrying out dismantling of cooling tower motor, ge Safe Work Procedure (Document No. TBM-PP-S re and record the existing fan blades pitch an arrying out installation of cooling tower new mo o following procedure:- Procedure (Document No. TBM-PP-SWP-0001) b Tuf-Lite II Fans Installation Manual (HUDSON Pr arrying out the alignment for new motor and ge vibration during the normal operation. Final a eporting purpose. e the alignment, PEC Ltd (MCY) was carried out t e and tip clearance. Setting measurement an des. (See attachment “A”) s recorded, PEC Ltd (MCY) was carrying out the m eparation for test run. Electrical contractor wa ontrol system of oil level switch and vibration swi , Micron carried out the test run for cooling e running period, no unusual sound, noise and v run as normal operation start from 2:00 pm on M ooling tower No (4) was attached with this report No: MCY-SR-ROT-0032 No: - No: 4 of 11 earbox and fan blade center SWP-0001). Before start the ngle and tip clearance for otor, gearbox and fan blade roducts Corporations) ear box in order to avoid alignment was record for the measurement of new nd carry out necessary manual turning of the fan as carried out the wire itch. tower no.4 with normal vibration were found and Monday (13/10/2014). (See Attachment “B”) Date : Ti 14 Oct 2014 Rev. No. 0 PEC LTD. 21 Shipyard Road, Sin URL: http:// www.pece 7. SITE PHOTOS Old Fan Bla Measurement of Centre Drive Sha Cut the Old F itle Doc N PUMP & EQUIPMENT SERVICE COMPLETION REPORT CT-4 (Cooling Tower Fan) Job N Page N ngapore 628144. Tel: 6268 9788 Fax: 6268 9488 eng.com ade Set Gearbox & Center H Tip Clearances Measurement of Bla aft & Coupling Gearbox and Fan Blades Before Dismantlin No: MCY-SR-ROT-0032 No: - No: 5 of 11 Hub Condition ade Pitch Angle Coupling ng Condition Date : Ti 14 Oct 2014 Rev. No. 0 PEC LTD. 21 Shipyard Road, Sin URL: http:// www.pece Supervisor In-charge : Engineer In-charge : Reviewed & Checked By : Measure the T Install back the v Check Manua itle Doc N PUMP & EQUIPMENT SERVICE COMPLETION REPORT CT-4 (Cooling Tower Fan) Job N Page N ngapore 628144. Tel: 6268 9788 Fax: 6268 9488 eng.com ZT Date : 14.10.20 MWN Date : 14.10.20 WTA Date : 14.10.20 Tip Clearance Tightening o vibration Switch Topping up New al Rotation Install the S No: MCY-SR-ROT-0032 No: - No: 7 of 11 014 014 014 of Bolts Gearbox Oil Seal Disc

Eq uipment No.: CT-4 · COMPLETION REPORT Job No: Page No: 21 Shipyard Road, Singapore 628144. Tel: 6268 9788 Fax: 6268 9488 ZT Date : 14.10 .20 MWN Date : 14.10.2014 WTA Date : 14.10.2014

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Eq uipment No.: CT-4 · COMPLETION REPORT Job No: Page No: 21 Shipyard Road, Singapore 628144. Tel: 6268 9788 Fax: 6268 9488 ZT Date : 14.10 .20 MWN Date : 14.10.2014 WTA Date : 14.10.2014

Date : Title

14 Oct 2014

Rev. No. 0

PEC LTD. 21 Shipyard Road, Singapore 628144. Tel: 6268 9788 Fax: 6268 9488URL: http:// www.peceng.com

Eq

Customer -

Description Cooling Tower Fan

Manufacturer -

Motor -

Serviced By PEC-MCY

0 14/10/14

Rev Date

Title Doc No: PUMP & EQUIPMENT SERVICE

COMPLETION REPORT CT-4 (Cooling Tower Fan)

Job No:

Page No:

21 Shipyard Road, Singapore 628144. Tel: 6268 9788 Fax: 6268 9488 URL: http:// www.peceng.com

Equipment No.: CT-4

Date

Cooling Tower Fan Size/ Model

Product/ Service

Capacity

Work Type

New MWN

Description Prepared

Doc No: MCY-SR-ROT-0032 Job No:

- Page No:

1 of 11

14.10.2014

18” Diameter Fan

/ Service -

-

Site Removal/Install

WTA SST

Checked Approved

Date : Title

14 Oct 2014

Rev. No. 0

PEC LTD. 21 Shipyard Road, Singapore 628144. Tel: 6268 9788 Fax: 6268 9488URL: http:// www.peceng.com

4. EQUIPMENT SERVICES

4.1 Dismantling

PEC Ltd (MCY) was carrying out

hub according to PEC Safe Work Procedure (Document No. TBM

dismantle job, measure and record the existing fan blades pitch angle and tip clearance for

reference.

4.2 Installation

PEC Ltd (MCY) was carrying out installation of cooling tower new motor, gearbox and fan blade

center hub according to following procedure:

a. PEC Safe Work Procedure (Document No. TBM

b. 4000 Series Hub Tuf

4.3 Check Alignment

PEC Ltd (MCY) was carrying out the alignment for new motor and gear box in order to avoid

unwanted sound and vibration during the normal operation. Final alignment

future reference and reporting

4.4 Measure Blade Angle

After completeion of the

fan blade pitch angle and tip clearance.

adjustment for all blades. (See attachment “A”)

5. FINAL TEST

After final measurement was recorded, PEC Ltd (MCY) was carrying out the manual turning of the fan

blades and necessary preparation

termination and check for control system of oil level switch and vibration switch.

When everything is ready, Micron carried out the

operating speed. During the running period, no unusual sound, noise and vibration were found and

cooling tower was continue run as normal operation

6. ALIGNMENT RESULT Final alignment result for cooling tower No (4

Title Doc No: PUMP & EQUIPMENT SERVICE

COMPLETION REPORT CT-4 (Cooling Tower Fan)

Job No:

Page No:

21 Shipyard Road, Singapore 628144. Tel: 6268 9788 Fax: 6268 9488 URL: http:// www.peceng.com

PEC Ltd (MCY) was carrying out dismantling of cooling tower motor, gearbox and fan blade

hub according to PEC Safe Work Procedure (Document No. TBM-PP-SWP

dismantle job, measure and record the existing fan blades pitch angle and tip clearance for

PEC Ltd (MCY) was carrying out installation of cooling tower new motor, gearbox and fan blade

hub according to following procedure:-

PEC Safe Work Procedure (Document No. TBM-PP-SWP-0001)

4000 Series Hub Tuf-Lite II Fans Installation Manual (HUDSON Products Corporations)

PEC Ltd (MCY) was carrying out the alignment for new motor and gear box in order to avoid

unwanted sound and vibration during the normal operation. Final alignment

reporting purpose.

Measure Blade Angle

the alignment, PEC Ltd (MCY) was carried out the measurement of new

fan blade pitch angle and tip clearance. Setting measurement and carry out necessary

adjustment for all blades. (See attachment “A”)

After final measurement was recorded, PEC Ltd (MCY) was carrying out the manual turning of the fan

necessary preparation for test run. Electrical contractor was carried out the wire

termination and check for control system of oil level switch and vibration switch.

ready, Micron carried out the test run for cooling tower no.4

. During the running period, no unusual sound, noise and vibration were found and

cooling tower was continue run as normal operation start from 2:00 pm on Monday (13/10

t result for cooling tower No (4) was attached with this report (See Attachment “B”)

Doc No: MCY-SR-ROT-0032 Job No:

- Page No:

4 of 11

cooling tower motor, gearbox and fan blade center

SWP-0001). Before start the

dismantle job, measure and record the existing fan blades pitch angle and tip clearance for

PEC Ltd (MCY) was carrying out installation of cooling tower new motor, gearbox and fan blade

Products Corporations)

PEC Ltd (MCY) was carrying out the alignment for new motor and gear box in order to avoid

unwanted sound and vibration during the normal operation. Final alignment was record for

, PEC Ltd (MCY) was carried out the measurement of new

Setting measurement and carry out necessary

After final measurement was recorded, PEC Ltd (MCY) was carrying out the manual turning of the fan

Electrical contractor was carried out the wire

termination and check for control system of oil level switch and vibration switch.

test run for cooling tower no.4 with normal

. During the running period, no unusual sound, noise and vibration were found and

start from 2:00 pm on Monday (13/10/2014).

with this report (See Attachment “B”)

Date : Title

14 Oct 2014

Rev. No. 0

PEC LTD. 21 Shipyard Road, Singapore 628144. Tel: 6268 9788 Fax: 6268 9488URL: http:// www.peceng.com

7. SITE PHOTOS

Old Fan Blade Set

Measurement of Tip Clearances

Centre Drive Shaft

Cut the Old Fan

Title Doc No: PUMP & EQUIPMENT SERVICE

COMPLETION REPORT CT-4 (Cooling Tower Fan)

Job No:

Page No:

21 Shipyard Road, Singapore 628144. Tel: 6268 9788 Fax: 6268 9488 URL: http:// www.peceng.com

Old Fan Blade Set Gearbox & Center Hub Condition

Measurement of Tip Clearances Measurement of Blade Pitch Angle

Centre Drive Shaft & Coupling Gearbox and Coupling

Cut the Old Fan Blades Before Dismantling Condition

Doc No: MCY-SR-ROT-0032 Job No:

- Page No:

5 of 11

Gearbox & Center Hub Condition

Measurement of Blade Pitch Angle

Gearbox and Coupling

Before Dismantling Condition

Date : Title

14 Oct 2014

Rev. No. 0

PEC LTD. 21 Shipyard Road, Singapore 628144. Tel: 6268 9788 Fax: 6268 9488URL: http:// www.peceng.com

Supervisor In-charge :

Engineer In-charge :

Reviewed & Checked By :

Measure the Tip Clearance

Install back the vibration

Check Manual R

Title Doc No: PUMP & EQUIPMENT SERVICE

COMPLETION REPORT CT-4 (Cooling Tower Fan)

Job No:

Page No:

21 Shipyard Road, Singapore 628144. Tel: 6268 9788 Fax: 6268 9488 URL: http:// www.peceng.com

ZT Date : 14.10.20

MWN Date : 14.10.2014

WTA Date : 14.10.2014

Measure the Tip Clearance Tightening of Bolts

Install back the vibration Switch Topping up New Gearbox Oil

Manual Rotation Install the Seal D

Doc No: MCY-SR-ROT-0032 Job No:

- Page No:

7 of 11

.2014

14.10.2014

14.10.2014

of Bolts

Topping up New Gearbox Oil

Install the Seal Disc