Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Date : Title
14 Oct 2014
Rev. No. 0
PEC LTD. 21 Shipyard Road, Singapore 628144. Tel: 6268 9788 Fax: 6268 9488URL: http:// www.peceng.com
Eq
Customer -
Description Cooling Tower Fan
Manufacturer -
Motor -
Serviced By PEC-MCY
0 14/10/14
Rev Date
Title Doc No: PUMP & EQUIPMENT SERVICE
COMPLETION REPORT CT-4 (Cooling Tower Fan)
Job No:
Page No:
21 Shipyard Road, Singapore 628144. Tel: 6268 9788 Fax: 6268 9488 URL: http:// www.peceng.com
Equipment No.: CT-4
Date
Cooling Tower Fan Size/ Model
Product/ Service
Capacity
Work Type
New MWN
Description Prepared
Doc No: MCY-SR-ROT-0032 Job No:
- Page No:
1 of 11
14.10.2014
18” Diameter Fan
/ Service -
-
Site Removal/Install
WTA SST
Checked Approved
Date : Title
14 Oct 2014
Rev. No. 0
PEC LTD. 21 Shipyard Road, Singapore 628144. Tel: 6268 9788 Fax: 6268 9488URL: http:// www.peceng.com
4. EQUIPMENT SERVICES
4.1 Dismantling
PEC Ltd (MCY) was carrying out
hub according to PEC Safe Work Procedure (Document No. TBM
dismantle job, measure and record the existing fan blades pitch angle and tip clearance for
reference.
4.2 Installation
PEC Ltd (MCY) was carrying out installation of cooling tower new motor, gearbox and fan blade
center hub according to following procedure:
a. PEC Safe Work Procedure (Document No. TBM
b. 4000 Series Hub Tuf
4.3 Check Alignment
PEC Ltd (MCY) was carrying out the alignment for new motor and gear box in order to avoid
unwanted sound and vibration during the normal operation. Final alignment
future reference and reporting
4.4 Measure Blade Angle
After completeion of the
fan blade pitch angle and tip clearance.
adjustment for all blades. (See attachment “A”)
5. FINAL TEST
After final measurement was recorded, PEC Ltd (MCY) was carrying out the manual turning of the fan
blades and necessary preparation
termination and check for control system of oil level switch and vibration switch.
When everything is ready, Micron carried out the
operating speed. During the running period, no unusual sound, noise and vibration were found and
cooling tower was continue run as normal operation
6. ALIGNMENT RESULT Final alignment result for cooling tower No (4
Title Doc No: PUMP & EQUIPMENT SERVICE
COMPLETION REPORT CT-4 (Cooling Tower Fan)
Job No:
Page No:
21 Shipyard Road, Singapore 628144. Tel: 6268 9788 Fax: 6268 9488 URL: http:// www.peceng.com
PEC Ltd (MCY) was carrying out dismantling of cooling tower motor, gearbox and fan blade
hub according to PEC Safe Work Procedure (Document No. TBM-PP-SWP
dismantle job, measure and record the existing fan blades pitch angle and tip clearance for
PEC Ltd (MCY) was carrying out installation of cooling tower new motor, gearbox and fan blade
hub according to following procedure:-
PEC Safe Work Procedure (Document No. TBM-PP-SWP-0001)
4000 Series Hub Tuf-Lite II Fans Installation Manual (HUDSON Products Corporations)
PEC Ltd (MCY) was carrying out the alignment for new motor and gear box in order to avoid
unwanted sound and vibration during the normal operation. Final alignment
reporting purpose.
Measure Blade Angle
the alignment, PEC Ltd (MCY) was carried out the measurement of new
fan blade pitch angle and tip clearance. Setting measurement and carry out necessary
adjustment for all blades. (See attachment “A”)
After final measurement was recorded, PEC Ltd (MCY) was carrying out the manual turning of the fan
necessary preparation for test run. Electrical contractor was carried out the wire
termination and check for control system of oil level switch and vibration switch.
ready, Micron carried out the test run for cooling tower no.4
. During the running period, no unusual sound, noise and vibration were found and
cooling tower was continue run as normal operation start from 2:00 pm on Monday (13/10
t result for cooling tower No (4) was attached with this report (See Attachment “B”)
Doc No: MCY-SR-ROT-0032 Job No:
- Page No:
4 of 11
cooling tower motor, gearbox and fan blade center
SWP-0001). Before start the
dismantle job, measure and record the existing fan blades pitch angle and tip clearance for
PEC Ltd (MCY) was carrying out installation of cooling tower new motor, gearbox and fan blade
Products Corporations)
PEC Ltd (MCY) was carrying out the alignment for new motor and gear box in order to avoid
unwanted sound and vibration during the normal operation. Final alignment was record for
, PEC Ltd (MCY) was carried out the measurement of new
Setting measurement and carry out necessary
After final measurement was recorded, PEC Ltd (MCY) was carrying out the manual turning of the fan
Electrical contractor was carried out the wire
termination and check for control system of oil level switch and vibration switch.
test run for cooling tower no.4 with normal
. During the running period, no unusual sound, noise and vibration were found and
start from 2:00 pm on Monday (13/10/2014).
with this report (See Attachment “B”)
Date : Title
14 Oct 2014
Rev. No. 0
PEC LTD. 21 Shipyard Road, Singapore 628144. Tel: 6268 9788 Fax: 6268 9488URL: http:// www.peceng.com
7. SITE PHOTOS
Old Fan Blade Set
Measurement of Tip Clearances
Centre Drive Shaft
Cut the Old Fan
Title Doc No: PUMP & EQUIPMENT SERVICE
COMPLETION REPORT CT-4 (Cooling Tower Fan)
Job No:
Page No:
21 Shipyard Road, Singapore 628144. Tel: 6268 9788 Fax: 6268 9488 URL: http:// www.peceng.com
Old Fan Blade Set Gearbox & Center Hub Condition
Measurement of Tip Clearances Measurement of Blade Pitch Angle
Centre Drive Shaft & Coupling Gearbox and Coupling
Cut the Old Fan Blades Before Dismantling Condition
Doc No: MCY-SR-ROT-0032 Job No:
- Page No:
5 of 11
Gearbox & Center Hub Condition
Measurement of Blade Pitch Angle
Gearbox and Coupling
Before Dismantling Condition
Date : Title
14 Oct 2014
Rev. No. 0
PEC LTD. 21 Shipyard Road, Singapore 628144. Tel: 6268 9788 Fax: 6268 9488URL: http:// www.peceng.com
Supervisor In-charge :
Engineer In-charge :
Reviewed & Checked By :
Measure the Tip Clearance
Install back the vibration
Check Manual R
Title Doc No: PUMP & EQUIPMENT SERVICE
COMPLETION REPORT CT-4 (Cooling Tower Fan)
Job No:
Page No:
21 Shipyard Road, Singapore 628144. Tel: 6268 9788 Fax: 6268 9488 URL: http:// www.peceng.com
ZT Date : 14.10.20
MWN Date : 14.10.2014
WTA Date : 14.10.2014
Measure the Tip Clearance Tightening of Bolts
Install back the vibration Switch Topping up New Gearbox Oil
Manual Rotation Install the Seal D
Doc No: MCY-SR-ROT-0032 Job No:
- Page No:
7 of 11
.2014
14.10.2014
14.10.2014
of Bolts
Topping up New Gearbox Oil
Install the Seal Disc