Photos: © EDF media library - Alexis Morin - Antoine Soubihou/All rights reserved. Flamanville 3 project, Communication EPR FLAMANVILLE 3 June 2017: The latest news in pictures

EPR FLAMANVILLE 3 · Installation of a spent fuel storage rack. These racks are used for storing spent fuel inside the spent fuel pool cooling compartment. Safeguard buildings

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EPR FLAMANVILLE 3 · Installation of a spent fuel storage rack. These racks are used for storing spent fuel inside the spent fuel pool cooling compartment. Safeguard buildings

Photo

s: ©

ED

F m

edia

lib

rary

- A

lexis

Morin

- A

nto

ine S

oubih

ou/A

ll rig

hts

reserv

ed.

Fla

manvill

e 3

pro

ject,

Com

munic

atio

n

EPR FLAMANVILLE 3 June 2017: The latest news in pictures

Page 2: EPR FLAMANVILLE 3 · Installation of a spent fuel storage rack. These racks are used for storing spent fuel inside the spent fuel pool cooling compartment. Safeguard buildings

Reactor building Dry testing of the refuelling machine.

Page 3: EPR FLAMANVILLE 3 · Installation of a spent fuel storage rack. These racks are used for storing spent fuel inside the spent fuel pool cooling compartment. Safeguard buildings

Reactor building For the purpose of these tests, a dummy assembly (replicating the exact characteristics of a

fuel element) is used to adjust the machine’s movements.

Page 4: EPR FLAMANVILLE 3 · Installation of a spent fuel storage rack. These racks are used for storing spent fuel inside the spent fuel pool cooling compartment. Safeguard buildings

Reactor building Workers installing instrumentation on the vessel closure head. This instrumentation

will be used for the on-line monitoring of reactivity inside the reactor core.

Page 5: EPR FLAMANVILLE 3 · Installation of a spent fuel storage rack. These racks are used for storing spent fuel inside the spent fuel pool cooling compartment. Safeguard buildings

Reactor building Worker applying orbital welds to an instrumentation pipe.

Page 6: EPR FLAMANVILLE 3 · Installation of a spent fuel storage rack. These racks are used for storing spent fuel inside the spent fuel pool cooling compartment. Safeguard buildings

Fuel building Installation of a spent fuel storage rack. These racks are used for storing spent fuel inside the

spent fuel pool cooling compartment.

Page 7: EPR FLAMANVILLE 3 · Installation of a spent fuel storage rack. These racks are used for storing spent fuel inside the spent fuel pool cooling compartment. Safeguard buildings

Safeguard buildings Workers installing emergency batteries that are capable of powering safety

components and instrumentation & control systems.

Page 8: EPR FLAMANVILLE 3 · Installation of a spent fuel storage rack. These racks are used for storing spent fuel inside the spent fuel pool cooling compartment. Safeguard buildings

Safeguard buildings Worker sealing the frame around the permanent hatches of handling penetrations.

Page 9: EPR FLAMANVILLE 3 · Installation of a spent fuel storage rack. These racks are used for storing spent fuel inside the spent fuel pool cooling compartment. Safeguard buildings

Safeguard buildings Workers testing one of the safety injection pumps.

Page 10: EPR FLAMANVILLE 3 · Installation of a spent fuel storage rack. These racks are used for storing spent fuel inside the spent fuel pool cooling compartment. Safeguard buildings

Safeguard buildings Worker installing flow-monitoring sensors after completion of hydrostatic tests on the

safety injection system.

Page 11: EPR FLAMANVILLE 3 · Installation of a spent fuel storage rack. These racks are used for storing spent fuel inside the spent fuel pool cooling compartment. Safeguard buildings

Turbine building Workers installing permanent heat insulation on moisture separator reheaters.

Page 12: EPR FLAMANVILLE 3 · Installation of a spent fuel storage rack. These racks are used for storing spent fuel inside the spent fuel pool cooling compartment. Safeguard buildings

Turbine building The three condensate extraction pumps (CEX) are started up for the first time.

Page 13: EPR FLAMANVILLE 3 · Installation of a spent fuel storage rack. These racks are used for storing spent fuel inside the spent fuel pool cooling compartment. Safeguard buildings

Pump house Worker applying paint to indicate the position of fire-fighting equipment.

Page 14: EPR FLAMANVILLE 3 · Installation of a spent fuel storage rack. These racks are used for storing spent fuel inside the spent fuel pool cooling compartment. Safeguard buildings

Site The northern gatehouse’s turnstiles have been installed …

Page 15: EPR FLAMANVILLE 3 · Installation of a spent fuel storage rack. These racks are used for storing spent fuel inside the spent fuel pool cooling compartment. Safeguard buildings

Site … and now for the foundation slab supporting the outdoor turnstiles.

Page 16: EPR FLAMANVILLE 3 · Installation of a spent fuel storage rack. These racks are used for storing spent fuel inside the spent fuel pool cooling compartment. Safeguard buildings

View of the Flamanville-3 EPR construction site – 22 June 2017