ENW208 - Cupola 5 Shelter - FEB 07

Embed Size (px)

Citation preview

  • 8/13/2019 ENW208 - Cupola 5 Shelter - FEB 07

    1/4

    WHITEFIELD ROAD,BREDBURY, STOCKPORT

    CHESHIRE, SK6 2SSUNITED KINGDOM

    Tel: +44 (0(161 430 6618Fax: +44 (0)161 430 7928

    EMAIL: [email protected]

    CUPOLA decon 5

    oll Free: 1800 671 864 E-mail: [email protected] Visit: www.enware.com.aunware Australia Pty Limited: 9-11 Endeavour Road, Caringbah, NSW 2229 Australia

    Tel: +61 2 9525 9511 Fax: +61 2 9525 9536nware Asia Safety System Pte Ltd: Block 1003 TOA PAYOH Ind Park #02-1519 Singapore, 319075

    Tel: +65 6536 2687 Fax: +65 6536 2689

  • 8/13/2019 ENW208 - Cupola 5 Shelter - FEB 07

    2/4

    WHITEFIELD ROAD,BREDBURY, STOCKPORT

    CHESHIRE, SK6 2SSUNITED KINGDOM

    Tel: +44 (0(161 430 6618Fax: +44 (0)161 430 7928

    EMAIL: [email protected]

    CU

    OL

    C UP

    OL Ae

    on

    d e

    c on 5

    WARRANTY INFORMATION

    he model offered would be guaranteed against bad workmanship or faulty materials for a period of 12onths from despatch our works.

    TECHNICAL SPECIFICATION

    MATERIALS DIMENSIONS (ERECTED)

    natable Frame: Neoprene coated polyester Length: 5450 mm

    iner: Polyurethane coated polyester Width: 4000 mm

    ump: Nylon/butyl/nylon Height: 3000 mm

    ection Partitions: Polyurethane coated polyester ordage: Terylene or nylon

    DIMENSIONS (PACKED)

    VALVES Length: 1400 mm

    nate only: Rectus type 25 KS NW 7.8 Width: 680 mmnate/Deate: Type A5 Height: 750 mm

    elief: Mirada 0.2 bar Weight: 150 kgs

    MISC Water Flow Rate: 75 Litres/minuteWater Inlet Size & Type: 2 off 19mm( inch) Geka quick

    coupling

    ssembly Time: Less than 8 minutes

    TN

    YR

    E

    TN

    YR

    E

  • 8/13/2019 ENW208 - Cupola 5 Shelter - FEB 07

    3/4

    WHITEFIELD ROAD,BREDBURY, STOCKPORT

    CHESHIRE, SK6 2SSUNITED KINGDOM

    Tel: +44 (0)161 430 6618Fax: +44 (0)161 430 7928

    EMAIL: [email protected]

    he CUPOLA decon 5 is a multi-personnel Rapid Decontamination Shelter comprising aavy-duty inatable frame and removable, disposable inner lining, which incorporates anegral sump tted with drain outlets in each corner. The inner lining has ve separate walk-

    rough sections, each of which can accommodate three-stage decontamination. The rstbicle (Stage 1) is used for de-robing and, if required, initial showering involving inducedditive or detergent, the centre cubicle (Stage 2) is where the main showering takes place,d the nal cubicle (Stage 3) is for re-robing. The rst stage cubicles can be tted withnd-held shower units which can be fed from separate Chemical Inducers to dose the waterth detergent/additive at different concentrations and with different additives. The second

    age cubicles can either be tted with high ow rate hand-held shower units or xed multi-zzle showers for thorough rinse down ensuring the safe removal of all contaminants andcontamination agents. When the CUPOLA decon 5 is not in use it is stored in a valise-type

    orage bag along with a hand pump, repair kit, guy lines, mallet and pegs.he unit is exceptionally stable even in strong blustery winds. The arch shape of the heavy-duty

    atable frame is designed to deect wind and increase stability and therefore minimize the effectthe structure. In addition, the shelter can be anchored using the tted guy lines pegged to the

    ound or to xed structures. The frame is made from a tough, neoprene coated polyester material,d is tted with pressure relief valves to prevent over-pressurisation. The inner lining is removabler easy and safe disposal, and is made from a bright yellow uorescent coated polyester to ensureaximum internal light during the day and night (all lighting external).he CUPOLA decon 5 can be accessed from both sides but is intended for the movement ofsualties in one direction only. The entrance and exit sides are clearly marked for instantcognition and casualties are guided through each stage of the process with pictograms indicatinge action to be taken and the direction of movement. Interchangeable pictogram signs are ttedove each entrance which allows the operators to section off the decontamination units dependentgender or for clearly marking which cubicles are being used for stretchered casualties.

    he shelter is tted with removable internal partitioning which separates the unit into ve sections,th three cubicles in each section. The rst and second cubicles can be tted with trigger operatednd-held showers incorporating multi-function spray heads which are suspended on 1.5 metresng exible hoses. These are connected by self-sealing auto shut-off valves to the external mainater feed pipes which consist of 19mm() lay-at hose fed from 19mm() Geka quick couplings.etergent can be added to the shower warm water supply for more effective decontamination usingternal Chemical Inducers tted in the supply line. The double chamber inducers have provisionr the introduction of one or two water additives depending on the type contamination. They can bedividually adjusted to deliver a concentration between 0.2% and 10% depending on the type of united and the selected inducer setting. The two inducer chambers can operate in parallel or seriesoffer a choice of congurations to suit the particular circumstances. Detergent may be introducedthe supply for the rst cubicle only or for both the rst and second cubicles in each sectionpending on circumstances. Alternatively, water feeding the shower in the second cubicle couldve a different additive, such as saline solution.

    CU

    OL

    C UP

    OL Ae

    on

    d e

    c on 5

    ote: photo showing yellow inner lining (military version in drab olive green).

  • 8/13/2019 ENW208 - Cupola 5 Shelter - FEB 07

    4/4

    me or all of the internal partitions can be removed to reduce the number, but increase the size ofbicle, offering an exceptionally flexible arrangement to suit a wide range of likely scenarios. Twothe five sections, for example, could be designated for stretchered casualties and the internalrtitions removed to create one large cubicle while the other three sections continue to offer 3 stagecontamination using separate cubicles. Stretchers can be supported and manoeuvred on anoptional free-standing fold-out Roller Bed that stretches the full length of the designated section.

    hen not in use the hinged Roller Bed sections fold up for compact storage and easy handling.ternatively, all internal partitions can be removed and the shelter, with entrance and exit openingsosed, can provide communal protection against the weather.e integral nylon/butyl/nylon sumps are incorporated within the lining, one below the mainowering areas (Stage 1 + Stage 2), and the other below the Stage 3 re-robing area. This is tosure that no contaminated water is present in the clean drying and re-robing area. All used water isntained in the sump of Stage 1 + 2 and can be pumped out for safe testing and disposal from themm() outlets fitted to each of the four corners. Plastic Floor Panels are laid over both the sumpsensure users are not standing in the contaminated wash-off. For transportation and storage theoor Panels can be stacked. In addition, Floor Matting can be laid over the panels for comfort andfety. This matting can be colour coded to avoid confusion during set-up.30cm(12) diameter ventilation tube, suspended from the roof lining, can be connected to a portableternal Warm Air Heater/ Ventilation Fan. This heater/fan can be switched to fan only to increase

    circulation in the summer months. Four weatherproof air vents are also fitted in the roof sectionr improved ventilation.

    UNIQUE DESIGN DETAILS

    The unit can be operational within 8 minutes.Arched shaped heavy duty frame - to withstand extreme weather conditions including blusterystorms.2-Stage showering system with additive inducing - for total flexibility of use.Shower system capable of being connected to Chemical Inducers and Water Heater - forimproved decontamination action.Choice of shower head configuration - ensuring a thorough final wash down.External water feed pipe - outside contaminated area, avoiding contamination.Fluorescent yellow inner lining - to ensure maximum internal light during day and night.Removable and replaceable inner lining - for safe disposal or decontamination, and inexpensivereplacement.Integral sumps with four waste outlets - for easier removal of contaminated wash-off.

    . Sumps made from materials used by the military for NBC protection.. Sumps designed to accept standard Floor Panels - for comfort and safety.. Separate clean area sump - to avoid cross contamination.. 30cm(12) diameter ventilation tube fitted - to accept Warm Air Heater/Ventilation Fan.

    4. Weatherproof air vents - to improve air circulation.. Removable curtains - for a choice of cubicle configurations from 1 to 15.

    6. Zip doors - to eliminate overspray and allow easy access.

    ANCILLARY EQUIPMENT APPLICABLE FOR USE WITH THIS PRODUCT

    15 off Floor PanelsFloor MattingWaste Water Pump6000 Litre Portable Reservoir Waste ReceptaclesWaste Outlet HoseTwin Inducer Water Inlet Manifold

    Air Regulator & Hoses Air Inflator (Electric)

    Portaheater 100

    Misc HosesWarm Air Heater Light UnitsGenerator SetsMisc Electrical Connection Wires &Extension CablesThermal Cover (or Camouflage Cover)43 Litre Stacking Decon TraysPortable Ultrasonic Atomizer Portable Air Movement FanRoller Bed

    C UP

    OL A

    d e c on1

    nware Australia Pty Limited: 9-11 Endeavour Road, Caringbah, NSW 2229 AustraliaTel : +61 2 9525 9511 Fax: +61 2 9525 9536

    WHITEFIELD ROAD,

    oll Free: 1800 671 864 E-mail: [email protected] Visit: www.enware.com.au

    nware Asia Safety System Pte Ltd: Block 1003 TOA PAYOH Ind Park #02-1519 Singapore, 319075Tel: +65 6536 2687 Fax: +65 6536 2689W208 Cupola 5 Shelter FEB 07