8/12/2019 Environmental Monitoring Report_Nov 14, 2013.pdf
1/18
1
Field Report
Environmental MonitoringNovember 13, 2013
To: Mr. Yogendra Kumar Karki, Project Director, PACT
Dr. Birendra Bir Basnet, M&E Specialist, TSG/PACTMs. Menaka Pant, Environment Specialist, RTSG/PACTMr. Ashok Paudyal, M&E Specialist, RTSG, Pokhara/PACT
Mr. Keshav Nepal, M&E Specialist, RTSG, Kathmandu/PACT
From: Niranjan Shrestha, Environment Specialist, TSG/PACT
Main Objective:
Environmental Monitoring of PACT sub-projectsSpecific Objectives:
Assess whether the current sub-projects have appropriately followed environmental andsocial mitigation measures as has been advised/guided by the RTSG environmentspecialist
Advise grant applicants and recipients to prepare environmental code of practices andenvironmental management plan in accordance with project's ESMF
Assist RTSG towards the implementation of project's ESMF Supervise and monitor the performance of environment specialist working at regional
level as part of RTSG recruited by the DVN-JV
Assist RTSG to appropriately apply ESMF within value chain development plans(VCDPs);
Guide/support RTSG in providing to sub-projects to follow ESMF guidelines andenhance their awareness regarding environmental and social issues
Review codes of practices, EMP and other environmental documents submitted by GRsand advise PMT/GEED on their quality and status
Assist RTSGs to undertake trimester environmental monitoring and reportingActivities:
Field observation Interview with sub-project Manager/Chairperson Interaction with members of Farmers Group/shareholder of cooperative
8/12/2019 Environmental Monitoring Report_Nov 14, 2013.pdf
2/18
2
Environmental Monitoring of Sub-Projects
S.N. Name of Sub-
project, address,
Thematic Area,
monitoring date Key findings Recommendation
1. Bhaltar Dairy,Baireni -8, Bhaltar
Dairy Processing
September 29, 2013 Building under construction Milk collection centre is in operation Sanitation condition of milk collection centre and
used utensils is poor.
Environmental Code of Practice not found in site
Stockpiling of construction material to be improved. Regular cleanliness is necessary in milk collectio
centre to improve the sanitation condition.
Sanitation of used utensils and equipment to bimproved
Awareness on hygienic milk collection practice inecessary.
Waste water from dairy processing should bdischarged without polluting the surroundin
environment.
Environmental code of practice should be preparedand kept in project site
2. Mahankal Dairy,Baireni -8, Galchhi
Dairy Processing
Ishwori Prasad
Dhital, Sub-project
manger, September
29, 2013
Refrigerated Showcase for dairy products Sanitation and hygienic practices of dariy
processing still need improvement
ECoP prepared and kept in dairy processing site
Regular cleanliness is necessary in milk collectiocentre to improve the sanitation condition.
Sanitation of used utensils and equipment to bimproved
Awareness on hygienic milk collection practice inecessary.
Waste water from dairy processing should bdischarged without polluting the surroundin
environment.
3. AandhimulVegetable ProducersCo-operative Pvt.,
Bandipur-8
Yampha, Phant,
Vegetable
September 29, 2013 Compound wall constructed for the vegetablecollection centre. Toilet construction complete At present, no construction activities ongoing
Waste collection point should be allocated within thcompound for vegetable waste produced from thcollection centre
Environmental Code of Practices should be preparedkept in project site and implemented strictly.
4. Namuna Gai Farm(Namuna Cow
Farm), Bandipur-8
Yampha Phant,
milk production
Chandra Paudel,
Sub-project
manager,
September 29,
2013, October
24, 2013
Construction of cow shed and compound wallcompleted
Cows are kept in shed. Environmental Code of Practice not yet prepared.
Maintain regular cleanliness of cowshed. Livestock urine should be collected in certain place. Initiative to be taken for improved livestock manure Environmental code of practice should be prepared
and kept in project site
5. Agriculture Jhalak Man E-telecentre now in operation for sharing and Farmers to be targeted as beneficiary
8/12/2019 Environmental Monitoring Report_Nov 14, 2013.pdf
3/18
3
Information &
Study Consultancy
Center, (AISCC)
Pokhara,
vegetable
Shrestha, Chairman,
September 29, 2013
dissemination of agricultural information
Affiliated cooperatives are 4 Mainly used for daily price inquiry and market
information for vegetables
Training provided to 200 person Well equipped audio-video resource centre Support agricultural line agencies Agricultural price information updated once a day
Website should be developed and regular updated It may collaborate with concerned government lin
agencies, public and private institutions for th
sustainability.
6. Baral FeedIndustries (Phewa
Meat Products),Pardi
Birauta,Pokhara, -17
Meat processing
Surya Prasad Baral,
Sub-project
manager, September30, 2013
Building construction and installment ofmachineries and equipment complete.
Meat processing activities ongoing Environmental code of practice not yet prepared. Training and safety measures provided to workers
for their personal safety during meat processing.
Provision of separate dress and dress changingroom for meat processing workers found
Waste water treatment process is necessary for thwaste water coming from meat processing
Hygienic meat processing practices should bfollowed strictly.
Necessary training, awareness should be provided tworkers on hygienic practices and personal safety.
Environmental Code of Practice should be prepareand kept in site.
Training should also be provided to farmers ohygienic meat production.
7. Jana Kalyan KrishiSahakari Sanstha,
Ropeway,
Jagatbhanjuang-2,
Triyasi
vegetable
Humnath
Lamichhane, sub-
project manager,
October 1, 2013,
October 25, 2013
Planned to operate ropeway two hour a day It takes 58 seconds to complete one cycle 120 kg (90 kg from upside and 3o kg from
downside)
120kg in 3 minute (18 quintal in 1 hour) Support for agriculture extension Approach road and station Land acquired in
company name
23 trees cut down in Community forest Community forest in Waling Municipality and
Jagat Bhanjyang VDC
Public land in upper station, permission takenfrom VDC
160HH engaged in vegetable farming, Pitlek Construction of gravity ropeway almost
completed except extension of ropeway cable.
Project has followed all required legal procedureto acquire land for the gravity ropeway station.
Necessary procedure followed to cut down treesof community forest and to relocate electricity
transmission line along the ropeway alignment.
Compensatory plantation to be done for cut downtrees as per forest act and rule.
Compensatory plantation should be done for the cudown trees as per Forest Act and Rule.
Training on operation and personal safety should bprovided to ropeway operators.
There should be provision of maintenance fund fothe regular repair and maintenance of gravit
ropeway. Waste materials that may be collected in gravit
ropeway station should be disposed properly
(composting, disposal at designated place)
Environmental Code of Practice should be prepareand kept in site.
8/12/2019 Environmental Monitoring Report_Nov 14, 2013.pdf
4/18
4
Environmental Code of Practices not yet prepared8. Ginger production
cooperative, Palpa,
Bheshraj Timalsina,
Sub-Project
Manager, Parvas,
Tansen
Ginger
October 2, 2013 Established in 2061BS Product: ginger, dry ginger, turmeric, powder Direct beneficiary: 5 cooperative, 2200 ginger
farmer, processing starts only after PACT support
Direct beneficiary from cooperative: 908 Last year, 55 quintal, 18 quintal still remaining Spice traders 200 ton fresh ginger purchased Last year, 15 ton ginger processed, ginger slices,
powder, 4 quintal powder, price for fresh ginger:40-60/kg
5kg fresh ginger equals 1 kg dry ginger 5 ton dry ginger slice, Beneficiaries: 908, women: 371, Dalit: 44,
Janajati: 496, Brahmin/Chhetri: 440
New collection centre building underconstruction, present office on rent 10,000/month
Collection, sell and purchase, loading andunloading, machineries will be installed in
collection centre
Building in own land (10 Aana) Environmental code of practices not yet prepared.
Construction site should be made neat and clean aftethe completion of work.
All the ginger processing machineries should binstalled properly and machines operators should b
trained for the safe operation.
Ginger storage place should be maintained as dry, neaand clean not to deteriorate the ginger quality an
pollute the environment.
Slope protection wall is necessary in southern aneastern side of the building.
Environmental Code of Practices should be preparedand implemented strictly.
9. Devdaha MilkProducer Co-
operative Ltd.,
Devdaha-3,Khaireni Bazar
Milk processing
Prakash Aryal, sub-
project manager,
October 2, 2013
New building for milk collection and processingis under construction
Existing milk collection and processing centre isin operation
Sanitation and hygienic practices of existingcentre observed poor.
Stockpiling of construction material to be done incertain place with safe manner.
Regular cleanliness is necessary in milk collectiocentre to improve the sanitation condition.
Sanitation of used utensils and equipment to bimproved
Awareness on hygienic milk collection practice inecessary.
Waste water from dairy processing should bdischarged without polluting the surroundin
environment.
Environmental code of practice should bimplemented strictly.
10. Radhakrishna MilkProducer Co-
operative Ltd.,
October 2, 2013 New building for milk collection and processingis under construction
Stockpiling of construction material to be done incertain place with safe manner.
8/12/2019 Environmental Monitoring Report_Nov 14, 2013.pdf
5/18
5
Devdaha-4,
Khaireni bazaar
Milk processing
Existing milk collection and processing centre isin operation
Sanitation and hygienic practices of existingcentre observed poor.
Environmental Code of Practices not found insite.
Regular cleanliness is necessary in milk collectiocentre to improve the sanitation condition.
Sanitation of used utensils and equipment to bimproved
Awareness on hygienic milk collection practice inecessary.
Waste water from dairy processing should bdischarged without polluting the surroundin
environment.
Environmental code of practice should be preparedand implemented strictly.
11. Belbas MilkProducer Co-
operative Ltd.,
Pokhari Bhanjayan-
1, Belbas
Milk processing
Ishwor Tiwari, sub-
project manager,
Laxmi Kanta
Mishra, Secretary,
October 24, 2013
New building for milk collection and processingis completed
Existing milk collection and processing centre isin operation
Everyday milk collection is 900 litre at present. Milk is collected from 65 farmers of Pokhari
Bhanjyang VDC. ( 1 dalit, women: 17, male: 48)
Direct employment: 7, indirect employment: 3 Dairy product varieties are milk, butter, ghee,
khuwa, ice cream, lassi, paneer, cream
Water quantity required everyday is 300 litre,adequate supply of water is available.
Purchase and installment of machineries stillremaining.
Sanitation and hygienic practices of existingcentre observed poor.
10 cowsehd are improved among 40 cowshed., Noof artificial inseminated livestock: 400, livestock
health check up: 200, forage seed distribution
Environmental Code of Practices not found insite.
Stockpiling of construction material to be done incertain place with safe manner.
Dust should be control to enter in milk processingplace, since the site is attached to the road. Use o
tight glass door may be the option.
Regular cleanliness is necessary in milk collectiocentre to improve the sanitation condition.
Sanitation of used utensils and equipment to bimproved
Awareness on hygienic milk collection practice inecessary.
Waste water from dairy processing should bdischarged without polluting the surroundin
environment.
Training is necessary to workers for safe operation odairy processing machines.
Farmers should be made aware on hygienic milkproduction.
Environmental code of practice should be preparedand implemented strictly.
12. District Co-operative Federation
Ltd., Vyas-2,
Damauli, Oct 25,
2013
Meat processing
Purushottam
Kafle,Chairman,
October 24, 2013
Available land for the meat processing site is 3ana 1 paisa 1 dam (0-3-1-1)
About 0-3-0-0 public land on the side of river istaken on lease from municipality after completing
all legal procedures. The public land is protected
through compound wall construction.
New meat processing building construction
Access road up to meat processing site should bimproved.
Protection measures including construction of gabiowall, plantation is necessary along the bank of Buld
Khola in eastern side of the meat processing site
Adequate occupational safety measures should bprovided to personnel involved in meat processing.
8/12/2019 Environmental Monitoring Report_Nov 14, 2013.pdf
6/18
6
almost completed.
Goat shed and worker residence building alsoconstructed.
Compost pit constructed for the disposal of wastematerials from meat processing.
Meat processing activities not yet started. 10 cubic meter biogas plant is constructed. Daily target of meat processing is 150kg., direct
employment: 11, indirectly benefitted farmers:
200, goat keeping training to be provided to 200
person (25 x 8), hygienic meat processing trainingto be provided to 8 person
Environmental Code of Practices not yet prepared
Hygienic meat processing practices should bfollowed strictly.
Hygienic meat processing practices (sanitation oworkers, utensil, equipment, dairy processing plac
and surroundings should be ensured.
Necessary training, awareness should be provided tworkers on hygienic practices and personal safety.
Meat processing site should be maintained neat andclean.
Disposal of waste from meat p rocessing site should bstrictly prohibited.
Environmental Code of Practice should be prepareand kept in site.
13. Tanahu DistrictMilk Producer's Co-
operative Union,
Vyas-2, Damauli,
milk processing
Raju Bhujel, sub-
project manager,
Amar Bahadur
Kunwar, Chairman,
October 24, 2013
Building construction completed Purchase and fittings of machinery and equipment
ongoing
Dairy processing activities ongoing. Beneficiary household: 479, Shareholder: women: 162, male: 317 Beneficiary Dalit: 89, Janajati: 233 Daily milk collection: 3,000 litre Dairy product: yoghurt, paneer, ghee, butter,
icecream
No of farmers trained for hygienic milkproduction: 30
2 ropani land is purchased in institution'sownership for construction of dairy processingbuilding
10 x 12 feet soak pit constructed for waste watercollection.
Compound is fenced with wire for the safety andsecurity.
One month machinery operation training will beprovided to workers through the person who came
from factory for machinery installment.
Direct employment: 17, there are 4 outlets inDamauli, direct employment target is 35.
Environmental Code of Practices not yet prepared. There's no waste water treatment facility for the
Hygienic dairy processing practices to be furtheimproved.
Hygienic dairy processing practices (sanitation oworkers, utensil, equipment, dairy processing plac
and surroundings should be further improved.
Necessary training, awareness should be provided tworkers on hygienic practices and personal safety.
Environmental Code of Practice should be prepareand kept in site.
There should be provision of waste water treatmenfacility immediately.
8/12/2019 Environmental Monitoring Report_Nov 14, 2013.pdf
7/18
7
waste water produced during dairy processing
activities.
14. Gandaki NepalInvestment
Company Pvt. Ltd.,
Farak Chaur, Vyas-
11 and Damauli,
milk processing
Shankar Gharti,
Sub-project
manager, October
24, 2013
Dairy collection and processing activitiesongoing.
Hygienic milk collection and processing practicesare observed to be poor.
Environmental Code of Practices not yet prepared.
Dairy processing site should have the provision oadequate water and electricity supply.
Hygienic dairy processing practices (sanitation oworkers, utensil, equipment, dairy processing plac
and surroundings should be further improved.
Necessary training, awareness should be provided tworkers on hygienic practices and personal safety.
Environmental Code of Practice should be prepareand kept in site.
There should be provision of waste water treatmenfacility before discharging to natural sources of water
15. District CoffeeProducers
Association,
Aviyanpath,Putalibazar
municipality-1,
coffee
Maya Tiwari, sub-
project manager,
October 25, 2013
Building construction for coffee processing placecompleted.
Machineries and equipment purchased. Environmental Code of Practices not yet prepared
Workers should be oriented on safe handling omachines and equipments during coffee processing.
Waste materials produced during coffee processinshould be managed properly. (Collection and disposa
at designated place).
Farmers should be regularly orientated on internacontrol system of organic coffee production
Sub-project should make optimum consideration foinclusion of Women, Dalit, and Indigenous an
Vulnerable people as project beneficiary.
Environmental Code of Practice should be prepareand kept in site.
16. JanamukhiMultipurpose Co-
operative Ltd.,Waling-8, vegetable
Tikaram Regmi,
sub-project
manager, October25, 2013
Environmental Code of Practice not yet prepared. No documentation on use of pesticide and
chemicals (type, quantity, use time, frequency,
precautionary method during use of pesticides)
Environmental code of Practices should be preparedand kept in project site.
Information regarding use of pesticide should bdocumented.
Farmers should be orientated on safe use of pesticide.17. Chandikalika
Coffee, Fruits and
Vegetable Co-
operative Ltd.,
Putali Bazar-8,
honey
Hum Nath Dhakal,
October 25, 2013 Honey production, collection and marketing
ongoing
Environmental Code of Practices not yet prepared Hygienic honey production and collection practice
should be further improved.
Environmental Code of Practice should be prepareand kept in site.
18. Milan MilkProducer Co-
operative Ltd.,
Bodhraj Gaire,
Yagya Pathak,
October 25, 2013
1 ropani land is registered in the name oforganization for the construction milk milk
processing building.
Access road from road head to the building should bconstructed after acquiring public or private as pe
land acquisition act
8/12/2019 Environmental Monitoring Report_Nov 14, 2013.pdf
8/18
8
Tindobate-5,
Pathakhola, dairy
processing
New building for milk processing constructioncompleted.
Access road to recently constructed dairyprocessing building is lacking
Dairy collection and processing activities stillongoing in old office building.
Daily milk collection amount is 350 litre. Direct employment: 2 at present, beneficiary
farmers: 100 (ward no 3, 4 of Tindobate VDC,
Thumpokhara-3 and Pakwadi-2)
Machineries are purchased Hygienic milk collection and processing practices
are observed to be poor.
Environmental Code of Practices not yet prepared.
Dairy processing site should have the provision oadequate water and electricity supply.
Protection measures including construction of slopprotection wall and plantation should be done i
northern side of the building without affecting th
existing foot trail and irrigation channel.
Hygienic dairy processing practices (sanitation oworkers, utensil, equipment, dairy processing plac
and surroundings should be further improved.
Necessary training, awareness should be provided tworkers on hygienic practices and personal safety.
Environmental Code of Practice should be prepareand kept in site.
There should be provision of waste water treatmenfacility before discharging to natural sources of water
19. Gatishil MahilaFarmers Group,
Waling-2, vakunde,
honey
Kabita Tiwari, Sub-
project manager,
October 25, 2013
Honey production, collection and marketingongoing
Environmental Code of Practices not yet prepared Hygienic honey production and collection practice
should be further improved.
Environmental Code of Practice should be prepareand kept in site.
20. Panthi Dairy Pvt.Ltd., Pokhara
Industrial Estate,
Pokhara, dairy
processing
Dharma Raj Panthi,
Sub-project
Manager, October
26, 2013
Building construction completed Purchase and fittings of machinery and equipment
completed
Dairy processing activities ongoing. Environmental Code of Practices not yet prepared. There's no waste water treatment facility for the
waste water produced during dairy processing
activities.
Hygienic dairy processing practices to be furtheimproved.
Hygienic dairy processing practices (sanitation oworkers, utensil and equipment, dairy processin
place and surroundings should be further improved.
Necessary training, awareness should be provided tworkers on hygienic practices and personal safety.
Environmental Code of Practice should be prepareand kept in site.
There should be provision of waste water treatmenfacility immediately.
21. OrganicAgricultural
Cooperative Ltd.
Tutunga,Dhungesanghu,
Pokhara SM City-
15, vegetable
Maya KC,
Chairman, October
26, 2013
Production and marketing of organic vegetableongoing
Organic practices followed for vegetableproduction.
Environmental Code of Practice is prepared inkept in project site.
Regular training, orientation and awareness should bprovided to cooperative members on organi
vegetable production practices.
22. Bhattarai PoultryPvt. Ltd., Lakeside-
Tej Bahadur
Bhattarai, Chairman, Building construction completed. Machinery and equipment fitting ongoing Construction waste and other waste materials fromthe site should be removed and made neat and clean.
8/12/2019 Environmental Monitoring Report_Nov 14, 2013.pdf
9/18
9
6,Pokhara, meat
processing
October 26, 2013 Sedimentation pond for waste water collectionconstructed.
It is expected to come in operation after twomonths
Environmental Code of Practices not yet prepared
Further waste water treatment process is necessary fothe waste water coming from meat processing
Environmental Code of Practice should be prepareand kept in site.
Adequate occupational safety measures should bprovided to personnel involved in meat processing.
Hygienic meat processing practices should bfollowed strictly.
Hygienic meat processing practices (sanitation oworkers, utensil, equipment, meat processing plac
and surroundings should be ensured. Necessary training, awareness should be provided t
workers on hygienic practices and personal safety.
Meat processing site should be maintained neat andclean.
8/12/2019 Environmental Monitoring Report_Nov 14, 2013.pdf
10/18
10
Some Photographs
Vegetable Collection Centre, Triyasi, Waling,Syangja, Janakalyan Agri-Cooperative
Collected tomatoes in vegetable collectioncentre, Waling, Syangja, Janakalyan Agri-
Cooperative
Ropeway under construction, Janakalyan Agri-
Cooperative, Waling, Syangja
Under construction ropeway alignment,
Janakalyan Agri-Cooperative, Waling,
Syangja
Phewa Meat Processing plant, Pokhara Monitoring of Phewa Meat Processing plant,
Pokhara
8/12/2019 Environmental Monitoring Report_Nov 14, 2013.pdf
11/18
11
Phewa Meat Processing plant, Pokhara Interaction with sub-project manager of
Phewa meat, Pokhara
Vegetable collection centre under constructionby Adhimul Vegetable Producers Co-operativePvt., Yamphaphant, Tanahu
Vegetable collection centre underconstruction by Adhimul VegetableProducers Co-operative Pvt., Yamphaphant,
Tanahu
Discussion held during monitoring of MahankalDairy, Galchhi, Dhading
Processing plant of Mahankal Dairy,Galchhi, Dhading
8/12/2019 Environmental Monitoring Report_Nov 14, 2013.pdf
12/18
12
Environmental Code of Practice kept in
Mahankal Dairy, Galchhi, Dhading
Feedback given to Mahankal Dairy
subproject for further improvement of socialand environmental safeguards measures
Under construction building of Valtar Dairy,Dhading
Valtar Dairy processing room, Dhading
Cowshed of Bansun Agro organics Pvt. Ltd.,
Jugedi, Chitwan
Livestock manure, Bansun Agro organics
Pvt. Ltd., Jugedi, Chitwan
8/12/2019 Environmental Monitoring Report_Nov 14, 2013.pdf
13/18
13
Milk Processing plant, Radha Krishna Dairy,
Devdaha, Rupandehi
Building for Milk Processing plant under
construction, Radha Krishna Dairy,Devdaha, Rupandehi
Environmental Code of Practices kept in DairyOffice, Devdaha Dairy
Existing Dairy processing plant, DevdahaDairy
Office Room, Dairy Processing Plant, Devdaha
Dairy
New building for dairy processing plant
under construction, Devdaha Dairy
8/12/2019 Environmental Monitoring Report_Nov 14, 2013.pdf
14/18
14
New collection centre of Ginger Producer'sCooperative in Palpa, under construction
Sub-project manager explaining about theactivities, Ginger Producer's Cooperative in
Palpa
Ginger processing machine in store room,
Ginger Producer's Cooperative in Palpa
Ginger store room, Ginger Producer's
Cooperative in Palpa
Feedback given to Mahankal Dairy, Dhading to
improve the Social and Environmental
Safeguards Measures
Dairy Processing site of Belbas Dairy
Cooperative, Pokhari Bhanjyang-1, Tanahu
8/12/2019 Environmental Monitoring Report_Nov 14, 2013.pdf
15/18
15
Old dairy processing place of Belbas Dairy,
Damauli
Feedback given to Belbas Dairy for
implementation of safeguards measures
Building construction almost completeby
district dairy cooperative for dairy processing,Tanahu
Machines and equipment being installed in
site by district dairy cooperative, Tanahu
Feedback given to District Dairy Cooperativefor implementation of safeguards measures in
dairy processing
Project site for building construction of meatprocessing by District Cooperative
Federation, Tanahu
8/12/2019 Environmental Monitoring Report_Nov 14, 2013.pdf
16/18
16
Compost pit being prepared for waste collection
from meat processing, District Cooperative
Federation, Tanahu
Feedback given to meat processing sub-
project of District Cooperative Federation
for implementation of safeguards measures
Newly constructed building of Milan Dairy
Cooperative for dairy collection and processing,Tindobate, Syangja
Existing Milk Collection Centre of Milan
Dairy Cooperative, Tindobate, Syangja
Feedback given to Milan Dairy forimplementation of safeguards measures
Coffee Collection and Processing Centreconstructed by District Coffee Producers
Association, Syangja
8/12/2019 Environmental Monitoring Report_Nov 14, 2013.pdf
17/18
17
Coffee Processing machines purchased byDistrict Coffee Producers Association, Syangja
Coffee Processing machines purchased byDistrict Coffee Producers Association,
Syangja
Dairy processing site of Panthi Dairy, Pokhara ECoP prepared for Organic VegetableFarming by Organic Agriculture
Cooperative, Pokhara
8/12/2019 Environmental Monitoring Report_Nov 14, 2013.pdf
18/18