Phelan Green Park, Adelanto California
2.9 Mw System
Existing solar field
3
Phelan Green Park, Adelanto California
Biomass Energy Proposal for Phelan Green Park
Construct a clean renewable energy facility on the Phelan Park site consistent with its proposed development plan
Sublease 20 acres from master lease• 4 acres for Biomass Energy System building, access and parking
All system components inside the building 60 foot by 300 foot butler building on a concrete pad No hazardous materials used in process, nor emitted from exhaust stack Stack discharge as clean or cleaner than natural gas discharge Water reclaimed from exhaust sufficient to provide all water needs to facility operations except
for people, restrooms, and fire suppression which need to be from city supply.• 16 acres for green house growing operations supported by the biomass energy facility
Hot water during winter to heat green houses Cold water in summer to regulate temperature for peak summer temperatures Reclaimed water from facility operations available to provide irrigation water to green houses
Jobs Created• 15 full time positions in energy facility• Up to 16 full time positions in green house operations
4
Biomass Energy Proposal for Phelan Green Park
Benefits to Phelan Pinion Hills Community Service District
Sustainable job creation in the renewable energy generation industru
Site improvements• Replacement and repair of all electrical, gas, water and storm water runoff systems • 24,000 sq ft Butler building containing renewable energy facility remains with the site• Ingress and egress roads, access ways and emergency routes repaired and maintained• Enhanced safety, 24/7 operations keep trained staff on site at all times
Local, State and National attention will be drawn to this site when the energy facility comes on line as it will be the first of its kind in the State of California since 1989
5
6
Biomass Energy Facility layout for Biomat Tariff Projects
7
UTILITY INTERCONNECTION
HIGH VOLTAGESWITCHGEAR
TRANSFORMER
GENERATORSWITCHGEAR
STEAM TURBINE
STEAM CONDENSER
AIR COOLEDWATER COOLERFINNED COILS & FANS
PUMP
WATER CLEANUPSYSTEM (ZERO DISCHARGE)
PUMP
GENERATOR
CITY (WELL) MAKEUP WATER& INITIAL FILLS
WATER DEMINERALIZATION& STORAGE TANK
GASIFICATION/COMBUSTIONWITH EXTENDED COMBUSTION
CHAMBER
FUELSPREPAREDBIOMASS
UREA
INJECTION
NOX BOX(SCR)
700oF
1800oF
400oF
180oF
130oF
CONTINUOUSEMISSIONS
MONITORINGSYSTEM
OPACITYOXYGEN
CARBON DIOXIDECARBON MONOXIDENITROGEN OXIDES
SULFUR OXIDES
UREAINJECTION
HIGH PRESSURE WATER
HIGH PRESSURE
STEAM
ASH COLLECTIONBUNKER ASH TO FERTILIZER
OPERATIONS
CYCLONEDUST
COLLECTOR
INDUCEDDRAFT
FAN
WET SCRUBBER
WITHPACKED TOWER
WET ELECTROSTATICPRECIPITATOR
WASTE WATER COLLECTION
HRSG
ECONOMIZER
DWG: EE-BEP-SSD1 06/02/2006
120oF
Envirepel Combustion Technology System Diagram
8
Lincoln Alabama Facility – 19.4 Acre Site
9
R&D Combustion Research Facility – Operating in Lincoln Alabama
10
Landfill Leachate processing line, Operational October 2017
Pre-treatment filter press
Reverse Osmosis unit
Reverse Osmosis feeder and storage tanks
Facility Equipment
11
Combustion Unit Ceramics
Fuel Storage Unit
2.6 Mw Steam Turbine Generator
This equipment has been disassembled for shipment
Phelan Green Park reconstruction schedule 2.9 Mw installed
12
Lease Agreement
Flow Agreement
Interconnect Agreement
Power Purchase Agreement
Design Construction drawn/certified
Throughput Engineering Review on Emissions
Consruction Contract and Guarentee Agreement
Construction Bonding Agreement
Loan Agreemnents
Building Permits
Water/Sewage
Air Permit/Operating Permit
Business Interuption
Construction
Trial/Testing Period
Sep Oct Nov Dec Jan Feb Mar Apr May
2018Commercial operations in May of 2018
13
Biomass Waste to Energy Opportunity – San Diego County
Biomat Tariff opportunity in California
• Requires each of the big 3 utilities in California to purchase up to 250 Mw collectively of power at a starting price of $127.8 per MWHR which can be adjusted up to increase participation
• Limits project size to gross installed capacity of 3 Mw• Provides for less than 6 month timeline to secure long term PPA with Utility• Provides for less than 2 months for interconnection study completion in 12 Kv
circuits allowing for an interconnection virtually anywhere you can obtain land use permits
• There are a minimum of 7 sites where the elements for a successful Biomat project exist in San Diego County
14
Contact Information
Envirepel Energy Inc.
www.envirepel.com
• Anthony J. Arand• 760-994-7922• [email protected]
• Delphine Macy• 619-348-7238• [email protected]
Qualifications and Project info
Submitted to
Phelan-Pinon Hills CSD
Description for expanded operations:Former Meadowbrook
Dairy
Summary Presentation
Current Operations Management Team Experience Update on Current Operations
Proposed Operations Proposed Organic Composting Proposed Renewable Energy
Management TeamCircle Green Inc.
Kevin SuttonOver 25 years in the Environmental Management Field
1983 - Undergraduate Degree in Environmental Studies
1988 - Masters in Urban and Environmental Planning
1985 -1990 Operations - Pacific Environmental Management
1991 -1996 Technical Sales - Greenfield Environmental / Waste Management Inc.
1992 - Registered Environmental Assessor (REA) State of California
1997 - 2007 Owner - Fleet Industries (sold) 1999 - 2008 Owner - Solid Solutions (sold) 2008 - 2009 Consultant -Terra Renewal
Services 2009 - current Partner Circle Green Inc.
Management Team Bill Irwin
Over 25 years in the Waste Management Field
1989 Agromin agricultural and landscape organic soils manufacture. Landscape product Development, Bagged goods & product marketing and development.
1992 -Waste Management Bio Gro Organics Division
1995 – 2009- Carlyle Consulting – Environmental Consultant
1996 – 2000 Member of International Erosion Control Association
1999 – 2002 Santa Clara Organics – On farm organic processing operations
2001 – 2003 Shoreline Organics – Owner permitted composting facility
2001 – 2005 Porterville / Indian Bell – On farm organic processing
2004 – current partner Circle Green Inc. Permitted Site
Relevant Project Experience
Developed a comprehensive program in 1992/1993 for Waste Management and the City of Los Angeles to support AB939.
Assisted in the development criteria for green waste use in agriculture along with Dr. Ben Faber, farm advisor for the University of California Agricultural Extension.
California Department of Forestry (CDF) using mulch for defensible space.
Los Angeles County Fire departments pilot projects at TOYON Canyon Landfill in Griffith Park.
As a member of International Erosion Control Association (IECA). We Worked with CALTRANS to develop and manufacture the first state specified recycled green waste compost blend called Hydropost.
Dust Busters Air and Valley Fever mitigation team
We worked with CALTRANS, Los Angeles and Orange County to do pilot projects during 1994 through 1998 to determine the effects of erosion control on storm water management and natural resource protection.
Santa Clara Organics, we built an onsite agricultural grinding and self use operation on a 1000 acre plus ranch financed by a low interest loan through CIWMB.
Awarded Ventura County Contract to operate agreen waste facility in Ojai.
Shoreline Organics Oxnard California, a permitted composting facility.
Circle Green Inc. DBA Beneficial Ag Services, a permitted composting facility located in Ontario California.
Relevant Project Experience
Current Operations
Started Lease: August 1, 2016
Current OperationsGreen Organic Management
1. Site Management Administrative Security Insurance House Keeping Vector
2. Site Operations Dust Busters Wind Sand Berms Farm Preparation
ProposedComposting Operation
Compost Windrows
Finished Product
Compost Beneficial Reuse
Wind Erosion Dust Berms
Proposed Organic Composting
Permitting Tom Dodson and Associates CEQA Cal Recycle State Water Board New Permit Mojave Air District ETC.
October10, 2017
Don Bartz
Phelan Pinion Hills Community Service District
4176 Warbler Road
Phelan Ca 92371
Dear Mr. Bartz,
Circle Green Inc. appreciates the continued opportunity to work with the Phelan Pinion Hills
Community Service District (CSD). Circle Green started our lease on the 160 acres located on
the former Meadowbrook Dairy on August 1, 2016. We originally proposed a three (3) phase
operation plan that included, 1) organic farming operations, 2) organic green and food waste
composting and 3) green waste to energy operation and other related services. Attached you will
find a Power Point presentation on our current operations and the proposed composting facility.
A second presentation by Enviropel Energy Inc. will discuss the proposed energy facility.
Founded in 2009, Circle Green Inc. is an organic waste management company with its corporate
office in Ontario California. We are a privately held company managed by the owners, Kevin
Sutton and Bill Irwin who both have over 50 years of combined experience in successful
environmental operations. We are a rapidly growing company that works with public and private
entities. Circle Green provides a variety of organic recycling services from collection to finished
recycled products. The Company currently operates a 20 acre green waste processing and
compost facility in the Inland Empire. Our process segregates high BTU bio-mass for green
energy fuel which is sold to bio-mass energy facilities. The residual by-products are processed
into mulch and high grade organic composts for landscaping and agricultural uses. The Company
also operates two organic farming sites in Ontario.
Circle Green Inc. uses several products on company managed farms and other local farms in the
Inland Empire and Lancaster Palmdale area. We provide a rich composted soil amendment to
increase the nutrient value of the soil resulting in higher crop yields and less water usage. This
compost meets all state regulations to insure it was properly made through the time and
temperature rules. We also provide a variety of mulches, ground covers and other mixes to the
farm sites. These products have several benefits such as erosion control, dust control, water
runoff and water retention.
Circle Green will work with the District and third party consultant Tom Dodson & Associates
(TDA) to permit the site for green waste, food waste and related feedstocks. This permit process
will be in accordance with the California Environmental Quality Act (CEQA) and all other local,
State or governmental agencies. Circle Green and TDA are committed to professionally work
with all agencies and local public entities to provide full disclosure and public understanding of
our goals. No human waste will be processed at the facility.
Circle Green at our Ontario, California facility, produces several thousands of tons of processed
green waste for fuel used in co-generation and cement kilns. This service allows these facilities
to use less negatively environmental fuels such as coal, natural gas, used tires and other fuel
sources. The former Meadowbrook dairy compost permit will allow us to expand this operation.
The composting permit will also provide an infrastructure that will secure needed biomass
feedstock for the proposed Energy operations.
Circle Green’s objective is to provide the District significant relief and protection from uncertain
electrical costs. Our proposed energy facility will be designed, permitted, built and operated by
Enviropel.Energy Inc.
We look forward to working with the district on this dynamic environmental project. If you have
any questions, comments or need additional information please contact me at 310-466-8114.
Sincerely,
Kevin Sutton
Circle Green Inc.
Circle Green Inc. 8271 Chino Avenue, Ontario, California 91761