All rights reserved. Enterprise Products Partners L.P. Enterprise Products Partners L.P. Platt’s NGL Conference September 24, 2013 Russ Kovin VP, Regulated Pipelines www.enterpriseproducts.com

Enterprise Products Partners L.P. Platt’s NGL Conference ... · PDF fileThis presentation contains forward-looking statements based on the beliefs of the ... 50,000 miles of natural

Embed Size (px)

Citation preview

All rights reserved. Enterprise Products Partners L.P.

Enterprise Products Partners L.P.

Platt’s NGL Conference

September 24, 2013 Russ Kovin

VP, Regulated Pipelines www.enterpriseproducts.com

All rights reserved. Enterprise Products Partners L.P. 2

Agenda

Enterprise Products Partners Overview Major Enterprise NGL Projects MAPL Rockies Expansion Texas Express Front Range Mont Belvieu Fractionation and Storage ATEX Aegis

All rights reserved. Enterprise Products Partners L.P. 3

Forward–Looking Statements

This presentation contains forward-looking statements based on the beliefs of the company, as well as assumptions made by, and information currently available to our management team. When used in this presentation, words such as “anticipate,” “project,” “expect,” “plan,” “seek,” “goal,” “estimate,” “forecast,” “intend,” “could,” “should,” “will,” “believe,” “may,” “potential” and similar expressions and statements regarding our plans and objectives for future operations, are intended to identify forward-looking statements. Although management believes that the expectations reflected in such forward-looking statements are reasonable, it can give no assurance that such expectations will prove to be correct. You should not put undue reliance on any forward-looking statements, which speak only as of their dates. Forward-looking statements are subject to risks and uncertainties that may cause actual results to differ materially from those expected, including insufficient cash from operations, adverse market conditions, governmental regulations, the possibility that tax or other costs or difficulties related thereto will be greater than expected, the impact of competition and other risk factors discussed in our latest filings with the Securities and Exchange Commission. All forward-looking statements attributable to Enterprise or any person acting on our behalf are expressly qualified in their entirety by the cautionary statements contained herein, in such filings and in our future periodic reports filed with the Securities and Exchange Commission. Except as required by law, we do not intend to update or revise our forward-looking statements, whether as a result of new information, future events or otherwise.

All rights reserved. Enterprise Products Partners L.P. 4

EPD Portfolio of Integrated Assets

50,000 miles of natural gas, NGL, crude oil, refined products and petrochemical pipelines 200 MMBbls of NGL, refined products and crude oil, and 14 Bcf of natural gas storage capacity 24 natural gas processing plants

22 NGL & Propylene fractionators 6 offshore hub platforms NGL import / export terminals (including LPG) Butane isomerization complex; octane enhancement facility; high-purity isobutylene facility

Major Asset Overview

All rights reserved. Enterprise Products Partners L.P. 5

NGL Flows

Inbound

Outbound

Source: EPD Fundamentals

All rights reserved. Enterprise Products Partners L.P. 6

Major NGL Capital Growth Projects Western Pipeline Expansions

MAPL Rocky Mountain Expansion 265 miles of 16” pipeline and pump modifications 10 year ship-or-pay contracts Capacity from 275 MBPD to ≈350 MBPD Expected in-service: 2Q 2014

Front Range JV: Enterprise, Anadarko and DCP 435 miles of 16” pipe; DJ basin to Skellytown; connections to Texas Express and MAPL Capacity: 150 MBPD, expandable to 230 MBPD 10 year ship-or-pay contracts Expected in-service: 4Q 2013

Texas Express JV: Enterprise, Enbridge, Anadarko and DCP 580 miles of 20” pipe; Skellytown to Mont Belvieu Capacity: 280 MBPD, expandable to 400 MBPD 10 year ship-or-pay contracts Expected in-service: 4Q 2013

All rights reserved. Enterprise Products Partners L.P. 7

MAPL Rocky Mountain Expansion

265 miles of 16" pipeline and pump station modification Anchored by 10-year ship-or-pay transportation agreements Increases capacity from 275 to ≈350 MBPD 2Q 2014 scheduled in-service

Rocky Mountain Expansion

All rights reserved. Enterprise Products Partners L.P. 8

Texas Express NGL Mainline

Joint venture EPD (35%), Enbridge (35%), Anadarko (20%) and DCP (10%) EPD design, construct and operate 580 miles of new 20" pipe from Skellytown to Mont Belvieu Capacity of 280 MBPD expandable to 400 MBPD Anchored by peak 250 MBPD, 10-year ship-or-pay contracts, with additional 5-year plant dedication 4Q 2013 expected in-service

Texas Express NGL Mainline

All rights reserved. Enterprise Products Partners L.P. 9

Texas Express NGL Gathering Systems

Joint venture EPD (45%), Enbridge (35%) and Anadarko (20%) Enbridge design, construct and operate two gathering systems: Elk City gathering: 200-mile

pipeline system with capacity of 125 MBPD connected to 10 plants

North Texas gathering: 70-mile pipeline system with capacity of 24 MBPD connected to 5 plants

Anchored by 10-year ship-or-pay contracts, with additional 5-year plant dedication 4Q 2013 expected in-service

Texas Express NGL Gathering Systems

All rights reserved. Enterprise Products Partners L.P. 10

Front Range NGL Pipeline

Joint venture EPD, Anadarko and DCP (each party owns ⅓ ) EPD design, construct and operate 435 miles of 16" pipe from DJ Basin to Skellytown with connections to Texas Express and MAPL Capacity of 150 MBPD expandable to 230 MBPD Anchored by peak 104 MBPD, 10-year ship-or-pay contracts, with additional 5-year plant dedication December 2013 expected in-service

Front Range

All rights reserved. Enterprise Products Partners L.P. 11

EPD’s Mont Belvieu Complex The World Class Facility Grows

Frac VI

Frac VII

Frac VIII

Source: EPD Fundamentals

Frac VII completed September 2013; Frac VIII expected to be completed in 4Q 2013 With the completion of Frac VIII, EPD’s MTBV fractionation capacity will be >650 MBPD, and system-wide capacity will be >1.0 MMBbls/d (MTBV, South Texas, Hobbs, Louisiana)

Mont Belvieu is the premier option for NGLs Increased shale production has led to higher demand for NGL fractionation at Mont Belvieu Connected to all major NGL Y-grade pipelines Direct access to largest salt dome storage caverns in the world Provides product to all Gulf Coast Ethylene Crackers Global NGL pricing point hub Heart of EPD NGL value chain; essential for LPG exports and other upstream and downstream projects

All rights reserved. Enterprise Products Partners L.P. 12

EPD’s Mont Belvieu Storage Caverns Largest NGL Storage Complex in the World

Frac Area North Storage

East Storage

West Storage

34 existing wells (100 MMBbls) 20+ different products in storage 4 wells (12 MMBbls) in development Infrastructure projects progressing to increase deliverability and reliability Over 100 pipeline interconnects

All rights reserved. Enterprise Products Partners L.P. 13

What Interconnectivity Looks Like MTBV West Storage Header

All rights reserved. Enterprise Products Partners L.P. 14

Major NGL Capital Growth Projects ATEX Pipeline

ATEX Express

1,230 mile pipeline

Capacity: Initial capacity of 125 MBPD, expandable to at least 260 MBPD

15 year ship-or-pay

Expected in-service: 1Q 2014

Considering transportation of propane, and if so, propane movements could begin as early as 2Q 2015

68 81104 116 131

0

20

40

60

80

100

120

140

2014 2015 2016 2017 2018-2028

MBP

D

ATEX C2 Contracted Volumes

Initial Northeast Origins: MarkWest Houston (PA) Blue Racer Natrium (WV) Utica East Ohio Scio (OH) MarkWest Cadiz (OH)

All rights reserved. Enterprise Products Partners L.P. 15

Major NGL Capital Growth Projects Aegis Ethane Pipeline

Aegis Ethane Pipeline 270 mile pipeline system Received commitments in excess of 200 MBPD Route depends on final shipper commitments Expected in-service: 2Q 2014 through 1Q 2015