All rights reserved. Enterprise Products Partners L.P.
Enterprise Products Partners L.P.
Platt’s NGL Conference
September 24, 2013 Russ Kovin
VP, Regulated Pipelines www.enterpriseproducts.com
All rights reserved. Enterprise Products Partners L.P. 2
Agenda
Enterprise Products Partners Overview Major Enterprise NGL Projects MAPL Rockies Expansion Texas Express Front Range Mont Belvieu Fractionation and Storage ATEX Aegis
All rights reserved. Enterprise Products Partners L.P. 3
Forward–Looking Statements
This presentation contains forward-looking statements based on the beliefs of the company, as well as assumptions made by, and information currently available to our management team. When used in this presentation, words such as “anticipate,” “project,” “expect,” “plan,” “seek,” “goal,” “estimate,” “forecast,” “intend,” “could,” “should,” “will,” “believe,” “may,” “potential” and similar expressions and statements regarding our plans and objectives for future operations, are intended to identify forward-looking statements. Although management believes that the expectations reflected in such forward-looking statements are reasonable, it can give no assurance that such expectations will prove to be correct. You should not put undue reliance on any forward-looking statements, which speak only as of their dates. Forward-looking statements are subject to risks and uncertainties that may cause actual results to differ materially from those expected, including insufficient cash from operations, adverse market conditions, governmental regulations, the possibility that tax or other costs or difficulties related thereto will be greater than expected, the impact of competition and other risk factors discussed in our latest filings with the Securities and Exchange Commission. All forward-looking statements attributable to Enterprise or any person acting on our behalf are expressly qualified in their entirety by the cautionary statements contained herein, in such filings and in our future periodic reports filed with the Securities and Exchange Commission. Except as required by law, we do not intend to update or revise our forward-looking statements, whether as a result of new information, future events or otherwise.
All rights reserved. Enterprise Products Partners L.P. 4
EPD Portfolio of Integrated Assets
50,000 miles of natural gas, NGL, crude oil, refined products and petrochemical pipelines 200 MMBbls of NGL, refined products and crude oil, and 14 Bcf of natural gas storage capacity 24 natural gas processing plants
22 NGL & Propylene fractionators 6 offshore hub platforms NGL import / export terminals (including LPG) Butane isomerization complex; octane enhancement facility; high-purity isobutylene facility
Major Asset Overview
All rights reserved. Enterprise Products Partners L.P. 5
NGL Flows
Inbound
Outbound
Source: EPD Fundamentals
All rights reserved. Enterprise Products Partners L.P. 6
Major NGL Capital Growth Projects Western Pipeline Expansions
MAPL Rocky Mountain Expansion 265 miles of 16” pipeline and pump modifications 10 year ship-or-pay contracts Capacity from 275 MBPD to ≈350 MBPD Expected in-service: 2Q 2014
Front Range JV: Enterprise, Anadarko and DCP 435 miles of 16” pipe; DJ basin to Skellytown; connections to Texas Express and MAPL Capacity: 150 MBPD, expandable to 230 MBPD 10 year ship-or-pay contracts Expected in-service: 4Q 2013
Texas Express JV: Enterprise, Enbridge, Anadarko and DCP 580 miles of 20” pipe; Skellytown to Mont Belvieu Capacity: 280 MBPD, expandable to 400 MBPD 10 year ship-or-pay contracts Expected in-service: 4Q 2013
All rights reserved. Enterprise Products Partners L.P. 7
MAPL Rocky Mountain Expansion
265 miles of 16" pipeline and pump station modification Anchored by 10-year ship-or-pay transportation agreements Increases capacity from 275 to ≈350 MBPD 2Q 2014 scheduled in-service
Rocky Mountain Expansion
All rights reserved. Enterprise Products Partners L.P. 8
Texas Express NGL Mainline
Joint venture EPD (35%), Enbridge (35%), Anadarko (20%) and DCP (10%) EPD design, construct and operate 580 miles of new 20" pipe from Skellytown to Mont Belvieu Capacity of 280 MBPD expandable to 400 MBPD Anchored by peak 250 MBPD, 10-year ship-or-pay contracts, with additional 5-year plant dedication 4Q 2013 expected in-service
Texas Express NGL Mainline
All rights reserved. Enterprise Products Partners L.P. 9
Texas Express NGL Gathering Systems
Joint venture EPD (45%), Enbridge (35%) and Anadarko (20%) Enbridge design, construct and operate two gathering systems: Elk City gathering: 200-mile
pipeline system with capacity of 125 MBPD connected to 10 plants
North Texas gathering: 70-mile pipeline system with capacity of 24 MBPD connected to 5 plants
Anchored by 10-year ship-or-pay contracts, with additional 5-year plant dedication 4Q 2013 expected in-service
Texas Express NGL Gathering Systems
All rights reserved. Enterprise Products Partners L.P. 10
Front Range NGL Pipeline
Joint venture EPD, Anadarko and DCP (each party owns ⅓ ) EPD design, construct and operate 435 miles of 16" pipe from DJ Basin to Skellytown with connections to Texas Express and MAPL Capacity of 150 MBPD expandable to 230 MBPD Anchored by peak 104 MBPD, 10-year ship-or-pay contracts, with additional 5-year plant dedication December 2013 expected in-service
Front Range
All rights reserved. Enterprise Products Partners L.P. 11
EPD’s Mont Belvieu Complex The World Class Facility Grows
Frac VI
Frac VII
Frac VIII
Source: EPD Fundamentals
Frac VII completed September 2013; Frac VIII expected to be completed in 4Q 2013 With the completion of Frac VIII, EPD’s MTBV fractionation capacity will be >650 MBPD, and system-wide capacity will be >1.0 MMBbls/d (MTBV, South Texas, Hobbs, Louisiana)
Mont Belvieu is the premier option for NGLs Increased shale production has led to higher demand for NGL fractionation at Mont Belvieu Connected to all major NGL Y-grade pipelines Direct access to largest salt dome storage caverns in the world Provides product to all Gulf Coast Ethylene Crackers Global NGL pricing point hub Heart of EPD NGL value chain; essential for LPG exports and other upstream and downstream projects
All rights reserved. Enterprise Products Partners L.P. 12
EPD’s Mont Belvieu Storage Caverns Largest NGL Storage Complex in the World
Frac Area North Storage
East Storage
West Storage
34 existing wells (100 MMBbls) 20+ different products in storage 4 wells (12 MMBbls) in development Infrastructure projects progressing to increase deliverability and reliability Over 100 pipeline interconnects
All rights reserved. Enterprise Products Partners L.P. 13
What Interconnectivity Looks Like MTBV West Storage Header
All rights reserved. Enterprise Products Partners L.P. 14
Major NGL Capital Growth Projects ATEX Pipeline
ATEX Express
1,230 mile pipeline
Capacity: Initial capacity of 125 MBPD, expandable to at least 260 MBPD
15 year ship-or-pay
Expected in-service: 1Q 2014
Considering transportation of propane, and if so, propane movements could begin as early as 2Q 2015
68 81104 116 131
0
20
40
60
80
100
120
140
2014 2015 2016 2017 2018-2028
MBP
D
ATEX C2 Contracted Volumes
Initial Northeast Origins: MarkWest Houston (PA) Blue Racer Natrium (WV) Utica East Ohio Scio (OH) MarkWest Cadiz (OH)
All rights reserved. Enterprise Products Partners L.P. 15
Major NGL Capital Growth Projects Aegis Ethane Pipeline
Aegis Ethane Pipeline 270 mile pipeline system Received commitments in excess of 200 MBPD Route depends on final shipper commitments Expected in-service: 2Q 2014 through 1Q 2015