Engineering with Engineering with Wood Wood Presenters: David W. Boehm, Presenters: David W. Boehm, P.E. P.E. Gary Sweeny, P.E. Gary Sweeny, P.E. Shear Walls and Diaphragms Why Buildings Don’t Fall Over

Engineering with Wood

Embed Size (px)

DESCRIPTION

Engineering with Wood. Shear Walls and Diaphragms Why Buildings Don’t Fall Over. Presenters: David W. Boehm, P.E. Gary Sweeny, P.E. Plan View. Assume seismic load is also 200 plf. l = 120’. 200 x 40 2 x 120. v ew = w ew x b. =. =. 33 #/FT. 2 x l. 200 x 120 2 x 40. - PowerPoint PPT Presentation

Citation preview

Page 1: Engineering with Wood

Engineering with Engineering with WoodWood

Presenters: David W. Boehm, P.E.Presenters: David W. Boehm, P.E.

Gary Sweeny, P.E.Gary Sweeny, P.E.

Shear Walls and DiaphragmsWhy Buildings Don’t Fall Over

Page 2: Engineering with Wood
Page 3: Engineering with Wood
Page 4: Engineering with Wood
Page 5: Engineering with Wood
Page 6: Engineering with Wood
Page 7: Engineering with Wood
Page 8: Engineering with Wood
Page 9: Engineering with Wood
Page 10: Engineering with Wood
Page 11: Engineering with Wood
Page 12: Engineering with Wood
Page 13: Engineering with Wood
Page 14: Engineering with Wood
Page 15: Engineering with Wood
Page 16: Engineering with Wood
Page 17: Engineering with Wood

Plan View

Page 18: Engineering with Wood
Page 19: Engineering with Wood

Assume seismic load is also 200 plf

Page 20: Engineering with Wood

veu

l = 120’

DIAPHRAGM UNIT SHEARS

wew=

200#/FT

b=40’

wns = 200#/FT

vns = wns x l 200 x 120 2 x 40

300 #/FT= =

vn

s

vew = wew x b 200 x 402 x 120

33 #/FT= =

2 x l

2 x b

Page 21: Engineering with Wood
Page 22: Engineering with Wood

PANEL LAYOUT AND FASTENER SCHEDULE

North-South Loading

Case 1 v = 300 #/FT

Assume 8 d nails

15/32 plywood

2” nominal framing

Choose: Blocked Diaphragm

8 d nails @ 4” panel edges

8 d nails @ 6” interior

East-West Loading

Case 3 v = 33 #/FT

Unblocked 6” max spacing at panel edges

Page 23: Engineering with Wood
Page 24: Engineering with Wood

DIAPHRAGM CHORD SIZE

Moment due to N-S wind

m = wl 2 = 200 1202 = 360,000 FT-LBS 8 8

Axial load in chords = C = T = M = 360,000 ft-lbs = 9,000 LBS b 40 ftAssume allowable ft = 1150 psi

Area required = 9,000# = 7.8 in2

Assume 2 x 8 wall plate, bolted

Area of 2 x 8 with bolt hole

A = 1.5 x (7.25 - .875) = 9.56 in2

Use double 2 x 8 top plate / chord to allow for splice

1150 psi

Page 25: Engineering with Wood

Diaphragm layout

Page 26: Engineering with Wood
Page 27: Engineering with Wood

Shear WallsShear Walls North wallNorth wall v=33 #/ftv=33 #/ft

Nominal nailing requiredNominal nailing required East and west walls v=300 #/ftEast and west walls v=300 #/ft

20’

Shear wall elevation

Nailing pattern

7/16 sheathing2 x studs8d nails @ 4” required

A40’

T C

Vns = 300#/ft(40’) = 12000#

Page 28: Engineering with Wood
Page 29: Engineering with Wood

Tiedown ForceTiedown Force

ΣΣMMA A = 0= 0

0 = (12000 x 20) – (T x 40)0 = (12000 x 20) – (T x 40)

T = 6,000#T = 6,000#

Page 30: Engineering with Wood
Page 31: Engineering with Wood

WALL DESIGN WITH OPENINGS

Page 32: Engineering with Wood

DRAG STRUT / COLLECTOR FORCE

Page 33: Engineering with Wood

OVERTURNING FORCE

Page 34: Engineering with Wood