PROJECT NO. xxx
INSERT DATE
PROJECT NO. G451
12th November 2019
Engineering Services Report
Development at Carpenterstown Road
for GLENVEAGH HOMES LIMITED
Engineering Services Report
Development at Carpenterstown Road
for GLENVEAGH HOMES LIMITED
PROJECT NO. G451
12th November 2019
Engineering Services Report
for
Residential Development,
at Carpenterstown Road,
Dublin 15.
NOTICE
DOCUMENT CONTROL & HISTORY
OCSC
Job
No.:
G451
Pro
ject
Co
de
Orig
inato
r
Zo
ne
Vo
lum
e
Level
File T
yp
e
Ro
le T
yp
e
Nu
mb
er
Sta
tus
/
Su
itab
ilit
y
Co
de
Revis
ion
G451 OCSC XX XX RP C 0001 A1 C03
Rev. Status Authors Checked Authorised Issue Date
C03 A1 MK PR AO’B 12.11.2019
C02 A1 MK PR AO’B 04.11.2019
P05 S2 MK PR AO’B 21.10.2019
P04 S2 DOM MK AO’B 02.10.2019
P03 S2 DOM MK AO’B 16.09.2019
C01 A1 DOM MK AO’B 25.04.2019
P02 S2 DOM MK AO’B 23.04.2019
P01 S2 MK PR AO’B 16.04.2019
This document has been produced by O’Connor Sutton Cronin & Associates for its
client, Glenveagh Homes Limited. It may not be used for any purpose other than
that specified by any other person without the written permission of the authors.
ENGINEERING SERVICES REPORT
TABLE OF CONTENTS PAGE
1 INTRODUCTION ................................................................................... 1
1.1 Appointment................................................................................................................. 1
1.2 Administrative Jurisdiction ............................................................................................ 1
1.3 Site Location ................................................................................................................. 1
1.4 Existing Site Overview ................................................................................................... 2
1.5 Proposed Development Context .................................................................................... 3
2 SCOPE OF SERVICES REPORT ................................................................ 4
3 SURFACE WATER DRAINAGE .................................................................. 6
3.1 Overview ...................................................................................................................... 6
3.2 Consultation ................................................................................................................. 6
3.3 Existing Site Drainage .................................................................................................... 7
3.3.1 Existing Site Catchment Areas ........................................................................................ 7
3.3.2 Existing Surface Water Drainage Infrastructure ............................................................. 8
3.3.3 Existing Site Rainfall Runoff ............................................................................................ 8
3.4 Proposed Surface Water Drainage Design Strategy ......................................................... 9
3.4.1 Proposed Surface Water Strategy Overview .................................................................. 9
3.4.2 Proposed Surface Water Design Criteria ...................................................................... 10
3.4.3 Proposed Surface Water Catchment Areas .................................................................. 11
3.4.4 Proposed Development Rainfall Runoff ....................................................................... 11
3.4.5 Proposed Surface Water Pipe Network Design ............................................................ 12
3.4.6 Proposed Surface Water Attenuation Storage ............................................................. 13
3.5 Specific SuDS Measures Proposed ................................................................................ 14
3.6 Taking in Charge .......................................................................................................... 16
3.7 Maintenance ............................................................................................................... 16
3.8 Surface Water Impact Assessment ............................................................................... 16
3.9 Criterion 1 – River Water Quality Protection ................................................................ 17
3.10 Criterion 2 – River Regime Protection .......................................................................... 17
3.11 Criterion 3 – Level of Service (Flooding) Site ................................................................. 18
3.11.1 Sub-Criterion 3.1 .......................................................................................................... 18
3.11.2 Sub-Criterion 3.2 .......................................................................................................... 18
3.11.3 Sub-Criterion 3.3 .......................................................................................................... 19
3.11.4 Sub-Criterion 3.4 .......................................................................................................... 19
3.12 Criterion 4 – River Flood Protection ............................................................................. 20
4 FLOOD RISK ASSESSMENT .................................................................. 21
4.1 Historical Flooding ....................................................................................................... 21
4.2 Fluvial Flooding ........................................................................................................... 21
4.3 Coastal Flooding .......................................................................................................... 22
4.4 Pluvial Flooding ........................................................................................................... 22
5 WASTEWATER DRAINAGE .................................................................... 24
5.1 Overview .................................................................................................................... 24
5.2 Existing Wastewater Drainage ..................................................................................... 24
5.3 Proposed Wastewater Drainage .................................................................................. 24
5.4 Taking In Charge .......................................................................................................... 25
5.5 Calculations ................................................................................................................ 25
5.6 Consultation ............................................................................................................... 25
6 POTABLE WATER SUPPLY ..................................................................... 27
6.1 Connection to the Existing Network ............................................................................. 27
6.2 Water Saving Devices .................................................................................................. 27
6.3 Water Meters.............................................................................................................. 27
6.4 Layout......................................................................................................................... 28
6.5 Consultation ............................................................................................................... 28
7 ROAD DESIGN .................................................................................. 29
7.1 Site Entrances ............................................................................................................. 29
7.2 Internal Roads ............................................................................................................. 31
7.3 Fire Tender.................................................................................................................. 32
7.4 Traffic Impact Assessment ........................................................................................... 32
APPENDICES
APPENDIX A. FINGAL COUNTY COUNCIL AND IRISH WATER PUBLIC
RECORDS
APPENDIX B. QBAR RUNOFF CALCULATIONS & NETWORK DESIGN TABLES
APPENDIX C. SURFACE WATER DESIGN & ATTENUATION CALCULATIONS
APPENDIX D. WASTEWATER CALCULATIONS & DESIGN NETWORK TABLES
APPENDIX E. IRISH WATER CORRESPONDENCE
APPENDIX F. OPW CATCHMENT FLOOD RISK ASSESSMENT MAPPING
APPENDIX G. CELLULAR ATTENUATION SYSTEM
APPENDIX H. CORRESPONDENCE WITH FINGAL COUNTY COUNCL
APPENDIX I. SITE INVESTIGATION REPORT
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
1
Project: G451 Issued: 12.11.2019
ENGINEERING SERVICES REPORT
1 INTRODUCTION
1.1 Appointment
O’Connor Sutton Cronin & Associates (OCSC) have been appointed by
Glenveagh Homes Limited; to carry out the design of the civil engineering
services associated with the proposed residential development at
Carpenterstown Road, Dublin 15.
1.2 Administrative Jurisdiction
The proposed development is located in the jurisdiction of Fingal County
Council (FCC), and therefore the engineering services design was carried out
with reference to the following:
Fingal County Council Development Plan;
Greater Dublin Strategic Drainage Study (GDSDS);
The Planning System and Flood Risk Management Guidelines for
Planning Authorities (Department of Environment, Heritage and Local
Government and the Office of Public Works);
It is noted that due to the number of residential units proposed as part of the
proposed development, the planning permission is sought through An Bord
Pleanála’s (ABP) Strategic Housing Development (SHD) application process.
1.3 Site Location
The subject site is located at Carpenterstown Road, Dublin 15, as shown in
Figure 1.1 - Site Location, and is immediately bound by:
Carpenterstown Road, to the north;
Existing residential property, to the east;
Existing residential property, to the west;
Existing Diswelltown Way residential properties, to the south.
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
2
Project: G451 Issued: 12.11.2019
Figure 1.1 - Site Location (www.myplan.ie)
1.4 Existing Site Overview
The overall site area is c.1.77-hectares, and is zoned by Fingal County Council
for RS, Residential. This zoning seeks to ‘To provide for residential
development and protect and improve residential amenity’.
The site currently comprises a large residential property, with shed, tennis
courts and significant landscaping and mature trees around the boundary.
Access to the site is currently gained off Carpenterstown Road, at the northern
boundary.
There is an existing open drain alongside the immediate vicinity, external of
the eastern boundary, within third party lands, which does not form part of the
proposed development’s surface water drainage strategy.
A recent topographical survey of the site indicate that the existing ground
levels across the overall site are typically graded from the highest point of
approximately +61.5m, in the southwest corner, to the lower level of
approximately +59.5 AOD, at the north-eastern corner. The finished floor level
Diswelltown Way
Carpenterstown Road
Site Area
M50 Motorway
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
3
Project: G451 Issued: 12.11.2019
of the existing dwelling and stables / shed on site are +61.2m AOD and
+61.39m AOD respectively.
The existing levels on Carpenterstown Road, which aligns the northern
boundary of the site, vary from approximately +60.80m AOD, at a location
adjacent to the northwest corner of the site, to approximately +59.31m, at a
location adjacent to the north-eastern corner.
The above illustrates that the site, in its existing condition, is typically at or
above levels of the adjacent Carpenterstown Road.
1.5 Proposed Development Context
The proposed development will consist of the demolition of the existing
residential property and the construction of 5nr. blocks of apartments, totalling
192nr. residential units. There is to be a basement car park located under
Blocks C, D and E of the proposed development site. Refer to Figure 1.2 for
details of proposed site layout.
Entrance to the site will be provided via a new entrance at the north east corner
of the site, while an additional site exist will be provided at the location of the
existing entrance at the Carpenterstown Road boundary. Intensive landscaping
and associated infrastructure will be provided throughout, in order to serve the
proposed development.
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
4
Project: G451 Issued: 12.11.2019
Figure 1.2 - Proposed Site Layout
2 SCOPE OF SERVICES REPORT
This Engineering Services Report was prepared by reviewing the available data
from the Local Authority sources and national bodies i.e. Fingal County Council,
Irish Water, The OPW, and the wider Design Team. The report addresses the
following services with respect to the proposed development:
Surface Water Drainage;
Flood Impact Assessment;
Wastewater Drainage;
Potable Water Supply;
This report should be read in conjunction with the following OCSC Civil Engineering
design drawings:
G451-OCSC-XX-XX-DR-C-0101– Visibility Splay
G451-OCSC-XX-XX-DR-C-0102– Indicative Carpenterstown Road Cycle
Scheme Land Requirement
G451-OCSC-XX-XX-DR-C-0105 – Development Entrance
G451-OCSC-XX-XX-DR-C-0106 – Road Alignment
A B
C D
E
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
5
Project: G451 Issued: 12.11.2019
G451-OCSC-XX-XX-DR-C-0500 – Proposed Surface Water and Wastewater
Strategy Layout Overview;
G451-OCSC-XX-XX-DR-C-0510 - Proposed Surface Water – Longitudinal Sections;
G451-OCSC-XX-XX-DR-C-0511 – Proposed Wastewater – Longitudinal Sections;
G451-OCSC-XX-XX-DR-C-0550 – Proposed Watermain – Design Layout;
The proposed design, for the aforementioned services, have been carried out in
accordance with the following technical guidelines and information:
Fingal County Council Development Plan;
Greater Dublin Strategic Drainage Study (GDSDS);
Greater Dublin Regional Code of Practice for Drainage Works (GDRCOP);
Irish Water Code of Practice for Wastewater, IW-CDS-5030-03;
Irish Water Code of Practice for Water Supply, IW-CDS-5020-03;
The Building Regulations – Technical Guidance Document Part H;
BE EN 752 – Drainage Outside Buildings;
BS 7533-13 – Guide for Design of Permeable Pavements;
The Office of Public Works, the Planning System and Flood Risk
Management;
Fingal County Council and Irish Water Drainage and Watermain Records.
Members of the wider design team cover all other elements of the application
pertaining to, traffic, sustainability, landscaping, planning and architectural detail.
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
6
Project: G451 Issued: 12.11.2019
3 SURFACE WATER DRAINAGE
3.1 Overview
Any planning permission sought on the subject lands are required to adhere to
the Local Authority requirements, the Fingal County Council Development Plan
and as such, the Greater Dublin Strategic Drainage Study (Dublin City Council,
2005).
New development must ensure that a comprehensive Sustainable Drainage
System, SuDS, is incorporated into the development. SuDS requires that post
development run-off rates be maintained at equivalent, or lower, levels than
pre-development levels. Thus, the development must be able to retain, within
its boundaries, surface water volumes from extreme rainfall events up to a 1
in 100-year rainfall event, more commonly expressed as a 1.0% AEP (Annual
Exceedance Probability), while also allowing for an additional climate change
factor of 10% increase in rainfall intensity. Any new development must also
have the physical capacity to retain surface water volumes as directed under
the Greater Dublin Strategic Drainage Strategy (GDSDS) and, if necessary,
release these attenuated surface water volumes to an outfall at a controlled
flow rate.
A further component of the SuDS protocol is to increase the overall water
quality of surface water runoff before it enters a natural watercourse or a public
sewer, which ultimately discharges to a water body. This is to ensure the
highest possible standard of surface water quality.
3.2 Consultation
O’Connor Sutton Cronin held the following pre-planning consultation with
Fingal County Council (FCC) Representatives, in relation to the surface water
drainage strategy for the proposed development:
1. Section 247 Meeting with FCC, on 10th January 2019, to discuss the
proposed development concept and drainage design strategy.
2. Section 247 Meeting with FCC, on 14th February 2019, to discuss and
agree the proposed drainage design concept.
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
7
Project: G451 Issued: 12.11.2019
3. Pre-Application Consultation tri-partite meeting with An Bord Pleanala
and Fingal County Council on 14th June 2019, to discuss items raised in
the opinion report.
Fingal County Council’s Water Services Department was represented by Mr.
Daragh Sheedy at the aforementioned meetings, where the proposed
drainage design strategy was discussed, with further information submitted
by OCSC, by email, for information and comment. Refer to a copy of the
most recent correspondence in Appendix H, which outlines Fingal County
Council’s satisfaction with the proposed surface water design and SuDS
strategy.
3.3 Existing Site Drainage
3.3.1 Existing Site Catchment Areas
As detailed in Section 1.4, the existing c.1.77-hectare site comprising a large
residential property with significant hardstanding, mature trees and green
space within the site boundary. Refer to Figure 3.1 for aerial image of the
proposed site, for context.
Figure 3.1 - Existing Site, Aerial Overview (Google Earth)
Site Boundary
Existing Property
Existing Tennis Courts
M50 Motorway
Existing Stable / Shed
Existing Open Drain
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
8
Project: G451 Issued: 12.11.2019
A site investigation carried out on site confirmed the existing ground conditions
as being poor and unsuitable for infiltration i.e. Soil Type 4.
As detailed in Section 1.4, the site is currently graded in a north-easterly
direction, to its lowest existing levels, with existing rainfall runoff appearing to
drain naturally to the existing ditch, adjacent to the site boundary.
3.3.2 Existing Surface Water Drainage Infrastructure
There is an existing 375mm ᴓ public surface water drainage network along
Carpenterstown Road, with manholes in the immediate vicinity of the northern
site boundary. This sewer increases in size to a 525mm ᴓ, approximately 230m
east from the northeast corner of the site. Refer to Appendix A for a copy of
public records, along with a confirmation later of taken in charge infrastructure.
Following discussions with FCC Water Services Department, there are no
apparent capacity issues associated with the adjacent public surface water
infrastructure. A CCTV survey of the existing surface water sewer is to be
carried out in advance of construction.
3.3.3 Existing Site Rainfall Runoff
All surface water runoff, on the existing site, currently drains naturally within
the site, with rainfall likely ending up in the existing ditch that is located
adjacent to the eastern boundary. Refer to Section 1.4 and Section 3.3.1 for
further details of existing site layout and topography context.
A site investigation was carried out by IGSL, on behalf of the client, in March
2019. The results of the site investigation and associated infiltration test
confirmed the presence of stiff boulder clay, with negligible infiltration
characteristics i.e. soil type 4. Therefore, infiltration was not considered as part
of the proposed design strategy. Refer to Appendix I for a copy of the site
investigation report.
Based on the above, and using the ICPSuDS Input, (Flood Studies Report
(FSR)) Method, the rainfall runoff discharging from the greenfield site area that
is to be developed (i.e. 1.77ha) in its existing condition has been estimated at
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
9
Project: G451 Issued: 12.11.2019
QBARRURAL = 9.0 l/s (5.15 l/s/ha). Refer to Figure 3.2 for an excerpt of the
results from the MicroDrainage Runoff Calculator, which also provides the
calculated QBAR runoff rate along with the discharge rate for varying Annual
Recurrence Intervals (ARI).
Figure 3.2 - Existing Site Runoff Calculator Results (MicroDrainage Excerpt)
Rural runoff design calculation results, as produced by MicroDrainage, is
included in Appendix B.
3.4 Proposed Surface Water Drainage Design Strategy
3.4.1 Proposed Surface Water Strategy Overview
It is proposed to separate the surface water and wastewater drainage
networks, which will serve the proposed development, and provide
independent connections to the local public surface water and wastewater
sewer networks respectively. Refer to Section 4 for details of the proposed
wastewater drainage design.
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
10
Project: G451 Issued: 12.11.2019
3.4.2 Proposed Surface Water Design Criteria
The proposed surface water network has been designed in accordance with the
regulations and guidelines outlined in Section 2, using MicroDrainage Network
Design package, by Innovyze Inc, which simulates the performance of the
integrated drainage network for varying rainfall return periods and storm
durations.
The MicroDrainage Network Design software applies the Flood Studies Report
(FSR) methodology for analysis of the rainfall profiles. However, the input
design parameters that were used, as part of this design, were based on the
available Flood Studies Update (FSU) data, i.e. the return period rainfall depths
for sliding durations, which determine the M5-60 and R values, and the standard
annual average rainfall (SAAR); as sourced from Met Éireann.
Figure 3.3 – Surface Water Design Criteria (MicroDrainage Excerpt)
As indicated in Figure 3.3, the proposed network was designed to allow for an
additional 10% increase in rainfall intensity, to allow for Climate Change, in
accordance with the Fingal County Council Development Plan and the GDSDS.
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
11
Project: G451 Issued: 12.11.2019
3.4.3 Proposed Surface Water Catchment Areas
As discussed previously, the proposed development will consist of the
demolition of the existing residential property and the construction of 5nr.
blocks of apartments, totalling 192nr. residential units with partial basement
located under the southern portion of the site. Details of the proposed site
layout is illustrated in Figure 1.2.
Intensive landscaping and associated infrastructure will be provided
throughout, in order to serve the proposed development.
For the purpose of the surface water network design simulation, we have
considered all roof and paving (roads, footpaths, car parking) areas as being
100% impermeable; giving a winter global runoff coefficient, Cv, of 0.84, in
accordance with the HR Wallingford and Modified Rational Method for runoff.
All car parking areas is to comprise pervious paving treatment, comprising
porous asphalt with permeable layers as a base. These will drain to the
proposed surface water drainage network via a perforated underdrain.
The area between blocks C, D and E is to be intensively landscaped, above
podium slab, with a typical build-up of 500mm – 750mm soil. This area has
been assigned a 60% impermeable factor, as it contributes to the drainage
network.
All other areas within the site boundary are to be intensively landscaped also
but above natural ground, allowing for natural drainage or significantly slower
contribution to the overall network, so have not been included in the catchment
area.
3.4.4 Proposed Development Rainfall Runoff
It is proposed to reduce and restrict the rainfall runoff, discharging from the
proposed development, to the greenfield equivalent, QBARRURAL, runoff rate, as
per the FSR ICP SuDS method, which is based on the IH124 method for
catchments smaller than 25km2 in area.
This is to be achieved with the provision of a flow restrictor (Hydro-Brake
Optimum by Hydro-International, or similar approved) prior to discharging to
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
12
Project: G451 Issued: 12.11.2019
the existing open drains at the north western corner of the site, with the
appropriate measures of attenuation provided. Sub-catchment flow-control
devices and associated attenuation are also to be strategically provided, in
order to maximise SuDS benefits and avail of the central open space for
preliminary attenuation.
Refer to Figure 3.2 for an excerpt from the results MicroDrainage Runoff
Calculator for the proposed development catchment area (c.1.77-hectares),
which indicates the greenfield equivalent, QBARRURAL, value of 9.0 l/s (5.15
l/s/ha) along with the calculated runoff for varying Average Recurrence
Intervals (ARI).
3.4.5 Proposed Surface Water Pipe Network Design
The overall surface water drainage system, serving the proposed development,
is to consist of a gravity sewer network that will convey runoff from the roofs
and paved areas to the outfall manhole, which will discharge a controlled flow
rate to the public surface water drainage infrastructure at Carpenterstown
Road, which fronts the northern boundary of the proposed development.
It is proposed to sub-divide the drainage catchments within the overall site
area, by providing flow controls and temporary underground attenuation at
strategic locations, in order to efficiently achieve the required greenfield runoff
equivalent flow rate.
The proposed piped-network has been designed in accordance with BS EN 752
and all new infrastructure is to be compliant with the requirements of the
GDSDS and the GDRCOP for Drainage Works, with minimum full bore velocities
of 1.0 m/s achieved throughout.
All main surface water carrier pipes have been sized to ensure no surcharging
of the proposed drainage network for rainfall events up to, and including, the
1 in 5-year ARI event, with a projected climate change allowance of 10%
increase in rainfall intensity, with no flooding from manholes experienced
during design rainfall events up to, and including, the 1% AEP event.
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
13
Project: G451 Issued: 12.11.2019
3.4.6 Proposed Surface Water Attenuation Storage
Temporary underground attenuation is to be provided at strategic locations, in
order to restrict discharge rates from the development’s surface water network
to the greenfield equivalent flow rate. The attenuation has been designed to
temporarily store the surface water runoff for design rainfall events up to, and
including, the 1% AEP with a 10% increase in rainfall intensity.
The temporary attenuation is to be provided in the form of underground cellular
storage units, such as the Y-ESS Pluvial Cube Modular Geo-Void System, or
similar approved product in Appendix G, which provide low flow channel, silt
management, high structural strength and durability and quality access for
inspection and maintenance, as discussed with Fingal County Council Water
Service Department at the PAC meeting on 14th February 2019 and as
submitted by email on 26th February 2019.
The proposed cellular storage units are to be fully sealed with an impermeable
liner, with no infiltration, due to poor results from site investigation and the
proximity to structures.
Figure 3.4 – Attenuation areas
On-Podium Attenuation
Attenuation under Pervious Paving
Extensive Green Roof
Attenuation
Attenuation under Pervious Paving
Attenuation under Pervious Paving
Pervious Paving (Brown)
Pervious Paving (Brown)
Extensive Green Roof
Pervious Paving (Brown)
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
14
Project: G451 Issued: 12.11.2019
3.5 Specific SuDS Measures Proposed
The proposed development is to contain the following measures of Sustainable
Drainage Systems:
Limiting discharge. The design outflow from the overall development is to be
restricted to a maximum total outflow rate of 9.0 l/s (5.15 l/s/ha), which is
the equivalent greenfield runoff. Refer to Section 3.3.3 and Section 3.4.4 for
further details.
Pervious Paving, in the form of porous asphalt, or similar approved, is to be
provided for all external car parking, which will have a layer of permeable
drainage stone underneath for further attenuation. This will attenuate rainfall
runoff from each property prior to entering the main surface water drainage
network via a perforated underdrain, while also providing at source treatment
for improved water quality.
Attenuation Storage will be provided using underground proprietary cellular
storage units, located at strategic locations, as outlined in Section 3.4.6. This
is to be provided, in order to temporarily store excessive surface water, due to
the restricted flow rates, during rainfall events up to, and including the design
1% AEP with a 10% additional allowance for climate change.
Temporary attenuation will also be achieved within the intensive landscaping,
above podium slab, along with the drainage layer underneath the pervious
paving, described above. Refer to Figure 3.4 for location of proposed
attenuation systems.
Intensive Landscaping is provided throughout this development, with all
external areas to be intensively landscaped and pervious in nature, with the
exception of the vehicular carriageways. The area between the northern Blocks
A and B contains a significant number of mature trees with new trees also being
provided to complement these, which results in this area being preserved
similar to existing. Further, all external areas above podium slab and
surrounding Blocks C, D and E, is to comprise a deep soil substrate with light
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
15
Project: G451 Issued: 12.11.2019
vegetation. All pedestrian paths through this area is also to be pervious in
nature. Refer to Landscape Architect design layout for further details.
Extensive Green Roofs are to be provided above external covered bike stores
and bin stores, along with at the lower level, inaccessible, roof areas to Blocks
C and D.
Water Quality of the surface water, discharging from site, is to be improved
with the following provisions:
Pervious Paving in all external car parking areas, as described above;
Intensive landscaping, on podium slab along with a significant area of
the remaining site area;
Provision of extensive green roofs, where practicable;
Trapped road gullies on all road carriageways, to trap silt and gross
pollutants;
Silt traps to be provided on manholes immediately upstream of
attenuation systems, as a further preventative measure to trap silt and
other gross pollutants;
Class 1 Bypass fuel separator to be provided prior to discharging from
site.
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
16
Project: G451 Issued: 12.11.2019
Figure 3.5 - Drainage Design Layout
3.6 Taking in Charge
As discussed at the Section 247 meetings with Fingal County Council, it is
proposed that all new surface water infrastructure, is not to be offered to be
taken in charge by Fingal County Council. However, it should be noted that the
proposed drainage infrastructure has been designed in accordance with the
guidance documents listed in Section 2.
3.7 Maintenance
Road gullies, flow control devices and attenuation systems, should be
maintained, as appropriate and in accordance with manufacturer’s
recommendations and guidelines.
3.8 Surface Water Impact Assessment
The design criteria for the drainage system are established in GDSDS-RDP
Volume 2, Section 6.3.4 and explained further in GDSDS-RDP Volume 2,
Appendix E. There are four design criteria, each of which has been considered
for the subject site:
On-Podium Attenuation
Development Surface Water Connection to Public Sewer
Extensive Green Roof
Attenuation under Pervious Paving
Attenuation
Attenuation under Pervious Paving
Attenuation under Pervious Paving
Pervious Paving (Brown)
Extensive Green Roof
Pervious Paving (Brown)
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
17
Project: G451 Issued: 12.11.2019
River Water Quality Protection;
River Regime Protection;
Level of Service (flooding) for the site and;
River Flood Protection.
3.9 Criterion 1 – River Water Quality Protection
It is proposed that the overall drainage system, serving this development, will
contain a range of surface water treatment methods, as outlined previously in
Section 3.5, which will improve the quality of surface water being discharged
from the proposed development.
Gross pollutants, sediments, hydrocarbons, and other impurities, will be
removed at source with the following provisions:
a) Pervious Paving to all external car parking areas;
b) Intensive landscaping, above podium slab and throughout the
development;
c) Extensive Green Roofs, where practicable;
d) Silt-traps prior to attenuation storage area.
e) All road gullies are to be trapped;
f) Fuel separator prior to discharge from the development.
The above proposals therefore satisfy Criterion 1.
3.10 Criterion 2 – River Regime Protection
Surface water discharge from the overall development will be restricted to an
equivalent rural runoff rate of 9.0 l/s (5.15 l/s/ha), as per the Fingal County
Council Development Plan and the GDSDS. Refer to Section 3.4.4 for further
details.
This will be achieved with the provision of a flow restrictor (Hydro-Brake
Optimum, by Hydro-International, or similar approved) upstream of the outfall
manhole.
Refer also to Appendix B for results QBARRURAL calculation results, which have
been carried out using the ICP SUDS Method on MicroDrainage software.
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
18
Project: G451 Issued: 12.11.2019
Therefore the proposed surface water drainage network and subject
development satisfies Criterion 2.
3.11 Criterion 3 – Level of Service (Flooding) Site
There are four sub-criteria for the required level of service, for a new
development; as set out in the GDSDS Volume 2, Section 6.3.4 (Table 6.3).
No flooding on site except where planned (30-year high intensity rainfall
event);
No internal property flooding (100-year high intensity rainfall event);
No internal property flooding (100-year river event and critical duration
for site) and;
No flood routing off site except where specifically planned. (100-year
high intensity rainfall event).
3.11.1 Sub-Criterion 3.1
The surface water drainage systems, serving the proposed development,
have been designed to accommodate the 100-year return period rainfall
event (including an allowance of 10% increase in rainfall intensity for
climate change) without flooding. Therefore, the system has capacity for
the 30-year return period rainfall event without flooding.
The performance of the proposed drainage system has been analysed for
design rainfall events up to, and including, the 1% AEP event (incl. 10%
climate change allowance) using the MicroDrainage Network Design
Software, by Innovyze Inc. Refer to Appendix C for details of design
criteria, calculations and results. The analyses indicate that no flooding will
occur for design rainfall events up to, and including, the 1% AEP.
3.11.2 Sub-Criterion 3.2
The surface water drainage systems, serving the proposed development,
have been designed to accommodate the 100-year return period rainfall
event (including an allowance of 10% increase in rainfall intensity for
climate change) without flooding.
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
19
Project: G451 Issued: 12.11.2019
The performance of the proposed drainage system in 100-year return
period storm events (incl. 10% climate change allowance) has been
analysed – Refer Appendix C for calculations. The analyses show that no
flooding will occur in 100-year return period storm events.
3.11.3 Sub-Criterion 3.3
Details of the flood risk assessment associated with the proposed
development is outlined in Section 4 of this report. The assessment
indicates that there is no apparent risk of internal property flooding for a
design 100-year return period pluvial rainfall event (including 10% climate
change allowance).
3.11.4 Sub-Criterion 3.4
The surface water drainage systems, serving the proposed development,
have been designed to accommodate the 100-year return period rainfall
event (including an allowance of 10% increase in rainfall intensity for
climate change) without flooding, so no flood routing off site will be
experienced for such a rainfall event.
The performance of the proposed drainage system in 100-year return
period storm events (incl. 10% climate change allowance) has been
analysed – Refer Appendix C for calculations. The analyses show that no
flooding will occur in 100-year return period storm events.
Details of the flood risk assessment associated with the proposed
development is outlined in Section 4 of this report. This assessment, along
with the network design simulation results, from the MicroDrainage Network
Analysis, indicates that no internal property flooding will occur in a 100-
year return period fluvial flood event (including 10% climate change
allowance).
Therefore the proposed surface water drainage network and subject
development satisfies Criterion 3.
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
20
Project: G451 Issued: 12.11.2019
3.12 Criterion 4 – River Flood Protection
As outlined in Section 3.10 (Criterion 2), the surface water runoff from the
development’s catchment will be limited to a maximum of 9.0 l/s (5.15
l/s/ha).
Refer to Section 3.4.3 and Section 3.7 for further details on the limiting
discharge rates. The GDSDS Volume 2, Appendix E states that this practice
ensures “that sufficient stormwater runoff retention is achieved to protect the
river during extreme events”.
Attenuation storage is to be provided for the 100-year return period rainfall
event (including an increased 10% rainfall intensity; to allow for climate
change). Discharge from site is to be achieved through the use of a vortex flow
control device (e.g. Hydro-Brake Optimum, by Hydro-International, or similar
approved), which will reduce the risk of blockage present with other flow
devices.
Refer to Appendix C for details of hydraulic modelling calculations of
attenuation and flow control facilities, as carried out using MicroDrainage
software by Innovyze Inc. Therefore the proposed surface water drainage
network and subject development satisfies Criterion 4.
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
21
Project: G451 Issued: 12.11.2019
4 FLOOD RISK ASSESSMENT
This section assesses the potential flood risks associated with the proposed
development, as per the regulations and guidelines outlined in Section 2.
Refer to Section 1.4 and Section 1.5 for site topography details and further
layout context.
The proposed residential development is considered Highly Vulnerable, in
accordance with the PSFRM Guidelines.
4.1 Historical Flooding
There are no reported incidents of flooding in the vicinity of the site, as outlined
on the OPW’s online National Flood Hazard Mapping website
www.floodmaps.ie.
Figure 4.1 - National Flood Hazard Mapping (excerpt from www.floodmaps.ie)
4.2 Fluvial Flooding
The proposed development is located approximately 1.25km north of the River
Liffey and approximately 1.9km south of the River Tolka. A review of the OPWs
Site Location
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
22
Project: G451 Issued: 12.11.2019
Catchment Flood Risk Assessment Mapping (CFRAM) indicates that the
proposed development is located outside of Flood Zone A and Flood Zone B of
the predicted 1% AEP flood extent of both the River Tolka and the River Liffey.
It is noted that the proposed development is not located within any of the
available CFRAM series of mapping due to its distance from the predicted flood
extents. Refer to Figure 4.2 for context.
Figure 4.2 - Rivers Liffey and Tolka CFRAM extent (excerpt from www.floodinfo.ie)
Therefore, the proposed development is not considered at risk of fluvial
flooding from the River Liffey and the River Tolka and is deemed acceptable for
use.
4.3 Coastal Flooding
The proposed development is not at risk of coastal flooding, due to the location
of the site, >11.25km west of the eastern coast of Ireland.
4.4 Pluvial Flooding
A review of the OPW’s online pluvial flood risk mapping indicates that the
proposed development does not appear to be at risk from pluvial flooding, in
its existing condition.
Site Location
River Liffey 1% AEP Predicted Flood Extent
River Tolka 1% AEP Predicted Flood Extent
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
23
Project: G451 Issued: 12.11.2019
Figure 4.3 - OPW Pluvial Flood Risk Mapping (excerpt from www.floodinfo.ie)
As detailed within Section 3 of this report, the proposed surface water drainage
network, as part of this development, has been designed to ensure that no
flooding is experienced during design rainfall events up to and including the
1% AEP, including an additional 10% intensity for climate change projections.
The above ensures that pluvial flooding is not considered a significant risk to
the proposed the development, nor as a result of the proposed development.
Site Location
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
24
Project: G451 Issued: 12.11.2019
5 WASTEWATER DRAINAGE
5.1 Overview
All proposed wastewater sewer design has been carried out in accordance with
Irish Water’s Code of Practice for Wastewater Infrastructure. The existing site
is currently greenfield, with no existing wastewater discharge to the public
wastewater infrastructure.
A Pre-Connection Enquiry Form (IW Ref Nr. 387807675) was submitted to
Irish Water for a total of 196nr. domestic units, with confirmation of feasibility
confirmed by return of letter. Refer to Appendix E for a copy of the
Confirmation of Feasibility letter, as issued on 3rd December 2018.
Following further consultation with Irish Water, a Statement of Design
Acceptance was issued on 7th October 2019.
5.2 Existing Wastewater Drainage
The existing property, within the proposed development boundary, currently
discharges wastewater to an on-site septic tank.
The Irish Water public drainage records indicate that there is an existing public
225mm wastewater network at Carpenterstown Road, adjacent to the north
western corner of the site. Refer to Appendix A for a copy of public records,
showing existing wastewater infrastructure, along with a confirmation later of
taken in charge infrastructure.
Irish Water have confirmed the existing public wastewater infrastructure has
capacity to take the discharge from the proposed development, by return of
Confirmation of Feasibility Letter.
5.3 Proposed Wastewater Drainage
It is proposed to separate the wastewater and surface water drainage
networks, which will serve the proposed development, and provide
independent connections to the local public wastewater sewer and local surface
water sewer networks respectively. Please refer to Section 3 for details of the
proposed surface water drainage design strategy.
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
25
Project: G451 Issued: 12.11.2019
The wastewater drainage from each block is to connect to a gravity pipe
network, which is to be installed to serve the proposed development, prior to
outfalling to the existing public sewer that is located adjacent to the northwest
corner of the site.
All proposed wastewater drainage infrastructure has been designed in
accordance with the Building Regulations Part H and Irish Water’s Code of
Practice for Wastewater Infrastructure.
5.4 Taking In Charge
All new wastewater drainage infrastructure, installed to serve the proposed
development is not to be offered to Irish Water for to be taken-in-charge.
5.5 Calculations
As outline earlier, it is proposed to discharge the wastewater flows, from the
proposed development, to the existing public wastewater sewer at
Carpenterstown Road, to the south of the site, at a location to be agreed with
Irish Water.
The total peak design flow from this proposed development has been
calculated as 6.19 l/s. Refer to Appendix D for wastewater loading
calculations and network design tables, which have been carried out in
accordance with Irish Water’s Code of Practice for Wastewater Infrastructure,
IW-CDS-5030-03.
5.6 Consultation
Consultation was had with Fingal County Council at the Section 247 meetings,
noted in Section 3.2.
A Pre Connection Enquiry Form was submitted to Irish Water, with a
Confirmation of Feasibility Letter returned, confirming that the existing
wastewater drainage infrastructure has sufficient capacity to serve the
proposed development, as outlined in Section 5.2.
Following further consultation with Irish Water, a Statement of Design
Acceptance was issued on 7th October 2019.
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
26
Project: G451 Issued: 12.11.2019
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
27
Project: G451 Issued: 12.11.2019
6 POTABLE WATER SUPPLY
All proposed potable water design has been carried out in accordance with Irish
Water’s Code of Practice for Water Infrastructure, IW-CDS-5020-03. The pre-
existing site was typically commercial and industrial in nature with all water
usage sourced directly from the local public water infrastructure.
A Pre-Connection Enquiry Form (IW Ref Nr. 387807675) was submitted to
Irish Water for a total of 196nr. domestic units, with confirmation of feasibility
confirmed by return of letter. Refer to Appendix E for a copy of the
Confirmation of Feasibility letter, as issued on 3rd December 2018.
Following further consultation with Irish Water, a Statement of Design
Acceptance was issued on 7th October 2019.
6.1 Connection to the Existing Network
It is proposed to provide a 150mm high density polyethylene connection to the
existing 300mm MOPVC/ Ductile Iron watermain on Carpenterstown Road.
(Refer to Appendix A for details of existing watermain infrastructure records
along with a confirmation later of taken in charge infrastructure), in order to
serve the proposed development.
The proposed connection is to be carried out in accordance with Irish Water’s
Code of Practice for Water Infrastructure, following agreement with Irish
Water, with a bulk water meter to be provided at the development’s entrance.
6.2 Water Saving Devices
Water saving devices are to be considered for use within the proposed
development units, in order to conserve the use of water, as part of the internal
fit-out.
6.3 Water Meters
A bulk water meter is to be provided at the connection to the public watermain,
at the development entrance, with individual blocks and residential units
metered to Irish Water’s requirements.
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
28
Project: G451 Issued: 12.11.2019
6.4 Layout
Refer to drawing G451-OCSC-XX-XX-DR-C-0550 for the proposed
watermain design layout, which has been designed in accordance with the Irish
Water Code of Practice for Water Infrastructure.
6.5 Consultation
Consultation was had with Fingal County Council at the Section 247 meetings,
noted in Section 3.2.
A Pre Connection Enquiry Form was submitted to Irish Water, with a
Confirmation of Feasibility Letter returned, confirming that the existing water
drainage infrastructure has sufficient capacity to serve the proposed
development. Refer to Appendix E for a copy of the Confirmation of Feasibility
letter, as issued by Irish Water.
Following further consultation with Irish Water, a Statement of Design
Acceptance was issued on 7th October 2019.
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
29
Project: G451 Issued: 12.11.2019
7 ROAD DESIGN
Taking into consideration the layout of the proposed development, particularly
in the context of the wider network, it contains relatively minimal proposals
with respect to roads, all of which are internal and to serve the proposed
development only. On this basis, all aspects of the proposed roads design have
been designed in accordance with the appropriate sections of the Design
Manual for Urban Roads & Streets (DMURS) with addition reference to other
relevant guidelines including the Traffic Signs Manual (TSM) and the Fingal
Development Plan 2017-2023.
The roads elements of this project have been classified as local streets as per
Table 3.1 of DMURS, shown below.
Figure 7.1 - Road Hierarchy Excerpt from DMURS
7.1 Site Entrances
The primary entrance to the development is proposed in the northeast corner
of the site and will operate under a simple priority configuration. An additional
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
30
Project: G451 Issued: 12.11.2019
exit only is proposed in the northwest corner of the site to facilitate the
proposed one-way road along the northern face of the development.
All entrances have a corner radii of 3.0m in compliance with Section 4.3.3 of
DMURS which encourages smaller radii to reduce vehicle speeds and improve
cyclist and pedestrian safety, as per the below extract.
Figure 7.2: DMURS Extract on Benefits of Reduced Corner Radii
Road markings at the respective entrances are proposed in accordance with
Section 4.2.4 of DMURS and Chapter 7 of the TSM.
The entrances also include a ramp treatment to ensure there is no change in
the level to the pedestrian footway in compliance with Section 4.3.1 of DMURS.
Tactile paving is also proposed to facilitate safe pedestrian movement.
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
31
Project: G451 Issued: 12.11.2019
A sight lines assessment has been carried out for each vehicular entrance in
accordance with the guidance set out in DMURS Section 4.4.5. This shows that
the required visibility of 45.0m is achieved in accordance with Table 4.2 of
DMURs, recreated below.
Figure 3: DMURS Table 4.2 Forward Visibility Requirements
7.2 Internal Roads
Internal roads consist of a mixture of two-way roads running north-south to
the proposed entrances on the east and west sides of the development
respectively. The former provides access to surface level car parking and the
basement car park ramp which the latter provides access to additional surface
car parking.
These two-way roads are linked via a proposed one-way road across the
northern front of the development. The rationale behind making this link one-
way is based on a desire to leave the maximum possible space available for a
future cycle track proposed by Fingal County Council and the National
Transport Authority. This is discussed in further detail in the Traffic Impact
Assessment submitted under separate cover.
The two-way roads range in width from 5.5-6.0m while the one-way link is
3.25m wide.
O’Connor Sutton Cronin & Associates Engineering Services Report
Multidisciplinary Consulting Engineers Residential Development at Carpenterstown.
32
Project: G451 Issued: 12.11.2019
7.3 Fire Tender
Access for fire tender and other emergency vehicles is also catered for via the
north-south link with a swept path analysis having been carried out for such
vehicles with drawings submitted separately in support of this application.
7.4 Traffic Impact Assessment
An assessment of the impact of the development on the local traffic is detailed
in the Traffic Impact Assessment Report, G451-OCSC-XX-XX-RP-C-0003,
which has been submitted under separate cover as part of this application.
Mark Killian
(MSc BE CEng MIEI)
For OCSC MULTIDISCIPLINARY CONSULTING ENGINEERS
APPENDIX A. FINGAL COUNTY COUNCIL AND IRISH WATER PUBLIC RECORDS
Appendix A
Fingal Co.Co. & Irish Water Public Records
© Ordnance Survey Ireland
Irish Water Carpenterstown Road Dublin 15
Irish Water gives this information as to the position of its underground network as a general
guide only on the strict understanding that it is based on the best available information
provided by each Local Authority in Ireland. It should not be relied upon in the event of
excavations or other works being carried out in the vicinity of the network. The onus is on the
parties carrying out the works to ensure the exact location of the network is identified prior to
mechanical works being carried out. Service pipes are not generally shown but their
presence should be anticipated. © Irish Water
Lege
ndSt
orm
wate
r Gra
vity M
ains (
Irish
Wate
r Own
ed)
Surface
Stor
mwa
ter G
ravit
y Main
s (No
n-Iri
sh W
ater
Own
ed)
Surface
Stor
m M
anho
lesCascade
Catchpit
Hatchbox
Lamphole
Standard
Other; Unknown
Stor
m In
lets
Gully
Standard
Other; Unknown
Stor
m F
ittin
gsVent/Col
Other; Unknown
Stor
m D
ischa
rge P
oints
Outfall
Overflow
Soakaway
Other; Unknown
Storm Culverts
Storm Clean Outs
Sewe
r Gra
vity M
ains (
Irish
Wate
r own
ed)
Combined
Foul
Overflow
Unknown
Sewe
r Gra
vity M
ains (
Non-
Irish
Wat
er ow
ned)
Combined
Foul
Overflow
Unknown
11/15/2018, 2:56:43 PM
00.055
0.11
0.0275
mi
00.085
0.17
0.0425
km
1:2,257
© Ordnance Survey Ireland | © Ordnance Survey Ireland |
Reproduced from the Ordnance
Survey Of Ireland by Permission of the
Government. License No. 3-3-34
“Gas Networks Ireland (GNI), their affiliates and assigns, accept no responsibility for any information contained in
this document concerning location and technical designation of the gas distribution and transmission network (“the
Information”). Any representations and warranties express or implied, are excluded to the fullest extent permitted by
law. No liability shall be accepted for any loss or damage including, without limitation, direct, indirect, special,
incidental, punitive or consequential loss including loss of profits, arising out of or in connection with the use of the
Information (including maps or mapping data). NOTE: DIAL BEFORE YOU DIG Phone 1850 427 747 or e-mail
[email protected] – The actual position of the gas/electricity distribution and transmission network must be
verified on site before any mechanical excavating takes place. If any mechanical excavation is proposed, hard copy
maps must be requested from GNI re gas. All work in the vicinity of the gas distribution and transmission network
must be completed in accordance with the current edition of the Health & Safety Authority publication, ‘Code of
Practice For Avoiding Danger From Underground Services’ which is available from the Health and Safety Authority
(1890 28 93 89) or can be downloaded free of charge at www.hsa.ie.”
´
APPENDIX B. QBAR RUNOFF CALCULATIONS & NETWORK DESIGN TABLES
Appendix B
QBAR Runoff Calculations & Network Design Tables
O'Connor Sutton Cronin Page 1
9 Prussia Street Residential Development
Dublin 7 Carpenterstown Road
Ireland
Date 21/01/2019 Designed by MK
File Checked by AO'B
XP Solutions Source Control 2018.1
ICP SUDS Mean Annual Flood
©1982-2018 Innovyze
Input
Return Period (years) 5 Soil 0.450
Area (ha) 1.750 Urban 0.000
SAAR (mm) 800 Region Number User Defined
User Defined Growth Curve
Filename gdsds_Growth Curve.gcfx Description GDSDS
Return Period
(years)
Growth Curve
Factor
1 0.850
2 0.000
5 0.000
10 1.700
20 0.000
25 0.000
30 2.100
50 0.000
100 2.600
200 2.900
500 0.000
1000 0.000
Results l/s
QBAR Rural 9.0
QBAR Urban 9.0
Q5 years 0.0
Q1 year 7.6
Q30 years 18.9
Q100 years 23.4
Met Eireann
Return Period Rainfall Depths for sliding Durations
Irish Grid: Easting: 307753, Northing: 236891,
Interval | Years
DURATION 6months, 1year, | 2, 3, 4, 5, 10, 20, 30, 50, 75, 100, 150, 200, 250, 500,
5 mins 2.4, 3.5, | 4.1, 5.0, 5.6, 6.1, 7.7, 9.6, 10.8, 12.6, 14.2, 15.5, 17.4, 19.0, 20.2, N/A ,
10 mins 3.3, 4.8, | 5.7, 6.9, 7.8, 8.5, 10.7, 13.4, 15.1, 17.6, 19.8, 21.6, 24.3, 26.4, 28.2, N/A ,
15 mins 3.9, 5.7, | 6.7, 8.2, 9.2, 10.0, 12.6, 15.7, 17.8, 20.7, 23.3, 25.4, 28.6, 31.1, 33.2, N/A ,
30 mins 5.2, 7.4, | 8.7, 10.5, 11.8, 12.8, 16.0, 19.8, 22.2, 25.8, 28.9, 31.4, 35.2, 38.2, 40.6, N/A ,
1 hours 6.9, 9.7, | 11.2, 13.5, 15.1, 16.3, 20.3, 24.9, 27.9, 32.1, 35.9, 38.8, 43.3, 46.8, 49.8, N/A ,
2 hours 9.1, 12.6, | 14.6, 17.4, 19.4, 20.9, 25.8, 31.3, 34.9, 40.0, 44.5, 48.0, 53.3, 57.5, 60.9, N/A ,
3 hours 10.7, 14.8, | 17.0, 20.2, 22.4, 24.1, 29.6, 35.7, 39.8, 45.4, 50.4, 54.3, 60.2, 64.8, 68.6, N/A ,
4 hours 12.0, 16.5, | 18.9, 22.4, 24.8, 26.7, 32.6, 39.3, 43.7, 49.8, 55.2, 59.3, 65.7, 70.6, 74.6, N/A ,
6 hours 14.1, 19.3, | 22.0, 26.0, 28.7, 30.8, 37.5, 45.0, 49.8, 56.6, 62.6, 67.1, 74.1, 79.5, 84.0, N/A ,
9 hours 16.6, 22.5, | 25.6, 30.2, 33.2, 35.6, 43.1, 51.4, 56.8, 64.3, 70.9, 76.0, 83.7, 89.7, 94.6, N/A ,
12 hours 18.6, 25.1, | 28.5, 33.5, 36.8, 39.4, 47.5, 56.6, 62.4, 70.5, 77.6, 83.0, 91.3, 97.6, 102.9, N/A ,
18 hours 21.9, 29.4, | 33.2, 38.8, 42.6, 45.4, 54.6, 64.7, 71.2, 80.1, 88.0, 94.0, 103.1, 110.1, 115.8, N/A ,
24 hours 24.6, 32.8, | 37.0, 43.1, 47.2, 50.3, 60.3, 71.1, 78.1, 87.8, 96.2, 102.6, 112.4, 119.8, 126.0, 147.0,
2 days 30.6, 39.8, | 44.5, 51.3, 55.8, 59.1, 69.8, 81.4, 88.7, 98.8, 107.5, 114.1, 124.1, 131.7, 137.8, 158.9,
3 days 35.4, 45.5, | 50.6, 57.9, 62.7, 66.3, 77.6, 89.8, 97.5, 108.0, 117.0, 123.8, 134.1, 141.9, 148.2, 169.7,
4 days 39.7, 50.5, | 55.9, 63.7, 68.7, 72.5, 84.4, 97.2, 105.2, 116.0, 125.4, 132.4, 143.0, 150.9, 157.4, 179.3,
6 days 47.1, 59.2, | 65.2, 73.7, 79.2, 83.4, 96.3, 109.9, 118.5, 130.0, 139.9, 147.3, 158.4, 166.8, 173.5, 196.3,
8 days 53.7, 66.8, | 73.3, 82.5, 88.4, 92.8, 106.6, 121.0, 130.1, 142.2, 152.6, 160.3, 171.9, 180.6, 187.6, 211.2,
10 days 59.7, 73.8, | 80.7, 90.5, 96.7, 101.4, 115.9, 131.1, 140.6, 153.2, 164.0, 172.1, 184.1, 193.0, 200.3, 224.6,
12 days 65.3, 80.3, | 87.6, 97.9, 104.4, 109.4, 124.5, 140.4, 150.2, 163.4, 174.6, 182.9, 195.3, 204.5, 212.0, 237.0,
16 days 75.7, 92.2, | 100.3, 111.5, 118.6, 124.0, 140.3, 157.3, 167.9, 181.9, 193.7, 202.6, 215.7, 225.4, 233.3, 259.5,
20 days 85.4, 103.3, | 111.9, 124.0, 131.6, 137.3, 154.7, 172.8, 183.9, 198.7, 211.1, 220.4, 234.1, 244.3, 252.5, 279.8,
25 days 96.7, 116.1, | 125.5, 138.4, 146.6, 152.7, 171.4, 190.6, 202.3, 218.0, 231.1, 240.9, 255.3, 266.0, 274.6, 303.0,
NOTES:
N/A Data not available
These values are derived from a Depth Duration Frequency (DDF) Model
For details refer to:
’Fitzgerald D. L. (2007), Estimates of Point Rainfall Frequencies, Technical Note No. 61, Met Eireann, Dublin’,
Available for download at www.met.ie/climate/dataproducts/Estimation-of-Point-Rainfall-Frequencies_TN61.pdf
APPENDIX C. SURFACE WATER DESIGN & ATTENUATION CALCULATIONS
- Design Criteria;
- Area Summary;
- Network Design & Results Table;
- Simulation Criteria;
- Hydrobrake / Controls & Storage Design;
- Summary of Results.
Appendix C
Surface Water Design and Attenuation Calculations
O'Connor Sutton Cronin
Page 1
9 Prussia Street
Carpenterstown
Dublin 7
Ireland
Date 28/08/2019
Designed by MK
File G451-MD-S2-P01.07.mdx
Checked by AH
XP Solutions
Network 2018.1
STORM SEWER DESIGN by the Modified Rational Method
Design Criteria for Surface Water
©1982-2018 Innovyze
Pipe Sizes
GDSDS
Manhole Sizes
GDSDS
FSR Rainfall Model - Scotland and Ireland
Return Period (years)
5Foul Sewage (l/s/ha)
0.000
Maximum Backdrop Height (m)
3.000
M5-60 (mm)
16.300
Volumetric Runoff Coeff.
0.840
Min Design Depth for Optimisation (m)
0.750
Ratio R
0.276
PIMP (%)
100
Min Vel for Auto Design only (m/s)
1.00
Maximum Rainfall (mm/hr)
50
Add Flow / Climate Change (%)
20
Min Slope for Optimisation (1:X)
300
Maximum Time of Concentration (mins)
30
Minimum Backdrop Height (m)
0.000
Designed with Level Soffits
Time Area Diagram for Surface Water
Time
(mins)
Area
(ha)
Time
(mins)
Area
(ha)
Time
(mins)
Area
(ha)
0-4
0.487
4-8
0.572
8-12
0.085
Total Area Contributing (ha) = 1.144
Total Pipe Volume (m³) = 40.473
Network Design Table for Surface Water
O'Connor Sutton Cronin
Page 2
9 Prussia Street
Carpenterstown
Dublin 7
Ireland
Date 28/08/2019
Designed by MK
File G451-MD-S2-P01.07.mdx
Checked by AH
XP Solutions
Network 2018.1
Network Design Table for Surface Water
©1982-2018 Innovyze
PN
Length
(m)
Fall
(m)
Slope
(1:X)
I.Area
(ha)
T.E.
(mins)
Base
Flow (l/s)
k
(mm)
HYD
SECT
DIA
(mm)
Section Type
Auto
Design
Network Results Table
PN
Rain
(mm/hr)
T.C.
(mins)
US/IL
(m)
Σ I.Area
(ha)
Σ Base
Flow (l/s)
Foul
(l/s)
Add Flow
(l/s)
Vel
(m/s)
Cap
(l/s)
Flow
(l/s)
O'Connor Sutton Cronin
Page 3
9 Prussia Street
Carpenterstown
Dublin 7
Ireland
Date 28/08/2019
Designed by MK
File G451-MD-S2-P01.07.mdx
Checked by AH
XP Solutions
Network 2018.1
Network Design Table for Surface Water
©1982-2018 Innovyze
PN
Length
(m)
Fall
(m)
Slope
(1:X)
I.Area
(ha)
T.E.
(mins)
Base
Flow (l/s)
k
(mm)
HYD
SECT
DIA
(mm)
Section Type
Auto
Design
SW1.000
8.040
0.054
150.0
0.027
4.00
0.0
0.600
o225
Pipe/Conduit
SW1.001
33.469
0.223
150.0
0.028
0.00
0.0
0.600
o225
Pipe/Conduit
SW2.000
12.252
0.204
60.0
0.043
4.00
0.0
0.600
o150
Pipe/Conduit
SW1.002
9.253
0.093
100.0
0.017
0.00
0.0
0.600
o225
Pipe/Conduit
SW3.000
9.505
0.158
60.0
0.000
4.00
0.0
0.600
o150
Pipe/Conduit
SW1.003
8.176
0.082
100.0
0.000
0.00
0.0
0.600
o225
Pipe/Conduit
Network Results Table
PN
Rain
(mm/hr)
T.C.
(mins)
US/IL
(m)
Σ I.Area
(ha)
Σ Base
Flow (l/s)
Foul
(l/s)
Add Flow
(l/s)
Vel
(m/s)
Cap
(l/s)
Flow
(l/s)
SW1.000
50.00
4.13
60.525
0.027
0.0
0.0
0.8
1.07
42.4
4.9
SW1.001
50.00
4.65
60.471
0.055
0.0
0.0
1.7
1.07
42.4
9.9
SW2.000
50.00
4.16
60.525
0.043
0.0
0.0
1.3
1.30
23.0
7.9
SW1.002
50.00
4.77
60.246
0.115
0.0
0.0
3.5
1.31
52.0
20.9
SW3.000
50.00
4.12
60.525
0.000
0.0
0.0
0.0
1.30
23.0
0.0
SW1.003
50.00
4.87
60.153
0.115
0.0
0.0
3.5
1.31
52.0
20.9
O'Connor Sutton Cronin
Page 4
9 Prussia Street
Carpenterstown
Dublin 7
Ireland
Date 28/08/2019
Designed by MK
File G451-MD-S2-P01.07.mdx
Checked by AH
XP Solutions
Network 2018.1
Network Design Table for Surface Water
©1982-2018 Innovyze
PN
Length
(m)
Fall
(m)
Slope
(1:X)
I.Area
(ha)
T.E.
(mins)
Base
Flow (l/s)
k
(mm)
HYD
SECT
DIA
(mm)
Section Type
Auto
Design
SW1.004
25.453
0.127
200.0
0.085
0.00
0.0
0.600
o450
Pipe/Conduit
SW4.000
19.440
0.324
60.0
0.048
4.00
0.0
0.600
o150
Pipe/Conduit
SW1.005
17.079
0.085
200.0
0.022
0.00
0.0
0.600
o450
Pipe/Conduit
SW5.000
8.765
0.146
60.0
0.023
4.00
0.0
0.600
o150
Pipe/Conduit
SW1.006
11.209
0.075
150.0
0.021
0.00
0.0
0.600
o225
Pipe/Conduit
Network Results Table
PN
Rain
(mm/hr)
T.C.
(mins)
US/IL
(m)
Σ I.Area
(ha)
Σ Base
Flow (l/s)
Foul
(l/s)
Add Flow
(l/s)
Vel
(m/s)
Cap
(l/s)
Flow
(l/s)
SW1.004
50.00
5.17
59.100
0.200
0.0
0.0
6.1
1.43
228.1
36.3
SW4.000
50.00
4.25
60.525
0.048
0.0
0.0
1.4
1.30
23.0
8.7
SW1.005
50.00
5.37
58.973
0.269
0.0
0.0
8.2
1.43
228.1
49.0
SW5.000
50.00
4.11
59.750
0.023
0.0
0.0
0.7
1.30
23.0
4.1
SW1.006
50.00
4.18
58.887
0.000
10.0
0.0
1.7
1.07
42.4
10.0
O'Connor Sutton Cronin
Page 5
9 Prussia Street
Carpenterstown
Dublin 7
Ireland
Date 28/08/2019
Designed by MK
File G451-MD-S2-P01.07.mdx
Checked by AH
XP Solutions
Network 2018.1
Network Design Table for Surface Water
©1982-2018 Innovyze
PN
Length
(m)
Fall
(m)
Slope
(1:X)
I.Area
(ha)
T.E.
(mins)
Base
Flow (l/s)
k
(mm)
HYD
SECT
DIA
(mm)
Section Type
Auto
Design
SW6.000
7.225
0.048
150.0
0.000
4.00
0.0
0.600
o225
Pipe/Conduit
SW7.000
15.445
0.103
150.0
0.054
4.00
0.0
0.600
o225
Pipe/Conduit
SW7.001
8.681
0.058
150.0
0.059
0.00
0.0
0.600
o225
Pipe/Conduit
SW7.002
13.937
0.005
2787.3
0.031
0.00
0.0
0.600
o450
Pipe/Conduit
SW8.000
15.962
0.106
150.0
0.031
4.00
0.0
0.600
o225
Pipe/Conduit
SW8.001
8.997
0.060
150.0
0.032
0.00
0.0
0.600
o225
Pipe/Conduit
SW8.002
16.295
0.005
3259.0
0.025
0.00
0.0
0.600
o450
Pipe/Conduit
Network Results Table
PN
Rain
(mm/hr)
T.C.
(mins)
US/IL
(m)
Σ I.Area
(ha)
Σ Base
Flow (l/s)
Foul
(l/s)
Add Flow
(l/s)
Vel
(m/s)
Cap
(l/s)
Flow
(l/s)
SW6.000
50.00
4.11
60.275
0.000
0.0
0.0
0.0
1.07
42.4
0.0
SW7.000
50.00
4.24
61.150
0.054
0.0
0.0
1.6
1.07
42.4
9.8
SW7.001
50.00
4.38
61.047
0.113
0.0
0.0
3.4
1.07
42.4
20.5
SW7.002
50.00
5.00
60.764
0.143
0.0
0.0
4.3
0.38
59.8
26.1
SW8.000
50.00
4.25
61.150
0.031
0.0
0.0
0.9
1.07
42.4
5.7
SW8.001
50.00
4.39
61.044
0.063
0.0
0.0
1.9
1.07
42.4
11.5
SW8.002
50.00
5.17
60.759
0.088
0.0
0.0
2.7
0.35
55.1
16.1
O'Connor Sutton Cronin
Page 6
9 Prussia Street
Carpenterstown
Dublin 7
Ireland
Date 28/08/2019
Designed by MK
File G451-MD-S2-P01.07.mdx
Checked by AH
XP Solutions
Network 2018.1
Network Design Table for Surface Water
©1982-2018 Innovyze
PN
Length
(m)
Fall
(m)
Slope
(1:X)
I.Area
(ha)
T.E.
(mins)
Base
Flow (l/s)
k
(mm)
HYD
SECT
DIA
(mm)
Section Type
Auto
Design
SW9.000
16.185
0.108
150.0
0.057
4.00
0.0
0.600
o225
Pipe/Conduit
SW9.001
8.971
0.060
150.0
0.058
0.00
0.0
0.600
o225
Pipe/Conduit
SW9.002
39.539
0.005
7907.9
0.056
0.00
0.0
0.600
o450
Pipe/Conduit
SW7.003
5.501
0.092
60.0
0.000
0.00
0.0
0.600
o225
Pipe/Conduit
SW6.001
20.790
0.139
150.0
0.000
0.00
0.0
0.600
o225
Pipe/Conduit
SW6.002
11.339
0.076
150.0
0.028
0.00
0.0
0.600
o225
Pipe/Conduit
SW10.000
30.198
0.201
150.0
0.031
4.00
0.0
0.600
o225
Pipe/Conduit
Network Results Table
PN
Rain
(mm/hr)
T.C.
(mins)
US/IL
(m)
Σ I.Area
(ha)
Σ Base
Flow (l/s)
Foul
(l/s)
Add Flow
(l/s)
Vel
(m/s)
Cap
(l/s)
Flow
(l/s)
SW9.000
50.00
4.25
61.150
0.057
0.0
0.0
1.7
1.07
42.4
10.3
SW9.001
50.00
4.39
61.042
0.115
0.0
0.0
3.5
1.07
42.4
20.9
SW9.002
50.00
7.40
60.757
0.171
0.0
0.0
5.2
0.22
34.8
31.1
SW7.003
50.00
4.05
60.752
0.000
5.0
0.0
0.8
1.69
67.3
5.0
SW6.001
50.00
4.44
60.227
0.000
5.0
0.0
1.0
1.07
42.4
6.0
SW6.002
50.00
4.62
60.088
0.028
5.0
0.0
1.8
1.07
42.4
11.1
SW10.000
50.00
4.47
60.525
0.031
0.0
0.0
1.0
1.07
42.4
5.7
O'Connor Sutton Cronin
Page 7
9 Prussia Street
Carpenterstown
Dublin 7
Ireland
Date 28/08/2019
Designed by MK
File G451-MD-S2-P01.07.mdx
Checked by AH
XP Solutions
Network 2018.1
Network Design Table for Surface Water
©1982-2018 Innovyze
PN
Length
(m)
Fall
(m)
Slope
(1:X)
I.Area
(ha)
T.E.
(mins)
Base
Flow (l/s)
k
(mm)
HYD
SECT
DIA
(mm)
Section Type
Auto
Design
SW10.001
24.340
0.162
150.0
0.022
0.00
0.0
0.600
o225
Pipe/Conduit
SW10.002
15.244
0.102
150.0
0.000
0.00
0.0
0.600
o225
Pipe/Conduit
SW11.000
11.657
0.194
60.0
0.048
4.00
0.0
0.600
o150
Pipe/Conduit
SW6.003
40.077
0.200
200.0
0.086
0.00
0.0
0.600
o450
Pipe/Conduit
SW6.004
14.232
0.095
150.0
0.026
0.00
0.0
0.600
o225
Pipe/Conduit
SW6.005
19.940
0.133
150.0
0.045
0.00
0.0
0.600
o225
Pipe/Conduit
SW12.000
9.865
0.164
60.0
0.044
4.00
0.0
0.600
o150
Pipe/Conduit
Network Results Table
PN
Rain
(mm/hr)
T.C.
(mins)
US/IL
(m)
Σ I.Area
(ha)
Σ Base
Flow (l/s)
Foul
(l/s)
Add Flow
(l/s)
Vel
(m/s)
Cap
(l/s)
Flow
(l/s)
SW10.001
50.00
4.85
60.324
0.053
0.0
0.0
1.6
1.07
42.4
9.7
SW10.002
50.00
5.09
60.161
0.053
0.0
0.0
1.6
1.07
42.4
9.7
SW11.000
50.00
4.15
59.825
0.048
0.0
0.0
1.4
1.30
23.0
8.7
SW6.003
50.00
5.56
59.331
0.214
5.0
0.0
7.5
1.43
228.1
45.0
SW6.004
50.00
4.22
59.130
0.000
5.0
0.0
0.8
1.07
42.4
5.0
SW6.005
50.00
4.53
59.035
0.045
5.0
0.0
2.4
1.07
42.4
14.3
SW12.000
50.00
4.13
59.825
0.044
0.0
0.0
1.3
1.30
23.0
8.1
O'Connor Sutton Cronin
Page 8
9 Prussia Street
Carpenterstown
Dublin 7
Ireland
Date 28/08/2019
Designed by MK
File G451-MD-S2-P01.07.mdx
Checked by AH
XP Solutions
Network 2018.1
Network Design Table for Surface Water
©1982-2018 Innovyze
PN
Length
(m)
Fall
(m)
Slope
(1:X)
I.Area
(ha)
T.E.
(mins)
Base
Flow (l/s)
k
(mm)
HYD
SECT
DIA
(mm)
Section Type
Auto
Design
SW6.006
25.884
0.173
150.0
0.021
0.00
0.0
0.600
o225
Pipe/Conduit
SW6.007
18.526
0.124
150.0
0.000
0.00
0.0
0.600
o225
Pipe/Conduit
SW13.000
8.854
0.148
60.0
0.033
4.00
0.0
0.600
o150
Pipe/Conduit
SW6.008
23.583
0.157
150.0
0.045
0.00
0.0
0.600
o225
Pipe/Conduit
SW1.007
11.494
0.077
150.0
0.000
0.00
0.0
0.600
o225
Pipe/Conduit
Network Results Table
PN
Rain
(mm/hr)
T.C.
(mins)
US/IL
(m)
Σ I.Area
(ha)
Σ Base
Flow (l/s)
Foul
(l/s)
Add Flow
(l/s)
Vel
(m/s)
Cap
(l/s)
Flow
(l/s)
SW6.006
50.00
4.40
58.903
0.000
5.0
0.0
0.8
1.07
42.4
5.0
SW6.007
50.00
4.69
58.730
0.000
5.0
0.0
1.0
1.07
42.4
6.0
SW13.000
50.00
4.11
59.425
0.033
0.0
0.0
1.0
1.30
23.0
5.9
SW6.008
50.00
5.06
58.606
0.078
5.0
0.0
3.4
1.07
42.4
20.2
SW1.007
50.00
5.24
58.449
0.078
15.0
0.0
5.4
1.07
42.4
32.2
O'Connor Sutton Cronin
Page 9
9 Prussia Street
Carpenterstown
Dublin 7
Ireland
Date 28/08/2019
Designed by MK
File G451-MD-S2-P01.07.mdx
Checked by AH
XP Solutions
Network 2018.1
Area Summary for Surface Water
©1982-2018 Innovyze
Pipe
Number
PIMP
Type
PIMP
Name
PIMP
(%)
Gross
Area (ha)
Imp.
Area (ha)
Pipe Total
(ha)
1.000
As Zoned
Landscaping
40
0.001
0.000
0.000
Roof
100
0.020
0.020
0.020
Landscaping on Podium
70
0.010
0.007
0.027
1.001
As Zoned
Landscaping
40
0.068
0.027
0.028
2.000
As Zoned
Road
100
0.009
0.009
0.009
Roof
100
0.033
0.033
0.042
Landscaping on Podium
70
0.002
0.001
0.043
1.002
As Zoned
Landscaping
40
0.022
0.009
0.009
Road
100
0.007
0.007
0.016
Roof
100
0.001
0.001
0.017
3.000
-
-
100
0.000
0.000
0.000
1.003
-
-
100
0.000
0.000
0.000
1.004
As Zoned
Landscaping
40
0.037
0.015
0.015
Road
100
0.027
0.027
0.041
Permeable Paving
100
0.023
0.023
0.057
As Zoned
Paving
100
0.005
0.005
0.069
Landscaping
40
0.018
0.007
0.076
Road
100
0.007
0.007
0.083
Permeable Paving
100
0.009
0.009
0.092
Roof
100
0.000
0.000
0.092
Landscaping on Podium
70
0.000
0.000
0.085
4.000
As Zoned
Landscaping
40
0.000
0.000
0.000
Roof
100
0.048
0.048
0.048
1.005
As Zoned
Paving
100
0.003
0.003
0.003
Road
100
0.145
0.145
0.149
Permeable Paving
100
0.007
0.007
0.022
5.000
As Zoned
Roof
100
0.023
0.023
0.023
O'Connor Sutton Cronin
Page 10
9 Prussia Street
Carpenterstown
Dublin 7
Ireland
Date 28/08/2019
Designed by MK
File G451-MD-S2-P01.07.mdx
Checked by AH
XP Solutions
Network 2018.1
Area Summary for Surface Water
©1982-2018 Innovyze
1.006
As Zoned
Paving
100
0.000
0.000
0.000
Landscaping
40
0.001
0.000
0.001
Road
100
0.093
0.093
0.094
Permeable Paving
100
0.000
0.000
0.021
6.000
-
-
100
0.000
0.000
0.000
7.000
As Zoned
Roof
100
0.038
0.038
0.038
Landscaping on Podium
70
0.022
0.015
0.054
7.001
As Zoned
Landscaping
40
0.000
0.000
0.000
Roof
100
0.045
0.045
0.045
Landscaping on Podium
70
0.019
0.014
0.059
7.002
As Zoned
Roof
100
0.023
0.023
0.023
Landscaping on Podium
70
0.012
0.008
0.031
8.000
As Zoned
Roof
100
0.018
0.018
0.018
Landscaping on Podium
70
0.019
0.013
0.031
8.001
As Zoned
Roof
100
0.020
0.020
0.020
Landscaping on Podium
70
0.017
0.012
0.032
8.002
As Zoned
Landscaping
40
0.000
0.000
0.000
Roof
100
0.000
0.000
0.000
Landscaping on Podium
70
0.038
0.026
0.025
9.000
As Zoned
Roof
100
0.022
0.022
0.022
Landscaping on Podium
70
0.049
0.035
0.057
9.001
As Zoned
Roof
100
0.032
0.032
0.032
Landscaping on Podium
70
0.037
0.026
0.058
9.002
As Zoned
Landscaping
40
0.000
0.000
0.000
Roof
100
0.025
0.025
0.025
Landscaping on Podium
70
0.045
0.032
0.056
7.003
-
-
100
0.000
0.000
0.000
Pipe
Number
PIMP
Type
PIMP
Name
PIMP
(%)
Gross
Area (ha)
Imp.
Area (ha)
Pipe Total
(ha)
O'Connor Sutton Cronin
Page 11
9 Prussia Street
Carpenterstown
Dublin 7
Ireland
Date 28/08/2019
Designed by MK
File G451-MD-S2-P01.07.mdx
Checked by AH
XP Solutions
Network 2018.1
Area Summary for Surface Water
©1982-2018 Innovyze
6.001
-
-
100
0.000
0.000
0.000
6.002
As Zoned
Landscaping
40
0.034
0.013
0.013
Road
100
0.008
0.008
0.021
Permeable Paving
100
0.006
0.006
0.028
10.000
As Zoned
Landscaping
40
0.078
0.031
0.031
Roof
100
0.000
0.000
0.031
Landscaping on Podium
70
0.000
0.000
0.031
10.001
As Zoned
Landscaping
40
0.054
0.022
0.022
Roof
100
0.000
0.000
0.022
10.002
-
-
100
0.000
0.000
0.000
11.000
As Zoned
Landscaping
40
0.000
0.000
0.000
Roof
100
0.048
0.048
0.048
6.003
As Zoned
Landscaping
40
0.017
0.007
0.007
Road
100
0.035
0.035
0.041
Permeable Paving
100
0.039
0.039
0.080
Roof
100
0.005
0.005
0.086
6.004
As Zoned
Paving
100
0.001
0.001
0.001
Landscaping
40
0.000
0.000
0.001
Road
100
0.018
0.018
0.020
Permeable Paving
100
0.000
0.000
0.020
Roof
100
0.007
0.007
0.026
6.005
As Zoned
Paving
100
0.009
0.009
0.009
Landscaping
40
0.005
0.002
0.011
Road
100
0.021
0.021
0.032
Permeable Paving
100
0.014
0.014
0.045
12.000
As Zoned
Landscaping
40
0.000
0.000
0.000
Roof
100
0.044
0.044
0.044
Pipe
Number
PIMP
Type
PIMP
Name
PIMP
(%)
Gross
Area (ha)
Imp.
Area (ha)
Pipe Total
(ha)
O'Connor Sutton Cronin
Page 12
9 Prussia Street
Carpenterstown
Dublin 7
Ireland
Date 28/08/2019
Designed by MK
File G451-MD-S2-P01.07.mdx
Checked by AH
XP Solutions
Network 2018.1
Area Summary for Surface Water
©1982-2018 Innovyze
6.006
As Zoned
Default
50.005
0.000
0.000
Paving
100
0.005
0.005
0.006
Landscaping
40
0.007
0.003
0.008
Road
100
0.012
0.012
0.021
6.007
-
-
100
0.000
0.000
0.000
13.000
As Zoned
Roof
100
0.033
0.033
0.033
6.008
As Zoned
Paving
100
0.007
0.007
0.007
Landscaping
40
0.002
0.001
0.008
Road
100
0.020
0.020
0.028
Permeable Paving
100
0.014
0.014
0.042
Roof
100
0.003
0.003
0.045
1.007
-
-
100
0.000
0.000
0.000
Total
Total
Total
1.651
1.144
1.144
Pipe
Number
PIMP
Type
PIMP
Name
PIMP
(%)
Gross
Area (ha)
Imp.
Area (ha)
Pipe Total
(ha)
Free Flowing Outfall Details for Surface Water
Outfall
Pipe Number
Outfall
Name
C. Level
(m)
I. Level
(m)
Min
I. Level
(m)
D,L
(mm)
W
(mm)
SW1.007
SW.
60.000
58.373
0.000
00
O'Connor Sutton Cronin
Page 13
9 Prussia Street
Carpenterstown
Dublin 7
Ireland
Date 28/08/2019
Designed by MK
File G451-MD-S2-P01.07.mdx
Checked by AH
XP Solutions
Network 2018.1
Online Controls for Surface Water
©1982-2018 Innovyze
Hydro-Brake® Optimum Manhole: SW.6, DS/PN: SW1.006, Volume (m³): 4.6
Unit Reference
MD-SHE-0102-5000-1250-5000
Sump Available
Yes
Design Head (m)
1.250
Diameter (mm)
102
Design Flow (l/s)
5.0
Invert Level (m)
58.887
Flush-Flo™
Calculated
Minimum Outlet Pipe Diameter (mm)
150
Objective
Minimise upstream storage
Suggested Manhole Diameter (mm)
1200
Application
Surface
Control Points
Head (m)
Flow (l/s)
Control Points
Head (m)
Flow (l/s)
Design Point (Calculated)
1.250
5.0
Kick-Flo®
0.772
4.0
Flush-Flo™
0.370
5.0
Mean Flow over Head Range
-4.4
The hydrological calculations have been based on the Head/Discharge relationship for the Hydro-Brake® Optimum as specified. Should
another type of control device other than a Hydro-Brake Optimum® be utilised then these storage routing calculations will be invalidated
Depth (m)
Flow (l/s)
Depth (m)
Flow (l/s)
Depth (m)
Flow (l/s)
Depth (m)
Flow (l/s)
Depth (m)
Flow (l/s)
Depth (m)
Flow (l/s)
0.100
3.4
0.600
4.7
1.600
5.6
2.600
7.0
5.000
9.6
7.500
11.6
0.200
4.7
0.800
4.1
1.800
5.9
3.000
7.5
5.500
10.0
8.000
12.0
0.300
5.0
1.000
4.5
2.000
6.2
3.500
8.1
6.000
10.4
8.500
12.3
0.400
5.0
1.200
4.9
2.200
6.5
4.000
8.6
6.500
10.9
9.000
12.7
0.500
4.9
1.400
5.3
2.400
6.8
4.500
9.1
7.000
11.2
9.500
13.0
O'Connor Sutton Cronin
Page 14
9 Prussia Street
Carpenterstown
Dublin 7
Ireland
Date 28/08/2019
Designed by MK
File G451-MD-S2-P01.07.mdx
Checked by AH
XP Solutions
Network 2018.1
Hydro-Brake® Optimum Manhole: SW.8, DS/PN: SW7.003, Volume (m³): 11.7
©1982-2018 Innovyze
Unit Reference
MD-SHE-0134-7500-0550-7500
Sump Available
Yes
Design Head (m)
0.550
Diameter (mm)
134
Design Flow (l/s)
7.5
Invert Level (m)
60.752
Flush-Flo™
Calculated
Minimum Outlet Pipe Diameter (mm)
150
Objective
Minimise upstream storage
Suggested Manhole Diameter (mm)
1200
Application
Surface
Control Points
Head (m)
Flow (l/s)
Control Points
Head (m)
Flow (l/s)
Design Point (Calculated)
0.550
7.5
Kick-Flo®
0.416
6.6
Flush-Flo™
0.211
7.5
Mean Flow over Head Range
-6.1
The hydrological calculations have been based on the Head/Discharge relationship for the Hydro-Brake® Optimum as specified. Should
another type of control device other than a Hydro-Brake Optimum® be utilised then these storage routing calculations will be invalidated
Depth (m)
Flow (l/s)
Depth (m)
Flow (l/s)
Depth (m)
Flow (l/s)
Depth (m)
Flow (l/s)
Depth (m)
Flow (l/s)
Depth (m)
Flow (l/s)
0.100
4.8
0.600
7.8
1.600
12.4
2.600
15.6
5.000
21.4
7.500
26.0
0.200
7.5
0.800
8.9
1.800
13.1
3.000
16.7
5.500
22.4
8.000
26.9
0.300
7.3
1.000
9.9
2.000
13.8
3.500
18.0
6.000
23.2
8.500
27.7
0.400
6.8
1.200
10.8
2.200
14.4
4.000
19.2
6.500
24.2
9.000
28.5
0.500
7.2
1.400
11.6
2.400
15.0
4.500
20.3
7.000
25.1
9.500
29.3
Hydro-Brake® Optimum Manhole: SW.15, DS/PN: SW6.004, Volume (m³): 8.5
Unit Reference
MD-SHE-0119-7500-1600-7500
Flush-Flo™
Calculated
Design Head (m)
1.600
Objective
Minimise upstream storage
Design Flow (l/s)
7.5
Application
Surface
O'Connor Sutton Cronin
Page 15
9 Prussia Street
Carpenterstown
Dublin 7
Ireland
Date 28/08/2019
Designed by MK
File G451-MD-S2-P01.07.mdx
Checked by AH
XP Solutions
Network 2018.1
Hydro-Brake® Optimum Manhole: SW.15, DS/PN: SW6.004, Volume (m³): 8.5
©1982-2018 Innovyze
Sump Available
Yes
Minimum Outlet Pipe Diameter (mm)
150
Diameter (mm)
119
Suggested Manhole Diameter (mm)
1200
Invert Level (m)
59.130
Control Points
Head (m)
Flow (l/s)
Control Points
Head (m)
Flow (l/s)
Design Point (Calculated)
1.600
7.5
Kick-Flo®
0.981
6.0
Flush-Flo™
0.477
7.5
Mean Flow over Head Range
-6.6
The hydrological calculations have been based on the Head/Discharge relationship for the Hydro-Brake® Optimum as specified. Should
another type of control device other than a Hydro-Brake Optimum® be utilised then these storage routing calculations will be invalidated
Depth (m)
Flow (l/s)
Depth (m)
Flow (l/s)
Depth (m)
Flow (l/s)
Depth (m)
Flow (l/s)
Depth (m)
Flow (l/s)
Depth (m)
Flow (l/s)
0.100
4.2
0.600
7.4
1.600
7.5
2.600
9.4
5.000
12.9
7.500
15.6
0.200
6.6
0.800
7.0
1.800
7.9
3.000
10.1
5.500
13.4
8.000
16.1
0.300
7.2
1.000
6.0
2.000
8.3
3.500
10.8
6.000
14.0
8.500
16.6
0.400
7.5
1.200
6.6
2.200
8.7
4.000
11.6
6.500
14.6
9.000
17.0
0.500
7.5
1.400
7.0
2.400
9.1
4.500
12.2
7.000
15.1
9.500
17.5
Hydro-Brake® Optimum Manhole: SW.20, DS/PN: SW1.007, Volume (m³): 4.4
Unit Reference
MD-SHE-0130-9000-1600-9000
Sump Available
Yes
Design Head (m)
1.600
Diameter (mm)
130
Design Flow (l/s)
9.0
Invert Level (m)
58.449
Flush-Flo™
Calculated
Minimum Outlet Pipe Diameter (mm)
150
Objective
Minimise upstream storage
Suggested Manhole Diameter (mm)
1200
Application
Surface
O'Connor Sutton Cronin
Page 16
9 Prussia Street
Carpenterstown
Dublin 7
Ireland
Date 28/08/2019
Designed by MK
File G451-MD-S2-P01.07.mdx
Checked by AH
XP Solutions
Network 2018.1
Hydro-Brake® Optimum Manhole: SW.20, DS/PN: SW1.007, Volume (m³): 4.4
©1982-2018 Innovyze
Control Points
Head (m)
Flow (l/s)
Control Points
Head (m)
Flow (l/s)
Design Point (Calculated)
1.600
9.0
Kick-Flo®
0.983
7.2
Flush-Flo™
0.472
9.0
Mean Flow over Head Range
-7.9
The hydrological calculations have been based on the Head/Discharge relationship for the Hydro-Brake® Optimum as specified. Should
another type of control device other than a Hydro-Brake Optimum® be utilised then these storage routing calculations will be invalidated
Depth (m)
Flow (l/s)
Depth (m)
Flow (l/s)
Depth (m)
Flow (l/s)
Depth (m)
Flow (l/s)
Depth (m)
Flow (l/s)
Depth (m)
Flow (l/s)
0.100
4.7
0.600
8.9
1.600
9.0
2.600
11.3
5.000
15.4
7.500
18.8
0.200
8.0
0.800
8.4
1.800
9.5
3.000
12.1
5.500
16.2
8.000
19.3
0.300
8.7
1.000
7.2
2.000
10.0
3.500
13.0
6.000
16.8
8.500
19.9
0.400
8.9
1.200
7.9
2.200
10.5
4.000
13.9
6.500
17.5
9.000
20.5
0.500
9.0
1.400
8.5
2.400
10.9
4.500
14.7
7.000
18.1
9.500
21.0
O'Connor Sutton Cronin
Page 17
9 Prussia Street
Carpenterstown
Dublin 7
Ireland
Date 28/08/2019
Designed by MK
File G451-MD-S2-P01.07.mdx
Checked by AH
XP Solutions
Network 2018.1
Storage Structures for Surface Water
©1982-2018 Innovyze
Cellular Storage Manhole: SW.6, DS/PN: SW1.006
Invert Level (m)
58.784
Infiltration Coefficient Side (m/hr)
0.00000
Porosity
0.95
Infiltration Coefficient Base (m/hr)
0.00000
Safety Factor
2.0
Depth (m)
Area (m²)
Inf. Area (m²)
Depth (m)
Area (m²)
Inf. Area (m²)
Depth (m)
Area (m²)
Inf. Area (m²)
0.000
135.0
0.0
0.900
135.0
0.0
0.901
0.0
0.0
Cellular Storage Manhole: SW.8, DS/PN: SW7.003
Invert Level (m)
60.752
Infiltration Coefficient Side (m/hr)
0.00000
Porosity
0.95
Infiltration Coefficient Base (m/hr)
0.00000
Safety Factor
2.0
Depth (m)
Area (m²)
Inf. Area (m²)
Depth (m)
Area (m²)
Inf. Area (m²)
Depth (m)
Area (m²)
Inf. Area (m²)
0.000
315.0
0.0
0.450
315.0
0.0
0.451
0.0
0.0
Cellular Storage Manhole: SW.15, DS/PN: SW6.004
Invert Level (m)
59.277
Infiltration Coefficient Side (m/hr)
0.00000
Porosity
0.95
Infiltration Coefficient Base (m/hr)
0.00000
Safety Factor
2.0
Depth (m)
Area (m²)
Inf. Area (m²)
Depth (m)
Area (m²)
Inf. Area (m²)
Depth (m)
Area (m²)
Inf. Area (m²)
0.000
198.0
0.0
0.900
198.0
0.0
0.901
0.0
0.0
O'Connor Sutton Cronin
Page 18
9 Prussia Street
Carpenterstown
Dublin 7
Ireland
Date 28/08/2019
Designed by MK
File G451-MD-S2-P01.07.mdx
Checked by AH
XP Solutions
Network 2018.1
Cellular Storage Manhole: SW.16, DS/PN: SW6.005
©1982-2018 Innovyze
Invert Level (m)
59.035
Infiltration Coefficient Side (m/hr)
0.00000
Porosity
0.95
Infiltration Coefficient Base (m/hr)
0.00000
Safety Factor
2.0
Depth (m)
Area (m²)
Inf. Area (m²)
Depth (m)
Area (m²)
Inf. Area (m²)
Depth (m)
Area (m²)
Inf. Area (m²)
0.000
83.0
0.0
0.900
83.0
0.0
0.901
0.0
0.0
Cellular Storage Manhole: SW.20, DS/PN: SW1.007
Invert Level (m)
58.844
Infiltration Coefficient Side (m/hr)
0.00000
Porosity
0.95
Infiltration Coefficient Base (m/hr)
0.00000
Safety Factor
2.0
Depth (m)
Area (m²)
Inf. Area (m²)
Depth (m)
Area (m²)
Inf. Area (m²)
Depth (m)
Area (m²)
Inf. Area (m²)
0.000
80.0
0.0
0.900
80.0
0.0
0.901
0.0
0.0
O'Connor Sutton Cronin
Page 19
9 Prussia Street
Carpenterstown
Dublin 7
Ireland
Date 28/08/2019
Designed by MK
File G451-MD-S2-P01.07.mdx
Checked by AH
XP Solutions
Network 2018.1
Summary of Critical Results by Maximum Level (Rank 1) for Surface Water
©1982-2018 Innovyze
Simulation Criteria
Areal Reduction Factor
1.000
Manhole Headloss Coeff (Global)
0.500
MADD Factor * 10m³/ha Storage
2.000
Hot Start (mins)
0Foul Sewage per hectare (l/s)
0.000
Inlet Coeffiecient
0.800
Hot Start Level (mm)
0Additional Flow - % of Total Flow
0.000
Flow per Person per Day (l/per/day)
0.000
Number of Input Hydrographs
0Number of Offline Controls
0Number of Time/Area Diagrams
0
Number of Online Controls
4Number of Storage Structures
5Number of Real Time Controls
0
Synthetic Rainfall Details
Rainfall Model
FSR
M5-60 (mm)
16.300
Cv (Summer)
0.750
Region
Scotland and Ireland
Ratio R
0.276
Cv (Winter)
0.840
Margin for Flood Risk Warning (mm)
150.0
DVD Status
ON
Analysis Timestep
2.5 Second Increment (Extended)
Inertia Status
ON
DTS Status
OFF
Profile(s)
Summer and Winter
Duration(s) (mins)
15, 30, 60, 120, 180, 240, 360, 480, 600, 720, 960, 1440, 2160, 2880,
4320, 5760, 7200, 8640, 10080
Return Period(s) (years)
100
Climate Change (%)
20
PN
US/MH
Name
Event
US/CL
(m)
Water
Level
(m)
Surcharged
Depth
(m)
Flooded
Volume
(m³)
Flow /
Cap.
Infil.
Vol (m³)
Maximum
Vol (m³)
Discharge
Vol (m³)
Pipe
Flow
(l/s)
Status
SW1.000
SW.E1
15 minute 100 year Winter I+20%
61.500
60.617
-0.133
0.000
0.34
0.014
4.854
11.1
OK
O'Connor Sutton Cronin
Page 20
9 Prussia Street
Carpenterstown
Dublin 7
Ireland
Date 28/08/2019
Designed by MK
File G451-MD-S2-P01.07.mdx
Checked by AH
XP Solutions
Network 2018.1
Summary of Critical Results by Maximum Level (Rank 1) for Surface Water
©1982-2018 Innovyze
PN
US/MH
Name
Event
US/CL
(m)
Water
Level
(m)
Surcharged
Depth
(m)
Flooded
Volume
(m³)
Flow /
Cap.
Infil.
Vol (m³)
Maximum
Vol (m³)
Discharge
Vol (m³)
Pipe
Flow
(l/s)
Status
SW1.001
SW.1
15 minute 100 year Winter I+20%
61.500
60.592
-0.104
0.000
0.55
0.237
9.799
22.0
OK
SW2.000
SW.E2
15 minute 100 year Summer I+20%
61.500
60.632
-0.043
0.000
0.86
0.116
6.951
17.9
OK
SW1.002
SW.2
15 minute 100 year Winter I+20%
61.250
60.481
0.011
0.000
1.01
0.991
20.601
43.0
SURCHARGED
SW3.000
SW.E3
360 minute 100 year Winter I+20%
61.500
60.525
-0.150
0.000
0.00
0.000
0.000
0.0
OK
SW1.003
SW.3
15 minute 100 year Summer I+20%
61.250
60.379
0.001
0.000
1.05
0.503
18.394
42.5
SURCHARGED
SW1.004
SW.4
960 minute 100 year Winter I+20%
61.250
59.949
0.399
0.000
0.03
1.209
152.778
6.6
SURCHARGED
SW4.000
SW.A1
15 minute 100 year Summer I+20%
61.500
60.637
-0.038
0.000
0.91
0.121
7.622
19.6
OK
SW1.005
SW.5
960 minute 100 year Winter I+20%
60.500
59.949
0.527
0.000
0.05
5.224
205.899
8.9
SURCHARGED
SW5.000
SW.A2
960 minute 100 year Winter I+20%
60.400
59.949
0.049
0.000
0.04
0.220
17.291
0.8
SURCHARGED
SW1.006
SW.6
960 minute 100 year Winter I+20%
60.250
59.949
0.837
0.000
0.13
0.000
119.754
217.430
4.8
SURCHARGED
SW6.000
SW.7
720 minute 100 year Summer I+20%
61.250
60.294
-0.206
0.000
0.00
0.016
0.000
0.0
OK
SW7.000
SW.P1
15 minute 100 year Winter I+20%
61.500
61.353
-0.022
0.000
0.57
0.031
9.627
21.2
FLOOD RISK
SW7.001
SW.P2
15 minute 100 year Winter I+20%
61.500
61.307
0.035
0.000
1.30
0.552
20.187
43.9
SURCHARGED
SW7.002
SW.P3
240 minute 100 year Winter I+20%
61.500
61.164
-0.050
0.000
0.21
0.325
72.549
12.6
OK
SW8.000
SW.P4
15 minute 100 year Winter I+20%
61.500
61.240
-0.135
0.000
0.34
0.014
5.590
12.8
OK
SW8.001
SW.P5
15 minute 100 year Winter I+20%
61.500
61.190
-0.079
0.000
0.75
0.258
11.315
25.7
OK
SW8.002
SW.P6
240 minute 100 year Winter I+20%
61.500
61.164
-0.045
0.000
0.14
0.342
44.641
7.7
OK
SW9.000
SW.P7
15 minute 100 year Winter I+20%
61.500
61.352
-0.023
0.000
0.59
0.031
10.187
22.3
FLOOD RISK
SW9.001
SW.P8
15 minute 100 year Winter I+20%
61.500
61.305
0.037
0.000
1.30
0.577
20.585
44.8
SURCHARGED
SW9.002
SW.P9
240 minute 100 year Winter I+20%
61.500
61.165
-0.042
0.000
0.19
0.345
86.478
15.0
OK
SW7.003
SW.8
240 minute 100 year Winter I+20%
61.500
61.163
0.186
0.000
0.18
0.000
132.718
171.856
7.5
SURCHARGED
SW6.001
SW.9
720 minute 100 year Summer I+20%
61.500
60.294
-0.158
0.000
0.19
0.114
249.432
7.5
OK
SW6.002
SW.10
30 minute 100 year Summer I+20%
61.250
60.193
-0.120
0.000
0.42
0.215
25.488
15.2
OK
SW10.000
SW.11
15 minute 100 year Winter I+20%
61.500
60.613
-0.137
0.000
0.32
0.094
5.635
12.8
OK
SW10.001
SW.12
15 minute 100 year Winter I+20%
61.400
60.444
-0.105
0.000
0.54
0.295
9.539
21.0
OK
O'Connor Sutton Cronin
Page 21
9 Prussia Street
Carpenterstown
Dublin 7
Ireland
Date 28/08/2019
Designed by MK
File G451-MD-S2-P01.07.mdx
Checked by AH
XP Solutions
Network 2018.1
Summary of Critical Results by Maximum Level (Rank 1) for Surface Water
©1982-2018 Innovyze
PN
US/MH
Name
Event
US/CL
(m)
Water
Level
(m)
Surcharged
Depth
(m)
Flooded
Volume
(m³)
Flow /
Cap.
Infil.
Vol (m³)
Maximum
Vol (m³)
Discharge
Vol (m³)
Pipe
Flow
(l/s)
Status
SW10.002
SW.13
15 minute 100 year Winter I+20%
61.250
60.283
-0.104
0.000
0.57
0.298
9.539
21.2
OK
SW11.000
SW.B1
960 minute 100 year Winter I+20%
60.800
60.142
0.167
0.000
0.08
0.353
36.405
1.6
SURCHARGED
SW6.003
SW.14
960 minute 100 year Winter I+20%
61.000
60.142
0.361
0.000
0.07
1.538
469.571
14.6
SURCHARGED
SW6.004
SW.15
960 minute 100 year Winter I+20%
60.800
60.139
0.783
0.000
0.19
0.000
169.683
489.672
6.9
SURCHARGED
SW6.005
SW.16
960 minute 100 year Winter I+20%
60.750
59.958
0.697
0.000
0.21
0.000
72.545
524.229
8.0
SURCHARGED
SW12.000
SW.B2
960 minute 100 year Winter I+20%
60.800
59.946
-0.029
0.000
0.07
0.131
33.849
1.5
OK
SW6.006
SW.17
960 minute 100 year Winter I+20%
60.650
59.945
0.817
0.000
0.22
2.060
573.841
8.7
SURCHARGED
SW6.007
SW.18
960 minute 100 year Winter I+20%
60.500
59.929
0.974
0.000
0.23
2.332
573.833
8.6
SURCHARGED
SW13.000
SW.A3
960 minute 100 year Winter I+20%
60.400
59.917
0.342
0.000
0.05
0.550
24.913
1.1
SURCHARGED
SW6.008
SW.19
960 minute 100 year Winter I+20%
60.450
59.916
1.085
0.000
0.26
2.300
633.427
10.2
SURCHARGED
SW1.007
SW.20
960 minute 100 year Winter I+20%
60.200
59.900
1.226
0.000
0.25
0.000
72.254
850.685
9.0
SURCHARGED
APPENDIX D. WASTEWATER CALCULATIONS & DESIGN NETWORK TABLES
- As per Irish Water Code of Practice for Wastewater
Infrastructure, IW-CDS-5030-03
- Network Design Tables
Appendix D
Wastewater Calculations & Design Network Tables
JO
B N
AM
E:
JO
B N
O:
DA
TE
:
Re
sid
en
tia
l D
eve
lop
me
nt a
t C
arp
en
ters
tow
n, D
ub
lin 1
5G
45
12
8.0
8.2
01
9
TIT
LE
:C
AL
CS
BY
:C
HE
CK
ED
:
Wa
ste
wa
ter
De
sig
n C
alc
ula
tio
ns
MK
PR
Are
aN
o.
of
Un
its
Are
a/p
ers
on
Oc
cu
pa
nc
yP
op
ula
tio
n
Eq
uiv
ale
nt
Flo
w R
ate
Flo
wIn
filt
rati
on
All
ow
an
ce
To
tal
Flo
wD
WF
Pe
ak
Fa
cto
r fo
r
Pip
e S
izin
gP
ea
k F
low
(m2)
(nr)
(m2)
(nr/
m2)
(l/p
ers
on
/da
y)
(l/u
nit
/da
y)
(% o
f fl
ow
)(m
3/d
ay)
(l/s
)(l
/s)
Do
me
sti
c
19
6 u
nits
19
62
.75
29
.21
50
40
51
0%
87
.32
1.0
16
.06
.1
TO
TA
L D
om
estic
01
96
52
9.2
40
58
7.3
21
.01
6.1
No
n-D
om
es
tic
Re
tail
n/a
Re
sta
ura
nts
n/a
Ca
fé/B
ars
n/a
Fa
st
Fo
od
n/a
Re
tail
sh
op
sn
/a
Off
ice
/Wo
rk S
pa
ce
n/a
Ho
tel
n/a
Ve
nu
e/E
ve
nt/
Co
mm
un
ity
n/a
TO
TA
L N
on
-Do
me
stic
00
0.0
00
.00
.00
TO
TA
L0
19
65
29
40
50
87
.32
1.0
16
.06
Res
iden
tial
Occ
up
ancy
rate
s fr
om
App
endix
C o
f IW
Code
of
Pra
ctic
e fo
r W
ast
ewate
r In
frast
ruct
ure
, D
ecem
ber
2017 (
IW-C
DS-5
030-0
3)
Flo
w r
ate
s fr
om
App
endix
D o
f IW
Code
of
Pra
ctic
e fo
r W
ast
ewate
r In
frast
ruct
ure
, D
ecem
ber
2017 (
IW-C
DS-5
030-0
3)
Infi
ltra
tion r
ate
s fr
om
App
endix
C o
f IW
Code
of
Pra
ctic
e fo
r W
ast
ewate
r In
frast
ruct
ure
, D
ecem
ber
2017 (
IW-C
DS-5
030-0
3)
Pea
king
Fact
or
from
App
endix
C o
f IW
Code
of
Pra
ctic
e fo
r W
ast
ewate
r In
frast
ruct
ure
, D
ecem
ber
2017 (
IW-C
DS-5
030-0
3)
Zo
ne
O'Connor Sutton Cronin
Page 1
9 Prussia Street
Carpenterstown
Dublin 7
Ireland
Date 28/08/2019
Designed by MK
File G451-MD-S2-P01.07.mdx
Checked by AH
XP Solutions
Network 2018.1
FOUL SEWERAGE DESIGN
Design Criteria for Wastewater
©1982-2018 Innovyze
Pipe Sizes
STANDARD
Manhole Sizes
STANDARD
Industrial Flow (l/s/ha)
0.00
Domestic (l/s/ha)
0.00
Maximum Backdrop Height (m)
0.900
Industrial Peak Flow Factor
0.00
Domestic Peak Flow Factor
6.00
Min Design Depth for Optimisation (m)
0.750
Flow Per Person (l/per/day)
150.00
Add Flow / Climate Change (%)
10
Min Vel for Auto Design only (m/s)
0.75
Persons per House
2.70
Minimum Backdrop Height (m)
0.000
Min Slope for Optimisation (1:X)
200
Designed with Level Soffits
Network Design Table for Wastewater
PN
Length
(m)
Fall
(m)
Slope
(1:X)
Area
(ha)
Houses
Base
Flow (l/s)
k
(mm)
HYD
SECT
DIA
(mm)
Section Type
Auto
Design
WW1.000
33.502
0.223
150.0
0.000
50
0.0
1.500
o225
Pipe/Conduit
WW1.001
8.643
0.058
149.0
0.000
00.0
1.500
o225
Pipe/Conduit
Network Results Table
PN
US/IL
(m)
Σ Area
(ha)
Σ Base
Flow (l/s)
Σ Hse
Add Flow
(l/s)
P.Dep
(mm)
P.Vel
(m/s)
Vel
(m/s)
Cap
(l/s)
Flow
(l/s)
WW1.000
60.075
0.000
0.0
50
0.1
31
0.46
0.94
37.2
1.5
WW1.001
59.852
0.000
0.0
50
0.1
31
0.46
0.94
37.4
1.5
O'Connor Sutton Cronin
Page 2
9 Prussia Street
Carpenterstown
Dublin 7
Ireland
Date 28/08/2019
Designed by MK
File G451-MD-S2-P01.07.mdx
Checked by AH
XP Solutions
Network 2018.1
Network Design Table for Wastewater
©1982-2018 Innovyze
PN
Length
(m)
Fall
(m)
Slope
(1:X)
Area
(ha)
Houses
Base
Flow (l/s)
k
(mm)
HYD
SECT
DIA
(mm)
Section Type
Auto
Design
WW2.000
48.498
0.323
150.0
0.000
40
0.0
1.500
o225
Pipe/Conduit
WW2.001
10.852
0.072
150.0
0.000
27
0.0
1.500
o225
Pipe/Conduit
WW1.002
50.776
0.339
150.0
0.000
00.0
1.500
o225
Pipe/Conduit
WW3.000
24.448
0.122
200.0
0.000
40
0.0
1.500
o225
Pipe/Conduit
WW3.001
36.632
0.183
200.0
0.000
40
0.0
1.500
o225
Pipe/Conduit
WW1.003
17.982
0.090
200.0
0.000
00.0
1.500
o225
Pipe/Conduit
Network Results Table
PN
US/IL
(m)
Σ Area
(ha)
Σ Base
Flow (l/s)
Σ Hse
Add Flow
(l/s)
P.Dep
(mm)
P.Vel
(m/s)
Vel
(m/s)
Cap
(l/s)
Flow
(l/s)
WW2.000
60.025
0.000
0.0
40
0.1
28
0.43
0.94
37.2
1.2
WW2.001
59.702
0.000
0.0
67
0.2
36
0.50
0.94
37.2
2.1
WW1.002
59.629
0.000
0.0
117
0.3
47
0.59
0.94
37.2
3.6
WW3.000
59.550
0.000
0.0
40
0.1
30
0.39
0.81
32.2
1.2
WW3.001
59.428
0.000
0.0
80
0.2
42
0.48
0.81
32.2
2.5
WW1.003
59.245
0.000
0.0
197
0.6
66
0.62
0.81
32.2
6.1
O'Connor Sutton Cronin
Page 3
9 Prussia Street
Carpenterstown
Dublin 7
Ireland
Date 28/08/2019
Designed by MK
File G451-MD-S2-P01.07.mdx
Checked by AH
XP Solutions
Network 2018.1
Free Flowing Outfall Details for Wastewater
©1982-2018 Innovyze
Outfall
Pipe Number
Outfall
Name
C. Level
(m)
I. Level
(m)
Min
I. Level
(m)
D,L
(mm)
W
(mm)
WW1.003
WW.
60.790
59.155
0.000
00
APPENDIX E. IRISH WATER CORRESPONDENCE
- Confirmation of Feasibility
- Statement of Design Acceptance
Appendix E
Irish Water Correspondence
Glenveagh Homes Ltdc
/o Daire O Mahoney
OCSC
9 Prussia Street
Dublin 7
Co. Dublin
7 October 2019
Re: Design Submission for Glenveagh Homes Ltd., Carpenterstown Rd, Castleknock, D15
(the “Design Submission”) / Connection Reference No: 387807675
Dear Daire O Mahoney,
Many thanks for your recent Design Submission.
We have reviewed your proposal for the connection(s) at the Development. Based on the
information provided, which included the documents outlined in Appendix A to this letter, Irish
Water has no objection to your proposals.
This letter does not constitute an offer, in whole or in part, to provide a connection to any Irish
Water infrastructure. Before you can connect to our network you must sign a connection
agreement with Irish Water. This can be applied for by completing the connection application
form at www.water.ie/connections. Irish Water’s current charges for water and wastewater
connections are set out in the Water Charges Plan as approved by the Commission for
Regulation of Utilities (CRU)(https://www.cru.ie/document_group/irish-waters-water-charges-
plan-2018/).
You the Customer (including any designers/contractors or other related parties appointed by you)
is entirely responsible for the design and construction of all water and/or wastewater
infrastructure within the Development which is necessary to facilitate connection(s) from the
boundary of the Development to Irish Water’s network(s) (the “Self-Lay Works”), as reflected in
your Design Submission. Acceptance of the Design Submission by Irish Water does not, in any
way, render Irish Water liable for any elements of the design and/or construction of the Self-Lay
Works.
If you have any further questions, please contact your Irish Water representative:
Name: Marina Zivanovic Byrne
Phone: 01 89 25991
Email: [email protected]
Yours sincerely,
Maria O’Dwyer Connections and Developer Services
Appendix A
Document Title & Revision
G451-OCSC-XX-XX-DR-C-0500-A1-C03
G451-OCSC-XX-XX-DR-C-0511-A1-C02
G451-OCSC-XX-XX-DR-C-0550-A1-C02
Standard Details/Code of Practice Exemption: N/A
For further information, visit www.water.ie/connections
Notwithstanding any matters listed above, the Customer (including any appointed
designers/contractors, etc.) is entirely responsible for the design and construction of the Self-Lay
Works. Acceptance of the Design Submission by Irish Water will not, in any way, render Irish
Water liable for any elements of the design and/or construction of the Self-Lay Works.
OCSC 9 Prussia Street Dublin 7
Dear Sir/Madam,
Re: Customer Reference No 387807675
5
Yours sincerely,
Maria O’Dwyer
Connections and Developer Services
In the case of wastewater connections this assessment does not confirm that a gravity connection is achievable.
Therefore a suitably sized pumping station may be required to be installed on your site. All infrastructure should be
designed and installed in accordance with the Irish Water Code of Practice.
03 December 2018
Irish Water has reviewed your pre-connection enquiry in relation to water and wastewater connections at
Carpenterstown Road, Dublin 15. Based upon the details that you have provided with your pre-connection enquiry
and on the capacity currently available in the network(s), as assessed by Irish Water, we wish to advise you that,
subject to a valid connection agreement being put in place, your proposed connection to the Irish Water network(s)
can be facilitated.
pre-connection enquiry - Subject to contract | Contract denied
[Connection for 200 domestic units]
Glenveagh Homes Ltdc/o Daire O Mahoney
If you have any further questions, please contact Marina Byrne from the design team on 018925991 or email
[email protected]. For further information, visit www.water.ie/connections
A connection agreement can be applied for by completing the connection application form available at
www.water.ie/connections. Irish Water’s current charges for water and wastewater connections are set out in the
Water Charges Plan as approved by the Commission for Regulation of Utilities.
You are advised that this correspondence does not constitute an offer in whole or in part to provide a connection to
any Irish Water infrastructure and is provided subject to a connection agreement being signed at a later date.
Irish Water notes that the scale of this development dictates that it is subject to the Strategic Housing Development
planning process. Therefore in advance of submitting your full application to An Bord Pleanala for assessment, you
must have reviewed this development with Irish Water and received a Statement of Design Acceptance in relation to
the layout of water and wastewater services. The design has to be in accordance with published Irish Water Code of
Practice and Standard Details for water and wastewater.
APPENDIX F. OPW CATCHMENT FLOOD RISK ASSESSMENT MAPPING
Appendix F
OPW Catchment Flood Risk Assessment Mapping
Liffey
mod
eldo
wnstr
eam
ofth
is po
int.
Leixl
ip mo
del
upstr
eam
of
this
point
.
3000
00
3000
00
3020
00
3020
00
3040
00
3040
00
3060
00
3060
00
3080
00
3080
00
3100
00
3100
00
3120
00
3120
00
3140
00
3140
00
228000
228000
230000
230000
232000
232000
234000
234000
236000
236000
238000
238000
240000
240000
C.C. S.P
.28
July
2016
28 Ju
ly 20
1628
July
2016
G.G.
GENE
RAL R
ISK
- ENV
IRON
MENT
FLUV
IAL
HPW
CURR
ENT
Luca
n to C
hape
lizod
Risk
to E
nviro
nmen
t Map
E09L
UC_R
VFCD
_F0_
01Dr
awing
No.
:
Map:
Map T
ype:
Sour
ce:
Map A
rea:
Scen
ario:
Date
:Dr
awn B
y :
Map S
eries
:Dr
awing
Scale
:
Chec
ked B
y :Da
te :
Date
:Ap
prov
ed B
y :
FINA
L
Page
1 of
1
NOTE
:RE
V:DA
TE:
[
The Of
fice of
Public
Work
sJon
athan
Swift S
treet
Trim Co Me
ath
01,0
002,0
003,0
004,0
005,0
0050
0Me
tres
© Or
dnan
ce S
urvey
Irelan
d. Al
l righ
ts res
erved
. Lice
nce n
umbe
r EN
0021
016/O
fficeo
fPub
licW
orks.
1:50,0
00Elmwo
od Ho
use
74 Bo
ucher
Road
Belfas
tBT
12 6R
Z
T +44
(0) 28
90 66
7914
F +44(
0) 28
90 66
8286
W ww
w.rpsg
roup.c
omE ir
eland@
rpsgro
up.com
@ A3
Lege
nd Mode
lled R
iver C
entre
line
SAC
Water
Dep
ende
ntSP
A Wate
r Dep
ende
nt
SAC
Water
Dep
ende
nt
Desig
nated
for D
rinkin
g Wate
r Abs
tracti
on
AFA E
xtent
Desig
nated
for D
rinkin
g Wate
r Abs
tracti
on
Recre
ation
al Wa
ters
IED Si
tes
SAC
Water
Dep
ende
nt
10%
Fluvia
l AEP
Even
t1%
Fluv
ial AE
P Eve
nt0.1
% Flu
vial A
EP Ev
ent
IMPO
RTAN
T USE
R NO
TE:
THE V
IEWER
OF T
HIS M
AP SH
OULD
REF
ERTO
THE D
ISCLA
IMER
, GUI
DANC
E NOT
ES
AND
COND
ITION
S OF U
SE TH
AT
ACCO
MPAN
Y THI
S MAP
.
APPENDIX G. CELLULAR ATTENUATION SYSTEM
- Y-E.S.S. Pluvial Cube with Access and Inspection Chamber
Appendix G
Cellular Attenuation System
Modular Geo-VoidSystemsTotal Water Management
ENVIRONMENTAL SUSTAINABLE SOLUTIONS LTD
Total Linear AccessPrecipitation Collection System
Unique Low Flow Channel System
Pluvial Cube
1
Flow Chart
Infiltration / Soakaway System
GroundwaterDischargeAllowed
GroundSuitability
ZeroDischarge
CheckGroundwaterTable LevelAcceptable
Stormwater Management
Attenuation /Storage System
DischargeRestriction from EAor Local Authority
Analyze Rainfall Data /Catchments
Characteristics
Analyze Rainfall Data /Catchments
Characteristics
Recycling / RainwaterHarvesting System
Design StorageVolume
Pluvial CubeRainwater Harvesting Tank Wrapped with Tuflex Impermeable
Geomembrane with ESSRecycling System
Design StorageVolume
Analyze Rainfall Data /Catchments
Characteristics
Pluvial CubeSoakaway / Infiltration
Tank Wrapped withGeotex 225 Filter Fabric
Design According toBRE 365 or CIRIA R156
Pluvial CubeAttenuation Storage Tank Wrapped with Tuflex Impermeable
Geomembrane
Pluvial CubeOutlet Connected to ESS
Flow Control Device
ESS EcologicalDrainage System
Yes
YesYes
No
No
No
No
2
Infiltration, Detention and Re-use made easy...
System Components
Pluvial Cube Geo-Cell Tank Modules
EcoSand biologically engineered soils
E.S.S. Filtration Unit
Geotex Filtration Fabric
Tuflex Waterproofing Membrane
Geotex Protection Fleece
Ventilation Units
Preformed Pipe Connection Covers
Aquabrake Flow Control Devices and Chambers
Refer to separate data sheets
Modular Geo-Cell Tank System
Complete Linear Access
QuickReduce site access delays
LightweightNo cranes required
StrongDesigned for car loadings
ModularEasily create any shape
EconomicalCheaper than concrete
Maintenance Free TankAll debris and sediment is pre-filtered
Determinate VolumeOne cubic metre of Pluvial Cubemodules contain 950 litres of water
Cost EffectiveReduces excavation and disposalby two thirds compared withconventional soak wells
High Infiltration90% void surface area
Structurally DesignedSupports shear loadings
Unique Low Flow ChannelsEnsuring complete removal of anysilts
Total Stormwater Management
E.S.S. Geo-Cell Modular Tank systems use surface and sub-surface
infiltration techniques, resulting in clean water that can be re-used or
allowed to re-enter the natural water system. E.S.S. Geo-Cell Modular
Systems offer a highly efficient option for Stormwater Management in any
kind of soils.
Water Quality
E.S.S. Geo-Cell Modular Tank Systems excel when there is a requirement
to achieve a high water quality, particularly in the effective removal of
nutrients and gross pollutants. In addition to the obvious environmental
benefits, the sub-surface location of the tank system provides more usable
space and an enhanced aesthetic setting compared to above ground
concrete or plastic tanks.
The Modular Advantage
E.S.S. Geo-Cell Modular Tank System performance supersedes outdated
aggregate trenches. The E.S.S. System provides a void space of over 90%
compared to less than 20% in typical aggregate trenches. Consequently,
the E.S.S. System offers a smaller footprint to achieve the same storage
capacity as an aggregate trench. This saves time and money in installation
and civil works costs. The lightweight design of E.S.S. Modular Tank
Modules also make installation quicker, safer and cheaper. No sediment
build up occurs in the E.S.S. System, unlike the clogging that is
characteristic of aggregate based approaches.
Benefits...
3
Clear Linear Access Through OpenSubterranean Channels
Permeable Paving
Water sensitive Urban Channels
The Channel Systems are based on permeable sub-surface waterwaysthat restore water quality and recharge the natural environment. The sub-surface E.S.S. Channel System provides a unique way of working withnature to solve the enormous problems currently associated with openconcrete channels and swales.
Traditional Concrete Channels
Open concrete channels and swales are currently one of the mainmethods of transporting large quantities of Stormwater for discharge intostreams, rivers and oceans. Open channels are used widely in the urbanlandscape even though they are considered unsafe. Channels are also abreeding ground for vermin and vector that endangers human health. Inaddition to the health and safety problem, large concrete channels take upvast areas of land and have a negative impact on the amenity of the area.
Note: Other Modules with Compressive Strength more than 1500 kN/m2 available* Modules tested using UKAS calibrated test machine, range 0 - 60 Tons, UDL, loading rate 0.2 kN/m2
** Modules tested for long term creep testing for 90 and 180 days# Any cover less than 450 mm - contact ESS design department
Size: 50cms x 50cms x 55cmsUnits / m3: 0.1375m37.27 per m3
Size: 50cms x 50cms x 107.5cmsUnits / m3: 0269m33.72 per m3
Size: 50cms x 50cms x 160cmsUnits / m3: 0.40m32.50 per m3
Single Module
Double Module
Triple Module Product DataStandard Pluvial
Cube ModuleHeavy Duty Pluvial
Cube Module
ApplicationStormwater
ManagementStormwater
Management
Average Weight (kg) - single module 6.05 7.05
Compressive Strength* (kN/m2) 240 400
lateral Strength* (kN/m2) 120 200
Long Term Creep Testing** (kN/m2) 90 120
Void Ratio (%) 96 96
Surface Void Ratio (%) Greater than 90 Greater than 90
Minimum Backfill Cover# (mm) 450 450
Maximum Backfill Cover (mm) 3000 4750
Material Propylene Propylene
Chemical Resistance Good Good
Bacterial Resistance Good Good
UV Resistance Good Good
Pluvial Cube ModuleDimensions* (mm)
ModuleConfiguration
Units per m3
ModuleVolume (m3)
500 (L) x 500 (W) x 550 (D)
Single 7.27 0.1375
500 (L) x 500 (W) x 1075 (D)
Double 3.72 0.2688
500 (L) x 500 (W) x 1600 (D)
Triple 2.5 0.4
4
E.S.S. Channel System
E.S.S. Channels
With the E.S.S. Channel System being a sub-surface system, theseproblems with open concrete channels are rectified. The permeablechannel system can be designed to follow the inherent contours of thelandform and emulate the flow of natural waterways. The curvilinearchannel design creates vertical flow, turbulence and reduces the overallflow of velocity while increasing the self cleansing capacity of the channelbed to create healthy aerobic conditions. The clear access channels allowfor continual and future maintenance
Environmental Benefits
By replacing open concrete channels orswales with E.S.S. Channel Systems,cities can now benefit from increasedenvironmental amenities, greaterrecreational space and healthierconditions by using the vast tracts ofland once given over to rapid flowingconcrete channels.
Car Park Infiltration Area.
Minimum Infiltration Area
Permeable surface (bitumen or concrete)will alleviate water contamination duringstorm periods and heat contaminationduring dry periods
Permeable bitumen or concrete paver area
Filter DrainHigh Traffic AreasGeocell 52
Geocell 25
Pluvial Cube
Road Edge Infiltration Area.
5
Low Flow Channel System
2 Clear Channels500mm x 210mm per 0.5mt width
225 Low Flow Channel (if required)
Typical InstallationTank Format
4 x160mm PipeAccess Point
300mm Dia Low Flow Channel (if required)
Typical Installation Channel Format4 Clear Access Channels x 210mm
Top ViewShowing Clear Channel
225 or 300mmInternal Dia Channel
The above channels can be multi-connected using preformedconnecters to larger inlet / outlet pipes
Self Cleaning at High Flow Velocity Provides Total Linear Access Controls Silt at Low Flow Velocity
6
Linear Access Channel.With slotted low flow silt control channel installed
Attenuation Tank HighlightingNumber and Position of AccessPoints.
Top view showing low flow maintenance channel.
Self cleaning channels.
Connection to low flow maintenance channel at invert level.
7
Infiltration Tank
Attenuation Tank.
E.S.S. Systems Permeable Paving
Cover Materials
Cover materials are an essential part ofthe infiltration process. E.S.S. EcoSandBiologically Engineered sand isdesigned to provide maximumpermeability through optimum physical,chemical and biological characteristics.To retain infiltration performance it isessential to choose the appropriatecover material and constantly maintainpH levels between 6 and 7.5.
The filter sand is engineered toinstallation and E.A. requirements.Depending on site contaminantsexpected.
Type 1 - Road run off
Type 2 - Road run off
Type 3
Type 4
Type 5 - Compactable
Type 1 - Road run off
Trafficable Landscape - CompactionPrevention:
Loading Minimum Cover
Pedestrian 300mm
Occasional traffic 500mm
If a trafficable, soft landscape surface is required (i.e. grass or gravel carparks, road verges etc.), it is recommended to use E.S.S. GeoCell 52grass reinforcement structure. The addition of product will allow long-termpermeability of the cover soil.
2mts deep tank with 3mts cover
8
Infiltration Swales & Underground Channels
Tank 2mts deep with access channels.
Subsurface Road Channels / SwalesPluvial Cube Tanking System provides an efficient way of managing roadstormwater runoff. It allows high infiltration areas, preventing road accidents,water ponding, and mosquito infestation Provides new accessible space
Attenuation Tank under Park and Ride Scheme showing versatility ofmodular system.
Typical SectionRoad Drainage Channel
Typical Pluvial CubeInfiltration Swale Detail
50mm Drainage CellTuflex Linear
Eco-sand
Geotex 225Membrane
PluvialCube
52mmDrainage Cell
150-300mm
150mm
Geotex 225Membrane
700mm
Minimum Infiltration Area
Permeable surface (bitumen or concrete)will alleviate water contamination duringstorm periods and heat contaminationduring dry periods
Permeable bitumen or concrete paver area
Filter DrainHigh Traffic Areas
Geocell 25
Pluvial Cube
9
Installation Procedures
Steps 1 to 6
Steps 7 to 11
Step 12
Installation Steps
Infiltration Tanks
Pluvial Cube
modular units
100mm coarse
sand bedding
1. Excavate the pipe trench and lay the inlet pipe to the required fall and install silt traps in appropriate locations in the pipe run.
2. Excavate the hole or trench to the required dimensions to modular units, and any external inspection chamber(s) and / or silt trap(s).
3. Ensure that the base plan dimensions of the hole allows sufficient working space for the site operatives to manoeuvre the units and geotextile into position.
4. Ensure that the base of the excavation is flat and level, batter back the sides of the excavation to a safe angle, and ensure that the safe access is provided for the site operatives.
5. Remove any soft spots from the excavation and replace with compacted granular material.
6. a) For Soakaway, lay 100mm coarse sand bedding to the base of the excavation and level.
b) For Attenuation, lay 100mm (minimum) compact solid level base (site concrete preferably).
7. a) For Soakaway, lay the geotextile, Geotex 225ff, over the base and up the sides of the excavation with minimum 200mm overlap joints between strips.
b) For Attenuation, repeat procedure with Tuflex Geo Membrane.
8. Ensure there is a minimum 200mm over-run of geo-textile at the end of the modular unit.
9. Inspect geotextile for damage. Tuflex for Attenuation, ensuring integrity of all welded laps.
10. Assemble the module tanks to required dimensions.
The illustrations show the correct relationships, orientation, and sequence of connection of each panel to form a basic full module tank(500 x 500 x depth).
11. Assemble the Pluvial Cube Modules in orientation as per drawing.L x W x D.
10
Installation Procedures
Steps 13
Steps 17 to 19
Steps 15 to 16
OUTLET
(if attenuation)
12. To receive the inlet pipe (and outlet/ inspection pipe if required). Insert tank connector and, using geotextile, form a wrap around apron of the tank connector spigot and secure using tape or jubilee clip. Ensure a minimum 50mm of spigot remains exposed. For Attenuation tanks, all inlets and outlets are sealed with welded preformed pipe flanges.
13. a) For Soakaway, Continue with the geotextile encapsulation of the Pluvial Cube tank.b) For Attenuation, use Tuflex Geo Membranes.
14. Fold the corners of the geotextile over-run at each end of the infiltration tank as shown, welting all corners. The same method applies for Tuflex Geo Membranes ensuring all corners are welted and folded (not cut).
15. a) For Soakaway, Complete the encapsulation by wrapping the geotextile horizontally around the tank and tape into position.b) For Attenuation, use Tuflex Geo Membranes.
16. Connect inlet / outlet / vent pipe and inspection chambers using appropriate adaptors.
17. Backfill around excavation using type 1 or 2 sub base or selected granular material, and compact in layers of not less than 150mm. The first 500mm of any installation should be compacted by hand.
18. Use a coarse sand protection layer over the top of the Pluvial Cube tanks and geotextile and the back fill to the required depth using Type 1 or 2 sub base material. If the area is to be trafficked.Where the area is to be landscaped then as-dug material may be used provided sharp or large solid matter is removed.
19. The area should then be compacted using suitable compaction equipment in accordance with specification for highway Works.
20. For Attenuation tank, steps 7-16 are also followed to encapsulate the Tuflex Geo Membranes lined tanks with Geotex 300 protection membrane prior to backfill.
N.B. Please refer to full sequence of works data for more detailedinstructions.
VENT
Sladen Mill, Halifax Road, Littleborough,Lancashire. OL15 0LB.
tel: 01706 374416, fax: 01706 376785
email: [email protected]: www.y-ess.com
E&OE. Without Guarantee.
All products are manufactured to the
highest quality, being subject to rigid
quality control. However, the
company cannot control conditions
of application and use of its
products, thus any warranty, written
or implied, is given in good faith for
materials only. ESS Ltd will not
accept any responsibility for
damage or injury arising from
storage handling, misapplication or
misuse of its products. All
transactions are subject to our
standard condition of sale, copies of
which are available on request.
To find out more about these systems and products please contact us
Environmental Sustainable Solutions LtdENVIRONMENTAL SUSTAINABLE SOLUTIONS LTD
Pluvial Cube
APPENDIX H. CORRESPONDENCE WITH FINGAL COUNTY COUNCL
Appendix H
Correspondence with Fingal County Council
1
Mark Killian
From: Daragh Sheedy <[email protected]>
Sent: 16 September 2019 12:16
To: Mark Killian
Cc: Niall McKiernan
Subject: RE: [OCSC: G451] RE: Residential development at Carpenterstown (ABP-304386-19 :
FCC Ref SHDW/007/19).
Mark,
Apologies for the delay. Your proposal has been reviewed and in summary is acceptable. see attached some
comment on the bullet points below.
It may be useful to carry out in advance to confirm the hydraulic capacity. However, It is more usually carried out
post-planning but prior to commencement of construction which is acceptable.
The further clarification with regard the calculation of QBAR is acceptable.
The response in relation to the use of underground tanks is understood. It is considered reasonable, given the likely
future privately managed nature of the development.
Regards,
Daragh
Daragh Sheedy
|Executive Engineer | Development Management / Forward Planning – Water Services |
| Planning and Strategic Infrastructure Deptartment |Fingal County Council |
| 01-8704489 | 085-8701276|
From: Mark Killian [mailto:[email protected]]
Sent: 16 September 2019 11:45
To: Daragh Sheedy Subject: FW: [OCSC: G451] RE: Residential development at Carpenterstown (ABP-304386-19 : FCC Ref
SHDW/007/19).
Hi Daragh,
Have you any comment regarding the below response?
We have been advised by the client that we are to submit the Stage 3 application within the next two weeks.
Thanks,
Mark
2
From: Mark Killian [mailto:[email protected]]
Sent: 28 August 2019 08:47
To: Daragh Sheedy <[email protected]>
Subject: [OCSC: G451] RE: Residential development at Carpenterstown (ABP-304386-19 : FCC Ref SHDW/007/19).
Hi Daragh,
Just following up on the email below. We would appreciate if you could advise if the proposed design satisfies FCC,
so that we may finalise our design package.
We have updated (refer attached) the design layout, to take account of Irish Water comments and some minor
amendments to the development layout. The overall drainage strategy remains the same, in principle, and has been
updated according to the revised layout. I have reattached the other relevant documents.
Please do not hesitate to contact me, should you require any further information.
Regards,
Mark
From: Mark Killian
Sent: 12 August 2019 09:56
To: 'Daragh Sheedy' <[email protected]>
Subject: RE: Residential development at Carpenterstown (ABP-304386-19 : FCC Ref SHDW/007/19).
Hi Daragh,
Have you had the chance to review the comments below, following our telephone conversation the other week?
We are looking to finalise the design package for final submission to ABP.
Thanks,
Mark
From: Mark Killian
Sent: 05 July 2019 09:41
To: 'Daragh Sheedy' <[email protected]>
Subject: Residential development at Carpenterstown (ABP-304386-19 : FCC Ref SHDW/007/19).
Hi Daragh,
I am following up on the comments raised to An Bord Pleanala, in relation to the surface water design for the
residential development at Carpenterstown (ABP-304386-19 : FCC Ref SHDW/007/19).
1. The development proposes an outfall into an existing 225mm dimeter surface water sewer on
Carpenterstown Road. A CCTV survey of the sewer shall be submitted prior to commencement of works to confirm
suitability.
I assume that this can be carried out post-planning but prior to commencement of construction. Is this correct?
2. The drainage proposal includes a conventional network of underground pipes, manholes and road gullies.
Attenuation for the larger site being proposed through a series of 5 no. underground attenuation tanks prior to
discharge through a flow control device at a greenfield runoff of 9.0 l/sec/ha. The calculation of the greenfield
runoff rate appears to be high. Further information in relation to the existing soil infiltration rate shall be
submitted be submitted prior to commencement of works.
As mentioned at the ABP meeting last month, the total development maximum runoff rate is 9/ls, which equates to
5.15 l/s/ha for the 1.75-hectare site. Please refer to the QBAR calculations attached, as submitted within Appendix B
of the Engineering Services Report (G451-OCSC-XX-XX -RP-C-0001-A1-C01). A site investigation was carried out by
IGSL, on behalf of the client, in March 2019. The results of the site investigation and percolation test that was
3
carried out, confirmed the presence if stiff boulder clay with negligible infiltration characteristics i.e. soil type 4.
Therefore, an infiltration value of 0m/hr has been used in calculations, with no potential for infiltration available.
Refer attached Site Investigation Report for confirmation of details.
2. In consideration of the proposed surface water drainage proposal it is recommended that the
sustainability of the proposal and the development could be improved in the following ways;
a) The drainage proposal should endeavour to incorporate a series of SUDS measures, as opposed to a pipe
network, attenuation basin and light liquid interceptor device in accordance with best practice including the
Greater Dublin Drainage Strategy and the Suds manual. The applicant should do a thorough SUDS evaluation, and
consider the range of alternative measures, such as swales, integrated tree pits, bio-retention areas, etc.
b) The substitution of green infrastructure in place of the underground attenuation tanks if possible should be
provided. However, it is acknowledged that the underground storage may be considered acceptable in this
instance given the high density and the type of development proposed which will remain private.
Significant intensive landscaping is being provided as part of the proposed development, with all external areas to
be intensively landscaped and pervious in nature, with the exception of the vehicular carriageways. Refer to the
attached drainage design layout drawing (G451-OCSC-XX-XX-DR-C-0500), for details. The area between Blocks A and
B contains a significant number of existing mature trees, with some new trees also being provided to complement
these. This is also consistent with the proposed boundary treatment and in particular, the surrounds to the southern
Blocks (C, D and E)
All pedestrian linkages through the landscaped areas, both above podium slab (between Blocks C, D & E) and
elsewhere, are to be pervious in nature, which along with the above landscaped features, will allow for treatment of
the rainfall runoff by draining laterally through the landscaped areas, prior to entering the drainage network via a
series of perforated pipes due to the poor infiltration qualities in the natural ground. Further, all external car parking
bays are to be pervious, which will allow for at source treatment of runoff from both the car parking bays and the
adjacent road carriageway, prior to entering the surface water network.
The series of underground tanks are provided to temporarily store excessive runoff, while restricting the
development outflow to a maximum QBAR equivalent. These have been strategically placed to minimise the size of
the ‘end-of-line’ tank and minimise impact on the existing mature trees that have a significant root protection zone.
The sites constraints (i.e. mature trees around perimeter and between blocks A and B) do not allow for the use of
swales and / or open basin, as suggested. While the road and car parking areas are to be treated at source by
pervious paving, the bypass separator is being provided as a final treatment, prior to entering the public network.
Considering the above, we believe that sufficient SuDS are being provided as part of the proposed development,
which has also been designed in accordance with the GDSDS to ensure no on-site flooding for design rainfall events
up to, and including, the 1% AEP.
We would appreciate if you could review the above responses and provide comment, if any, prior to us formalising
our final submission to ABP.
Please do not hesitate to contact me, should you require any further information.
Regards,
Mark Killian
Chartered Civil Engineer MSc BE CEng MIEI
Please consider the environment before printing this email.
APPENDIX I. SITE INVESTIGATION REPORT
Appendix I
Site Investigation Report