eNGie
Amador
GO
Formerly: OPTERRA AMADOR PARTNERSHIP An e NGle company
Who is ENGIE?
In 2016 $66.68 in revenue
152,900 employees (58,200 in power and natural gas + 94, 700 in energy services)
900 researchers and experts in 11 R&D Centers
:· ..
::;: . ·::- :: ... =: ~: •••• • • • ~: ;s_ ••• : ••
-99 ""i.. ··~ ...... .:. . . ..
!.
OPERATIONS IN 70 COUNTRIES .
© 2018 ENGIE SERVICES U.S. INC. Unauthorized use or duplication of this material with the express wrinen permission of the owner is stnctly prohib1tod
ENGIE Services by the Numbers (Formerly OpTerra Energy Services)
42+ Years Experience as an Accredited Energy
Service Provider (NAESCO)
2 B+ in Customer Savings
25+ U.S. Office Locations
+ Installed Solar Projects for
Public Entities in CA
1,000+ Satisfied Customers Nationwide
325+ Employees, Including 150 Engineers
(ME, EE & CE PEs, CEMs, & LEED APs)
2018 ENGIE SERVICES U.S. INC. Unauthorized use or duplication of this material with the e>press written permission of the owner is strictly proh1b1ted.
Team Communication
./Weekly Friday Construction Meetings
./ Bi-Weekly Leadership Meetings on March 5th and March 22nd
© 2018 ENGIE SERVICES U.S. INC. Unauthorized use or duplication of this material with the express written permission at the owner is striclly proh1biteo.
Amador G L STEM Education Program
./ February Sth - STEM kick-off meeting with ENGIE Services Education Manager and District Staff
./ Next meeting scheduled for April 5th
© 2018 ENGIE SERVICES U.S. INC. Unauthorized use or duplication of ttlis material with the express wntten permission of the owner is strictly prohibited. 5
Solar PV Status - Argonaut High School
• Argonaut HS Canopy Structures: • Canopy installation complete November 2018
• Replacement of site transformer completed by PG&E
3/23/18
• PG&E final inspection pending scheduled date from PG&E
• PG&E issuance of Permission to Operate (PTO) pending
PG&E final inspection.
• Interconnect of array by ENGIE Services will take place
upon receipt of PTO from PG&E. (anticipated by end of
April)
© 2018 ENGIE SERVICES U.S. INC. Unauthorized use or duplication of this material with the express written permission of the owner is strictly prohibited.
Solar PV Status -Argonaut High School
• Argonaut HS Ground Mount
• Ground mount array installation completed December 2018.
• PG&E design & pre-construction meeting 1/17/18
• Electrical gear installation completed 3/16/18
• PG&E extension agreement executed 3/2/18
• Utility upgrades by PG&E tentatively schedule for mid April
pending firm schedule from PG&E
• PG&E final inspection pending completion of ground mount
array.
• Interconnection of array by ENGIE will take place upon receipt
of PTO from PG&E. (anticipated early to mid May)
© 2018 ENGIE SERVICES U.S. INC. Unauthorized use or duplicstion of this material with the express written permission of tne owner is strictly prohibited.
Solar PV Status - Amador High School
• Amador HS Canopy & Ground Mount {Single interconnection agreement)
• Canopy array installation and supporting infrastructure out to the
ground mount location completed 2/12/18.
• Ground mount array scheduled to begin April 16. (pending design
approval by ACUSD)
• PG&E pre-construction meeting TBD
• PG&E extension agreement executed 1 /30/18
• Utility upgrades by PG&E tentatively schedule for late April pending
firm schedule from PG&E
• PG&E final inspection pending completion of ground mount array.
• Interconnection of array by ENGIE will take place upon receipt of
PTO from PG&E. (anticipated early to mid July)
•9 2018 ENGIE SERVICES U.S. INC. Unauthorized use or duplication of this material with the express written permission of the owner i$ strictly proh1b1led.
Lighting Progress
• Facility Lighting Retrofit Progress:
• Lighting retrofits complete (pending ACUSD walk)
• Approximately 7112 light fixtures retrofitted (ESC 6953 fixtures)
• 198 retrofits planned with 10 year material warranty changed to retrofits
with 5 year material warranty due to application of existing fixture.
• 53 retrofits planned with 5 year material warranty changed to product
with 10 year material warranty due to application of existing fixture.
• 153 lamp retrofits change to new LED fixture retrofit due to condition of
existing fixture and/or to maintain consistency
© 2018 ENGIE SERVICES U.S. INC. Unauthonzed use or duplication of this material with the express written permission of the owner is stnctly prohibited.
Lighting Next Steps
• Facility Lighting Retrofit Next Steps:
• Site walks by ENGIE scheduled for 3/29 & 4/2 to identify dual
circuit light sensor installed on single circuits
• Replacement of dual circuit sensors to single circuit sensors
will be scheduled upon receipt of product delivery schedule
© 2018 ENGIE SERVICES U.S. INC. Unauthorized use or duplication of this material with the express written permission ot the owner is strictly prohibited
HVAC Progress & Next Steps
• All (84) HVAC units have been replaced as of March 23th
• Completion of punch list repairs and final commissioning with ACUSD planned for the month of April
© 2018 ENGIE SERVICES U.S. INC. Unauthorized use or duplication of this material with the express writt~n permission of the owner strictly prohibit~d .
Master Schedule
OpTHTO En•r9y '"'""• Amadat CUSD • ESt Wed 3/28/18
Ptoj«t Sd!41dula
w r·- °"'"'"" :SC.• rrritl .. J"~ l""-- 1•Q<llM' !""- .r::r..._ .S.S.-""' • L.i& -• _._.- -Jlll~ .IO!t-1..- •- --1 .... l .... - 1- ;~; 4Hdl¥1 W•d IJ/%1/U W•d 8/Zf/U
' . ...... "'f,~t'd l dl\' Vfdd ll./d/':.b Wed 11/Jb/l.b
NTP • PV•!, l·l l do\! Tl!u l/S/17 Thu 1/S/17
-.ri·t-M)t.N"<··: 1dl)' Fri S/S/17 f ti 5/5/17
Ddilsn a Procu,.IMflt Z7Zd.lys flt 1/4/17 Moltl/21/11 29 ~Is IJ111•ys JAl>n4/I0/17 Molt9/Z5/17
!6 Ptoc:wemenc Ulldlyt Wod5/31/17 Fii IJ/ZZ/17 .. - ZHdays Mon7/17/17 Wedl/29/11 - • .-s
"""""'"-"'""""' Od•v> Motl 7/17/17 Mon 7/17/ 17 • •6 KMll-i.tlon ZHft\'I Mon7/17/17 1Nod7/Jl/U 47 l'Y-l~tPt~ ZHdays Mon7/l7/17 Wed7/U/11 -.. Ground Mc11.111t 250dl)'I Mon7/l7/17 Fft6/2f/U. 49 AqontlllHS zuuyo ·Mon7/17/17 Wed5/9/U
50 A1r1.y -fltlon us-. "Mon7/17/17 FtlU/U/17 -. j PGae,_~ Odav> Wod 1/17/18 Weel 1/11/JJI • PGl<E,ACIJSD,Engle -,J llodtlall Gur lntllll 40days Manl/22/11 FtlJ/16/11 '
~;:~ PGlil! Utlffty Uptrldff Sd•I' Man4/1'/1B ftl4/2fl/1S PG&E
PG&E IM4"!Cllon (T80) Odl\" ft14/27/la Ftl4/27/la •PG&E
I'.~ PG&E PTO (TBD) Od1rt FllS/4/14 Fri S/4/18 • PG&f
SI Sytem Commlss1anln8 ld•v> MonS/1/14 Wed S/9/18 • fn\ll• 5~ I AmodarHI ffd.llys Mon4/11/ll Ftlf/29/11
60 lnllallltion SS day1 lotl}tltfjJbJU. Fri 6/79/18 ln9l• 61 C•llOl>V HJuys Mon7/17/11 Wed7/1l/11 62 AtioJUlllHI lt7 Uy1 Mon7/17/17 Tul4/17/11
""63 o\tfl\'lmtall- Udlys MGR 7/17/11 Tu.11/7/17 -55 PGl.E UllUty Uptrl<l11 Odll'f Fri l/21/11 Fri 3/23/18 · · PG&E
66 PGloE ln;pection jTBDI Od•VI FtU/6/28 M4/6/1S • PG&E
7 l'GloEPTO(TBD) Od1y1 Frl4/U/18 fri 4/13/18 • PG&E
61 r.yc.m ConwnlulOfli"I 2dl)'I Man4/16/18 Tue4/17/18 Emjle
69 -·Hf 2flft\'I Man7/17/17 Wed7/U/U
7o ,,,,.., .,.,.,Jltlllon tHdlyt Man7/17/l7 Tl!uZ/22/U
n PlllE UMll!y Upt111dai 2dtyi Th"4/26/11 M4/27/18 PG&f
·;:1 iTBO) PG&E lnipoctlon (TBDJ Odl\" Mon7/9/18 Mon 7/9/18 •PG&E
PG&E PTO (TBO) Od1y1 Man7/16/18 Mon 7/16/1' • PG&E
15 Sytam comml<oloniOJ 2dlyl Tue7/17/18 Wed7/18/18 Engle
16 L-1 FoclUty llahliftl lJDdaVt Monl/U/17 Ftf l/21/U. M·1HVAC UOdayl Mon10/t/t7 Frt3/D/18
lplll/GrOllnd Mount l70ft\'I Monlll/t/17 Ftll/U/11
RooftapP ....... Unltt tday1 T"1 IJ/28/17 Fri 1/5/11 ,..... l1td Wiii MOunt 65dal'f W•dlJ/8/17 r .. J/&/11
PtojoctOOHa<rt 10dap Thu7/1'/U Wedl/29/U
Pagel
2018 ENGIE SERVICES U.S. INC. Unauthorized use or duplication of this rnatenal with the express written permission of the owner is &lriclly prohiblled.
Contact Information
Dan Usher Project Manager [email protected] (916) 496-5875
Carolyn Kiesner Program Development Manager [email protected] (916) 541-2068
ENGIE Services 1721 2nd Street, Suite 200 Sacramento, CA 95811