31
BANGALORE INTERNATIONAL AIRPORT LIMITED ENERGY MANAGEMENT CII National Award for Excellence in Energy Management 2017

ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

  • Upload
    dangnga

  • View
    217

  • Download
    1

Embed Size (px)

Citation preview

Page 1: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

BANGALORE INTERNATIONAL

AIRPORT LIMITED

ENERGY MANAGEMENT

CII National Award for Excellence in Energy Management 2017

Page 2: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

Company Profile

Public limited company under Indian Companies Act

Private Public Partnership

BOOT project transferred after 60 years (30 + 30)

Operated by BIAL according to international standards.

Started operation: May 23rd 2008

No. Of Employees at BIAL: 838

Vision

Kempegowda International Airport will

excel in consistent efficient & friendly

delivery of airport services as gate way

to South India

48

26

1313

FairFax Siemens GoI GoK

Shares in %

Page 3: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

Certifications

Certifications Details

ISO 14001 Environmental Management System

ISO 27001 Information Security & Data Management System

ISO 9001 Quality Management System

OHSAS 18001 Occupational Healthy & Safety System

BS 25999-2 Business Continuity Management System

LEED – PTB LEED certification of terminal building under EB

Terminal expansion is certified in GOLD category.

GREENCO First company to be certified under GreenCo rating and also recently

awarded under PLATINUM rating.

ISO 20000 IT Service Management

ISO 50001:2011 Energy Management System

Airport Carbon

Accreditation

Airport Carbon Accreditation for Level 3+ (Neutralization)

Page 4: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

To reduce the energy consumption

To encourage use renewable source of

energy

To reduce losses & wastages

This is achieved by

Use of latest technologies

Use of high energy efficient equipment

Conversion of conventional lights with

energy efficient lights (LED)

Use of renewable (solar) energy

To improve energy efficiency performance

of equipment

Employee involvement through trainings &

capacity building

Objectives

Energy

Efficient

Equipments

Bench

Marking

Energy

Audits

Monitoring

and review

systems

Energy

Management

planning

Total

Employee

Involvement

Energy

Excellence

Energy

Management

Structure

Page 5: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

Airport Energy Data

0.9

0.91

0.92

0.93

0.94

0.95

0.96

0.97

0.98

0.99

1

Apr-

11

Aug-1

1

Dec-1

1

Apr-

12

Aug-1

2

Dec-1

2

Apr-

13

Aug-1

3

Dec-1

3

Apr-

14

Aug-1

4

Dec-1

4

Apr-

15

Aug-1

5

Dec-1

5

Apr-

16

Aug-1

6

Dec-1

6

Apr-

17

Power Factor

0

2000

4000

6000

8000

10000

12000

Sept,

07

Mar,

08

Sept,

08

Mar,

09

Sept,

09

Mar,

10

Sept,

10

Mar

'11

Sep-1

1

Mar-

12

Sep-1

2

Mar-

13

Sep-1

3

Mar-

14

Sep-1

4

Mar-

15

Sep-1

5

Mar-

16

Sep-1

6

Mar-

17

Maximum Demand Recorded (KVA)

Maximum …

43,2

26,0

00

46,6

50,0

00

45,8

51,0

00

46,1

55,0

00

46,3

98,0

00

51,3

72,8

00

64,9

80,0

00

70,8

58,8

00

74,1

45,4

00

-

10,000,000

20,000,000

30,000,000

40,000,000

50,000,000

60,000,000

70,000,000

80,000,000

Energy Consumption (KWH)

-

5,000,000

10,000,000

15,000,000

20,000,000

25,000,000

2013-14 2014-15 2015-16 2016-17

12,869,678 15,401,931

18,971,290

22,881,410

Passenger Movement (Nos.)

Page 6: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

National & International Benchmarking :

SEC (KWH/PAX.)

KIAL (Kulalumpur)

Stavager Airport

(Norway)

Hongkong International

Airport DIAL HIAL BIAL

2014-15 5.83 3.45 4.37 2.4 2.99 3.02

2015-16 5.92 3.57 4.01 2.077

2016-17 5.67 1.77

5.83

3.45

4.37

2.4

2.99 3.02

5.92

3.57 4.01

2.08

5.67

1.77

0

1

2

3

4

5

6

7 2014-15 2015-16 2016-17

Page 7: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

Innovation Project - 1

Earlier in AHU rooms tube-lights were ON all the times even though no man power is

available there. Hence we have introduced a guard switch. These lights will get ON

when any one enter the room and put the guard switch on the pocket. All the

technicians are briefed about the system

Use of key guard switch for AHU rooms

Guard Switch

Total Rooms: 25 AHU rooms of the terminal building

Advantages:

1. Energy saving 2, 40,363 units/yr

2. Enhanced life of light fixtures

3. Low maintenance cost

Page 8: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

Innovation Project - 2

Switching off of the high mast lamps which are not required for the operations and

doesn’t impact the safety at the apron area. Considering the actual requirements of the

taxiing aircrafts and in order to achieve the required illumination levels it has been

proposed to switch off the 50% of the isolation bay high mast lamps, also realigning the

angles of the luminaries and reorienting the same so as to provide the effective

illumination required for carrying out the safe operations

Optimum usage of High Mast in Apron lighting

During OFF

condition

During ON

condition

Advantages:

• Energy savings of 1,13,880 units/yr

• Reduced maintenance cost

Page 9: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

Innovation Project - 3

Installed Nature switch (daylight sensor) with GSM to control Automate of main access

road, Trumpet and Car parking area street lighting.

Online Monitoring of Energy & control ON/OFF circuit for maintenance through SMS

Nature Switch-GSM for Road Street lights

SMS

Command

Option

1 Get ON/OFF Status

41 Emergency ON/ Manual Override ON

42 Emergency OFF/Manual Override OFF

43 Restore to previous auto modes

SMS Text Command to control the Lights

Advantage - Energy Savings & Man hour savings

Page 10: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

Innovation Project - 4

Auto

Manual

Selector

Switch

Energy Consumption Before and After AC Automation

0

50

100

150

Day-1 Day-2 Day-3 Day-4 Day-5

107 109 119

82 94 92 69

80 83 72

Ener

gy

Co

nsu

mp

tio

n

in K

WH

Night Power Consumption Before Automation

Night Power Consumption After Automation

Energy Consumption Comparison

Automation Done through Timer and Contactor

Air Conditioner units will work from 07:00 hrs. to 19:00 hrs. only

IT Room and UPS Room AC Unit Power circuits are converted as if to work round the clock

Auto-Manual Selector Switch Provided to override the Timer function to work all AC Units

beyond the defined time if required

Total of Air Conditioner units (Each 2.5 Ton) available in site

office. ACs are running even after working hours. Observed

number of ACs are functional even at midnight. Since Energy

Conservation thought is person dependent, Auto switching is the

best way to Achieve Ensured energy Conservation

Advantage -20% of Energy savings 7300units/yr

Page 11: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

Innovation Project - 5

Power outage of Charging points due to

mishandling & other issues resulting low

value to ASQ. Power trips at source level

will halt functioning of charging points

multiple locations at a Time.

Separated circuits from other loads

Installed Automatic reclosing RCCB

Annunciation system & connected to

monitoring station

95% Complaints reduced

Power outage issues in Mobile/Laptop Charging Facilities in PTB

Power trips & reset 79%

Socket pin/wire

loose connectio

n 9%

faulty socket/U

SB 6%

false complain

ts 6%

Average Complaints category taken per Month in 2016

Won QC Gold Award

for the yr. 2017

Advantage -Customer Delight & Man hour savings

Page 12: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

Energy Saving Projects Implemented in last 3 years

S.N. Description Energy Savings in

Million KWH

Investment made in

Million Rs.

1 Implemented in 2014-15 0.87 0.33

2 Implemented in 2015-16 1.45 5.19

3 Implemented in 2016-17 4.05 10.93

# Year of

implementation Title of Energy saving project implemented

1

2014-15

Installation of solar lights in compact stations at 09 & 27 New RMU

Yard

2 Reducing idle timing of domestic carousals and international

carousals in T1 BHS Arrival lines

3 Power Conservation T1A (Expanded terminal) AHU scheduling

4 Power Conservation T1A (Expanded terminal) Tunnel Ventilation fans

Operational Control

5 Conversion of halogen lights to LED for stand ID boards (12 nos.)

6 Operational management of energy conservation in Apron lighting

7 Conversion of halogen to LED for stand ID signage boards (25 no’s)

Page 13: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

# Year of

implementation Title of Energy saving project implemented

1

2015-16

Energy conservation in domestic lighting by sensors, providing

independent control, assessing the requirement of lux levels and

removal of unwanted installations

2 Installation of Air Curtains at PTB exit points to Baggage handling areas

to prevent loss of conditioned air.

3 Energy conservation by introducing idle time on BHS departure lines

4 Energy conservation by introducing idle time on BHS arrival lines

5 Installation of Air Curtains at PTB exit points to Baggage handling areas

to prevent loss of conditioned air.

6 Project Office Timer automation installed for 15nos of 2.5Tr Split AC

units

7 VHT: Replacement of CFL lamps with LED in T1A Elevators

8 Key guard Switch implemented in All 25nos AHU rooms inside expanded

Terminal

9 Replacement of 250W HPSV light fixtures with 120/150W LED lights –

252 nos. in Main Access Road

Energy Saving Projects Implemented in last 3 years

Page 14: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

# Year of

implementation Title of Energy saving project implemented

10

2015-16

LED light implementation in Domestic PESC, Domestic Transfer, East

& West Bus Lounges light fixtures - 270nos

11 LED Street lights in Terminal Parking area - 70nos

12 SG1&2 UPS replacement from 4x220KVA to 2x160KVA considering the

load

13 LED Street lights with DG back up project for Trumpet flyover.

Total 245nos. Of 90W LED in place of 250W HPSV fixtures

1

2016-17

Replacement of 1000W HPSV high mast lighting with 450W LED lights

– 64 nos. in car park areas

2 Replacement of 150W MH roof lighting of terminal building with 100W

LED lights –41 nos.

3 Replacement of 2X36W FTL with 18W LED lights – 200 nos. in office

areas

4 Replacement of 2X54W FTL with 2X18W LED lights – 149 nos. in

basement corridors and office areas of terminal building.

5 Replacement of 70W halogen lights with 24W LED lights – 150 nos. in

bus gates, pillar spot lights etc. in terminal building

Energy Saving Projects Implemented in last 3 years

Page 15: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

S.N. Year of

implementation Title of Energy saving project implemented

6

2016-17

Replacement of 2X36W CFL with 36W LED lights – 137 nos. in bus

gates, pillar spot lights etc. in terminal building

7 Replacement of 250W HPSV with 98W LED lights – 68 nos. in vehicle

& equipment building

8

Replacement of following light fixtures in offices & toilet rooms

i) 4 feet 36 W to 18W LED

ii) 2X18 W CFL round with 18W LED : 80 nos. replaced

iii) 18W CFL with 9W LED: 200 nos. replaced

iv) 2X14W to 2X4W: 172 nos. replaced

v) 12W CFL to 5W LED: 32 nos. replaced

VI) 2X36W FTL with 36W LED: 80 nos. replaced

V) 10W LED to 5W LED: 70 nos. replaced

Vi) 50W halogen to 5W LED: 9 no. replaced

9 Occupancy Sensor Fixed in all PBB FLB Passage to Control Light

fixtures.

10 Lux Sensor Fixing at Access Road Feeder Pillars to gain Optimum

Energy Savings.

Energy Saving Projects Implemented in last 3 years

Page 16: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

Energy Policy

Salient features are:

Commitment to supply energy on 24 x7 basis

Use of Renewal Energy

Conserve energy

Minimizing the energy losses

Comply with legal & regulatory requirement

Commitment to maintain Energy parameters

Support to purchase energy efficient products & services

Involvement of all employees

Page 17: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

GHG Inventorisation

Carbon Emission in tonnes of CO2 Equivalent

Year Passengers

(in Numbers) Scope-1 Scope-2

Total Emission

(tCO2)

Total Emission/Pax

tCO2/Pax

2014-15 15402931 754.39 38162.26 38916.65 0.002526574

2015-16 18971290 751.32 37398.32 38149.64 0.002010914

2016-17 22187906 770.90 36808.62 37579.52 0.001694000

0.00000

0.00050

0.00100

0.00150

0.00200

0.00250

0.00300

0.00350

0.00400

2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17

0.00379

0.00266

0.00221 0.00206 0.00200

0.002349 0.002526

0.002011

0.001694

Carbon Emission/Pax (MT of CO2)

-20% -33%

Reference point

Page 18: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

SEC in last 3 years (KWH/Pax) & KWH/Sq.m)

36982964 39398316 39222721

15401931 18971290

22881410

0

10000000

20000000

30000000

40000000

50000000

2014-15 2015-16 2016-17

Passenger Commutation Vs. KWh

Passagner Commutation (Nos.) PTB Consumption (KWh)

3.02

2.077 1.714

0

0.5

1

1.5

2

2.5

3

3.5

2014-15 2015-16 2016-17

SEC (KWh/Pax)

18.86

20.10 20.01

18

18.5

19

19.5

20

20.5

2014-15 2015-16 2016-17

SEC (KWH/Sq. M/Month)

6.53% 6.06%

48.56% 23.17%

-31% -43%

Page 19: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

Team Work in Encon

Welcome suggestions from all levels of employees on energy

conservation

Reward and recognition system through R&R, start of quarter,

team of quarter, leader of the year & team of the year

Training /awareness for contract staff/Office staff on energy

conservation.

Sharing of best practices among the industries, like Kannur

airport people visited & BIAL visited BOSCH plant

Objectives are set for employees on reduction in energy & water

which are linked with their KPIs.

Page 20: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

Monitoring & Reporting

Dedicated energy Meters for all the panels

including for lighting, HVAC, pumps etc.

The BMS is used for controlling & monitoring of

Energy, Lighting, HVAC, Fire, water system

All the Tenants have separate energy meters

All the HT energy meters are monitored through

SCADA while LT meters through BMS

Record of daily energy meter through SCADA

Annual calibration of all energy meters.

Carry out variance analysis of energy.

Monthly review of energy balancing by energy

Management Cell

Page 21: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

Utilization of Renewable Energy Sources

(commissioned)

Current Solar Installations Yearly solar power

Generation (KWH)

Installation of 503 KWp roof top Solar PV system on

Utilities buildings 780,000

Installation of 440 KWp Solar Car parking

structure opposite to corporate office 690,300

Installation of 2.5 MWp Solar PV system at Airside 3,778,248

With current installations we are offsetting between 9% -10% of grid power.

440KWp Car Port Solar 503KWp Roof Top Solar 2.5MWp Ground Mounted Solar

Total of 3.443MWp Solar PV system installed 5,248,548

Page 22: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

Utilization of Renewable Energy Sources (pipeline)

Solar Installations

Probable

Completion

Schedule

Yearly solar power

Generation (KWH)

Approx. 2.5 MWp roof top Solar PV system on

Utility buildings (Techno-commercial

evaluation under progress)

March 2018 3,77,8,248

20 Million units through Open Access already

land is acquired & work started

February 2018 20,000,000

Installation of 5 MW Solar PV system at

Airside December 2018 75,000,000

20 Million units through Open Access already

(RFP published)

March 2018

20,000,000

Plan to offset approx. 70% of grid power and in turn reduction of carbon emissions.

Goal - Energy Neutral in 2020

Total of 35.5MWp Solar PV system 118,778,248

Page 23: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

Utilization of Waste Materials as Fuel

Initiatives taken by BIAL on recycling of waste material

All the Solid Wastes of the airport is being

processed scientifically.

After extracting the Biogas the expelled material is

converted to Compost.

The Pet bottle, plastic, polythene etc. sent to

authorised recyclers.

Newspaper & waste papers are sending to ITC Ltd

for recycling.

Tetra packs are send to an SAHAS (NGO) an

authorised institution for collecting the tetra packs.

Glass bottles are separated for coloured Glass &

others, it is send for Pulverising Industries for

recycling.

Page 24: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

Best Practices Adopted

Introduction of roof glazing system in terminal

building to minimize the day time light usage.

Lighting system is controlled through Lux sensor

inside as well as outside the terminal building.

Use of motion sensors installed in BBA area,

near belt area, PBB passage way and some

toilets to avoid unnecessary glowing of lights.

Maintaining power factor 0.99 to reduce losses

as reactive power component is reduced. The

PF can be improved by installing capacitor

banks

Conversion of conventional lights with LED

lights.

Page 25: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

Use of variable frequency drives (VFDs) for

pumps, motors & chillers.

Reshuffling of UPS for their optimum utilization.

Use of solar energy to reduce grid energy

consumption.

Centralized breaker status monitoring system.

SIM based remote control for collection wells.

All signage boards are replaced with LED lights

Best Practices Adopted

Page 26: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

Awards

2015 -SKYTRAX award for

Best Regional Connectivity

in Central Asia,

2016: All 13 QC teams

are awarded under the “Gold”

category in Chapter

Convention on Quality Circles –

CCQC 2017” at Bengaluru

2015 - Passenger satisfaction

survey which is the most

prestigious amongst all the

surveys measuring airport

services.

2017 - Out of 14

QC projects, won

13 “Gold” & 1

“Silver” category –

CCQC 2017” at

Bengaluru on 20th

August 2017.

2017 – HR team Won

Golden Peacock

Award for

Significant

achievement in the

field of excellence

in Training by

Institute of

Directors

Page 27: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

Certificates

KIA Bengaluru is certified “GreenCo Platinum”

Company by CII Green Building council

Page 28: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

Environmental Activities & Initiatives

Continuous monitoring of Environmental Parameters and compliance report submission

to KSPCB:

Quarterly stack emission monitoring

Raw & Treated sewage quality monitoring

Carbon footprint study conducted and report submission to CDP

Water balance analysis on monthly basis

Awareness Programs for Employees, concessioners/Associates & nearby communities

Enhancement of Landscape area by 60 acres this year to achieve a total area of 360

acres

Use of High-Efficiency fixtures (water closet & urinal) to reduce the potable water

demand

The creation of high performance, environmental friendly commercial building by

adopting LEED guidelines.

BIAL is setting up in-house solid waste management center.

Page 29: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

Installation of Ambient Air Quality monitoring system

Installed Continuous Ambient Air Quality Monitoring

Station with Online Display to monitor the ambient air

quality and continuously monitors the air emissions and

submit the report to KSPCB.

Installation of Noise Monitoring Station

Continuously monitoring noise level generated due to

aircraft movement.

Installed two permanent Noise monitoring station

outside the airport campus in two nearby villages at

exactly on the aircrafts movement lane.

Monitoring the noise level up to 10 KM radius by mobile

noise monitoring station.

Environmental Activities & Initiatives

Page 30: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

Waste Collection Centre

The waste collection center is constructed to handle the waste

generated in airport by means of scientific method of

segregation and recycling. It is constructed in environment

friendly manner. The roof top of the waste collection center is

fixed with transparent roof for natural light illumination due

to which the activities at waste collection center takes place

without light during day time. The main idea of this structure

is to save power. The activities at waste collection center are

planned in day time only. The roof mounted exhaust system

runs on wind energy to eliminate the foul smell through roof

top resulting in no energy consumed as well the exhaust is

directed upward direction thus eliminating the foul smell at

ground level. The platform of the waste collection center is

raised by 10 ft. from ground level in order to avoid any rain

water entry or animals.

Environmental Activities & Initiatives

Page 31: ENERGY MANAGEMENT - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Buildings... · ISO 50001:2011 Energy Management System Airport Carbon ... Replacement

Thank you