Energy Audit and Energy Savings Project Review
February, 2012
1
Tipp City Exempted Village Schools
HB264 Energy Savings & Facility Improvement Project
Today’s Agenda
Introductions
Open Forum and Discussions
“The bitterness of poor quality remains long after the sweetness of low price is forgotten” – Benjamin Franklin
“I am not very smart, I just know a lot of smart people.”
Facility & Energy Savings Opportunities
2
Energy Optimizers, USA
Greg Smith, President
Exclusive Focus with Ohio K-12 Schools and Energy Conservation Projects
Pre-Approved OSFC Vendor
Certified Energy Managers, Lighting Efficiency Professionals, Certified Energy Auditors, LEED AP’s & mechanical Contractors
$20,000,000+ of Successful Energy Savings Projects
3
Energy Optimizers, USA
HB 264 Success
2011 - Most HB 264 Projects in Ohio!!
Successful Projects:
School District Annual Savings
Eaton Community Schools $249,562
Jackson City Schools $163,822
Ontario Local Schools $130,971
Springfield City Schools $105,300
Edgerton Schools $59,826
Bethel Local Schools $58,411
Covington Schools $42,832
Fort Recovery Schools $42,5104
Facilities Audited
5
Electric Usage and Cost Summary
8.5% less cooling demand than the average year (February 2011 – January 2012)
6
Facility
Electricity Usage
kBtu/Sq.Ft. Electricity CostHigh School 51.51 $ 243,942 LT Ball 32.79 $ 84,167
Average K-12 kBtu/Sq.Ft. is 37.81 for full A/C facility
Natural Gas Usage and Cost Summary
<1% less heating demand than the average year (February 2011 – January 2012)
7
Avg. kBtu/Sq.Ft is 42.28
Facility
Natural Gas Usage
kBtu/Sq.Ft. Natural Gas Cost
High School 44.05 $ 90,825LT Ball Intermediate School 44.10 $ 45,415
Total Utility Usage and Cost Summary
8
FacilityTotal Usage kBtu/Sq.Ft. Total Cost
High School 95.56 $ 334,767
LT Ball Intermediate School 76.89 $ 129,272
Total 89.60 $ 464,039
Energy Star Overview
9
Tipp City School FacilityEnergyStar Rating
(1 - 100)National Avg.
Difference
High School 4 77%
LT Ball Intermediate School 22 30%
100 is Highest Rating
Positive Community & Voter Response
10
Potential Energy Savings Opportunities
Building Automation Enhancements & Integration
LT Ball
Upgrade control systems with Direct Digital Controls (DDC)
Include all HVAC equipment (Chiller, boiler, air handlers, VAV boxes, etc)
High School
Utilize all existing control wire, sensors, open protocol sensors, etc. with enhancements
Enable the High School to communicate with potential new schools
Web-Based and Vendor-Neutral
11
Potential Energy Savings Opportunities
Advanced Energy Management Programming
Demand Ventilation and Demand Limiting
Humidity Control
Optimized Schedules
Optimum Start/Stop
Chiller Start-up
Domestic Hot Water Pump Control
12
Potential Energy Savings Opportunities
LightingGymnasium Retrofit - HS
Less wattage (455 watts vs. 221 watts)
Better Light
De-Lamp Fluorescent Fixtures Reduce the number of lamps
Re-Lamp Fluorescent Fixtures Facility-wide (32 watts to 25 watts per bulb)
T-12 to T-8 @ LT Ball
Occupancy Sensors Automatically turns lights off when area is
unoccupied
Vending Misers Turns machine lights off and cycles compressors less
13
Potential Energy Savings Opportunities
Energy Management Services Install Direct Digital Gas and Electric Meters
Allows for real-time and historic usage information and modifications
Demand Limiting
School Board and OSFC Updates
14
Potential Energy Savings Opportunities
Energy Management Services
15
Potential Energy Savings Opportunities
Ice Storage
Reduced Electrical Demand (approximately 45% of Bill)
Operate Chillers at Night
Utilize New Controls to Operate
16
Potential Energy Savings Opportunities
Boiler Plant Upgrades
Burner optimization controls to limit excess combustion air to recommended levels
Less wasted heat leaving through exhaust
Domestic hot water pump controls
Regulate flow based on demand
17
Potential Energy Savings Opportunities
Mechanical Commissioning & Repairs
Inspect, Analyze and Perform Preventative Maintenance on HVAC Equipment
Air Handlers, Chiller, Boilers, etc.
Repair Equipment as Necessary $25,00 budget (“checkbook”)
Kitchen Equipment Enhancements
Exhaust Hood Controls Reduce the amount of conditioned air exhausted
Freezer/Cooler Backup Generator Tie-In Remain cool even during power outages
Less chance for food to spoil
18
Potential Energy Savings Opportunities
PC Power Management System Work with District’s IT Department
IT control of systems
Automatic shut-down with override
HVAC/Controls Service and Energy Management Agreement
3-Year Program
Use Permanent Improvement and Maintenance Funds for other projects
Dynamics Air Filtration Systems Improved Indoor Air Quality
Reduced Energy Costs and Reduced Maintenance Costs
19
Potential Energy Savings Opportunities
District-Wide Energy Manager & Education Program
Continue the District Energy Management Plan
Change behaviors and establish expectations
District “Green Team”
Establish District Energy Goals
Student and Staff Incentive Programs
“Green Suggestions” Program
“Energy Waste Patrol” Program
20
True Turn-Key Project
Turn-Key Project
Project Development With District
Project Engineering Energy Mechanical Electrical Structural
Project Management
Full Warranty Parts & Labor
21
Financial Analysis
Project Cost:$1,011,220(includes estimated AMP rebates) $ 16,790
Project Annual Savings: $ 118,910 Electrical Savings: $ 80,780 Natural Gas Savings: $ 18,340 Maintenance Savings: $ 19,790
Simple Payback: 8.5 Years
22
Annual Cash Flow (after loan payment): $ 31,531
Grants/Rebates
Grants & Rebates
Utilize the Ohio Dept. of Development’s Renewable Energy Grants to implement solar electric and solar thermal projects
AMP Ohio Rebates
Demand Response
23
Why Choose Energy Optimizers, USA?
Why HB264 and Why Energy Optimizers, USA?
Implement all Opportunities at One Time
Positive Effect on Current Budgets (Operating, PI, etc.) Positive PR if completed and presented correctly
Enhanced District Involvement Ensure project integrates with new construction project
OSFC, OASBO, OSBA & BASA Supported Program Vendor - Neutral
Does not Count Against the Districts Indebtedness
OSFC and Dept. of Energy Oversight24
Why Choose Energy Optimizers, USA?
Resolution Safety Contingencies
All Contingencies MUST be met to proceed:
1. Project cost must be the same or less than the budget;
2. Project savings must be the same or more than the budget;
3. The OSFC and the Dept. of Energy must review and approve the proposed project as submitted.
If any of these contingencies are not met, the district has no obligation to proceed, nor any monetary obligation.
25
Potential Timeline /What Next if We Want to Proceed?
Review & Modify Project: February, 2012
Board Review of Project: March, 2012 Board Presentation & Approval: March 26
Detailed Engineering: March 26 – May 20 HB264 Project Delivered to OSFC: May 20 HB264 Project Approval by OSFC: May 20 – July 15 Financing Finalized: July 30 Project Implementation: August 2 –
December 30, 201226