15 th Pre-application Meeting ACRS Meeting (Apr.20-21. 2016) APR1400-E-N-EC-16004-NP NON-PROPRIETARY KEPCO/KHNP Apr. 20~21. 2016 APR1400 Plant Security Design (Aircraft Impact Analysis)

Enclosure 25: APR1400-E-N-EC-16004-NP, APR1400 Plant ... · 2 APR1400-E-N-EC-16004-NP NON-PROPRIETARY Perform design-specific assessment for the effects of the impact of a large commercial

  • Upload
    others

  • View
    11

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Enclosure 25: APR1400-E-N-EC-16004-NP, APR1400 Plant ... · 2 APR1400-E-N-EC-16004-NP NON-PROPRIETARY Perform design-specific assessment for the effects of the impact of a large commercial

15th

Pre

-ap

pli

cati

on M

eeti

ng

A

CR

S M

eeti

ng

(A

pr.

20-2

1. 2

016

)

APR1400-E-N-EC-16004-NP

NON-PROPRIETARY

KEPCO/KHNP Apr. 20~21. 2016

APR1400 Plant Security Design (Aircraft Impact Analysis)

Page 2: Enclosure 25: APR1400-E-N-EC-16004-NP, APR1400 Plant ... · 2 APR1400-E-N-EC-16004-NP NON-PROPRIETARY Perform design-specific assessment for the effects of the impact of a large commercial

15th

Pre

-ap

pli

cati

on M

eeti

ng

A

CR

S M

eeti

ng

(A

pr.

20-2

1. 2

016

)

1 APR1400-E-N-EC-16004-NP

NON-PROPRIETARY

Contents

Overview

Part I: Structural Assessment Structural Response Assessments Summary

Part II: Heat Removal Assessment Heat Removal Assessment Summary

Page 3: Enclosure 25: APR1400-E-N-EC-16004-NP, APR1400 Plant ... · 2 APR1400-E-N-EC-16004-NP NON-PROPRIETARY Perform design-specific assessment for the effects of the impact of a large commercial

15th

Pre

-ap

pli

cati

on M

eeti

ng

A

CR

S M

eeti

ng

(A

pr.

20-2

1. 2

016

)

2 APR1400-E-N-EC-16004-NP

NON-PROPRIETARY

Perform design-specific assessment for the effects of the impact of a large commercial aircraft on the NPP facility based on 10CFR50.150

US NRC Regulatory Guide 1.217 allows guidance provided in NEI 07-13(Rev. 8) as acceptable methodology for assessments

Use NEI 07-13 Methodology to Show that Core remains cooled, and Spent fuel pool integrity is maintained

Sufficiency Criteria Needed Containment integrity

• No perforation - protects internal SSC’s from damage and fire • Polar crane does not fall inside containment

Spent fuel pool integrity • Pool structure, supports, and liner remain intact • Consider debris and wreckage falling into pool

Protect critical penetrations into containment Protect sufficient equipment for all possible strike locations

• Control fire spread with 3-hour & 5-psid doors and dampers • Prevent shock damage

Overview

Page 4: Enclosure 25: APR1400-E-N-EC-16004-NP, APR1400 Plant ... · 2 APR1400-E-N-EC-16004-NP NON-PROPRIETARY Perform design-specific assessment for the effects of the impact of a large commercial

15th

Pre

-ap

pli

cati

on M

eeti

ng

A

CR

S M

eeti

ng

(A

pr.

20-2

1. 2

016

)

3 APR1400-E-N-EC-16004-NP

NON-PROPRIETARY

Part I: Structural Assessment

Page 5: Enclosure 25: APR1400-E-N-EC-16004-NP, APR1400 Plant ... · 2 APR1400-E-N-EC-16004-NP NON-PROPRIETARY Perform design-specific assessment for the effects of the impact of a large commercial

15th

Pre

-ap

pli

cati

on M

eeti

ng

A

CR

S M

eeti

ng

(A

pr.

20-2

1. 2

016

)

4 APR1400-E-N-EC-16004-NP

NON-PROPRIETARY

Structural Response Assessments TS

Page 6: Enclosure 25: APR1400-E-N-EC-16004-NP, APR1400 Plant ... · 2 APR1400-E-N-EC-16004-NP NON-PROPRIETARY Perform design-specific assessment for the effects of the impact of a large commercial

15th

Pre

-ap

pli

cati

on M

eeti

ng

A

CR

S M

eeti

ng

(A

pr.

20-2

1. 2

016

)

5 APR1400-E-N-EC-16004-NP

NON-PROPRIETARY

Integrity of Containment TS

Page 7: Enclosure 25: APR1400-E-N-EC-16004-NP, APR1400 Plant ... · 2 APR1400-E-N-EC-16004-NP NON-PROPRIETARY Perform design-specific assessment for the effects of the impact of a large commercial

15th

Pre

-ap

pli

cati

on M

eeti

ng

A

CR

S M

eeti

ng

(A

pr.

20-2

1. 2

016

)

6 APR1400-E-N-EC-16004-NP

NON-PROPRIETARY

Integrity of Spent Fuel Pool

Exterior Walls Removed of Interior View Spent Fuel Pool

TS

Page 8: Enclosure 25: APR1400-E-N-EC-16004-NP, APR1400 Plant ... · 2 APR1400-E-N-EC-16004-NP NON-PROPRIETARY Perform design-specific assessment for the effects of the impact of a large commercial

15th

Pre

-ap

pli

cati

on M

eeti

ng

A

CR

S M

eeti

ng

(A

pr.

20-2

1. 2

016

)

7 APR1400-E-N-EC-16004-NP

NON-PROPRIETARY

SFP Integrity Due to Strike Above SFP TS

Page 9: Enclosure 25: APR1400-E-N-EC-16004-NP, APR1400 Plant ... · 2 APR1400-E-N-EC-16004-NP NON-PROPRIETARY Perform design-specific assessment for the effects of the impact of a large commercial

15th

Pre

-ap

pli

cati

on M

eeti

ng

A

CR

S M

eeti

ng

(A

pr.

20-2

1. 2

016

)

8 APR1400-E-N-EC-16004-NP

NON-PROPRIETARY

Summary TS

Page 10: Enclosure 25: APR1400-E-N-EC-16004-NP, APR1400 Plant ... · 2 APR1400-E-N-EC-16004-NP NON-PROPRIETARY Perform design-specific assessment for the effects of the impact of a large commercial

15th

Pre

-ap

pli

cati

on M

eeti

ng

A

CR

S M

eeti

ng

(A

pr.

20-2

1. 2

016

)

9 APR1400-E-N-EC-16004-NP

NON-PROPRIETARY

Part II: Heat Removal Assessment

Page 11: Enclosure 25: APR1400-E-N-EC-16004-NP, APR1400 Plant ... · 2 APR1400-E-N-EC-16004-NP NON-PROPRIETARY Perform design-specific assessment for the effects of the impact of a large commercial

15th

Pre

-ap

pli

cati

on M

eeti

ng

A

CR

S M

eeti

ng

(A

pr.

20-2

1. 2

016

)

10 APR1400-E-N-EC-16004-NP

NON-PROPRIETARY

Heat Removal Assessment TS

Page 12: Enclosure 25: APR1400-E-N-EC-16004-NP, APR1400 Plant ... · 2 APR1400-E-N-EC-16004-NP NON-PROPRIETARY Perform design-specific assessment for the effects of the impact of a large commercial

15th

Pre

-ap

pli

cati

on M

eeti

ng

A

CR

S M

eeti

ng

(A

pr.

20-2

1. 2

016

)

11 APR1400-E-N-EC-16004-NP

NON-PROPRIETARY

Heat Removal Assessment TS

Page 13: Enclosure 25: APR1400-E-N-EC-16004-NP, APR1400 Plant ... · 2 APR1400-E-N-EC-16004-NP NON-PROPRIETARY Perform design-specific assessment for the effects of the impact of a large commercial

15th

Pre

-ap

pli

cati

on M

eeti

ng

A

CR

S M

eeti

ng

(A

pr.

20-2

1. 2

016

)

12 APR1400-E-N-EC-16004-NP

NON-PROPRIETARY

Heat Removal Assessment TS

Page 14: Enclosure 25: APR1400-E-N-EC-16004-NP, APR1400 Plant ... · 2 APR1400-E-N-EC-16004-NP NON-PROPRIETARY Perform design-specific assessment for the effects of the impact of a large commercial

15th

Pre

-ap

pli

cati

on M

eeti

ng

A

CR

S M

eeti

ng

(A

pr.

20-2

1. 2

016

)

13 APR1400-E-N-EC-16004-NP

NON-PROPRIETARY

Heat Removal Assessment TS

Page 15: Enclosure 25: APR1400-E-N-EC-16004-NP, APR1400 Plant ... · 2 APR1400-E-N-EC-16004-NP NON-PROPRIETARY Perform design-specific assessment for the effects of the impact of a large commercial

15th

Pre

-ap

pli

cati

on M

eeti

ng

A

CR

S M

eeti

ng

(A

pr.

20-2

1. 2

016

)

14 APR1400-E-N-EC-16004-NP

NON-PROPRIETARY

Summary TS