Employee Performance Review

Embed Size (px)

DESCRIPTION

Employee Performance Review

Citation preview

  • Employee Performance Review

    SB

    AD

    M/

    /08/2

    013-V

    01

    SATHUTA READY-MIX PVT LTD( )No. 71, Negombo Road, Kurunegala.

    Tel: 037 222 1836 Fax: 037 222 1839 Email: [email protected]

    Name of Employee :

    Designation :

    Work Location / Project : Period of Evaluation

    From: To:

    Evaluation Date :

    [A] General Information

    [B] General Rating

    1. Honesty

    2. Punctuality

    3. Attitude

    4. Creativity

    5. Flexibility

    6. Communication Skills

    7. Discipline

    8. Behavior with Colleagues

    E* Special CommentsD*B* C*A*

    [D] Work Quality

    1. Accuracy

    2. Thoroughness

    3. Dependability of results

    E* Special CommentsD*B* C*A*

    [E] Attendance

    1. Reports to work as scheduled

    2. Follows established procedures for breaks

    3. Notifies supervisor in advance of scheduling changes

    4. Achieve Goals and Attendance targets

    E* Special CommentsD*B* C*A*

    [G] Work attitude and cooperation

    1. Extent to which employee demonstrates a positive attitude

    2. Cooperation with supervisors, peer and others

    3. Team Work

    4. Achieve turnover targets

    E* Special CommentsD*B* C*A*

    [F] Initiative

    1. Ability to be self-directed

    2. Efficient

    3. Creative and Resourceful

    4. Assume extra works on own initiative

    5. Adapts quickly to new responsibilities

    E* Special CommentsD*B* C*A*

    [C] Job Knowledge

    1. Understand duties

    2. Responsibilities

    3. Ability to use materials needed

    5. Has the level of proficiency required toaccomplish the work

    4. Fluent in Drawings

    E* Special CommentsD*B* C*A*

    *A

    BC

    DE

    ()

    Poor;

    ()

    Fair; (

    ) S

    atisfa

    cto

    ry; (

    ) G

    ood; (

    ) E

    xcelle

    nt

    Evaluated By: Accepted by Employee:

    SATHUTA READYMIX

    H. K. Rupasinghe

    Plant Technician

    Uhumeeya PalntAPR-2015 JUN-2015

    July 10, 2015