    A MAJOR PROJECT REPORT

    ON

    EMPLOYEE EVALUATION SYSTEM

    Submitted in Partial Fulfillment for the award of

    Bachelor of Engineering in Information Technology.(2006-2010)

    Submitted to

    RAJIV GANDHI PROUDYOGIKI VISHWAVIDYALAYABHOPAL (M.P.)

    Submitted By:

    Avinash Singh (0302it061020)

    Dhirendra Kumar Dubey (0302it061023)

    Approved By Under the Guidance of

    Mr.V.K.Singh Mr. R. S. Patel

    (Head of the Department) (Lect. CS/IT)Information Technology

    Department Of Information TechnologyVINDHIYA INSTITUTE OF TECHNOLOGY AND SCIENCE

  • 8/7/2019 Employee Evaluation System

    2/54

    SATNA (M.P.)

    Rajiv Gandhi Proudyogivi Vishwavidyalaya, Bhopal(M.P)

    Vindhya Institute of Technology & ScienceSanta (M.P)

    CERTIFICATE

    This is to certify that the project entitled as

    EMPLOYEE EVALUATION SYSTEM which has been

    completed & submitted by Avinash Singh &

    Dhirendra Kumar Dubey in partial fulfillment

    of the requirement for the award of the degree of

    Bachelor of Engineering in Information

    Technology for the session 2009-2010 is a

    bonafied work by them and has been completed

    under my guidance and supervision.It has not

    been submitted elsewhere for any other degree.

    2

  • 8/7/2019 Employee Evaluation System

    3/54

    H.O.D Guided By

    Mr.V.K.Singh Mr. R.S. Patel

    (Information Technology) (Lect. CS/IT)

    Principal

    Mr.R.C.Srivastava

    Rajiv Gandhi Proudyogivi Vishwavidyalaya, Bhopal (M.P)

    Vindhya Institute of Technology & Science

    Santa (M.P)

    CERTIFICATE

    This is to certify that the project entitled as

    EMPLOYEE EVALUATION SYSTEM which has been

    completed & submitted by Avinash Singh &

    Dhirendra Kumar Dubey in partial

    fulfillment of the requirement for the award of

    the degree of Bachelor of Engineering in

    Information Technology for the session 2009-

    2010 is a bonafied work by them. It has not

    been submitted elsewhere for any other

    degree.

    3

  • 8/7/2019 Employee Evaluation System

    4/54

    (External Examiner) (Internal Examiner)

    ACKNOWLEDGEMENT

    A project like this one involves many

    people and would be incomplete without the

    mention of all those people whose guidance and

    encouragement helped in the successful

    completion of this project.

    Our heartily thanks to all faculty

    members of Department of Information

    Technology,Vindhiya Institute of

    Technology & Science,Satna for their effort

    towards our project.

    We would like to thanks our

    H.O.D Mr. V.K.Singh who has been a great

    4

  • 8/7/2019 Employee Evaluation System

    5/54

  • 8/7/2019 Employee Evaluation System

    6/54

    fulfillment of the requirement of the degree ofBachelor of Engineering in

    Information Technologybranch is an authentic record of our work carried

    out under the able guidance ofMr.V.K.Singh.The work has been carried

    out at Vindhya Institute Of Technology & Science, Satna.

    Project Associate

    Avinash Singh (0302it061020)

    Dhirendra Kumar Dubey

    (0302it061023)

    ABSTRACT

    The project EMPLOYEE EVALUATION SYSTEM is basically aimed to efficiently design the application with the help of

    which we can maintain and store the records of the employees status in

    6

  • 8/7/2019 Employee Evaluation System

    7/54

    any company or organization. It provides an easy and convenient to

    manage and use resources.

    The project is basically aimed to create a graphical user interface

    for the employees status in different field of company. Our basic aim isto eliminate all the overhead involved in maintaining the hardcopy of the

    records.

    This software is helps to organize the current status of the

    employees and better security has been given in this field to safe and

    secure database of the employees.

    This system works more or less like informational record

    software for any company or organization where they can deal with

    any type of information related to the employees in the

    organization.

    CONTENT

    S.NO TITLE PAGE NO

    1 INTRODUCTION 8

    1.1 Problem Description 9

    7

  • 8/7/2019 Employee Evaluation System

    8/54

    2 SYSTEM ANALYSIS 9

    2.1 System Objective 9

    2.2 Feasibility study

    10 2.2.1 Technical feasibility

    11

    2.2.2 Economical Feasibility

    11

    2.2.3 Operational Feasibility

    12

    3 DEVELOPMENT ENVIRONMENT13

    3.1 Hardware Requirements 13

    3.1 Software Requirements

    13

    4 SYSTEM DESIGN

    15

    4.1 Data Flow Diagram

    15

    5 IMPLEMENTATION

    18

    5.1 Project Description

    185.2 Sample Screenshots

    20

    8

  • 8/7/2019 Employee Evaluation System

    9/54

    6 CODING 36

    7 SYSTEM TESTING 49

    8 FUTURE ENHANCEMANT 55

    9 CONCLUSION 56

    10 BIBLOGRAPHY 57

    9

  • 8/7/2019 Employee Evaluation System

    10/54

    INTRODUCTION

    10

  • 8/7/2019 Employee Evaluation System

    11/54

    INTRODUCTION

    Each company or organizations must have to maintain the record of their

    employees. Here we attempt to create software which will help us to

    manage informational records of the employees.

    The project is basically aimed to create a graphical user interface for the

    employees informational status system in a company. Here our basic

    aim is to eliminate all the overhead involved in maintaining the hardcopy

    of the records.

    This software will help to manage the all information regarding employees

    done in any company such as any query related to the employees. it also

    keeps track of the employee status and its efficiency.

    This system also works as a evolution system software for any company

    where employees can choose or elect their senior ordinates with the

    reference of their efficiency as well as their experience through online

    ,just filling a simple form or offline also done very well.

    I have not used swing in most of the forms which could be useful in makingan interactive graphical user interface. This software also helps This

    system also works as a evolution system software for any companywhere employees can choose or elect their senior ordinates with the

    reference of their efficiency as well as their experience through online

    ,just filling a simple form or offline also done very well.

    11

  • 8/7/2019 Employee Evaluation System

    12/54

    SYSTEM ANALYSIS

    12

  • 8/7/2019 Employee Evaluation System

    13/54

    SYSTEM ANALYSIS

    An analysis model that is a part of the requirements phase is necessary as the

    first step for implementing the user requirements. A systematic investigationof the system was carried out to determine the functions of the system and

    how they relate to each other and to any other system.

    One of the most important factors in system analysis is to develop good

    understanding of the system and its problems that enables the designers to

    identify the correct problems, suggest realistic solutions for them and also

    develop solutions to satisfy the users thus making the system acceptable in the

    organization. Based on the observations made, requirement specification was

    prepared and the approval from the higher officials and approved by the

    project leader.

    System Objectives

    The main objective of the project is to study the requirements of the user,

    design a system and implement the system

    To study the existing system and conduct the requirements study, then

    determine the activities and procedures to be computerized.

    To record the finding of the study, to prepare a document containing

    the functional requirements, performance requirements, interfacerequirements, constraints etc.

    To prepare the design document containing DFD, input design, output

    design of reports etc.

    To translate the design phase into implementation phase by coding

    programs for all modules designed.

    To implement the system to manage the content on online basis.

    FEASIBILITY STUDY

    When complex problem and opportunities are to be defined, it is generally

    desirable to conduct a preliminary investigation called a feasibility study. A

    feasibility study is conduct to obtain an overview of the problem and to

    roughly assess whether feasible solution exists prior to committing

    substantial resources to a project. During a feasibility study, the system

    13

  • 8/7/2019 Employee Evaluation System

    14/54

    analyst usually works with representatives from the departments(s) expected

    to benefit from the solution.

    Every project is feasible if given unlimited resource and infinite time.

    Unfortunately, the development of computer based systems is more likely to

    be plagued by scarcity of resources and difficult delivery of data it is both

    necessary and prudent to evaluate the feasibility of a project at the earliest

    possible time. Precious time and money can be saved and untold

    professional embarrassment can be averted if an ill conceived system is

    recognized early in the definition phase. So a detailed study is carried out to

    check the workability of the system.

    Feasibility study is undertaken to evaluate its workability, impact on the

    organization, ability to meet user needs, and effective use of resources. The

    main objective of feasibility study is to test the technical, operational and

    economical feasibility of developing the computer system. Thus, during

    feasibility analysis for this project the following three primary areas of

    interest were considered very carefully. The feasibility of a project can beascertained in terms of technical factors, economic factors, or both. A

    feasibility study is documented with a report showing all the ramification of

    the project.

    The primary objective of a feasibility study is to assess three types of

    feasibility.

    1) Technical feasibility: can a solution be supported with existing

    technology?

    2) Economical feasibility: is existing technology cost effective?

    3) Operational feasibility: will the solution work in the organization if

    implemented?

    Technical Feasibility

    A systems development project may be regarded as technically feasibility or

    practical if the organization has the necessary expertise and infrastructure

    to develop, install, operate and maintain the proposed system. Organizations

    will need to make this assessment based on:

    Knowledge of current and emerging technological solutions.

    Availability of technically qualified staff in house for the duration of

    the project and subsequent maintenance phase.

    Availability of infrastructure in house to support the development and

    maintenance of the proposed system.

    Where necessary, the financial and/or technical capacity to procure

    appropriate infrastructure and expertise from outside.

    14

  • 8/7/2019 Employee Evaluation System

    15/54

    Capacity of the proposed system to accommodate increasing levels of

    use over the medium term and capacity of the proposed system to

    meet initial performance expectations and accommodate new

    functionality over the medium term.

    The existing computer system has a good hardware configuration and good

    software facilities in such a way that any alteration can be implemented with

    slight modifications of the existing process. Hence this project is technically

    feasible.

    Economic Feasibility

    A systems development project may be regarded as economically feasible or

    good value to the organization if its anticipated benefits outweigh its

    estimated costs. However, many of the organizational benefits arising from

    record keeping projects are intangible and may be hard to quantify. In

    contrasts, many development costs are easier to identify.

    These costs may include the time, budget and staff resources invested during

    the design and implementation phase as well as infrastructure, support,

    training and maintenance costs incurred after implementation. In these high

    risk situations it may be appropriate assessments of financial feasibility.

    Operational Feasibility

    A systems development project is likely to be operationally feasible if it

    meets the needs and expectations of the organization. User acceptance is

    an important determinant of operational feasibility.

    Feasibility study of the proposed system

    The feasibility study of the proposed system has been carried out in all the

    three areas.

    Technical Feasibility

    The proposed system can be easily developed using resources available in

    the organization. Hence it is technically feasible.

    15

  • 8/7/2019 Employee Evaluation System

    16/54

    Economic feasibility

    The proposed system can be easily developed using the resources availablein the organization and they do not invest in procurement of additional

    hardware or software. The cost of developing the system, including all the

    phases have been taken into account and it is strict minimum. Hence the

    system is economically feasible.

    Operational feasibility

    The system has been developed after extensive discussion with the end user

    and all the operational requirements has been taken into account during the planning and implementation stages. Hence the system is operationally

    feasible.

    16

  • 8/7/2019 Employee Evaluation System

    17/54

    DEVELOPMENT ENVIRONMENT

    17

  • 8/7/2019 Employee Evaluation System

    18/54

    DEVELOPMENT ENVIRONMENT

    HARDWARE CONFIGURATION

    Processor : Pentium 4 processor

    Memory : 1 GB RAM

    Display : 14 LCD

    Hard disk Drive : 80 GB

    SOFTWARE CONFIGURATION

    Operating System : Windows XP professional

    Environment : ASP.net

    Database : SQL Server

    ASP.NET

    ASP.NET is a web application framework developed and marketed by

    Microsoft to allow programmers to build dynamic web sites, web

    applications and web services. It was first released in January 2002 with

    version 1.0 of the .NET Framework, and is the successor to Microsoft's

    Active Server Pages (ASP) technology. ASP.NET is built on the Common

    Language Runtime (CLR), allowing programmers to write ASP.NET code

    using any supported .NET language.

    ASP.NET aims for performance benefits over other script-based

    technologies (including Classic ASP) by compiling the server-side code to

    one or more DLL files on the web server. This compilation happens

    automatically the first time a page is requested (which means the developer

    need not perform a separate compilation step for pages). This feature

    18

    http://en.wikipedia.org/wiki/Web_application_frameworkhttp://en.wikipedia.org/wiki/Microsofthttp://en.wikipedia.org/wiki/Programmerhttp://en.wikipedia.org/wiki/Web_sitehttp://en.wikipedia.org/wiki/Web_applicationhttp://en.wikipedia.org/wiki/Web_applicationhttp://en.wikipedia.org/wiki/Web_servicehttp://en.wikipedia.org/wiki/.NET_Frameworkhttp://en.wikipedia.org/wiki/Active_Server_Pageshttp://en.wikipedia.org/wiki/Common_Language_Runtimehttp://en.wikipedia.org/wiki/Common_Language_Runtimehttp://en.wikipedia.org/wiki/.NET_Languageshttp://en.wikipedia.org/wiki/Dynamic_link_libraryhttp://en.wikipedia.org/wiki/Computer_filehttp://en.wikipedia.org/wiki/Web_serverhttp://en.wikipedia.org/wiki/Web_application_frameworkhttp://en.wikipedia.org/wiki/Microsofthttp://en.wikipedia.org/wiki/Programmerhttp://en.wikipedia.org/wiki/Web_sitehttp://en.wikipedia.org/wiki/Web_applicationhttp://en.wikipedia.org/wiki/Web_applicationhttp://en.wikipedia.org/wiki/Web_servicehttp://en.wikipedia.org/wiki/.NET_Frameworkhttp://en.wikipedia.org/wiki/Active_Server_Pageshttp://en.wikipedia.org/wiki/Common_Language_Runtimehttp://en.wikipedia.org/wiki/Common_Language_Runtimehttp://en.wikipedia.org/wiki/.NET_Languageshttp://en.wikipedia.org/wiki/Dynamic_link_libraryhttp://en.wikipedia.org/wiki/Computer_filehttp://en.wikipedia.org/wiki/Web_server
  • 8/7/2019 Employee Evaluation System

    19/54

    provides the ease of development offered by scripting languages with the

    performance benefits of a compiled binary. However, the compilation might

    cause a noticeable but short delay to the web user when the newly-edited

    page is first requested from the web server, but won't again unless the page

    requested is updated further.

    The ASPX and other resource files are placed in a virtual host on an Internet

    Information Services server (or other compatible ASP.NET servers; see

    Other Implementations, below). The first time a client requests a page,

    the .NET framework parses and compiles the file(s) into a .NET assembly

    and sends the response; subsequent requests are served from the DLL files.

    By default ASP.NET will compile the entire site in batches of 1000 files

    upon first request. If the compilation delay is causing problems, the batch

    size or the compilation strategy may be tweaked.

    Developers can also choose to pre-compile their code before deployment,eliminating the need for just-in-time compilation in a production

    environment.

    Criticism

    On IIS 6.0 and lower, pages written using different versions of the ASP

    framework cannot share Session State without the use of third-party

    libraries. This criticism does not apply to ASP.NET and ASP applications

    running side by side on IIS 7. With IIS 7, modules may be run in an

    integrated pipeline that allows modules written in any language to be

    executed for any request.

    ASP.NET 2.0 Web Forms produces markup that passes W3C validation, but

    it is debatable as to whether this increases accessibility, one of the benefits

    of a semantic XHTML page + CSS representation. Several controls, such as

    the Login controls and the Wizard control, use HTMLtables for layout bydefault. Microsoft has solved this problem by releasing the ASP.NET 2.0

    CSS Control Adapters, a free add-on that produces compliant accessible

    XHTML+CSS markup.

    19

    http://en.wikipedia.org/wiki/Internet_Information_Serviceshttp://en.wikipedia.org/wiki/Internet_Information_Serviceshttp://en.wikipedia.org/wiki/Internet_Information_Serviceshttp://en.wikipedia.org/wiki/Session_Statehttp://en.wikipedia.org/wiki/Internet_Information_Serviceshttp://en.wikipedia.org/wiki/Internet_Information_Serviceshttp://en.wikipedia.org/wiki/Web_accessibilityhttp://en.wikipedia.org/wiki/XHTMLhttp://en.wikipedia.org/wiki/CSShttp://en.wikipedia.org/wiki/Loginhttp://en.wikipedia.org/wiki/HTMLhttp://en.wikipedia.org/wiki/Table_(HTML)http://en.wikipedia.org/wiki/Microsofthttp://www.asp.net/cssadapters/http://www.asp.net/cssadapters/http://en.wikipedia.org/wiki/XHTMLhttp://en.wikipedia.org/wiki/CSShttp://en.wikipedia.org/wiki/Internet_Information_Serviceshttp://en.wikipedia.org/wiki/Internet_Information_Serviceshttp://en.wikipedia.org/wiki/Internet_Information_Serviceshttp://en.wikipedia.org/wiki/Session_Statehttp://en.wikipedia.org/wiki/Internet_Information_Serviceshttp://en.wikipedia.org/wiki/Internet_Information_Serviceshttp://en.wikipedia.org/wiki/Web_accessibilityhttp://en.wikipedia.org/wiki/XHTMLhttp://en.wikipedia.org/wiki/CSShttp://en.wikipedia.org/wiki/Loginhttp://en.wikipedia.org/wiki/HTMLhttp://en.wikipedia.org/wiki/Table_(HTML)http://en.wikipedia.org/wiki/Microsofthttp://www.asp.net/cssadapters/http://www.asp.net/cssadapters/http://en.wikipedia.org/wiki/XHTMLhttp://en.wikipedia.org/wiki/CSS
  • 8/7/2019 Employee Evaluation System

    20/54

    SQL SERVER

    Microsoft SQL Server is a relational database management system produced by Microsoft. Its primary query language is Transact-SQL, an

    implementation of the ANSI/ISO standard Structured Query Language used

    by both Microsoft and Sybase. SQL Server is commonly used by business

    for small-to medium-sized databases, but the past five years have seen

    greater adoption of the product for larger enterprise databases.

    Microsoft SQL Server 2000 is a full-featured relational database

    management system that offers a variety of administrative tools to ease the

    burdens of database development, maintenance and administration.

    FEATURES OF SQL SERVER:-

    Microsoft SQL Server uses a variant of SQL called T-SQL, or Transact-

    SQL, an implementation of SQL-92 with many extensions. T-SQL mainly

    adds additional syntax for use in stored procedures, and affects the syntax of

    transaction support. Microsoft SQL Server and Sybase/ASE both

    communicate over networks using an application-level protocol called

    Tabular Data Stream. The TDS protocol has also been implemented by the

    Free TDS project in order to allow more kinds of client applications to

    communicate with Microsoft SQL Server and Sybase databases. Microsoft

    SQL Server also supports Open Database Connectivity. The latest release

    SQL Server 2005 also supports the ability to deliver client connectivity via

    the Web Services SOAP protocol. This allows non-Windows Clients to

    communicate cross platform with SQL Server. Microsoft has also released acertified JDBC driver to let Java Applications like BEA and IBM

    WebSphere communicate with Microsoft SQL Server 2000 and

    2005.Microsoft SQL Server 2005 also features automated database

    mirroring, failover clustering, and database snapshots.

    20

  • 8/7/2019 Employee Evaluation System

    21/54

    SYSTEM DESIGN

    21

  • 8/7/2019 Employee Evaluation System

    22/54

    SYSTEM DESIGN

    DATA FLOW DIAGRAMS

    LEVEL - 0

    LEVEL - 1

    22

    LoginModul

    e

    Administrator/

    Employee

    Login

    RespectiveHome Page

    EmployeeSearch

    Module

    Employee Info./

    Vote/Vote Result/

    Voting criteria

    AdministratorAdd/Upd

    ate/View

    Module

    Admin Info./Emloyee Info./

    Edit Voting

    Criteria

  • 8/7/2019 Employee Evaluation System

    23/54

    IMPLEMENTATION

    23

  • 8/7/2019 Employee Evaluation System

    24/54

    IMPLEMENTATION

    PROJECT DISCRIPTION

    This project is divided into four modules

    Login Module

    Registration Module

    Search Module

    Update Module

    Details about the modules

    Login Module

    This module basically deals to verify the user name and password by which

    only a valid user can login and will be able to go on respective page. It

    provides login facility to an administrator and the user separately. User can

    search or view only for their respective queries while administrator canperform all operations like add, update, search etc

    Registration Module

    This module basically deals to provide the new account for all the students,where they can see their financial status individually. In this for all

    students we provide the user name and password bywhich all of them

    can have personal login facility. For registration they have to fill all their

    personal information by which university can keep track all the

    information of the students.

    Search Module

    24

  • 8/7/2019 Employee Evaluation System

    25/54

    This module will help to view details of any student by which user will be

    able to see all the information of the students. In this both user and

    administrator can search for their respective query.

    Update

    This module provides facility to user to update the financial status of thestudent. If user wants to change any data or information about the

    financial status of the student then they will be able to do it by this

    module.

    25

  • 8/7/2019 Employee Evaluation System

    26/54

    EMPLOYEE EVALUATION SYSTEM

    26

  • 8/7/2019 Employee Evaluation System

    27/54

    WELCOME PAGE

    27

  • 8/7/2019 Employee Evaluation System

    28/54

    ADMIN LOGIN

    28

  • 8/7/2019 Employee Evaluation System

    29/54

    EMPLOYEE INFORMATION

    29

  • 8/7/2019 Employee Evaluation System

    30/54

    EMPLOYEE PERSONAL INFORMATION

    30

  • 8/7/2019 Employee Evaluation System

    31/54

    VOTING CRITERIA

    31

  • 8/7/2019 Employee Evaluation System

    32/54

    EMPLOYEE LOGIN

    32

  • 8/7/2019 Employee Evaluation System

    33/54

    EMPLOYEE INFORMATION

    33

  • 8/7/2019 Employee Evaluation System

    34/54

    VOTE

    34

  • 8/7/2019 Employee Evaluation System

    35/54

    VOTING RESULT

    35

  • 8/7/2019 Employee Evaluation System

    36/54

    MD LOGIN

    36

  • 8/7/2019 Employee Evaluation System

    37/54

    CONTACTS

    37

  • 8/7/2019 Employee Evaluation System

    38/54

    DATA SAVED SUCCESSFULLY

    38

  • 8/7/2019 Employee Evaluation System

    39/54

    SCHOLARSHIP

    39

  • 8/7/2019 Employee Evaluation System

    40/54

    40

  • 8/7/2019 Employee Evaluation System

    41/54

    CODING

    CODING:-

    41

  • 8/7/2019 Employee Evaluation System

    42/54

    42

  • 8/7/2019 Employee Evaluation System

    43/54

    SYSTEM TESTING

    SYSTEM TESTING

    43

  • 8/7/2019 Employee Evaluation System

    44/54

    Software testing entails running software products under known conditions

    with defined inputs and documented outcomes that can be compared to their

    predefined expectations. It is a time consuming, difficult, and imperfect

    activity. As such, it requires early planning in order to be effective and

    efficient.

    Test plans and test cases should be created as early in the software

    development process as feasible. They should identify the schedules,

    environments, resources (personnel, tools, etc.), methodologies, cases

    (inputs, procedures, outputs, expected results), documentation, and reporting

    criteria. The magnitude of effort to be applied throughout the testing process

    can be linked to complexity, critically, reliability, and/or safety issues (e.g.,

    requiring functions or modules that produce critical outcomes to be

    challenged with intensive testing of their fault tolerance features).

    Implementation of software testing and its implications with respect to

    software quality cannot be over emphasized. Software testing is a critical

    element of the software quality assurance and represents the ultimate reviewof specification, design and coding.

    A software testing process should be based on principles that foster effective

    examinations of a software product. Applicable software testing tenets

    include:

    The expected test outcome is predefined.

    A good test case has a high probability of exposing an error.

    A successful test is one that finds an error.

    There is independence from coding.

    Both application(user) and software (programming) expertise areemployed.

    Testers use different tools from coders

    Examining only the usual case is insufficient.

    In order to provide a through and rigorous examination of a software

    product, development testing is typically organized into levels. As an

    example, a software products testing can organized into unit, integration,

    and system levels of testing.

    TESTING OBJECTIVES

    44

  • 8/7/2019 Employee Evaluation System

    45/54

    The objectives for the testing have to be set keeping in mind the scope of the

    system. The objectives are:

    1) The input values have to be validated for the variable type and size

    specified in the data base.

    2) Secured pages should be accessed only trough session.

    3) Logical sequence in navigation has to be maintained.

    TESTING

    The testing process focuses on the internal logic of the software assuring that

    all the statements have been tested and also on the functional external by

    conducting tests to uncover the errors. The amount of testing required

    related to the size and complexity of the application.

    Before testing any system test cases for each screen should be prepared. The

    test cases are made to check and execute all the functionalities of Remote

    Desktop. The following are the tests conducted for this system:

    CONTENT TESTING

    Content testing checks that users can easily understand all items that appear

    on a interface and, importantly, that they are able to correctly interpret the

    information they read. Accordingly, it identifies any problem areas that may

    require simplification or re-writing.

    INTERFACE TESTING

    Testing conducted to ensure that the end users enter appropriate data.

    NAVIGATION TESTING

    Once the first layers of the interface have been examined, it is time to

    perform simple tests to probe the quality of the global site navigation. Good

    sites will provide consistent, well-executed navigation and should providealternative navigation schemes.

    SECURITY TESTING

    45

  • 8/7/2019 Employee Evaluation System

    46/54

    Techniques used to confirm the design and/or operational effectiveness of

    security controls implemented within a system. Examples: Attack and

    penetration studies to determine whether adequate controls have been

    implemented to prevent breach of system controls.

    UNIT TESTING

    Unit(module or component) level testing focuses on the early examination of

    sub-program functionality and ensures that functionality not visible at the

    system level is examined by testing. Unit testing ensures that quality

    software units are furnished for integration into the finished software

    product.

    INTEGRATION TESTING

    Integration level testing focuses on the transfer of data and control across a

    programs internal and external interfaces. External interfaces are those with

    other software, system hardware, and the users and can be described as

    communications links.

    SYSTEM TESTING

    System level testing demonstrates that all specified functionality exists and

    that the software product is trustworthy. This testing verifies the as builtprograms functionality and performance with respect to the requirements

    for the software product as exhibited on the specified operating platform(s).

    System level software testing addresses functional concerns and the

    following elements of a devices software that are related to the intended

    use(s).

    Performance issues (e.g. response times, reliability measurements):

    Response to stress conditions, e.g. behavior under maximum load,

    continuous use.

    Operational of internal and external security features.

    Effectiveness of recovery procedures, including disaster recovery.

    Usability.

    Compatibility with other software products.

    Behavior in each of the defined hardware configurations and

    Accuracy of documentation.

    46

  • 8/7/2019 Employee Evaluation System

    47/54

    Control measures (e.g. a tractability analysis) should be used to ensure that

    the intended coverage is achieved.

    WHITE BOX TESTING

    White box testing, sometimes called glass-box testing is a test case design

    method that uses the control structure of the procedural design to derive test

    cases. Some of the basic white box test cases were cyclomatic complexity

    and graph matrices.

    TESTING AND DESIGN

    The development team must plan for testing when they create anapplications design. The team should recognize that the product eventually

    will be tested for validity and consistency. The verification process uses

    standard testing procedures (for examples regression testing) that the team

    can plan for.

    The design work generally reveals potential problems such as running out of

    disk space or a possible failure of the system services. If such problems

    cannot be designed out of the system, having a record of them can be

    valuable when the team prepares its tests.

    The team writes the set of functional validation tests during preliminary

    design to ensure that the tests measure the functions the software is to perform. If the team writes the tests after the code is written. Their

    knowledge of the code may affect the way they write the tests. This

    approach diminishes the objectivity of the test and the value of the results.

    Functional tests are usually black box tests and can be written based on the

    requirements, specifications, and design documents. White box tests can be

    written at the design phase only if the design documents are quite detailed.

    PERFORMANCE TESTING

    47

  • 8/7/2019 Employee Evaluation System

    48/54

    Performance testing helps ensure that a product performs its functions at the

    required speed. Planning for performance testing starts at the beginning of

    the project when product goals and requirements are defined. Performance

    testing is a part of the products initial engineering plan.

    TEST CASES

    A test case is as set of conditions or variables under which a tester will

    determine if a requirement or use case upon an application is partially or

    fully satisfied. It may take many test cases to determine that a requirement is

    fully satisfied. In order to fully test that all the requirements of and

    application met, there must be at least one test case for each requirement

    unless a requirement has sub requirement. In that situation, each sub

    requirement must have at least one test case.

    The written test case is that there is known input and an expected output,

    which is worked out before the test is executed. The known input should test

    a precondition and the expected output should test a post condition test cases

    uncover the following categories:

    Erroneous initialization or default values and inconsistent data types

    Incorrect (misspelled or truncated) variable name

    Underflow, overflow and addressing exceptions

    48

  • 8/7/2019 Employee Evaluation System

    49/54

    FUTURE ENHANCEMENTS

    49

  • 8/7/2019 Employee Evaluation System

    50/54

    FUTURE ENHANCEMENTS

    APPLICATION ENHANCEMENT

    This project is basically meant to keep track of all records of any employeesin a any organization and this area must be enhanced for future development.

    EXTEND FACILITIES.

    I personally feel that there should be provision of searching of the

    employees by their names also.

    INTRACTIVE VIEW

    I have not used swing in most of the forms which could be useful in making

    an interactive graphical user interface. This software also helps This

    system also works as a evolution system software for any company

    where employees can choose or elect their senior ordinates with the

    reference of their efficiency as well as their experience through online

    ,just filling a simple form or offline also done very well.

    50

  • 8/7/2019 Employee Evaluation System

    51/54

    CONCLUSION

    CONCLUSION

    51

  • 8/7/2019 Employee Evaluation System

    52/54

    The project will satisfy the needs of any organization and since it is

    maintaining the whole records of any employee as well as update process

    will also done very easily way. It will help much in keep track of the recordsof all the employees and provide an interface to doing its work as a single

    user. The security of the system is maintained.

    The Company will use this to maintain the informational record of the

    employee in any organization.

    52

  • 8/7/2019 Employee Evaluation System

    53/54

    BIBLIOGRAPHY

    53

  • 8/7/2019 Employee Evaluation System

    54/54

    BIBLIOGRAPHY

    (1) The Complete Reference .NET fifth edition

    (2) ASP .NET Cookbook (e-book)(3) .NET Documentation