The Role of Executive Leadership in Municipal Infrastructure Asset Management – A case study of the iLembe District Municipality Emmanuel Ngcobo iLembe District Municipality, Asset Manager Dasagen Pather SMEC South Africa, Project Manager &

Emmanuel Ngcobo Dasagen Pather - CNAM...This is a follow on project from that of the Infrastructure Asset Management, and entails the following: Planning and Data collection using

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Emmanuel Ngcobo Dasagen Pather - CNAM...This is a follow on project from that of the Infrastructure Asset Management, and entails the following: Planning and Data collection using

The Role of Executive Leadership in Municipal Infrastructure

Asset Management – A case study of the iLembe District

Municipality

Emmanuel NgcoboiLembe District Municipality, Asset Manager

Dasagen PatherSMEC South Africa, Project Manager&

Page 2: Emmanuel Ngcobo Dasagen Pather - CNAM...This is a follow on project from that of the Infrastructure Asset Management, and entails the following: Planning and Data collection using

Local Government & Asset Management

Section 152 (1) South African Constitution: Ensure the provision of services to

communities in a sustainable manner.

Infrastructure assets are the

vehicles through which this

objective can be met.

Effective & efficient

Infrastructure Asset

Management is a must!

Page 3: Emmanuel Ngcobo Dasagen Pather - CNAM...This is a follow on project from that of the Infrastructure Asset Management, and entails the following: Planning and Data collection using

Structure of South Africa Government

National Government Provincial Government (9) Local Government/Municipalities (278)

Comprising District & Local Municipalities,such as the iLembe DMRepresented by the South African Local Government Association (SALGA)

Durban

Cape Town

Page 4: Emmanuel Ngcobo Dasagen Pather - CNAM...This is a follow on project from that of the Infrastructure Asset Management, and entails the following: Planning and Data collection using

The Role of Executive Leadership

The organizational approach must embrace

both the technical & financial objectives of

Asset Management in a holistic manner.

Responsible for fostering a culture which promotes

proactive collaboration between all structures within the organisation

Responsible for the adoption of a successful

& sustainable Infrastructure Asset

Management Approach.

Must ensure compliance to all

relevant standards and regulations, particularly

GRAP & MFMA

Enforces a Top-Down approach to achieving

sound Asset Management Practice

Page 5: Emmanuel Ngcobo Dasagen Pather - CNAM...This is a follow on project from that of the Infrastructure Asset Management, and entails the following: Planning and Data collection using

The iLembe District Municipality (IDM)

Located on the East Coast of KwaZulu-Natal, about 65 km North of Durban, South Africa.

Extent of Infrastructure spans 4 Local municipalities: KwaDukuza, Mandeni,

Maphumulo & Ndwedwe; totalling +2 Billion Rands.

Currently services approximately

600,000 people.

Large degree of people live in rural or

semi-urban conditions.

Primarily a Water & Sanitation Authority, with a few municipal

offices.

Initially, battled to achieve Municipal

Asset Management Compliance.

Page 6: Emmanuel Ngcobo Dasagen Pather - CNAM...This is a follow on project from that of the Infrastructure Asset Management, and entails the following: Planning and Data collection using

IDM’s Infrastructure Comprises

Water & Sanitation Authority

Water Treatment

Works

Water Pumpstations

Reservoirs & Storage Tanks

Boreholes & Standpipes

Sewer Pumpstations

Waste-Water Treatment

Works

Administration Offices

Bulk & Consumer

Water Meters

Water Bulk Pipeline &

Reticulation

Sewer Bulk Pipeline &

Reticulation

Page 7: Emmanuel Ngcobo Dasagen Pather - CNAM...This is a follow on project from that of the Infrastructure Asset Management, and entails the following: Planning and Data collection using

Infrastructure Asset Management Compliance

GRAP

IMESA

MFMA

Often stigmatises Asset Management as an

accounting or finance issue

Emphasises the role of engineers or technical

personnel, as vital to ensuring best practice & adequate

maintenance practices

Asset Management needs to be a jointly run strategy between both Finance &

Technical municipal spheres, to ensure accurate reporting

& accountability

Page 8: Emmanuel Ngcobo Dasagen Pather - CNAM...This is a follow on project from that of the Infrastructure Asset Management, and entails the following: Planning and Data collection using

The Role of IDM’s Executive LeadershipIncludes the Executive Committee (The Mayor & Ward Councillors), The

Municipal Manager & Senior Management

Top-Down Approach; a jointly run strategy between their finance & technical departments was established.

Ensured buy-in from all facets of the organisation; Required adequate ‘Change Management’ Strategies.

Fostered a culture of collaboration & transparency necessary to address issues. Effective monitoring of the municipality’s administration in accordance with policy

directions. Ensured that organisational hold-ups and identified challenges were addressed

appropriately & timeously.

Page 9: Emmanuel Ngcobo Dasagen Pather - CNAM...This is a follow on project from that of the Infrastructure Asset Management, and entails the following: Planning and Data collection using

IDM’s Adopted Asset Management Approach

Establishment ofa Working

Committee of a Municipal Personnel

Stakeholder Engagement

Quality Control

Spear-headed by the Executive Leadership & Facilitated by SMEC South Africa An Holistic Programmed & Phased Approach

Verification & Review of Existing Municipal Data (GIS, Asset Inventories, Systems)

Engagement Workshops with Departmental

Personnel & Existing Consultants

Gap Analysis of Current Asset Management Maturity

Level

Physical Verification & Visual Condition Assessment

of Water & Sanitation Infrastructure Assets, including Components

Valuation of Infrastructure Assets (CRCs) including

Calculation of Asset Remaining Useful Lives

(RULs)

Compilation of Updated, Compliant Fixed Asset

Registers, Including Impairment Testing & Audit

Support

Skills Transfer

Page 10: Emmanuel Ngcobo Dasagen Pather - CNAM...This is a follow on project from that of the Infrastructure Asset Management, and entails the following: Planning and Data collection using

Gap Analysis & Engagement Workshops

Review of all electronic data, policy documents and existing asset registers/inventories. Formulation of a Gap Analysis. Engagement Workshops conducted. The is prescribed Asset management practice, and comprised a group of municipal experts

who are knowledgeable of the infrastructure assets under the custodianship of their respective Departments.

These sessions take on an interactive workshop feel, thereby allowing for the confirmation and updating of asset information in the asset register & accompanying GIS.

This exercise ultimately serves as an interim solution to reviewing the conditions and useful lives of the Municipalities assets; to be followed by field inspection/physical verification

Page 11: Emmanuel Ngcobo Dasagen Pather - CNAM...This is a follow on project from that of the Infrastructure Asset Management, and entails the following: Planning and Data collection using

Asset Tree Structure Formation & Componentization

This entailed the establishment of Asset Classes and a hierarchy for the management of Assets, i.e. A comprehensive Asset Tree.

Organised into Systems, Subsystems, Facilities, Assets and Components. Reflected on the Fixed Asset Register. Enabled for the accurate unbundling or componentisation of assets, in

preparation for field inspections.

Page 12: Emmanuel Ngcobo Dasagen Pather - CNAM...This is a follow on project from that of the Infrastructure Asset Management, and entails the following: Planning and Data collection using

Physical Verification & Condition Assessments

Condition Assessment of above ground Assets/Components. All inspections are visual in nature, i.e. not intrusive. Photographic evidence of Assets/Components attained. Unbundling/Componentisation of Assets into Generic Civil, Electrical & Mechanical

Components. Development of a spatial geodatabase (GIS) for IDM’s infrastructure. Engagement and collaboration with IDM Technical, during inspections. Quality Audit of the data by IDM Technical following inspections. Enabled for accurate accounting treatment of Assets/Components.

Field Data

Team Leaders

Graduate Engineers/

Technologists

Civil Engineering Specialists

Continuous Stakeholder Engagement

Tran

spar

en

t

Page 13: Emmanuel Ngcobo Dasagen Pather - CNAM...This is a follow on project from that of the Infrastructure Asset Management, and entails the following: Planning and Data collection using

Inspection Process Flow

Page 14: Emmanuel Ngcobo Dasagen Pather - CNAM...This is a follow on project from that of the Infrastructure Asset Management, and entails the following: Planning and Data collection using

Inspection Data – Facility Inventory

Local Municipality Facilities Borehole ReservoirsSewage Pump

Station

Water Pump

StationWTW WWTW Grand Total

KwaDukuza 5 58 37 25 5 7 137

Mandeni 13 43 10 8 7 4 85

Maphumulo 47 68 NA 20 10 3 148

Ndwedwe 30 161 NA 21 7 1 220

Total 95 330 47 74 29 15 590

Facility Type Counts Inspected,

Per Local Municipality

Page 15: Emmanuel Ngcobo Dasagen Pather - CNAM...This is a follow on project from that of the Infrastructure Asset Management, and entails the following: Planning and Data collection using

Inspection Data – Average Conditions

0

10

20

30

40

50

60

70

80

Borehole Reservoirs Sewage PumpStation

Water PumpStation

WTW WWTW Overall Ave CIfor LM

Average Condition Index (CI), Per Facility Type

Page 16: Emmanuel Ngcobo Dasagen Pather - CNAM...This is a follow on project from that of the Infrastructure Asset Management, and entails the following: Planning and Data collection using

Geospatial Database of Infrastructure

Development of a spatial database (GIS) of Water & Sanitation Infrastructure

Page 17: Emmanuel Ngcobo Dasagen Pather - CNAM...This is a follow on project from that of the Infrastructure Asset Management, and entails the following: Planning and Data collection using

Inspection Data - Analysis

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

Borehole Reservoirs Sewage PumpStation

Water PumpStation

WTW WWTW Overall LM AveCI

Overall Facility Type Ave CI 2013/14 Overall Facility Type Ave CI 2014/15

Condition Index (CI) Comparison between the Initial Engagement Workshops & Actual Site Verifications

Primary reason for the increase in average condition per water and sanitation facility typesthroughout the DM found to be a direct result of known maintenance efforts (approximately 50million spent over the course of 2 FY’s by IDM).

Another significant factor is that of capitalisation of projects (IDM spent close to 80 million in thelast 2 FY’s against their MWIG), of which backlog items were only addressed/capitalised in the lastFY; resulting in their inspection in the current FY.

Page 18: Emmanuel Ngcobo Dasagen Pather - CNAM...This is a follow on project from that of the Infrastructure Asset Management, and entails the following: Planning and Data collection using

FAR Accounting Treatment

The valuation of the Infrastructure Assets will be based on their

conditions assessed in the field

Calculation of Asset Current & Depreciated Replacement Costs

Calculation of Asset Expected and Remaining Useful Lifes (the

calculation takes into consideration the age of an asset,

its condition and its ability to provide the intended service)

Calculation of Asset Impairments

Page 19: Emmanuel Ngcobo Dasagen Pather - CNAM...This is a follow on project from that of the Infrastructure Asset Management, and entails the following: Planning and Data collection using

Impairment Testing

Impairment

Page 20: Emmanuel Ngcobo Dasagen Pather - CNAM...This is a follow on project from that of the Infrastructure Asset Management, and entails the following: Planning and Data collection using

Assets Under Construction (AUC)/Work In Progress (WIP)

Engagement workshops with Technical Departments. Upon completion of asset construction, the following information needs

to be provided by the Technical Department: A Completion Certificate – Official Project/Facility/Scheme Name;

Date of completion; Relevant signatories. BOQ aligned to the Generic Components of the Asset/s, i.e.

Componentisation; and not at Item level. Project Value (Inclusive of Consulting, Inception, Feasibility,

Technical, Environmental, Social, Construction and Project Management fees) – Must be distributed amongst the Assets/Components identified.

Page 21: Emmanuel Ngcobo Dasagen Pather - CNAM...This is a follow on project from that of the Infrastructure Asset Management, and entails the following: Planning and Data collection using

Asset Disposal & Movements

Engagement Workshops with Technical Departments. Obsolete and damaged assets/components (i.e. no future economic

benefits) need to be treated as disposals and communicated as such to the Finance Department. An official disposal form should be completed and counter signed by

the Asset Management Unit. Movement of assets/components which relate to the transfer of

assets/components from one facility to another or from a stores facility to site; must also be communicated to the Finance Department.

Theft or Losses, also to be considered and communicated as such. Key to ensuring a constant updated inventory of assets/components is

constant communication!!!

Page 22: Emmanuel Ngcobo Dasagen Pather - CNAM...This is a follow on project from that of the Infrastructure Asset Management, and entails the following: Planning and Data collection using

Water Meter Audit

Water Meters play a vital role in determining customer usage of this valuable and life sustainingcommodity, and as such directly determines the revenue to be generated from the provision of thisservice. Revenue generation and collection is particularly important when it comes to themaintenance of the infrastructure at hand, of which Ilembe has already invested over a billion rands.

This is a follow on project from that of the Infrastructure Asset Management, and entails the following:

Planning and Data collection using Mobile Applications/Tablet devices. Training/Upskilling of Local FET Students working as field data capturers on the project. Field Investigation of Conventional & Intelligent Meters for Residential & Commercial

Customers. Updating of Customer information on the Municipal Revenue Billing System. Spatial Zoning of all meters according to supply areas from water sources such as reservoirs

and the like. Programme to resolve replacement of damaged meters, fixing of leaks, eradication of illegal

connections, implementation of monitoring mechanisms, and quantification of water losses via the network.

Page 23: Emmanuel Ngcobo Dasagen Pather - CNAM...This is a follow on project from that of the Infrastructure Asset Management, and entails the following: Planning and Data collection using

The Way Forward for IDM

Other Deliverables in the Pipeline:

Continuation & Strengthening of Infrastructure Asset Management Forums/Steer Comms. Continued Skills Transfer Initiatives. Continuous Updates of the Policy Implementation Guideline, Developed Templates &

Reporting Mechanisms, as suggested by executive leadership. Updating of Infrastructure Asset Management Plans & Master Plans. Further Development of a GIS Database of Bulk Pipelines & Reticulation (Schematics). Development of the High Level Maintenance Plan into a Detailed one (Strategic vs Poor

Condition) (Reactive vs Planned/Preventative). Continued Revenue Enhancement Strategies. Maintaining a Culture among Financial, Technical and Operational Personnel…So as to

enable Sustainable Asset Management Practice…well into the future.

Page 24: Emmanuel Ngcobo Dasagen Pather - CNAM...This is a follow on project from that of the Infrastructure Asset Management, and entails the following: Planning and Data collection using

Conclusion

Teamwork

Transparency

Collaboration

Delivery

SustainabilityCompliance to

GRAP Standards &

Relevant MFMA Sections

Thorough Reporting &

Accountability

Pro-active Approach to Maintenance

Accurate Budgetting

Infrastructure Backlog

Eradication

Enhanced Service Delivery

Finance

Department

Technical Department

Other IDM Departments

Planning/GIS Unit

Output of a Successful

Asset Management

Approach driven by IDM

Executive Leadership

Page 25: Emmanuel Ngcobo Dasagen Pather - CNAM...This is a follow on project from that of the Infrastructure Asset Management, and entails the following: Planning and Data collection using

Contact Me:

Emmanuel Ngcobo

iLembe District Municipality, Asset Manager

[email protected]

Contact Me:

Dasagen Pather

SMEC South Africa, Project Manager

[email protected]

Questions?