18
BAR LENGTH ON ORIGINAL DRAWING EQUALS ONE INCH. ADJUST SCALE ACCORDINGLY. ISSUE DATE DESCRIPTION PROJECT MANAGER PROJECT NUMBER DESIGNED BY DESIGNED BY CHECKED BY PROJECT DATE DRAWN BY DRAWN BY DIGESTER HEATING CENTRAL WASTEWATER TREATMENT PLANT WACO METROPOLITAN AREA REGIONAL SEWERAGE SYSTEM EMERGENCY ON-CALL SERVICES Texas P.E. Firm Registration No. F-754 SHEET DECEMBER 2018 CONTRACT DRAWINGS FOR: WACO METROPOLITAN AREA REGIONAL SEWERAGE SYSTEM P.O. BOX 2570 WACO, TEXAS 76702 EMERGENCY ON-CALL SERVICES WACO METROPOLITAN AREA REGIONAL SEWERAGE SYSTEM OWNER: 00G001 DIGESTER HEATING C:\pwworking\central01\d0715146\00G001.dwg, 12/13/2018 8:49:27 AM, MWAUER RFB 2020-017 WMARSS Central Plant Heat Exchanger Replacement Project 1 of 18

EMERGENCY ON-CALL SERVICES DIGESTER HEATING...digester heating. central wastewater treatment plant waco metropolitan area regional sewerage system. 1 a b c 2 3 4 5 6 7 8 d. issue date

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EMERGENCY ON-CALL SERVICES DIGESTER HEATING...digester heating. central wastewater treatment plant waco metropolitan area regional sewerage system. 1 a b c 2 3 4 5 6 7 8 d. issue date

BA

R LE

NG

TH

O

N O

RIG

IN

AL

DR

AW

IN

G E

QU

ALS

O

NE

IN

CH

.

AD

JU

ST

S

CA

LE

A

CC

OR

DIN

GLY

.

ISSUE DATE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

DESIGNED BY

DESIGNED BY

CHECKED BY

PROJECT DATE

DRAWN BY

DRAWN BY

DIG

ES

TE

R H

EA

TIN

G

CE

NT

RA

L W

AS

TE

WA

TE

R T

RE

AT

ME

NT

P

LA

NT

WA

CO

M

ET

RO

PO

LIT

AN

A

RE

A

RE

GIO

NA

L S

EW

ER

AG

E S

YS

TE

M

EM

ER

GE

NC

Y O

N-C

AL

L S

ER

VIC

ES

Texas P.E. Firm

Registration No. F-754

SHEET

DECEMBER 2018

CONTRACT DRAWINGS FOR:

• • • • • •

WACO METROPOLITAN AREA

REGIONAL SEWERAGE SYSTEM

P.O. BOX 2570

WACO, TEXAS 76702

EMERGENCY ON-CALL SERVICES

WACO METROPOLITAN AREA

REGIONAL SEWERAGE SYSTEM

OWNER:

00G001

DIGESTER HEATING

C:\p

ww

orkin

g\ce

ntra

l0

1\d

07

15

14

6\0

0G

00

1.d

wg

, 1

2/1

3/2

01

8 8

:4

9:2

7 A

M, M

WA

UE

R

RFB 2020-017 WMARSS Central Plant Heat Exchanger Replacement Project

1 of 18

AutoCAD SHX Text
J. A. MARLER
AutoCAD SHX Text
10090300
AutoCAD SHX Text
DECEMBER 2018
AutoCAD SHX Text
A
AutoCAD SHX Text
12/13/2018
AutoCAD SHX Text
ISSUED FOR BIDS
AutoCAD SHX Text
BELLMEAD • HEWITT • LACY LAKEVIEW • LORENA • ROBINSON • WACO • WOODWAY HEWITT • LACY LAKEVIEW • LORENA • ROBINSON • WACO • WOODWAY LACY LAKEVIEW • LORENA • ROBINSON • WACO • WOODWAY LORENA • ROBINSON • WACO • WOODWAY ROBINSON • WACO • WOODWAY WACO • WOODWAY WOODWAY
AutoCAD SHX Text
W. D. WEHNER
AutoCAD SHX Text
J. A. MARLER
AutoCAD SHX Text
M. E. WAUER
AutoCAD SHX Text
--
AutoCAD SHX Text
--
AutoCAD SHX Text
INDEX OF DRAWINGS: No. SHEET DESCRIPTION SHEET DESCRIPTION DESCRIPTION SERIES 00 - GENERAL 1. 00G001 COVER/TITLE SHEET AND INDEX OF DRAWINGS 00G001 COVER/TITLE SHEET AND INDEX OF DRAWINGS COVER/TITLE SHEET AND INDEX OF DRAWINGS 2. 00G002 PROJECT CONSTRUCTION AND PROTECTION NOTES 00G002 PROJECT CONSTRUCTION AND PROTECTION NOTES PROJECT CONSTRUCTION AND PROTECTION NOTES SERIES 09 - DIGESTER PUMP STATION 3. 09X101 DEMOLITION - HEAT EXCHANGER DEMOLITION PLAN 09X101 DEMOLITION - HEAT EXCHANGER DEMOLITION PLAN DEMOLITION - HEAT EXCHANGER DEMOLITION PLAN 4. 09D101 PROCESS - HEAT EXCHANGER PIPING PLAN 09D101 PROCESS - HEAT EXCHANGER PIPING PLAN PROCESS - HEAT EXCHANGER PIPING PLAN 5. 09D301 PROCESS - HEAT EXCHANGER PIPING SECTIONS 09D301 PROCESS - HEAT EXCHANGER PIPING SECTIONS PROCESS - HEAT EXCHANGER PIPING SECTIONS 6. 09D302 PROCESS - HEAT EXCHANGER PIPING SECTIONS 09D302 PROCESS - HEAT EXCHANGER PIPING SECTIONS PROCESS - HEAT EXCHANGER PIPING SECTIONS 7. 09D501 PROCESS - STANDARD DETAILS 09D501 PROCESS - STANDARD DETAILS PROCESS - STANDARD DETAILS 8. 09E001 ELECTRICAL - LEGEND AND SYMBOLOGY 09E001 ELECTRICAL - LEGEND AND SYMBOLOGY ELECTRICAL - LEGEND AND SYMBOLOGY 9. 09E101 ELECTRICAL - ELECTRICAL FLOOR PLAN 09E101 ELECTRICAL - ELECTRICAL FLOOR PLAN ELECTRICAL - ELECTRICAL FLOOR PLAN 10. 09E102 ELECTRICAL - REFERENCE PHOTOS AND CONTROL SCHEMATIC 09E102 ELECTRICAL - REFERENCE PHOTOS AND CONTROL SCHEMATIC ELECTRICAL - REFERENCE PHOTOS AND CONTROL SCHEMATIC 11. 09I100 INSTRUMENTATION - LEGEND AND SYMBOLOGY 09I100 INSTRUMENTATION - LEGEND AND SYMBOLOGY INSTRUMENTATION - LEGEND AND SYMBOLOGY 12. 09I101 INSTRUMENTATION - P&ID 09I101 INSTRUMENTATION - P&ID INSTRUMENTATION - P&ID 13. 09I102 INSTRUMENTATION - ONE-LINE DIAGRAMS AND TERMINAL PANEL LAYOUT 09I102 INSTRUMENTATION - ONE-LINE DIAGRAMS AND TERMINAL PANEL LAYOUT INSTRUMENTATION - ONE-LINE DIAGRAMS AND TERMINAL PANEL LAYOUT ONE-LINE DIAGRAMS AND TERMINAL PANEL LAYOUT 14. 09I103 INSTRUMENTATION - CONTROL PANEL LAYOUT 09I103 INSTRUMENTATION - CONTROL PANEL LAYOUT INSTRUMENTATION - CONTROL PANEL LAYOUT 15. 09I104 INSTRUMENTATION - INSTALLATION DETAILS 09I104 INSTRUMENTATION - INSTALLATION DETAILS INSTRUMENTATION - INSTALLATION DETAILS 16. 09I105 INSTRUMENTATION - PLC PANEL PICTURES - SHEET 1 09I105 INSTRUMENTATION - PLC PANEL PICTURES - SHEET 1 INSTRUMENTATION - PLC PANEL PICTURES - SHEET 1 17. 09I106 INSTRUMENTATION - PLC PANEL PICTURES - SHEET 209I106 INSTRUMENTATION - PLC PANEL PICTURES - SHEET 2INSTRUMENTATION - PLC PANEL PICTURES - SHEET 2
Page 2: EMERGENCY ON-CALL SERVICES DIGESTER HEATING...digester heating. central wastewater treatment plant waco metropolitan area regional sewerage system. 1 a b c 2 3 4 5 6 7 8 d. issue date

DIGESTER HEATING

CENTRAL WASTEWATER TREATMENT PLANT

WACO METROPOLITAN AREA

REGIONAL SEWERAGE SYSTEM

1

A

B

C

2 3 4 5 6 7 8

D

ISSUE DATE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

FILENAME

SCALE

SHEET

Texas P.E. Firm

Registration No. F-754

DESIGNED BY

DESIGNED BY

CHECKED BY

PROJECT DATE

DRAWN BY

DRAWN BY

EMERGENCY ON-CALL SERVICES

GENERAL

PROJECT CONSTRUCTION

AND PROTECTION NOTES

00G002

C:\p

ww

orkin

g\ce

ntra

l0

1\d

07

15

14

6\0

0G

00

2.D

WG

, 1

2/1

3/2

01

8 8

:4

9:5

9 A

M, M

WA

UE

R

RFB 2020-017 WMARSS Central Plant Heat Exchanger Replacement Project

2 of 18

AutoCAD SHX Text
PROTECTION OF EXISTING FACILITIES NOTES: : 1. PRIOR TO BEGINNING ANY CONSTRUCTION, THE CONTRACTOR SHALL FIELD VERIFY THE LOCATIONS AND ELEVATIONS OF, AND SHALL BE RESPONSIBLE FOR THE PROTECTION OF, ALL EXISTING FACILITIES (UTILITIES, PIPING, EQUIPMENT, STRUCTURES, FENCING, BARRIERS, PAVEMENT, SIDEWALKS, SIGNAGE, ETC.) WHICH PERTAIN TO AND/OR AFFECT CONSTRUCTION OF THIS PROJECT. 2. VERIFY ALL DEPTHS AND LOCATIONS OF EXISTING UTILITIES PRIOR TO ANY CONSTRUCTION. ALL UTILITIES MAY NOT BE SHOWN! THE ALL UTILITIES MAY NOT BE SHOWN! THE ! THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING UTILITY SERVICE PROVIDERS AT LEAST 48 HOURS PRIOR TO TRENCHING OR EXCAVATION, AND REQUEST FIELD LOCATION OF UTILITIES. ONE-CALL LOCATOR SERVICES MAY NOT COVER ALL UTILITIES IN THIS ONE-CALL LOCATOR SERVICES MAY NOT COVER ALL UTILITIES IN THIS AREA! ! 3. ANY EXISTING FACILITIES THAT ARE DAMAGED OR REMOVED SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR TO A CONDITION EQUAL TO OR BETTER THAN ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE OWNER. 4. RESTORE ALL DRIVEWAYS, CULVERTS, HEADWALLS, LANDSCAPING, AND OTHER IMPROVEMENTS (REGARDLESS OF WHETHER THEY WERE CONSTRUCTED OR INSTALLED BY PUBLIC AGENCIES, UTILITIES, OR INDIVIDUALS) THAT ARE DISTURBED BY CONSTRUCTION TO A CONDITION EQUAL TO OR BETTER THAN ORIGINAL CONDITIONS. 5. ALL AREAS DISTURBED OR EXPOSED DURING CONSTRUCTION SHALL BE REVEGETATED AND RESTORED TO ORIGINAL CONDITIONS IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS.
AutoCAD SHX Text
TEXAS COMMISSION ON ENVIRONMENTAL QUALITY GENERAL CONSTRUCTION NOTES: : 1. ALL CONTRACTORS CONDUCTING REGULATED ACTIVITIES ASSOCIATED WITH THIS PROJECT WILL BE PROVIDED WITH COMPLETE COPIES OF THE T.C.E.Q. LETTER INDICATING THE SPECIFIC CONDITIONS OF ITS APPROVAL. DURING THE COURSE OF THESE REGULATED ACTIVITIES, THE CONTRACTOR(S) WILL KEEP COPIES OF THE APPROVED PLAN AND APPROVAL LETTER ON-SITE. 2. NO TEMPORARY ABOVEGROUND HYDROCARBON AND HAZARDOUS SUBSTANCE STORAGE TANK SYSTEM MAY BE INSTALLED WITHIN 150 FEET OF A DOMESTIC, INDUSTRIAL, IRRIGATION, OR PUBLIC WATER SUPPLY WELL. 3. PRIOR TO COMMENCING CONSTRUCTION, ALL TEMPORARY EROSION AND SEDIMENTATION (E&S) CONTROL MEASURES MUST BE PROPERLY SELECTED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS AND GOOD ENGINEERING PRACTICES. IF INSPECTIONS INDICATE A CONTROL HAS BEEN USED INAPPROPRIATELY, OR INCORRECTLY, THE APPLICANT MUST REPLACE OR MODIFY THE CONTROL FOR SITE SITUATIONS. THE CONTROLS MUST REMAIN IN PLACE UNTIL DISTURBED AREAS ARE REVEGETATED AND THE AREAS HAVE BECOME PERMANENTLY STABILIZED. 4. IF SEDIMENT ESCAPES THE CONSTRUCTION SITE, OFF-SITE ACCUMULATIONS OF SEDIMENT MUST BE REMOVED AT A FREQUENCY SUFFICIENT TO MINIMIZE OFFSITE IMPACTS TO WATER QUALITY (E.G., FUGITIVE SEDIMENT IN STREET BEING WASHED INTO SURFACE STREAMS OR SENSITIVE FEATURES BY THE NEXT RAIN). 5. SEDIMENT MUST BE REMOVED FROM SEDIMENT TRAPS OR SEDIMENTATION PONDS NOT LATER THAN WHEN DESIGN CAPACITY HAS BEEN REDUCED BY 50%. A PERMANENT STAKE MUST BE PROVIDED THAT CAN INDICATE WHEN THE SEDIMENT OCCUPIES 50% OF THE BASIN VOLUME. 6. LITTER, CONSTRUCTION DEBRIS, AND CONSTRUCTION CHEMICALS EXPOSED TO STORMWATER SHALL BE PREVENTED FROM BECOMING A POLLUTANT SOURCE FOR STORMWATER DISCHARGES (E.G., SCREENING OUTFALLS, PICKED UP DAILY). 7. ALL SPOILS (EXCAVATED MATERIAL) GENERATED FROM THE PROJECT SITE AND STORED ON-SITE MUST HAVE PROPER E&S CONTROLS INSTALLED. 8. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, AND CONSTRUCTION ACTIVITIES WILL NOT RESUME WITHIN 21 DAYS. WHEN THE INITIATION OF STABILIZATION MEASURES BY THE 14TH DAY IS PRECLUDED BY WEATHER CONDITIONS, STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE. 9. THE FOLLOWING RECORDS SHOULD BE MAINTAINED AND MADE AVAILABLE TO THE T.C.E.Q. UPON REQUEST: THE DATES WHEN MAJOR GRADING ACTIVITIES OCCUR; THE DATES WHEN CONSTRUCTION ACTIVITIES TEMPORARILY OR PERMANENTLY CEASE ON A PORTION OF THE SITE; AND THE DATES WHEN STABILIZATION MEASURES ARE INITIATED. 10. THESE GENERAL CONSTRUCTION NOTES MUST BE PROVIDED TO ALL SUBCONTRACTORS.
AutoCAD SHX Text
GENERAL NOTES: : 1. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF THE CURRENT CITY OF WACO ORDINANCES, AND THE TEXAS COMMISSION ON ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF THE CURRENT CITY OF WACO ORDINANCES, AND THE TEXAS COMMISSION ON ENVIRONMENTAL QUALITY REGULATIONS. 2. ANY EXISTING UTILITIES, PAVEMENT, FENCING, CURBS, SIDEWALKS, STRUCTURES, TREES, ETC., THAT ARE DAMAGED OR REMOVED SHALL ANY EXISTING UTILITIES, PAVEMENT, FENCING, CURBS, SIDEWALKS, STRUCTURES, TREES, ETC., THAT ARE DAMAGED OR REMOVED SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT NO COST TO THE OWNER. (SEE RESTORATION NOTE BELOW) 3. PRIOR TO BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL FIELD VERIFY LOCATIONS AND ELEVATIONS OF EXISTING UTILITIES, PIPING, PRIOR TO BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL FIELD VERIFY LOCATIONS AND ELEVATIONS OF EXISTING UTILITIES, PIPING, EQUIPMENT, AND STRUCTURES WHICH PERTAIN TO AND/OR AFFECT CONSTRUCTION OF THIS PROJECT. ALL UTILITIES MAY NOT BE SHOWN. ANY DISCREPANCIES WITH THE CONSTRUCTION PLANS AND ACTUAL CONDITIONS FOUND IN THE FIELD SHALL BE BROUGHT IMMEDIATELY TO THE ATTENTION OF THE ENGINEER. DIMENSIONS ARE RELATIVE TO ASSUMED ELEVATIONS. 4. THE CONTRACTOR SHALL CONFINE ALL WORK TO WITHIN THE CITY OF WACO PROPERTY. PRIOR TO FINAL ACCEPTANCE, THE CONTRACTOR THE CONTRACTOR SHALL CONFINE ALL WORK TO WITHIN THE CITY OF WACO PROPERTY. PRIOR TO FINAL ACCEPTANCE, THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ALL TRASH AND DEBRIS WITHIN THE PROJECT PROPERTY. CLEANUP SHALL BE TO THE SATISFACTION OF THE OWNER. 5. PRIOR TO ANY CONSTRUCTION, THE CONTRACTOR SHALL APPLY FOR AND SECURE ALL PROPER PERMITS FROM THE APPROPRIATE PRIOR TO ANY CONSTRUCTION, THE CONTRACTOR SHALL APPLY FOR AND SECURE ALL PROPER PERMITS FROM THE APPROPRIATE AUTHORITIES. 6. THE CONTRACTOR SHALL KEEP ACCURATE RECORDS OF ALL CONSTRUCTION THAT DEVIATES FROM THE PLANS. THE CONTRACTOR SHALL KEEP ACCURATE RECORDS OF ALL CONSTRUCTION THAT DEVIATES FROM THE PLANS. 7. CONTRACTOR AND MANUFACTURERS ARE RESPONSIBLE FOR MEASURING EXISTING STRUCTURES PRIOR TO SUBMITTING ON; OR CONTRACTOR AND MANUFACTURERS ARE RESPONSIBLE FOR MEASURING EXISTING STRUCTURES PRIOR TO SUBMITTING ON; OR FABRICATING PROPOSED EQUIPMENT FOR INSTALLATION TO ASSURE THEMSELVES THAT AS-BUILT CONDITIONS HAVE BEEN ACCOMMODATED. NO SEPARATE PAY.
AutoCAD SHX Text
SPECIAL NOTES: 1. THE CONTRACTOR SHALL BE AWARE THAT EXISTING UTILITY LINES ARE CURRENTLY LIVE AND IN SERVICE, THERE MAY BE TIMES WHEN THE CONTRACTOR SHALL BE AWARE THAT EXISTING UTILITY LINES ARE CURRENTLY LIVE AND IN SERVICE, THERE MAY BE TIMES WHEN HE CONTRACTOR SHALL BE AWARE THAT EXISTING UTILITY LINES ARE CURRENTLY LIVE AND IN SERVICE, THERE MAY BE TIMES WHEN SHUTTING DOWN SAID LINES, CONNECTING TO SAID LINES OR TERMINATING SAID LINES WILL HAVE TO OCCUR AT OFF-PEAK HOURS. SUCH HOURS ARE USUALLY OUTSIDE NORMAL WORKING HOURS AND POSSIBLY BETWEEN 12 A.M. AND 6 A.M. COORDINATE ALL SHUT DOWNS WITH THE OWNER PER SPECIFICATION REQUIREMENTS. 2. PRIOR TO ISSUANCE OF NOTICE TO PROCEED, THE CONTRACTOR SHALL PROVIDE A WRITTEN PLAN FOR REVIEW AND APPROVAL BY THE PRIOR TO ISSUANCE OF NOTICE TO PROCEED, THE CONTRACTOR SHALL PROVIDE A WRITTEN PLAN FOR REVIEW AND APPROVAL BY THE CITY OF WACO WHICH OUTLINES SCHEDULING AND SEQUENCING FOR WASTEWATER PLANT MODIFICATIONS AND CONSTRUCTION. 3. ALL CONSTRUCTION SHOULD BE COORDINATED WITH: ALL CONSTRUCTION SHOULD BE COORDINATED WITH: CLIFF NESMITH, CITY OF WACO WMARSS SUPERINTENDENT PHONE: 254-299-2450 4. ANY WORK IMPACTING FENCES MUST BE PUT BACK TO EXISTING CONDITIONS (INTRUDER RESISTANT) OUTSIDE OF NORMAL WORKING ANY WORK IMPACTING FENCES MUST BE PUT BACK TO EXISTING CONDITIONS (INTRUDER RESISTANT) OUTSIDE OF NORMAL WORKING HOURS, IF CONTRACTOR IS NOT PRESENT. 5. CONTRACTOR IS RESPONSIBLE FOR MONITORING AND DISINFECTING ANY UNAUTHORIZED DISCHARGES OF SEWAGE, INCLUDING BUT NOT CONTRACTOR IS RESPONSIBLE FOR MONITORING AND DISINFECTING ANY UNAUTHORIZED DISCHARGES OF SEWAGE, INCLUDING BUT NOT LIMITED TO, DISCHARGES THAT STAY ENTIRELY ON WMARSS PROPERTY. CONTRACTOR IS RESPONSIBLE FOR MONITORING E-COLI LEVELS ON ANY UNAUTHORIZED DISCHARGES.
AutoCAD SHX Text
EQUIPMENT NOTE: OWNER FURNISHED EQUIPMENT LISTED IN SPECIFICATION SECTIONS 01 11 10 AND 01 61 05 TO BE INSTALLED BY THE CONTRACTOR. ALL OTHER REQUIRED PIPING, VALVES AND ANICILLARY ITEMS TO BE PROVIDED BY THE CONTRACTOR..
AutoCAD SHX Text
J. A. MARLER
AutoCAD SHX Text
10090300
AutoCAD SHX Text
DECEMBER 2018
AutoCAD SHX Text
A
AutoCAD SHX Text
12/13/2018
AutoCAD SHX Text
ISSUED FOR BIDS
AutoCAD SHX Text
00G002.DWG
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
W. D. WEHNER
AutoCAD SHX Text
J. A. MARLER
AutoCAD SHX Text
M. E. WAUER
AutoCAD SHX Text
--
AutoCAD SHX Text
--
Page 3: EMERGENCY ON-CALL SERVICES DIGESTER HEATING...digester heating. central wastewater treatment plant waco metropolitan area regional sewerage system. 1 a b c 2 3 4 5 6 7 8 d. issue date

DIGESTER HEATING

CENTRAL WASTEWATER TREATMENT PLANT

WACO METROPOLITAN AREA

REGIONAL SEWERAGE SYSTEM

1

A

B

C

2 3 4 5 6 7 8

D

ISSUE DATE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

FILENAME

SCALE

SHEET

Texas P.E. Firm

Registration No. F-754

DESIGNED BY

DESIGNED BY

CHECKED BY

PROJECT DATE

DRAWN BY

DRAWN BY

EMERGENCY ON-CALL SERVICES

DIGESTER PUMP STATION

DEMOLITION

HEAT EXCHANGER DEMOLITION PLAN

09X101

C:\p

ww

orkin

g\ce

ntra

l0

1\d

07

15

14

6\0

9X

10

1.d

wg

, 1

2/1

3/2

01

8 8

:5

0:3

1 A

M, M

WA

UE

R

RFB 2020-017 WMARSS Central Plant Heat Exchanger Replacement Project

3 of 18

AutoCAD SHX Text
DIGESTER 2A
AutoCAD SHX Text
DIGESTER 1A
AutoCAD SHX Text
DIGESTER B
AutoCAD SHX Text
DIGESTER 3A
AutoCAD SHX Text
24" AUX. DRAW-OFF
AutoCAD SHX Text
24" AUX. DRAW-OFF
AutoCAD SHX Text
24" RECIRCULATION LINE FROM CENTER COLUMN
AutoCAD SHX Text
24" RECIRCULATION LINE FROM CENTER COLUMN
AutoCAD SHX Text
SUMP
AutoCAD SHX Text
24" AUX. DRAW-OFF
AutoCAD SHX Text
24" RECIRCULATION LINE FROM CENTER COLUMN
AutoCAD SHX Text
DIGESTED SLUDGE PUMP NO. 2
AutoCAD SHX Text
DIGESTED SLUDGE PUMP NO. 1
AutoCAD SHX Text
DIGESTED SLUDGE PUMP NO. 3
AutoCAD SHX Text
6" PRESSURE RELIEF AND FLAME TRAP ASSEMBLY
AutoCAD SHX Text
6" SEDIMENT DRIP TRAP
AutoCAD SHX Text
SCUM BREAKER
AutoCAD SHX Text
MIX NOZZLE
AutoCAD SHX Text
6" SEDIMENT DRIP TRAP
AutoCAD SHX Text
6" GAS LINE
AutoCAD SHX Text
6" METER
AutoCAD SHX Text
6" METER
AutoCAD SHX Text
12" GAS LINE
AutoCAD SHX Text
24" AUX. DRAW-OFF
AutoCAD SHX Text
24" RECIRCULATION LINE FROM CENTER COLUMN
AutoCAD SHX Text
RECIRC. PUMP NO. 1
AutoCAD SHX Text
16" PLUG VALVE TO BE REMOVED AND RELOCATED
AutoCAD SHX Text
RECIRC. PUMP NO. 2
AutoCAD SHX Text
OVERFLOW BOX (ABOVE)
AutoCAD SHX Text
OVERFLOW BOX (ABOVE)
AutoCAD SHX Text
16"x16" TEE TO BE REMOVED AND RELOCATED
AutoCAD SHX Text
16"x16" CROSS
AutoCAD SHX Text
16" PLUG VALVE, TYP.
AutoCAD SHX Text
24"x16" REDUCER, TYP.
AutoCAD SHX Text
24" SLUDGE LINE, TYP.
AutoCAD SHX Text
16"x16" CROSS
AutoCAD SHX Text
16" PLUG VALVE, TYP.
AutoCAD SHX Text
24"x16" REDUCER, TYP.
AutoCAD SHX Text
24" SLUDGE LINE, TYP.
AutoCAD SHX Text
CLOSED-LOOP RECIRCULATION PUMP
AutoCAD SHX Text
CONC. COLUMN, TYP. OF FOUR
AutoCAD SHX Text
6" HOT WATER RETURN
AutoCAD SHX Text
6" HOT WATER SUPPLY
AutoCAD SHX Text
16" PLUG VALVE, TYP.
AutoCAD SHX Text
REMOVE 16" HEAT EXCHANGER
AutoCAD SHX Text
REMOVE 16" HEAT EXCHANGER
AutoCAD SHX Text
REMOVE 6" H.W. LINE AND INSULATION, TYP.
AutoCAD SHX Text
REMOVE 16" HEAT EXCHANGER
AutoCAD SHX Text
REMOVE 16" HEAT EXCHANGER
AutoCAD SHX Text
REMOVE 16" SPOOL PIPE
AutoCAD SHX Text
REMOVE 16" SPOOL PIPE
AutoCAD SHX Text
SCUM BREAKER
AutoCAD SHX Text
MIX NOZZLE
AutoCAD SHX Text
SCUM BREAKER
AutoCAD SHX Text
MIX NOZZLE
AutoCAD SHX Text
SCUM BREAKER
AutoCAD SHX Text
MIX NOZZLE
AutoCAD SHX Text
REMOVE 6" H.W. LINE AND INSULATION, TYP.
AutoCAD SHX Text
16" 90° BENDTO BE REMOVED AND RELOCATED
AutoCAD SHX Text
16"x16" TEE TO BE REMOVED AND RELOCATED
AutoCAD SHX Text
REMOVE 6" H.W. LINES TO CONNECTION AS WALL, TYP.
AutoCAD SHX Text
CUT AND REMOVE PORTION OF 16" PIPE
AutoCAD SHX Text
16" PLUG VALVE, TYP.
AutoCAD SHX Text
16" PLUG VALVE, TYP.
AutoCAD SHX Text
CUT AND REMOVE PORTION OF 16" PIPE
AutoCAD SHX Text
TRUE NORTH
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
J. A. MARLER
AutoCAD SHX Text
10090300
AutoCAD SHX Text
DECEMBER 2018
AutoCAD SHX Text
A
AutoCAD SHX Text
12/13/2018
AutoCAD SHX Text
ISSUED FOR BIDS
AutoCAD SHX Text
09X101.dwg
AutoCAD SHX Text
1/4" = 1'-0"
AutoCAD SHX Text
W. D. WEHNER
AutoCAD SHX Text
J. A. MARLER
AutoCAD SHX Text
M. E. WAUER
AutoCAD SHX Text
--
AutoCAD SHX Text
J. E. KOCH
Page 4: EMERGENCY ON-CALL SERVICES DIGESTER HEATING...digester heating. central wastewater treatment plant waco metropolitan area regional sewerage system. 1 a b c 2 3 4 5 6 7 8 d. issue date

DIGESTER 2ADIGESTER 1A

DIGESTER B

DIGESTER 3A

24" AUX.

DRAW-OFF

24" AUX.

DRAW-OFF

24" RECIRCULATION

LINE FROM

CENTER COLUMN

24" RECIRCULATION

LINE FROM

CENTER COLUMN

SUMP

16"x6" TEE

6" PUMP

DISCHARGE

6" R.W. GATE

VALVE, TYP.

16"x6" TEE

6" HOT WATER (H.W.)

WITH INSULATION

24" AUX.

DRAW-OFF

24" RECIRCULATION

LINE FROM

CENTER COLUMN

DIGESTED SLUDGE

PUMP NO. 2

DIGESTED SLUDGE

PUMP NO. 1

DIGESTED SLUDGE

PUMP NO. 3

6" PRESSURE

RELIEF AND FLAME

TRAP ASSEMBLY

6" SEDIMENT

DRIP TRAP

6" SEDIMENT

DRIP TRAP

6" GAS LINE

6" METER 6" METER

12" GAS LINE

16"x6" TEE

16"x6" TEE

PUMP DISCH.6" H.W. INLET

6" SLUDGE

DISCHARGE

24" AUX.

DRAW-OFF

24" RECIRCULATION

LINE FROM

CENTER COLUMN

RELOCATED

16" PLUG VALVE

RECIRC.

PUMP NO. 1

OVERFLOW

BOX (ABOVE)

OVERFLOW

BOX (ABOVE)

16" SLUDGE

SUCTION LINE

RELOCATED

16"x16" TEE,

VERT. BRANCH

16"x16" CROSS

16" PLUG VALVE, TYP.

24"x16" REDUCER, TYP.

24" SLUDGE LINE, TYP.

CLOSED-LOOP

RECIRCULATION

PUMP

CONC. COLUMN,

TYP. OF FOUR

6" HOT WATER RETURN

6" HOT WATER SUPPLY

SCUM

BREAKER

MIX

NOZZLE

16"x16" CROSS

16" PLUG VALVE, TYP.

24"x16" REDUCER, TYP.

24" SLUDGE LINE, TYP.

SCUM

BREAKER

MIX

NOZZLE

SCUM

BREAKER

MIX

NOZZLE

SCUM

BREAKER

MIX

NOZZLE

16" PLUG

VALVE, TYP.

16" SPOOL PIPE WITH 1 1/2"

MANUAL AIR RELEASE VALVE

16" SWING CHECK VALVE

5'-0"

FIELD VERIFY

3'-1

0"

FIE

LD

VE

RIF

Y

ACCESS HATCH (ABOVE)

RELOCATED

16" 90° BEND

6" CHECK

VALVE

6" CHECK

VALVE

6" R.W. GATE

VALVE, TYP.

RELOCATED

16"x16" TEE,

VERT. BRANCH

16" 90° BEND

DIG-HEX-02

DIG-GDR-02

DIG-P-04

DIG-P-02

6" SLUDGE INLET

6" H.W. DISCHARGE

6" H.W. INLET

6" SLUDGE

DISCHARGE

DIG-P-03

DIG-HEX-016" H.W. DISCHARGE

DIG-GDR-01

DIG-FE-01

4

3

1

2

6" SLUDGE INLET

2

16"-TPS

C

09D302

B

09D301

A

09D301

B

09D301

A

09D301

C

09D302

DIG-FE-01

16" SLUDGE LINE

16"-TPS

16" SLUDGE

DISCHARGE LINE

4" THICKENED

W.A.S. LINE, NOT

IN THIS CONTRACT

4"-TWAS

DIG-P-01

RELOCATED

16" PLUG VALVE

RECIRC.

PUMP NO. 2

CONNECT TO 6" FITTING,

FIELD VERIFY, RESTRAINED

16"x16" TEE

16"x16" TEE

6"x4" RED. 90° BEND,

VERIFY SIZE WITH

PUMP MFR., TYP.

16" DISMANTLING

JOINT, RESTRAINED

16" 90° BEND

16" PLUG

VALVE, TYP.

16" DISMANTLING

JOINT, RESTRAINED

16" PLUG

VALVE, TYP.

16"-TPS

6"-DCL

6"-DCL

6" CLOSED-LOOP

RECIRCULATION

SUPPLY LINE

6" CLOSED-LOOP

RECIRCULATION

RETURN LINE

TRUE NORTH PROJECT NORTH

SPECIFIC NOTES:

FOOTPRINT DIMENSIONS OF BOOSTER PUMPS

ARE APPROXIMATELY 5'-7" x 3'-2",

VERIFY WITH EQUIPMENT MANUFACTURER.

FOOTPRINT DIMENSIONS OF HEAT EXCHANGERS

ARE APPROXIMATELY 4'-1" x 3'-3",

VERIFY WITH EQUIPMENT MANUFACTURER.

DIMENSIONS OF ACCESS HATCH OPENING ARE

APPROXIMATELY 5'-0" x 3'-10", FIELD VERIFY.

ALL HOT WATER SUPPLY AND RETURN PIPING TO BE

INSTALLED SHALL BE PROVIDED WITH INSULATION

PER THE SPECIFICAT1ONS.

4

3

2

1

DIGESTER HEATING

CENTRAL WASTEWATER TREATMENT PLANT

WACO METROPOLITAN AREA

REGIONAL SEWERAGE SYSTEM

1

A

B

C

2 3 4 5 6 7 8

D

ISSUE DATE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

FILENAME

SCALE

SHEET

Texas P.E. Firm

Registration No. F-754

DESIGNED BY

DESIGNED BY

CHECKED BY

PROJECT DATE

DRAWN BY

DRAWN BY

EMERGENCY ON-CALL SERVICES

DIGESTER PUMP STATION

PROCESS

HEAT EXCHANGER PIPING PLAN

09D101

C:\p

ww

orkin

g\ce

ntra

l0

1\d

07

15

14

6\0

9D

10

1.d

wg

, 1

2/1

3/2

01

8 8

:5

1:0

7 A

M, M

WA

UE

R

RFB 2020-017 WMARSS Central Plant Heat Exchanger Replacement Project

4 of 18

AutoCAD SHX Text
J. A. MARLER
AutoCAD SHX Text
10090300
AutoCAD SHX Text
DECEMBER 2018
AutoCAD SHX Text
A
AutoCAD SHX Text
12/13/2018
AutoCAD SHX Text
ISSUED FOR BIDS
AutoCAD SHX Text
09D101.dwg
AutoCAD SHX Text
1/4" = 1'-0"
AutoCAD SHX Text
W. D. WEHNER
AutoCAD SHX Text
J. A. MARLER
AutoCAD SHX Text
M. E. WAUER
AutoCAD SHX Text
--
AutoCAD SHX Text
J. E. KOCH
Page 5: EMERGENCY ON-CALL SERVICES DIGESTER HEATING...digester heating. central wastewater treatment plant waco metropolitan area regional sewerage system. 1 a b c 2 3 4 5 6 7 8 d. issue date

CONC. ROOF

16"x6" TEE

16" SLUDGE LINE

2'-4"

CONC. PIER, TYP.

DIGESTER 1A

(BEYOND)

DIGESTER 3A

(BEYOND)

CONC. COLUMN, TYP.

SLOPE

NOTE:

SECTION SHOWN IS FOR SLUDGE BOOSTER

PUMP DIG-P-03. PIPING FOR SLUDGE BOOSTER

PUMP DIG-P-04 IS SIMILAR.

6"-DCL 6"-DCL

6" CLOSED-LOOP

RECIRCULATION

SUPPLY LINE

6" CLOSED-LOOP

RECIRCULATION

RETURN LINE

DISMANTLING JOINT,

RESTRAINED, VERIFY

SIZE WITH PUMP MFR.

TOP OF CONC.

H.P. EL. 388.21'

FIELD VERIFY

TOP OF CONC.

EL. 375.00'

FIELD VERIFY

℄ EL. 377.33'

FIELD VERIFY,

MATCH EXIST.

℄ EL. 379.75'

FIELD VERIFY

BOOSTER PUMP

PIPING SECTION

SCALE: 1/4" = 1'-0"

A

09D101

℄ EL. 384.67'

FIELD VERIFY,

MATCH EXIST.

TOP OF CONC.

L.P. EL. 387.00'

FIELD VERIFY

2'-5"

6" PUMP DISCHARGE

RELOCATED

16"x16" TEE

16" 90° BEND

DIG-P-03 DIG-GR-01

6"x4" REDUCER, VERIFY

SIZE WITH PUMP MFR.

6" R.W. GATE VALVE

6" SPOOL PIPE

16" PLUG

VALVE, TYP.

6"x4" RED. 90°

BEND, VERIFY SIZE

WITH PUMP MFR.

16" FLANGE,

WELD TO PIPE

16" DISMANTLING

JOINT, RESTRAINED

16" SLUDGE LINE

CONC. EQUIP.

PAD, TYP.

7'-6" M

IN

.

9'-8"

FIE

LD

V

ER

IF

Y

BASE FITTING WITH

CONC. SUPPORT

TYP. SEE DETAIL

2

01D506

HEAT EXCHANGER

PIPING SECTION

SCALE: 1/4" = 1'-0"

B

09D101

CONC. ROOF

16" SLUDGE LINE

2'-4"

CONC. PIER, TYP.

SLOPE

NOTE:

SECTION SHOWN IS FOR SLUDGE HEAT

EXCHANGER DIG-HEX-01. PIPING FOR SLUDGE

HEAT EXCHANGER DIG-HEX-02 IS SIMILAR.

TOP OF CONC.

H.P. EL. 388.21'

FIELD VERIFY

℄ EL. 377.33'

FIELD VERIFY,

MATCH EXIST.

TOP OF CONC.

L.P. EL. 387.00'

FIELD VERIFY

DIG-HEX-01

16"x6" TEE

6" CHECK

VALVE

6" R.W. GATE

VALVE, TYP.

6" H.W. INLET

6" SLUDGE DISCHARGE

6" H.W. DISCHARGE

16" SLUDGE LINE

DISMANTLING JOINT,

RESTRAINED, TYP.

7'-6

" M

IN

.

6" SLUDGE INLET

6" 90° BEND, TYP.

9'-8

"

FIE

LD

V

ER

IF

Y

TOP OF CONC.

EL. 375.00'

FIELD VERIFY

℄ EL. 384.67'

FIELD VERIFY,

MATCH EXIST.

DIGESTER HEATING

CENTRAL WASTEWATER TREATMENT PLANT

WACO METROPOLITAN AREA

REGIONAL SEWERAGE SYSTEM

1

A

B

C

2 3 4 5 6 7 8

D

ISSUE DATE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

FILENAME

SCALE

SHEET

Texas P.E. Firm

Registration No. F-754

DESIGNED BY

DESIGNED BY

CHECKED BY

PROJECT DATE

DRAWN BY

DRAWN BY

EMERGENCY ON-CALL SERVICES

DIGESTER PUMP STATION

PROCESS

HEAT EXCHANGER PIPING SECTIONS

09D301

C:\p

ww

orkin

g\ce

ntra

l0

1\d

07

15

14

6\0

9D

30

1.d

wg

, 1

2/1

3/2

01

8 8

:5

1:3

2 A

M, M

WA

UE

R

RFB 2020-017 WMARSS Central Plant Heat Exchanger Replacement Project

5 of 18

AutoCAD SHX Text
J. A. MARLER
AutoCAD SHX Text
10090300
AutoCAD SHX Text
DECEMBER 2018
AutoCAD SHX Text
A
AutoCAD SHX Text
12/13/2018
AutoCAD SHX Text
ISSUED FOR BIDS
AutoCAD SHX Text
09D301.dwg
AutoCAD SHX Text
1/4" = 1'-0"
AutoCAD SHX Text
W. D. WEHNER
AutoCAD SHX Text
J. A. MARLER
AutoCAD SHX Text
M. E. WAUER
AutoCAD SHX Text
--
AutoCAD SHX Text
J. E. KOCH
Page 6: EMERGENCY ON-CALL SERVICES DIGESTER HEATING...digester heating. central wastewater treatment plant waco metropolitan area regional sewerage system. 1 a b c 2 3 4 5 6 7 8 d. issue date

7'-6" M

IN

.

RELOCATED 16"x16"

TEE, VERT. BRANCH

16" 90° BEND

16" CHECK VALVE

16" SLUDGE

DISCHARGE LINE

DIG-P-02DIG-P-01DIG-P-03 DIG-HEX-01

DIG-GDR-01

DIG-FE-01

DIG-P-04DIG-HEX-02

DIG-GDR-02

DIG-FE-02

6" HOT WATER

RETURN LINE

6" HOT WATER

SUPPLY LINE

16"x16" CROSS

16"x16" TEE

6" R.W. GATE

VALVE, TYP.

6" H.W. INLET

6" SLUDGE

DISCHARGE

6" SLUDGE INLET

RELOCATED 16" PLUG

VALVE, TYP. OF TWO

6" H.W. INLET

6" SLUDGE

DISCHARGE

6" SLUDGE INLET

6" R.W. GATE

VALVE, TYP.

16" DISMANTLING

JOINT, RESTRAINED

CONC. EQUIP. PAD,

TYP. SEE DETAIL

2

01S502

16" SPOOL PIPE WITH 1 1/2"

THREADED TAP AND 1 1/2"

MANUAL AIR RELEASE VALVE

6" H.W. DISCHARGE

RELOCATED

16" 90° BEND

RELOCATED 16"x16"

TEE, VERT. BRANCH

16" 90° BEND

16"x16" TEE ℄ EL. 379.75'

FIELD VERIFY

CONNECT TO 6" FITTING,

FIELD VERIFY, RESTRAINED,

TYP. OF FOUR

16" SLUDGE

DISCHARGE LINE

16" SLUDGE

SUCTION LINE

16" SLUDGE

SUCTION LINE

ROUTE TO DRAIN

SUMP, MAINTAIN

2% SLOPE, TYP.

6"x4" REDUCER,

VERIFY SIZE WITH

PUMP MFR., TYP.

PIPING SECTION

SCALE: 1/4" = 1'-0"

C

09D101

TOP OF CONC. VARIES

H.P. EL. 388.21'

L.P. EL. 387.00'

FIELD VERIFY

℄ EL. 379.75'

FIELD VERIFY

DISMANTLING JOINT,

RESTRAINED, TYP. ALL

EQUIP. CONNECTIONS

6" H.W.

DISCHARGE

BASE FITTING WITH

CONC. SUPPORT

TYP. SEE DETAIL

2

01D506

9'-8"

FIE

LD

V

ER

IF

Y

7'-6"

MIN

.

16"x16" CROSS

6"x4" RED. 90° BEND,

VERIFY SIZE WITH

PUMP MFR., TYP.

TOP OF CONC.

EL. 375.00'

FIELD VERIFY

℄ EL. 377.33'

FIELD VERIFY

℄ EL. 384.67'

FIELD VERIFY,

MATCH EXIST.

6"-DCL

6" CLOSED-LOOP

RECIRCULATION

RETURN LINE

DIGESTER HEATING

CENTRAL WASTEWATER TREATMENT PLANT

WACO METROPOLITAN AREA

REGIONAL SEWERAGE SYSTEM

1

A

B

C

2 3 4 5 6 7 8

D

ISSUE DATE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

FILENAME

SCALE

SHEET

Texas P.E. Firm

Registration No. F-754

DESIGNED BY

DESIGNED BY

CHECKED BY

PROJECT DATE

DRAWN BY

DRAWN BY

EMERGENCY ON-CALL SERVICES

DIGESTER PUMP STATION

PROCESS

HEAT EXCHANGER PIPING SECTIONS

09D302

C:\p

ww

orkin

g\ce

ntra

l0

1\d

07

15

14

6\0

9D

30

2.d

wg

, 1

2/1

3/2

01

8 8

:5

1:5

9 A

M, M

WA

UE

R

RFB 2020-017 WMARSS Central Plant Heat Exchanger Replacement Project

6 of 18

AutoCAD SHX Text
J. A. MARLER
AutoCAD SHX Text
10090300
AutoCAD SHX Text
DECEMBER 2018
AutoCAD SHX Text
A
AutoCAD SHX Text
12/13/2018
AutoCAD SHX Text
ISSUED FOR BIDS
AutoCAD SHX Text
09D302.dwg
AutoCAD SHX Text
1/4" = 1'-0"
AutoCAD SHX Text
W. D. WEHNER
AutoCAD SHX Text
J. A. MARLER
AutoCAD SHX Text
M. E. WAUER
AutoCAD SHX Text
--
AutoCAD SHX Text
J. E. KOCH
Page 7: EMERGENCY ON-CALL SERVICES DIGESTER HEATING...digester heating. central wastewater treatment plant waco metropolitan area regional sewerage system. 1 a b c 2 3 4 5 6 7 8 d. issue date

DIGESTER HEATING

CENTRAL WASTEWATER TREATMENT PLANT

WACO METROPOLITAN AREA

REGIONAL SEWERAGE SYSTEM

1

A

B

C

2 3 4 5 6 7 8

D

ISSUE DATE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

FILENAME

SCALE

SHEET

Texas P.E. Firm

Registration No. F-754

DESIGNED BY

DESIGNED BY

CHECKED BY

PROJECT DATE

DRAWN BY

DRAWN BY

EMERGENCY ON-CALL SERVICES

DIGESTER PUMP STATION

PROCESS

STANDARD DETAILS

09D501

C:\p

ww

orkin

g\ce

ntra

l0

1\d

07

15

14

6\0

9D

50

1.d

wg

, 1

2/1

3/2

01

8 8

:5

2:2

3 A

M, M

WA

UE

R

RFB 2020-017 WMARSS Central Plant Heat Exchanger Replacement Project

7 of 18

AutoCAD SHX Text
%%UPRESSURE GAUGE NOTES:
AutoCAD SHX Text
PRESSURE GAUGE ASSEMBLY
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
1. ALL COMPONENTS SHALL BE STAINLESS STEEL, ALL COMPONENTS SHALL BE STAINLESS STEEL, UNLESS NOTED OTHERWISE. 2. REFER TO DRAWING FOR APPLICATION. REFER TO DRAWING FOR APPLICATION. 3. MOUNT ON SPRING-LINE (SIDE) OF PIPE. MOUNT ON SPRING-LINE (SIDE) OF PIPE. 4. INSTALL ONE "DANGER" SIGN AT EACH INSTALL ONE "DANGER" SIGN AT EACH NON-POTABLE WATER OUTLET.
AutoCAD SHX Text
PRESSURE GAUGE
AutoCAD SHX Text
1/4" x 1/2" 300 LB M.I. OR 3000 LB F.S. BUSHING, TYP.
AutoCAD SHX Text
1/2" 90° BEND WITH THREADED OUTLET
AutoCAD SHX Text
1/2" x 1/2" TEE
AutoCAD SHX Text
1" 3000 LB F.S. HALF-COUPLING
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
3/16
AutoCAD SHX Text
1/2" SCH. 80 S.ST. NIPPLE, TYP.
AutoCAD SHX Text
ANNULAR PRESSURE SEAL
AutoCAD SHX Text
1/2" x 1" 300 LB OR 3000 LB F.S. BUSHING
AutoCAD SHX Text
1" 3000 LB F.S. HALF-COUPLING
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
3/16
AutoCAD SHX Text
1/2" SCH. 80 S.ST. NIPPLE, TYP.
AutoCAD SHX Text
1/4" x 1/2" 300 LB M.I. OR 3000 LB F.S. BUSHING
AutoCAD SHX Text
PRESSURE SWITCH OR TRANSMITTER (REFER TO INSTRUMENTATION/ CONTROL DRAWINGS)
AutoCAD SHX Text
%%UPRESSURE TRANSMITTER NOTES:
AutoCAD SHX Text
1. ALL COMPONENTS SHALL BE STAINLESS STEEL, ALL COMPONENTS SHALL BE STAINLESS STEEL, UNLESS NOTED OTHERWISE. 2. REFER TO DRAWING FOR APPLICATION. REFER TO DRAWING FOR APPLICATION. 3. MOUNT ON SPRING-LINE (SIDE) OF PIPE. MOUNT ON SPRING-LINE (SIDE) OF PIPE. 4. REFER TO INSTRUMENTATION SHEETS FOR REFER TO INSTRUMENTATION SHEETS FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
AutoCAD SHX Text
1/2" QUARTER-TURN BALL VALVE
AutoCAD SHX Text
1/2" x 1" 300 LB OR 3000 LB F.S. BUSHING
AutoCAD SHX Text
1/2" QUARTER-TURN BALL VALVE, TYP.
AutoCAD SHX Text
PRESSURE TRANSMITTER ASSEMBLY
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
1
AutoCAD SHX Text
09D501
AutoCAD SHX Text
2
AutoCAD SHX Text
09D501
AutoCAD SHX Text
ANNULAR PRESSURE SEAL
AutoCAD SHX Text
PROVIDE PIPE SUPPORTS FOR ALL PIPE AND CONDUITS IN ACCORDANCE WITH THESE DETAILS AND SECTION 40 05 07. THE TERM "PIPE" OR "PIPING" REFERS TO BOTH PIPE AND ELECTRICAL CONDUIT, UNLESS THE LANGUAGE REFERS TO EACH SPECIFICALLY. SUPPORTS FOR PIPING 4" AND LARGER ARE IDENTIFIED ON THE DRAWINGS. CONTRACTOR IS RESPONSIBLE FOR SELECTION OF SUPPORTS FOR PIPING SMALLER THAN 4" USING DETAILS SHOWN ON THIS SHEET. CONTRACTOR MAY USE ALTERNATE DETAILS WITH THE ENGINEER'S REVIEW AND APPROVAL IF THE DETAILS SHOWN ARE UNSUITABLE FOR CONDITIONS ENCOUNTERED. CORROSIVE ENVIRONMENTS ARE DEFINED AS FOLLOWS: AREAS WITHIN OR ABOVE WATER BEARING STRUCTURES, CHEMICAL STORAGE ROOMS AND AREAS, BELOW THE RIM OF SECONDARY CONTAINMENT STRUCTURES, UNVENTILATED ROOMS AND OTHER ENCLOSED AREAS WHERE MOISTURE ACCUMULATIONS MAY OCCUR (INCLUDING VAULTS), OTHER LOCATIONS SUBJECT TO SPLASH OR SPILLAGE, AND WHERE SHOWN ON THE PLANS.
AutoCAD SHX Text
GENERAL NOTES: 1. ANCHORS AND ALL-THREADS: USE FRP ALL-THREADS, WASHERS, AND NUTS ANCHORS AND ALL-THREADS: USE FRP ALL-THREADS, WASHERS, AND NUTS IN CORROSIVE AREAS, CADMIUM PLATED STEEL ELSEWHERE. INSTALL USING "EPCON SYSTEM" ADHESIVE ANCHOR BY ITW RAMSET/REDHEAD OR APPROVED EQUAL. INSTALL PER MFR.'S WRITTEN INSTRUCTIONS. EMBEDMENT DEPTH AND TYPE SHALL BE AS RECOMMENDED BY THE MFR. OR 12 x DIA., WHICHEVER IS GREATER. BEAM CLAMPS MAY BE USED IN LIEU OF EPOXY ANCHORAGE WHERE SUITABLE CONDITIONS EXIST. BEAM CLAMPS TO BE FRP OR CADMIUM PLATED STEEL TO MATCH HANGER RODS. 2. STRUCTURAL FRAMING CHANNEL (SFC): USE FRP WITH STAINLESS STEEL STRUCTURAL FRAMING CHANNEL (SFC): USE FRP WITH STAINLESS STEEL HARDWARE IN CORROSIVE AREAS, GALVANIZED WITH CADMIUM PLATED STEEL HARDWARE ELSEWHERE. SFC TO BE UNISTRUT, AICKENSTRUT, OR APPROVED EQUAL. 3. PIPE CLAMPS FOR SFC: USE FRP CLAMPS WITH NYLON FASTENERS IN PIPE CLAMPS FOR SFC: USE FRP CLAMPS WITH NYLON FASTENERS IN CORROSIVE AREAS, CADMIUM PLATED STEEL CLAMPS AND HARDWARE ELSEWHERE. INSTALL PER MFRS RECOMMENDATIONS. 4. SWAY BRACING: PROVIDE BRACING ADJACENT TO 90 BENDS FOR SUSPENDED SWAY BRACING: PROVIDE BRACING ADJACENT TO 90° BENDS FOR SUSPENDEDPIPE. USE ANVIL INTERNATIONAL FIG. 211 SIZE A FOR PIPE 6" AND SMALLER, SIZE B FOR PIPE 8" AND LARGER. APPROVED ALTERNATE TYPE OF BRACING IS ACCEPTABLE. 5. SPACING: PROVIDE SUPPORTS AT THE SPACINGS SHOWN IN SPECIFICATION SPACING: PROVIDE SUPPORTS AT THE SPACINGS SHOWN IN SPECIFICATION SECTION 40 05 07 IF SPACING OR SUPPORT LOCATIONS ARE NOT SHOWN ON THE DRAWINGS. 6. CUTTING FRP: CUT AND COAT CUT ENDS OF ALL FRP COMPONENTS WITH CUTTING FRP: CUT AND COAT CUT ENDS OF ALL FRP COMPONENTS WITH RESIN AS RECOMMENDED BY COMPONENT MFR.
AutoCAD SHX Text
PIPE/CONDUIT SUPPORT NOTES:
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
SIZE
AutoCAD SHX Text
2 1/2
AutoCAD SHX Text
3
AutoCAD SHX Text
3 1/2
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
8
AutoCAD SHX Text
10
AutoCAD SHX Text
12
AutoCAD SHX Text
14
AutoCAD SHX Text
16
AutoCAD SHX Text
18
AutoCAD SHX Text
20
AutoCAD SHX Text
24
AutoCAD SHX Text
30
AutoCAD SHX Text
32
AutoCAD SHX Text
36
AutoCAD SHX Text
6
AutoCAD SHX Text
6
AutoCAD SHX Text
6
AutoCAD SHX Text
6
AutoCAD SHX Text
6
AutoCAD SHX Text
6
AutoCAD SHX Text
4
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
2 1/2
AutoCAD SHX Text
2 1/2
AutoCAD SHX Text
2 1/2
AutoCAD SHX Text
"A"
AutoCAD SHX Text
"B"
AutoCAD SHX Text
1 1/2
AutoCAD SHX Text
1 1/2
AutoCAD SHX Text
1 1/2
AutoCAD SHX Text
2 1/2
AutoCAD SHX Text
2 1/2
AutoCAD SHX Text
2 1/2
AutoCAD SHX Text
2 1/2
AutoCAD SHX Text
2 1/2
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
3 1/2
AutoCAD SHX Text
3 1/2
AutoCAD SHX Text
4
AutoCAD SHX Text
4
AutoCAD SHX Text
4
AutoCAD SHX Text
4
AutoCAD SHX Text
13 1/2
AutoCAD SHX Text
13 1/2
AutoCAD SHX Text
13 1/2
AutoCAD SHX Text
13 1/2
AutoCAD SHX Text
13 1/2
AutoCAD SHX Text
13 1/2
AutoCAD SHX Text
11
AutoCAD SHX Text
11
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
"C"
AutoCAD SHX Text
MINIMUM
AutoCAD SHX Text
8
AutoCAD SHX Text
8 1/2
AutoCAD SHX Text
8 1/2
AutoCAD SHX Text
9 1/2
AutoCAD SHX Text
10 1/2
AutoCAD SHX Text
11 1/2
AutoCAD SHX Text
13 1/2
AutoCAD SHX Text
15
AutoCAD SHX Text
16 1/2
AutoCAD SHX Text
17 1/2
AutoCAD SHX Text
19 1/2
AutoCAD SHX Text
21
AutoCAD SHX Text
23 1/2
AutoCAD SHX Text
27
AutoCAD SHX Text
28 1/2
AutoCAD SHX Text
30 1/2
AutoCAD SHX Text
34 1/2
AutoCAD SHX Text
32 1/2
AutoCAD SHX Text
31 1/2
AutoCAD SHX Text
28 1/2
AutoCAD SHX Text
25 1/2
AutoCAD SHX Text
24
AutoCAD SHX Text
22 1/2
AutoCAD SHX Text
20 1/2
AutoCAD SHX Text
19 1/2
AutoCAD SHX Text
18 1/2
AutoCAD SHX Text
16 1/2
AutoCAD SHX Text
15 1/2
AutoCAD SHX Text
14
AutoCAD SHX Text
13 1/2
AutoCAD SHX Text
13 1/2
AutoCAD SHX Text
13
AutoCAD SHX Text
MAXIMUM
AutoCAD SHX Text
"D"
AutoCAD SHX Text
DIMENSIONS IN INCHES
AutoCAD SHX Text
ADJUSTABLE PIPE SUPPORT SCHEDULE
AutoCAD SHX Text
<
AutoCAD SHX Text
-
AutoCAD SHX Text
HOT-DIP GALVANIZE AFTER FABRICATION.
AutoCAD SHX Text
PIPE SHALL BE SCHEDULE 40.
AutoCAD SHX Text
2.
AutoCAD SHX Text
3.
AutoCAD SHX Text
%%uNOTES:
AutoCAD SHX Text
"D"
AutoCAD SHX Text
"B"
AutoCAD SHX Text
"A"
AutoCAD SHX Text
"C"
AutoCAD SHX Text
LENGTH AND THREADS TO ALLOW
AutoCAD SHX Text
MIN. AND MAX. DIMENSIONS SHOWN
AutoCAD SHX Text
IN TABLE. USE STRAIGHT THREADS.
AutoCAD SHX Text
FOUR 3/4" DIA. ANCHOR BOLTS
AutoCAD SHX Text
AND NUTS (SEE GENERAL NOTE 1)
AutoCAD SHX Text
THREADED 150 LB REDUCING FLANGE
AutoCAD SHX Text
1" MIN NON-SHRINK GROUT
AutoCAD SHX Text
PIPE STANCHION SADDLE SUPPORT
AutoCAD SHX Text
WITH U-BOLT YOKE AND NUTS
AutoCAD SHX Text
INSTALL ONLY WHERE SHOWN ON DRAWINGS.
AutoCAD SHX Text
1.
AutoCAD SHX Text
ADJUSTABLE STANCHION SUPPORT DETAIL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
6
AutoCAD SHX Text
09D501
AutoCAD SHX Text
CLEVIS TYPE SUPPORT DETAIL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
HANGER ROD
AutoCAD SHX Text
(SEE TABLE)
AutoCAD SHX Text
PIPE SIZE VARIES
AutoCAD SHX Text
PIPE HANGER
AutoCAD SHX Text
7/8"
AutoCAD SHX Text
1"
AutoCAD SHX Text
1 1/2"
AutoCAD SHX Text
ROD SIZE
AutoCAD SHX Text
PIPE SIZE
AutoCAD SHX Text
ROD SIZE
AutoCAD SHX Text
PIPE SIZE
AutoCAD SHX Text
20"-30"
AutoCAD SHX Text
14"-18"
AutoCAD SHX Text
8"-12"
AutoCAD SHX Text
3/4"
AutoCAD SHX Text
1/2"
AutoCAD SHX Text
3/8"
AutoCAD SHX Text
4" & 6"
AutoCAD SHX Text
2 1/2" & 3"
AutoCAD SHX Text
2" & SMALLER
AutoCAD SHX Text
AS SPECIFIED
AutoCAD SHX Text
SUPPORT BRACKET
AutoCAD SHX Text
OR EMBEDDED
AutoCAD SHX Text
SURFACE MOUNTED
AutoCAD SHX Text
AS RECOMMENDED
AutoCAD SHX Text
BY PIPE HANGER MFR.
AutoCAD SHX Text
7
AutoCAD SHX Text
09D501
AutoCAD SHX Text
DIA (IN)
AutoCAD SHX Text
ANCHOR BOLT SCHED
AutoCAD SHX Text
WELD
AutoCAD SHX Text
MK
AutoCAD SHX Text
TACK
AutoCAD SHX Text
WASHER
AutoCAD SHX Text
HEAVY
AutoCAD SHX Text
DIA.
AutoCAD SHX Text
THD (IN)
AutoCAD SHX Text
L
AutoCAD SHX Text
"L"
AutoCAD SHX Text
1
AutoCAD SHX Text
3/4
AutoCAD SHX Text
5
AutoCAD SHX Text
2'-0"
AutoCAD SHX Text
NOTES: 1. ALL BOLTS SHALL BE STAINLESS ALL BOLTS SHALL BE STAINLESS STEEL 316, UNO. 2. PROVIDE ANTI-SEIZE COMPOUND ON PROVIDE ANTI-SEIZE COMPOUND ON THREADS. 3. REFERENCE SPECS FOR ANCHOR BOLT REFERENCE SPECS FOR ANCHOR BOLT MATERIAL.
AutoCAD SHX Text
VERIFY W/COLUMN REQUIREMENTS THREADED PROJECTION (THD)
AutoCAD SHX Text
EQUIPMENT PAD NOTES: 1. FOR NEW EQUIPMENT BASES ON EXISTING SLABS, DRILL INTO EXISTING SLAB TO FOR NEW EQUIPMENT BASES ON EXISTING SLABS, DRILL INTO EXISTING SLAB TO DEVELOPMENT DEPTH AT 12" CENTERS AROUND PERIMETER OF EQUIPMENT BASE AND SET #5 HOOKED DOWELS IN EPOXY GROUT. 2. FOR EQUIPMENT BASES ON NEW SLABS, PROVIDE #5 DOWELS HAVING TWO FOR EQUIPMENT BASES ON NEW SLABS, PROVIDE #5 DOWELS HAVING TWO HOOKED ENDS AT 12" CENTERS AROUND PERIMETER OF EQUIPMENT BASE. 3. EQUIPMENT BASE DIMENSIONS SHALL BE AS REQUIRED BY THE APPROVED SHOP EQUIPMENT BASE DIMENSIONS SHALL BE AS REQUIRED BY THE APPROVED SHOP DRAWINGS. 4. ANCHOR BOLTS AS RECOMMENDED BY THE EQUIPMENT MANUFACTURER. BOLTS ANCHOR BOLTS AS RECOMMENDED BY THE EQUIPMENT MANUFACTURER. BOLTS SHALL BE HELD IN POSITION WITH A TEMPLATE WHILE EQUIPMENT BASE IS BEING CAST. 5. PIPE SLEEVES SHALL BE USED TO PROVIDE THE ANCHOR BOLT A MINIMUM PIPE SLEEVES SHALL BE USED TO PROVIDE THE ANCHOR BOLT A MINIMUM MOVEMENT OF 1/2" IN ALL DIRECTIONS. MINIMUM SLEEVE LENGTH SHALL BE 8 TIMES THE BOLT DIAMETER. SLEEVES SHALL BE FILLED WITH NON-SHRINK GROUT. PIPE SLEEVES SHALL HAVE A MINIMUM INTERNAL DIAMETER 1" GREATER THAN BOLT DIAMETER AND A MAXIMUM INTERNAL DIAMETER OF 3" GREATER THAN BOLT DIAMETER. 6. EQUIPMENT BASES SHALL BE INSTALLED LEVEL, TOLERANCE IS 1/16".EQUIPMENT BASES SHALL BE INSTALLED LEVEL, TOLERANCE IS 1/16".
AutoCAD SHX Text
SLAB REINFORCEMENT NOT SHOWN
AutoCAD SHX Text
SEE NOTE 1
AutoCAD SHX Text
#5 CLOSED TIES @ 6
AutoCAD SHX Text
AS INDICATED ON DWGS OR AS REQUIRED BY EQUIPMENT MFR., 6" MIN.
AutoCAD SHX Text
ANCHOR BOLT SEE NOTE 4
AutoCAD SHX Text
ROUGHEN CONCRETE SURFACE
AutoCAD SHX Text
SEE NOTE 2
AutoCAD SHX Text
#5@12
AutoCAD SHX Text
LOCK NUT
AutoCAD SHX Text
1:1 SLOPE TYP
AutoCAD SHX Text
1" MIN NON-SHRINK GROUT
AutoCAD SHX Text
LEVELING NUT
AutoCAD SHX Text
EQUIP BASE SEE NOTE 3
AutoCAD SHX Text
2" CLEAR COVER, TYP.
AutoCAD SHX Text
PIPE SLEEVE TYPICAL SEE NOTE 5
AutoCAD SHX Text
1 1/2" CLEAR
AutoCAD SHX Text
6" MIN.
AutoCAD SHX Text
6" MIN.
AutoCAD SHX Text
INSTALL CONC. EQUIPMENT SUPPORT PAD WITH ANCHOR BOLTS, SEE DETAIL 3/09D501
AutoCAD SHX Text
BASE FITTING SUPPORT DETAIL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
5
AutoCAD SHX Text
09D501
AutoCAD SHX Text
FOUR ANCHOR BOLTS WITH LEVELING NUTS, WASHERS, AND DOUBLE NUTS, SIZE AND SPACING AS REQUIRED TO FIT BASE FITTING FOR TEE OR ELBOW
AutoCAD SHX Text
1" MIN. LEVELING GROUT
AutoCAD SHX Text
TEE OR ELBOW WITH BASE FITTING, SEE DRAWINGS FOR SIZE
AutoCAD SHX Text
CONCRETE SLAB
AutoCAD SHX Text
CONCRETE SURFACE SHALL BE CLEAN, ROUGHENED TO A FULL AMPLITUDE OF APPROXIMATELY 1/4", FREE OF LAITANCE, AND COATED WITH BONDING AGENT
AutoCAD SHX Text
ANCHOR BOLT DETAIL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
4
AutoCAD SHX Text
09D501
AutoCAD SHX Text
EQUIPMENT SUPPORT PAD DETAIL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
3
AutoCAD SHX Text
09D501
AutoCAD SHX Text
J. A. MARLER
AutoCAD SHX Text
10090300
AutoCAD SHX Text
DECEMBER 2018
AutoCAD SHX Text
A
AutoCAD SHX Text
12/13/2018
AutoCAD SHX Text
ISSUED FOR BIDS
AutoCAD SHX Text
09D501.dwg
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
W. D. WEHNER
AutoCAD SHX Text
J. A. MARLER
AutoCAD SHX Text
M. E. WAUER
AutoCAD SHX Text
--
AutoCAD SHX Text
J. E. KOCH
Page 8: EMERGENCY ON-CALL SERVICES DIGESTER HEATING...digester heating. central wastewater treatment plant waco metropolitan area regional sewerage system. 1 a b c 2 3 4 5 6 7 8 d. issue date

DIGESTER HEATING

CENTRAL WASTEWATER TREATMENT PLANT

WACO METROPOLITAN AREA

REGIONAL SEWERAGE SYSTEM

1

A

B

C

2 3 4 5 6 7 8

D

ISSUE DATE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

FILENAME

SCALE

SHEET

Texas P.E. Firm

Registration No. F-754

DESIGNED BY

DESIGNED BY

CHECKED BY

PROJECT DATE

DRAWN BY

DRAWN BY

EMERGENCY ON-CALL SERVICES

DIGESTER PUMP STATION

ELECTRICAL

LEGEND AND SYMBOLOGY

09E001

RFB 2020-017 WMARSS Central Plant Heat Exchanger Replacement Project

8 of 18

Page 9: EMERGENCY ON-CALL SERVICES DIGESTER HEATING...digester heating. central wastewater treatment plant waco metropolitan area regional sewerage system. 1 a b c 2 3 4 5 6 7 8 d. issue date

DIGESTER 2ADIGESTER 1A

DIGESTER B

DIGESTER 3A

DIGESTER HEATING

CENTRAL WASTEWATER TREATMENT PLANT

WACO METROPOLITAN AREA

REGIONAL SEWERAGE SYSTEM

1

A

B

C

2 3 4 5 6 7 8

D

ISSUE DATE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

FILENAME

SCALE

SHEET

Texas P.E. Firm

Registration No. F-754

DESIGNED BY

DESIGNED BY

CHECKED BY

PROJECT DATE

DRAWN BY

DRAWN BY

EMERGENCY ON-CALL SERVICES

DIGESTER PUMP STATION

ELECTRICAL

ELECTRICAL FLOOR PLAN

09E101

RFB 2020-017 WMARSS Central Plant Heat Exchanger Replacement Project

9 of 18

Page 10: EMERGENCY ON-CALL SERVICES DIGESTER HEATING...digester heating. central wastewater treatment plant waco metropolitan area regional sewerage system. 1 a b c 2 3 4 5 6 7 8 d. issue date

DIGESTER HEATING

CENTRAL WASTEWATER TREATMENT PLANT

WACO METROPOLITAN AREA

REGIONAL SEWERAGE SYSTEM

1

A

B

C

2 3 4 5 6 7 8

D

ISSUE DATE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

FILENAME

SCALE

SHEET

Texas P.E. Firm

Registration No. F-754

DESIGNED BY

DESIGNED BY

CHECKED BY

PROJECT DATE

DRAWN BY

DRAWN BY

EMERGENCY ON-CALL SERVICES

DIGESTER PUMP STATION

ELECTRICAL

REFERENCE PHOTOS AND

CONTROL SCHEMATIC

09E102

RFB 2020-017 WMARSS Central Plant Heat Exchanger Replacement Project

10 of 18

Page 11: EMERGENCY ON-CALL SERVICES DIGESTER HEATING...digester heating. central wastewater treatment plant waco metropolitan area regional sewerage system. 1 a b c 2 3 4 5 6 7 8 d. issue date

DIGESTER PUMP STATION

INSTRUMENTATION

LEGENDS AND SYMBOLOGY

09I100.DWG

N. T. S. 09I100

S. S. DEO

--

V. VANKAR

--

J. E. KOCH

DIGESTER HEATING

CENTRAL WASTEWATER TREATMENT PLANT

WACO METROPOLITAN AREA

REGIONAL SEWERAGE SYSTEM

1

A

B

C

2 3 4 5 6 7 8

D

ISSUE DATE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

FILENAME

SCALE

SHEET

Texas P.E. Firm

Registration No. F-754

DESIGNED BY

DESIGNED BY

CHECKED BY

PROJECT DATE

DRAWN BY

DRAWN BY

EMERGENCY ON-CALL SERVICES

RFB 2020-017 WMARSS Central Plant Heat Exchanger Replacement Project

11 of 18

Page 12: EMERGENCY ON-CALL SERVICES DIGESTER HEATING...digester heating. central wastewater treatment plant waco metropolitan area regional sewerage system. 1 a b c 2 3 4 5 6 7 8 d. issue date

DIGESTER PUMP STATION

SLUDGE HEATING PUMPS

P&ID

09I101.DWG

N. T. S. 09I101

S. S. DEO

--

V. VANKAR

--

J. E. KOCH

DIGESTER HEATING

CENTRAL WASTEWATER TREATMENT PLANT

WACO METROPOLITAN AREA

REGIONAL SEWERAGE SYSTEM

1

A

B

C

2 3 4 5 6 7 8

D

ISSUE DATE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

FILENAME

SCALE

SHEET

Texas P.E. Firm

Registration No. F-754

DESIGNED BY

DESIGNED BY

CHECKED BY

PROJECT DATE

DRAWN BY

DRAWN BY

EMERGENCY ON-CALL SERVICES

RFB 2020-017 WMARSS Central Plant Heat Exchanger Replacement Project

12 of 18

AutoCAD SHX Text
J. A. MARLER
AutoCAD SHX Text
10090300
AutoCAD SHX Text
DECEMBER 2018
AutoCAD SHX Text
A
AutoCAD SHX Text
12/13/2018
AutoCAD SHX Text
ISSUED FOR BIDS
AutoCAD SHX Text
DIG-1A
AutoCAD SHX Text
DIG-3A
AutoCAD SHX Text
DIG-2A
AutoCAD SHX Text
SCADA HMI
AutoCAD SHX Text
PCS
AutoCAD SHX Text
(FUTURE)
AutoCAD SHX Text
RECIRCULATION LOOP
AutoCAD SHX Text
A
AutoCAD SHX Text
SLUDGE RECIRC PUMP NO. 1
AutoCAD SHX Text
SLUDGE HEAT EXCHANGER NO. 1
AutoCAD SHX Text
DIG-HEX-01
AutoCAD SHX Text
PI
AutoCAD SHX Text
02
AutoCAD SHX Text
PSH
AutoCAD SHX Text
01
AutoCAD SHX Text
SLUDGE RECIRC PUMP NO. 3
AutoCAD SHX Text
DIG-P-03
AutoCAD SHX Text
TE
AutoCAD SHX Text
01
AutoCAD SHX Text
TIT
AutoCAD SHX Text
01
AutoCAD SHX Text
SLUDGE HEATING PUMP NO. 1
AutoCAD SHX Text
MCC5
AutoCAD SHX Text
HS
AutoCAD SHX Text
HOA
AutoCAD SHX Text
M
AutoCAD SHX Text
TSH
AutoCAD SHX Text
01
AutoCAD SHX Text
RUNNING
AutoCAD SHX Text
YA
AutoCAD SHX Text
FAULT
AutoCAD SHX Text
YA
AutoCAD SHX Text
STOPPED
AutoCAD SHX Text
YA
AutoCAD SHX Text
SLUDGE RECIRC PUMP NO. 2
AutoCAD SHX Text
PI
AutoCAD SHX Text
04
AutoCAD SHX Text
PSH
AutoCAD SHX Text
02
AutoCAD SHX Text
SLUDGE HEATING PUMP-4
AutoCAD SHX Text
DIG-P-04
AutoCAD SHX Text
M
AutoCAD SHX Text
TSH
AutoCAD SHX Text
02
AutoCAD SHX Text
I
AutoCAD SHX Text
MCC5
AutoCAD SHX Text
HS
AutoCAD SHX Text
HOA
AutoCAD SHX Text
RUNNING
AutoCAD SHX Text
YA
AutoCAD SHX Text
FAULT
AutoCAD SHX Text
YA
AutoCAD SHX Text
STOPPED
AutoCAD SHX Text
YA
AutoCAD SHX Text
I
AutoCAD SHX Text
RUNNING
AutoCAD SHX Text
IN AUTO
AutoCAD SHX Text
FAIL
AutoCAD SHX Text
RUN COMMAND
AutoCAD SHX Text
TEMPERATURE
AutoCAD SHX Text
RUNNING
AutoCAD SHX Text
IN AUTO
AutoCAD SHX Text
FAIL
AutoCAD SHX Text
RUN COMMAND
AutoCAD SHX Text
TEMPERATURE
AutoCAD SHX Text
SLUDGE HEATING PUMP NO. 2
AutoCAD SHX Text
SLUDGE HEATING PUMP NO. 1
AutoCAD SHX Text
SLUDGE HEATING PUMP NO. 2
AutoCAD SHX Text
SLUDGE HEATING PUMP NO. 1 DISCHARGE
AutoCAD SHX Text
SLUDGE HEATING PUMP NO. 2 DISCHARGE
AutoCAD SHX Text
SLUDGE HEATING PUMP NO. 1
AutoCAD SHX Text
DIG-LCS-01
AutoCAD SHX Text
HS
AutoCAD SHX Text
HOA
AutoCAD SHX Text
RUNNING
AutoCAD SHX Text
YA
AutoCAD SHX Text
FAULT
AutoCAD SHX Text
YA
AutoCAD SHX Text
STOPPED
AutoCAD SHX Text
YA
AutoCAD SHX Text
GENERAL NOTES: 1. SEE SHEET 00Y-01 FOR PROCESS CONTROL SYSTEM SEE SHEET 00Y-01 FOR PROCESS CONTROL SYSTEM ABBREVIATIONS, SYMBOLS AND NOTES. 2. SEE SHEETS 97Y-XX FOR SCADA NETWORK ARCHITECTURE SEE SHEETS 97Y-XX FOR SCADA NETWORK ARCHITECTURE DIAGRAM. 3. REFERENCE SPECIFICATION 40 90 05 FOR CONTROL REFERENCE SPECIFICATION 40 90 05 FOR CONTROL DESCRIPTIONS. 4. REFERENCE SPECIFICATION 40 91 10 FOR INSTRUMENT REFERENCE SPECIFICATION 40 91 10 FOR INSTRUMENT SCHEDULE. 5. REFERENCE SPECIFICATION 40 94 43 FOR PLC I/O SCHEDULE. REFERENCE SPECIFICATION 40 94 43 FOR PLC I/O SCHEDULE. 6. INSTRUMENTATION AND CONTROL EQUIPMENT SHALL BE SUITABLE INSTRUMENTATION AND CONTROL EQUIPMENT SHALL BE SUITABLE FOR INSTALLATION IN HAZARDOUS AREAS AS DEFINED ON SHEET 00G-07 HAZARDOUS AREA PLAN. 7. MAJOR FUNCTIONS FOR PACKAGED EQUIPMENT VENDOR SUPPLIED MAJOR FUNCTIONS FOR PACKAGED EQUIPMENT VENDOR SUPPLIED CONTROL PANELS ARE SHOWN ACTUAL EQUIPMENT VENDOR PANELS MAY OFFER ADDITIONAL FUNCTIONALITY.
AutoCAD SHX Text
1
AutoCAD SHX Text
KEY NOTES: EXISTING PLC TO BE RE-USED. CLASS I DIV 1 RATED INSTRUMENT. FURNISHED BY MANUFACTURER
AutoCAD SHX Text
1
AutoCAD SHX Text
FE
AutoCAD SHX Text
01
AutoCAD SHX Text
FIT
AutoCAD SHX Text
01
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
M
AutoCAD SHX Text
PI
AutoCAD SHX Text
01
AutoCAD SHX Text
FE
AutoCAD SHX Text
02
AutoCAD SHX Text
FIT
AutoCAD SHX Text
02
AutoCAD SHX Text
M
AutoCAD SHX Text
PI
AutoCAD SHX Text
03
AutoCAD SHX Text
GRINDER NO. 2
AutoCAD SHX Text
DIG-LCP-02
AutoCAD SHX Text
HS
AutoCAD SHX Text
HOA
AutoCAD SHX Text
RUNNING
AutoCAD SHX Text
YA
AutoCAD SHX Text
FAULT
AutoCAD SHX Text
YA
AutoCAD SHX Text
STOPPED
AutoCAD SHX Text
YA
AutoCAD SHX Text
SLUDGE HEAT EXCHANGER NO. 2
AutoCAD SHX Text
TE
AutoCAD SHX Text
02
AutoCAD SHX Text
TIT
AutoCAD SHX Text
02
AutoCAD SHX Text
SLUDGE HEATING PUMP NO. 1 SUCTION
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
SLUDGE HEATING PUMP NO. 1 SUCTION
AutoCAD SHX Text
DIG-PLC
AutoCAD SHX Text
DIG-P-01
AutoCAD SHX Text
DIG-P-02
AutoCAD SHX Text
DIG-HEX-02
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
M
AutoCAD SHX Text
SLUDGE HEATING PUMP NO. 2
AutoCAD SHX Text
DIG-LCS-02
AutoCAD SHX Text
HS
AutoCAD SHX Text
HOA
AutoCAD SHX Text
RUNNING
AutoCAD SHX Text
YA
AutoCAD SHX Text
FAULT
AutoCAD SHX Text
YA
AutoCAD SHX Text
STOPPED
AutoCAD SHX Text
YA
AutoCAD SHX Text
M
AutoCAD SHX Text
GRINDER NO. 1
AutoCAD SHX Text
DIG-LCP-01
AutoCAD SHX Text
HS
AutoCAD SHX Text
HOA
AutoCAD SHX Text
RUNNING
AutoCAD SHX Text
YA
AutoCAD SHX Text
FAULT
AutoCAD SHX Text
YA
AutoCAD SHX Text
STOPPED
AutoCAD SHX Text
YA
AutoCAD SHX Text
RUNNING
AutoCAD SHX Text
IN AUTO
AutoCAD SHX Text
FAIL
AutoCAD SHX Text
RUN COMMAND
AutoCAD SHX Text
GRINDER NO. 1
AutoCAD SHX Text
RUNNING
AutoCAD SHX Text
IN AUTO
AutoCAD SHX Text
FAIL
AutoCAD SHX Text
RUN COMMAND
AutoCAD SHX Text
GRINDER NO. 2
AutoCAD SHX Text
GRINDER NO. 1
AutoCAD SHX Text
DIG-GDR-01
AutoCAD SHX Text
GRINDER NO. 2
AutoCAD SHX Text
DIG-GDR-02
AutoCAD SHX Text
TE
AutoCAD SHX Text
03
AutoCAD SHX Text
TE
AutoCAD SHX Text
05
AutoCAD SHX Text
TE
AutoCAD SHX Text
06
AutoCAD SHX Text
TE
AutoCAD SHX Text
04
AutoCAD SHX Text
HW RETURN
AutoCAD SHX Text
HW SUPPLY
AutoCAD SHX Text
TE
AutoCAD SHX Text
07
AutoCAD SHX Text
TE
AutoCAD SHX Text
08
AutoCAD SHX Text
HW RETURN
AutoCAD SHX Text
HW SUPPLY
AutoCAD SHX Text
THIS DOCUMENT IS
AutoCAD SHX Text
RELEASED FOR THE
AutoCAD SHX Text
PURPOSE OF REVIEW
AutoCAD SHX Text
UNDER THE AUTHORITY OF
AutoCAD SHX Text
IT IS NOT TO BE USED
AutoCAD SHX Text
FOR CONSTRUCTION OR
AutoCAD SHX Text
ANY OTHER PURPOSE.
AutoCAD SHX Text
SAMEER S. DEO
AutoCAD SHX Text
TEXAS P.E. NO. 107246
AutoCAD SHX Text
DATE: SEP 13, 2018
Page 13: EMERGENCY ON-CALL SERVICES DIGESTER HEATING...digester heating. central wastewater treatment plant waco metropolitan area regional sewerage system. 1 a b c 2 3 4 5 6 7 8 d. issue date

DIGESTER PUMP STATION

INSTRUMENTATION

ONE-LINE DIAGRAMS AND

TERMINAL PANEL LAYOUT

09I102.DWG

N. T. S. 09I102

S. S. DEO

--

V. VANKAR

--

J. E. KOCH

DIGESTER HEATING

CENTRAL WASTEWATER TREATMENT PLANT

WACO METROPOLITAN AREA

REGIONAL SEWERAGE SYSTEM

1

A

B

C

2 3 4 5 6 7 8

D

ISSUE DATE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

FILENAME

SCALE

SHEET

Texas P.E. Firm

Registration No. F-754

DESIGNED BY

DESIGNED BY

CHECKED BY

PROJECT DATE

DRAWN BY

DRAWN BY

EMERGENCY ON-CALL SERVICES

RFB 2020-017 WMARSS Central Plant Heat Exchanger Replacement Project

13 of 18

Page 14: EMERGENCY ON-CALL SERVICES DIGESTER HEATING...digester heating. central wastewater treatment plant waco metropolitan area regional sewerage system. 1 a b c 2 3 4 5 6 7 8 d. issue date

DIGESTER PUMP STATION

INSTRUMENTATION

CONTROL PANEL LAYOUT

09I103.DWG

N. T. S. 09I103

S. S. DEO

--

V. VANKAR

--

J. E. KOCH

DIGESTER HEATING

CENTRAL WASTEWATER TREATMENT PLANT

WACO METROPOLITAN AREA

REGIONAL SEWERAGE SYSTEM

1

A

B

C

2 3 4 5 6 7 8

D

ISSUE DATE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

FILENAME

SCALE

SHEET

Texas P.E. Firm

Registration No. F-754

DESIGNED BY

DESIGNED BY

CHECKED BY

PROJECT DATE

DRAWN BY

DRAWN BY

EMERGENCY ON-CALL SERVICES

RFB 2020-017 WMARSS Central Plant Heat Exchanger Replacement Project

14 of 18

Page 15: EMERGENCY ON-CALL SERVICES DIGESTER HEATING...digester heating. central wastewater treatment plant waco metropolitan area regional sewerage system. 1 a b c 2 3 4 5 6 7 8 d. issue date

DIGESTER PUMP STATION

INSTRUMENTATION

INSTALLATION DETAILS

09I104.DWG

N. T. S. 09I104

S. S. DEO

--

V. VANKAR

--

J. E. KOCH

DIGESTER HEATING

CENTRAL WASTEWATER TREATMENT PLANT

WACO METROPOLITAN AREA

REGIONAL SEWERAGE SYSTEM

1

A

B

C

2 3 4 5 6 7 8

D

ISSUE DATE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

FILENAME

SCALE

SHEET

Texas P.E. Firm

Registration No. F-754

DESIGNED BY

DESIGNED BY

CHECKED BY

PROJECT DATE

DRAWN BY

DRAWN BY

EMERGENCY ON-CALL SERVICES

RFB 2020-017 WMARSS Central Plant Heat Exchanger Replacement Project

15 of 18

Page 16: EMERGENCY ON-CALL SERVICES DIGESTER HEATING...digester heating. central wastewater treatment plant waco metropolitan area regional sewerage system. 1 a b c 2 3 4 5 6 7 8 d. issue date

DIGESTER PUMP STATION

INSTRUMENTATION

PLC PANEL PICTURES - SHEET 1

09I105.DWG

N. T. S. 09I105

S. S. DEO

--

V. VANKAR

--

J. E. KOCH

DIGESTER HEATING

CENTRAL WASTEWATER TREATMENT PLANT

WACO METROPOLITAN AREA

REGIONAL SEWERAGE SYSTEM

1

A

B

C

2 3 4 5 6 7 8

D

ISSUE DATE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

FILENAME

SCALE

SHEET

Texas P.E. Firm

Registration No. F-754

DESIGNED BY

DESIGNED BY

CHECKED BY

PROJECT DATE

DRAWN BY

DRAWN BY

EMERGENCY ON-CALL SERVICES

RFB 2020-017 WMARSS Central Plant Heat Exchanger Replacement Project

16 of 18

Page 17: EMERGENCY ON-CALL SERVICES DIGESTER HEATING...digester heating. central wastewater treatment plant waco metropolitan area regional sewerage system. 1 a b c 2 3 4 5 6 7 8 d. issue date

DIGESTER PUMP STATION

INSTRUMENTATION

PLC PANEL PICTURES - SHEET 2

09I106.DWG

N. T. S. 09I106

S. S. DEO

--

V. VANKAR

--

J. E. KOCH

DIGESTER HEATING

CENTRAL WASTEWATER TREATMENT PLANT

WACO METROPOLITAN AREA

REGIONAL SEWERAGE SYSTEM

1

A

B

C

2 3 4 5 6 7 8

D

ISSUE DATE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2"

FILENAME

SCALE

SHEET

Texas P.E. Firm

Registration No. F-754

DESIGNED BY

DESIGNED BY

CHECKED BY

PROJECT DATE

DRAWN BY

DRAWN BY

EMERGENCY ON-CALL SERVICES

RFB 2020-017 WMARSS Central Plant Heat Exchanger Replacement Project

17 of 18

Page 18: EMERGENCY ON-CALL SERVICES DIGESTER HEATING...digester heating. central wastewater treatment plant waco metropolitan area regional sewerage system. 1 a b c 2 3 4 5 6 7 8 d. issue date

RFB 2020-017 WMARSS Central Plant Heat Exchanger Replacement Project

18 of 18