elemental cost analysis report

Embed Size (px)

Citation preview

  • 8/9/2019 elemental cost analysis report

    1/3

    Bil. Element % RM

    1 Substructures 8.91 154,020.80

    2 Superstructure 37.31 644,410.55

    3 Finishes 13.39 231,297.10

    4 Fitting and furnishing 0.34 6,032.93

    5 Services 22.96 396,657.59

    6 !terna" #$r%s 7.02 121,308.46

    Total Building Cost 1,627,032.92

    7 &re"i'inaries 4.24 73,305.49

    8 ($ntingencies )"ess* +-

    9 &r$visi$na" Su' 5.80 100,000.00

    10 &ri'e c$st su' +-

    TOTA CO!TRACT "#M 100 1,727,032.92

    $cati$n / angi, Se"ang$r 

    ear / 2003

    r$ss F"$$r -rea/ 1,433 '

    ($st' /1,727,032.92

    1,433= RM 1,205.19

    ($st inde! an 2003 / 101.10

    1.1.  Cost o$ &o'osed Building

    $cati$n / a'an niversiti

    ear / 2014

    r$ss F"$$r -rea/ 1500 '

    ($st nde! ac 2014/ 98.6

  • 8/9/2019 elemental cost analysis report

    2/3

    i. Cost index:

    cost index proposed

    cost index analysis  x cost/m2(analysis)

    98.6

    101.1  x RM 1,205.19= RM 1,175.39

    ii. Total Cost:

    Cost /m2(analysis) x Gross Floor Area

     RM 1,175.9x 1500m2 = RM 1,763,077.67 

    iii. Add 5% Preliminaries:

    5

    100  ! 1,763,077.67: 88,153.88

      : 88,153.88 ; 1,763,077.67

      :RM 1,()1,231.))

    i. Add 3% Contin!en"#:

    3

    100  ! 1,851,231.55 : 55,536.95

      : 55,536.95; 1,851,231.55

      * RM 1,906,76(.)0

  • 8/9/2019 elemental cost analysis report

    3/3

    . Add 5% $xternal or&:

    5

    100  ! 1,906,768.50: 95,338.42

      : 95,338.42; 1,906,768.50

      : RM 2,002,106.93

    i. Total Constr'"tion Cost: RM (,00(,106.93

    ii. Cost)m(:

    ¿ RM 2,002,106.93

    1500

      : RM 1,33*.7*