20
Factory Name Address Factory ID 9502 Initial Inspection Date 06/04/2014 Date of 5 th Follow Up 22/09/2016 Date of 11 th Follow Up Report Received Date 18/07/2014 Date of 6 th Follow Up 30/11/2016 Date of 12 th Follow Up Date of 1 st Follow Up 28/02/2015 Date of 7 th Follow Up 12/02/2017 Date of 13 th Follow Up Date of 2 nd Follow Up 06/01/2016 Date of 8 th Follow Up 18/05/2017 Date of 14 th Follow Up Date of 3 rd Follow Up 29/03/2016 Date of 9 th Follow Up 18/09/2017 Date of 15 th Follow Up Date of 4 th Follow Up 30/06/2016 Date of 10 th Follow Up 12/11/2017 Date of 16 th Follow Up Item No Accord Inspection Observation Accord Action Plan (Recommendation ) Accord Time line (given in report ) Comments from Accord (After Physical Inspection ) Final Timeline (Approved timeline ) Final Action Plan (Factory) Progress Status (On the date of inspection ) Pictorial Evidence 1 HT service cable dropping from pole is not protected near the base of the pole, above ground level HT cable dropping from HT pole must be protected in steel pipe of required size at least 2m from the ground level to protect the cable from any physical damage. The cable should be supported on covered tray or ladder throughout its length up to the HT panel base-plate (except the part of the cable laid underground at a depth of at least 1 meter). Within 1 month On 06/01/2016: Corrected. The cable is protected near base. 31/12/2015 Corrected Corrected 2 Silica gel in transformer breather, discoloured. Shut down the transformer and replace the silica gel or perform maintenance to remove moisture from it. Within 1 month On 28/02/2015: Corrected. Corrected at 1st follow-up inspection 31/12/2015 Corrected Corrected Note: Retrofitting work is going on. Inspected by ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10 th ) Md. Assaduzzaman Electrical Safety Inspection dates MAGPIE KNIT WEAR LTD Yarpur, Plot # 141, Zirabo, Savar Other Factory: Page 1 of 20

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th … KNIT WEAR … · Within 1 month On 28/02/2015: Corrected. Corrected at 1st follow-up inspection 31/12/2015 Corrected Corrected

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th … KNIT WEAR … · Within 1 month On 28/02/2015: Corrected. Corrected at 1st follow-up inspection 31/12/2015 Corrected Corrected

Factory Name

Address

Factory ID 9502

Initial Inspection Date 06/04/2014 Date of 5th

Follow Up 22/09/2016 Date of 11th

Follow Up

Report Received Date 18/07/2014 Date of 6th

Follow Up 30/11/2016 Date of 12th

Follow Up

Date of 1st Follow Up 28/02/2015 Date of 7

th Follow Up 12/02/2017 Date of 13

th Follow Up

Date of 2nd

Follow Up 06/01/2016 Date of 8th

Follow Up 18/05/2017 Date of 14th

Follow Up

Date of 3rd

Follow Up 29/03/2016 Date of 9th

Follow Up 18/09/2017 Date of 15th

Follow Up

Date of 4th

Follow Up 30/06/2016 Date of 10th

Follow Up 12/11/2017 Date of 16th

Follow Up

Item

No

Accord

Inspection

Observation

Accord Action Plan

(Recommendation )

Accord Time line

(given in report )

Comments from Accord

(After Physical Inspection )

Final Timeline

(Approved

timeline )

Final Action Plan (Factory)

Progress Status

(On the date of

inspection )

Pictorial Evidence

1

HT service cable

dropping from

pole is not

protected near

the base of the

pole, above

ground level

HT cable dropping from HT

pole must be protected in steel

pipe of required size at least 2m

from the ground level to

protect the cable from any

physical damage. The cable

should be supported on

covered tray or ladder

throughout its length up to the

HT panel base-plate (except the

part of the cable laid

underground at a depth of at

least 1 meter).

Within 1 month

On 06/01/2016:

Corrected.

The cable is protected near

base.

31/12/2015 Corrected Corrected

2

Silica gel in

transformer

breather,

discoloured.

Shut down the transformer

and replace the silica gel or

perform maintenance to

remove moisture from it.

Within 1 month

On 28/02/2015:

Corrected.

Corrected at 1st follow-up

inspection

31/12/2015 Corrected Corrected

Note: Retrofitting work is going on.

Inspected by

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th)

Md. Assaduzzaman

Electrical Safety Inspection dates

MAGPIE KNIT WEAR LTD

Yarpur, Plot # 141, Zirabo, Savar

Other Factory:

Page 1 of 20

Page 2: ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th … KNIT WEAR … · Within 1 month On 28/02/2015: Corrected. Corrected at 1st follow-up inspection 31/12/2015 Corrected Corrected

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th)

Item

No

Accord

Inspection

Observation

Accord Action Plan

(Recommendation )

Accord Time line

(given in report )

Comments from Accord

(After Physical Inspection )

Final Timeline

(Approved

timeline )

Final Action Plan (Factory)

Progress Status

(On the date of

inspection )

Pictorial Evidence

3

Cables are not

supported behind

the panel.

Cable must be supported

and arranged in cable tray

up to the panel base to

prevent any physical

damage to the noted cables

laid haphazardly on floor.

Within 1 month

On 28/02/2015:

Corrected.

Corrected at 1st follow-up

inspection

31/12/2015 Corrected Corrected

4

Excessive lint

and dust inside

the panel.

Provide the base plate of

the panel and clean it

regularly.

Within 1 month

On 28/02/2015:

Corrected.

Corrected at 1st follow-up

inspection

31/12/2015 Corrected Corrected

5Hot spot found

inside the panel.

Arrange periodic inspection

& thermal scan to identify

the overloading, loose

connection, unbalanced

load which may cause the

excessive heat-rise and take

action accordingly.

Within 1 monthOn 06/01/2016:

Corrected.31/12/2015 Corrected Corrected

Page 2 of 20MAGPIE KNIT WEAR LTD

Page 3: ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th … KNIT WEAR … · Within 1 month On 28/02/2015: Corrected. Corrected at 1st follow-up inspection 31/12/2015 Corrected Corrected

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th)

Item

No

Accord

Inspection

Observation

Accord Action Plan

(Recommendation )

Accord Time line

(given in report )

Comments from Accord

(After Physical Inspection )

Final Timeline

(Approved

timeline )

Final Action Plan (Factory)

Progress Status

(On the date of

inspection )

Pictorial Evidence

6

Multiple cables

are connected in

the MCCB.

Multiple cables connecting

at a MCCB terminal must

be removed. Individual

circuit breaker must be

used for each load

according to the respective

cable-size.

Within 1 monthOn 06/01/2016:

Corrected.31/12/2015 Corrected Corrected

7

Panel doors not

connected with

earth bond.

Provide earth connection

for body and doors of

metallic distribution boards

using green cables

preferably braid so that the

metallic door remains at

zero potential all the time.

Within 1 month

On 28/02/2015:

Corrected.

Corrected at 1st follow-up

inspection

31/12/2015 Corrected Corrected

8

Cables

terminating at

panel are not

firmly fixed.

Make circular hole at the base

plate of panels and provide

cable gland according to the

respective cable size for cable

entry and exit so that the cables

are not stressed on the sharp

edges of the hole of panels.

Provide covers (of non-

combustible material) if any

additional gap remains after

installing cable glands.

Within 1 monthOn 06/01/2016:

Corrected.31/12/2015 Corrected Corrected

Page 3 of 20MAGPIE KNIT WEAR LTD

Page 4: ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th … KNIT WEAR … · Within 1 month On 28/02/2015: Corrected. Corrected at 1st follow-up inspection 31/12/2015 Corrected Corrected

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th)

Item

No

Accord

Inspection

Observation

Accord Action Plan

(Recommendation )

Accord Time line

(given in report )

Comments from Accord

(After Physical Inspection )

Final Timeline

(Approved

timeline )

Final Action Plan (Factory)

Progress Status

(On the date of

inspection )

Pictorial Evidence

9Wires are joint by

tape.

Cable-joint must be done

providing proper connector

and PIB tape wound

around joint or the cable

may be replaced with new

one.

Within 1 month

On 28/02/2015:

Corrected.

Corrected at 1st follow-up

inspection

31/12/2015 Corrected Corrected

10Dust deposit on

transformer.

Establish a routine cleaning

program to keep neat and

clean the transformer

room. Shut the power of

the transformer and clean

the exterior of the

transformer at scheduled

period.

Within 1 month

On 28/02/2015:

Corrected.

Corrected at 1st follow-up

inspection

31/12/2015 Corrected Corrected

11Silica gel

discoloured.

Shut down the transformer and

replace the silica gel or perform

maintenance to remove

moisture from it. Consult with

transformer servicing company

before performing the task.

Establish a routine maintenance

& inspection program for

transformer as well as all other

electrical equipment to ensure

any future repetition of the

occurrence.

Within 1 monthOn 29/03/2016:

Corrected. 31/12/2015 Corrected Corrected

Page 4 of 20MAGPIE KNIT WEAR LTD

Page 5: ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th … KNIT WEAR … · Within 1 month On 28/02/2015: Corrected. Corrected at 1st follow-up inspection 31/12/2015 Corrected Corrected

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th)

Item

No

Accord

Inspection

Observation

Accord Action Plan

(Recommendation )

Accord Time line

(given in report )

Comments from Accord

(After Physical Inspection )

Final Timeline

(Approved

timeline )

Final Action Plan (Factory)

Progress Status

(On the date of

inspection )

Pictorial Evidence

12

Barrier/separator

s between

different phases

are not installed.

Install separators between

different phases of MCCB.

Standard separators

provided by the MCCB

manufacturer must be used.

Within 1 monthOn 29/03/2016:

Corrected. 31/12/2015 Corrected Corrected

13

Cables are not

supported

outside the

building wall.

Cables laid on outside-wall

of the building must be

supported in cable

trays/ladder with metallic

protective covers and

protected against harsh

weather and possible

physical damages.

Within 1 month

On 28/02/2015:

Corrected.

Corrected at 1st follow-up

inspection

31/12/2015 Corrected Corrected

14

Excessive wires

crowding inside

the panel.

Check the capacity of the

panel & establish a load

management program for

avoiding any installation

exceeding its capacity in

future. Install slotted wiring-

duct inside the panel to

arrange and latch the

haphazard cables. An

additional panel may be

installed.

Within 1 month

On 28/02/2015:

Corrected.

Corrected at 1st follow-up

inspection

31/12/2015 Corrected Corrected

Page 5 of 20MAGPIE KNIT WEAR LTD

Page 6: ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th … KNIT WEAR … · Within 1 month On 28/02/2015: Corrected. Corrected at 1st follow-up inspection 31/12/2015 Corrected Corrected

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th)

Item

No

Accord

Inspection

Observation

Accord Action Plan

(Recommendation )

Accord Time line

(given in report )

Comments from Accord

(After Physical Inspection )

Final Timeline

(Approved

timeline )

Final Action Plan (Factory)

Progress Status

(On the date of

inspection )

Pictorial Evidence

15

Cable duct is not

adequate for

existing cables.

Keep 30% free inside cable

tray/channels/ducts for

proper heat dissipation.

The cable tray should be

covered. Install another

duct to accommodate all

the cables

Within 1 month

On 28/02/2015:

Corrected.

Corrected at 1st follow-up

inspection

31/12/2015 Corrected Corrected

16

Excessive lint

and dust inside

the cable duct.

Disconnect the power source

of the cable laid into channel

and clean dust and debris of all

interior components. Establish

a periodic cleaning program

and maintain records of the

activities. Provide cover made

of non-combustible material on

the channel for preventing

ingress of dust and debris in

future.

Within 1 month

On 28/02/2015:

Corrected.

Corrected at 1st follow-up

inspection.

31/12/2015 Corrected Corrected

17

New Findings:

Electrical single

Line Diagram

(SLD) has

inadequate

information

Prepare SLD more

informative thus anyone

can understand it. SLD has

to be drawn by single line

also.

3 Months

On 06/01/2016:

Corrected.

On 30/06/2016:

Corrected at 3rd follow-up but

due to some electrical

renovation work SLD is not

matched at some areas. This

issue is open again.

On 22/09/2016:

Not Corrected..

On 30/11/2016:

Not Corrected.

On 12/02/2017:

Not corrected.

On 18/05/2017:

Not Corrected. SLD is not as-

built at some location. Need

proper marking and panel

identification.

On 18/09/2017:

Corrected

31/12/2015 Corrected Corrected

Page 6 of 20MAGPIE KNIT WEAR LTD

Page 7: ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th … KNIT WEAR … · Within 1 month On 28/02/2015: Corrected. Corrected at 1st follow-up inspection 31/12/2015 Corrected Corrected

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th)

Item

No

Accord

Inspection

Observation

Accord Action Plan

(Recommendation )

Accord Time line

(given in report )

Comments from Accord

(After Physical Inspection )

Final Timeline

(Approved

timeline )

Final Action Plan (Factory)

Progress Status

(On the date of

inspection )

Pictorial Evidence

18

New Findings:

Earth pit

resistance record

is poorly

maintained/inco

mplete

Record earth pit resistance

for all the earth pit and not

as a part of other report

3 MonthsOn 06/01/2016:

Corrected.31/12/2015 Corrected Corrected

19

New Findings:

Lighting

protection system

(LPS) is

inadequate

LPS designed has

completed, factory need to

install LPS as per design.

3 Months

On 29/03/2016:

LPS designed has completed,

factory need to install LPS as

per design. Not corrected, time

extension is 07/05/2016.

On 30/06/2016:

LPS design is available but not

installed. Not corrected.

On 22/09/2016:

Not Corrected.

On 30/11/2016:

Not Corrected.

On 12/02/2017:

Not corrected.

On 18/05/2017:

Not Corrected.

On 18/09/2017:

Not Corrected.

On 12/11/2017:

Corrected

07/05/2016We are working on this

issue.Corrected

20

New Findings:

Thermography

scanning report is

unavailable

Keep a Thermography

scanning record of your

electrical system al least

twice a year

3 MonthsOn 06/01/2016:

Corrected.31/12/2015 Corrected Corrected

Page 7 of 20MAGPIE KNIT WEAR LTD

Page 8: ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th … KNIT WEAR … · Within 1 month On 28/02/2015: Corrected. Corrected at 1st follow-up inspection 31/12/2015 Corrected Corrected

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th)

Item

No

Accord

Inspection

Observation

Accord Action Plan

(Recommendation )

Accord Time line

(given in report )

Comments from Accord

(After Physical Inspection )

Final Timeline

(Approved

timeline )

Final Action Plan (Factory)

Progress Status

(On the date of

inspection )

Pictorial Evidence

21

New Findings:

Electric safety

training program

is not

initiated/conduct

ed.

Electrical safety training

and awareness program for

the electrical personal and

workers must be initiated

and recorded

1 MonthsOn 06/01/2016:

Corrected.31/12/2015 Corrected Corrected

22

New Findings:

There is no

programmed

scheduled for

periodical

inspection &

testing of

electrical

equipment.

Develop and electrical

maintenance program that

includes inspections and

testing of the electrical

system (preventive,

proactive and breakdown

maintenance

1 MonthsOn 06/01/2016:

Corrected.31/12/2015 Corrected Corrected

23

New Findings:

No separation

between LT

panels and HT in

its (Transformer,

HT switchgear)

`Make a brick built separation

between LT and HT units;

ensure that after making

separator you have adequate

ventilation and working

clearance around each electrical

equipment. Also transformer is

installed congested. Factory

may also consider rearranging

the substation room.

6 MonthOn 29/03/2016:

Corrected.18/01/2016 Corrected Corrected

Page 8 of 20MAGPIE KNIT WEAR LTD

Page 9: ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th … KNIT WEAR … · Within 1 month On 28/02/2015: Corrected. Corrected at 1st follow-up inspection 31/12/2015 Corrected Corrected

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th)

Item

No

Accord

Inspection

Observation

Accord Action Plan

(Recommendation )

Accord Time line

(given in report )

Comments from Accord

(After Physical Inspection )

Final Timeline

(Approved

timeline )

Final Action Plan (Factory)

Progress Status

(On the date of

inspection )

Pictorial Evidence

24

New Findings:

Transformer

arcing horns are

not aligned

Align all the arcing horns 1 MonthsOn 06/01/2016:

Corrected.31/12/2015 Corrected Corrected

25

New Findings:

Battery terminals

are left open

Use insulated rubber cap to

cover all the battery

terminals

1 monthsOn 06/01/2016:

Corrected.31/12/2015 Corrected Corrected

26

New Findings:

Inadequate

rubber

(insulation) mat

on the working

are of

distribution

board/panel

Put adequate electrical

insulation (rubber mat) on

the working area of each

electrical installation(

transformer/LT

panel/MDB/DB/SDB/

other manual operated

machineries

1 MonthsOn 29/03/2016:

Corrected.31/12/2015 Corrected Corrected

Page 9 of 20MAGPIE KNIT WEAR LTD

Page 10: ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th … KNIT WEAR … · Within 1 month On 28/02/2015: Corrected. Corrected at 1st follow-up inspection 31/12/2015 Corrected Corrected

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th)

Item

No

Accord

Inspection

Observation

Accord Action Plan

(Recommendation )

Accord Time line

(given in report )

Comments from Accord

(After Physical Inspection )

Final Timeline

(Approved

timeline )

Final Action Plan (Factory)

Progress Status

(On the date of

inspection )

Pictorial Evidence

27

New Findings:

Excess cables

coiled and kept at

the back of panel

Rearrange cables using

cable tray/ladder; or trim

the unnecessary cables and

use only the required

length (if it is HT cable, do

not trim it rather

rearranging it)

3 MonthsOn 06/01/2016:

Corrected.31/12/2015 Corrected Corrected

28

New Findings:

Power cable are

bent excessively

Avoid power cable system;

in unavoidable case bend

cables without any stress

but not less than 135

degree.

3 MonthsOn 06/01/2016:

Corrected.31/12/2015 Corrected Corrected

29

New Findings:

Generator body

has been earthed

by inadequate/

improper sized

(type) cable.

Ensure minimum two

earthing connection for

generator body (consult

with your generator

supplier)

1 MonthsOn 29/03/2016:

Corrected.31/12/2015 Corrected Corrected

Page 10 of 20MAGPIE KNIT WEAR LTD

Page 11: ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th … KNIT WEAR … · Within 1 month On 28/02/2015: Corrected. Corrected at 1st follow-up inspection 31/12/2015 Corrected Corrected

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th)

Item

No

Accord

Inspection

Observation

Accord Action Plan

(Recommendation )

Accord Time line

(given in report )

Comments from Accord

(After Physical Inspection )

Final Timeline

(Approved

timeline )

Final Action Plan (Factory)

Progress Status

(On the date of

inspection )

Pictorial Evidence

30

New Findings:

Wiring has done

using flexible

PVC cable

around vertical

boiler surface

Wires close/attached to

boiler must be protected

from external heat. In

unavoidable case use metal

type flexible pipe, Again

power cable should keep

0.9m apart from hot area.

1 MonthsOn 06/01/2016:

Corrected.31/12/2015 Corrected Corrected

31

New Findings:

MCCBs are not

adjusted

accordingly

Adjusted all the MCCBs

according to cable ampacity

(connected load). Avoid

using different sized cable

at the terminals.

1 Months

On 29/03/2016:

Not corrected. Time

extension is 07/05/2016.

On 30/06/2016:

Not corrected.

On 22/09/2016:

Corrected.

07/05/2016 Corrected Corrected

32

New Findings:

Distribution

Board's

top/bottom is

left open (typical

issue)

Seal each distribution

board's top/bottoms and

use cable glands

holding/supporting cables.

3 MonthsOn 06/01/2016:

Corrected.31/12/2015 Corrected Corrected

Page 11 of 20MAGPIE KNIT WEAR LTD

Page 12: ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th … KNIT WEAR … · Within 1 month On 28/02/2015: Corrected. Corrected at 1st follow-up inspection 31/12/2015 Corrected Corrected

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th)

Item

No

Accord

Inspection

Observation

Accord Action Plan

(Recommendation )

Accord Time line

(given in report )

Comments from Accord

(After Physical Inspection )

Final Timeline

(Approved

timeline )

Final Action Plan (Factory)

Progress Status

(On the date of

inspection )

Pictorial Evidence

33

New Findings:

Power cables

touch opposite

phase bus bar/s

Power bus bar must be

installed with adequate

clearance (not less than 2.5

inch) between two bars.

Cables must not touch

opposite bus bars.

1 MonthOn 22/09/2016:

Corrected.10/08/2016 Corrected Corrected

34

New Findings:

Heat sink tube

on the bus bar

are damaged,

May cause

electrical short

circuit.

Replace the heat sink tube

or provided any means of

insulation.

1 MonthOn 22/09/2016:

Corrected.10/08/2016 Corrected Corrected

35

New Finding:

Exposed and

heated steam line

is close to cable

channel.

Wires close/attached to

steam line/heat source

must be protected from

external heat. In

unavoidable case provide

proper insulation for the

heat source/steam line.

Normally power cable

should keep 0.9m apart

from hot area.

2 MonthsOn 22/09/2016:

Corrected.10/09/2016 Corrected Corrected

Page 12 of 20MAGPIE KNIT WEAR LTD

Page 13: ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th … KNIT WEAR … · Within 1 month On 28/02/2015: Corrected. Corrected at 1st follow-up inspection 31/12/2015 Corrected Corrected

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th)

Item

No

Accord

Inspection

Observation

Accord Action Plan

(Recommendation )

Accord Time line

(given in report )

Comments from Accord

(After Physical Inspection )

Final Timeline

(Approved

timeline )

Final Action Plan (Factory)

Progress Status

(On the date of

inspection )

Pictorial Evidence

36

New Finding:

Light in store

room / storage

areas is

uncovered.

Lights in store room /

storage areas shall be

covered

1 MonthOn 22/09/2016:

Corrected.10/08/2016 Corrected Corrected

37

New Finding:

Hot spots at

terminations

inside panel.

Find the cause of excessive

heat-rise which may be the

overloading, loose

connection, unbalanced load

and others and take action

immediately. Thermo

graphic scanning for the

entire electrical system must

be performed on a bi-annual

basis and recorded.

1 Month

On 22/09/2016:

Not Corrected.

On 30/11/2016:

Corrected.

10/08/2016 Corrected Corrected

38

New Finding:

Transformer

Body & neutral

earthing cable are

inadequate

Use 10-12 mm dia bare

copper conductor for

reliability; or the earth cable

size must not be less than

half of the phase cable (LT

cables)

2 Months

On 22/09/2016:

Not Corrected.

On 30/11/2016:

Not Corrected. Number of

body earthing and size

needs to increase.

On 12/02/2017:

Corrected.

10/09/2016 Corrected Corrected

Page 13 of 20MAGPIE KNIT WEAR LTD

Page 14: ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th … KNIT WEAR … · Within 1 month On 28/02/2015: Corrected. Corrected at 1st follow-up inspection 31/12/2015 Corrected Corrected

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th)

Item

No

Accord

Inspection

Observation

Accord Action Plan

(Recommendation )

Accord Time line

(given in report )

Comments from Accord

(After Physical Inspection )

Final Timeline

(Approved

timeline )

Final Action Plan (Factory)

Progress Status

(On the date of

inspection )

Pictorial Evidence

39

New Finding:

Power cables

entering to or

exiting from

Distribution

board/panel are

not properly

fixed.

Power cables entering to or

exiting from distribution

board/panel must be fixed

through Panel base/top

plate using cable glands

(metal/PVC). You may use

cable tray/ladder to

support cables.

2 MonthsOn 22/09/2016:

Corrected.10/09/2016 Corrected Corrected

40

New Finding:

Generator

installed on

wooden plunk.

Remove the combustible

wooden plunk and prepare

a base for the generator.

2 MonthsOn 22/09/2016:

Corrected.10/09/2016 Corrected Corrected

41

New Finding:

Panel/distributio

n board is not

firmly fixed with

the foundation.

Panel base must be securely

fixed to the foundation.

With appropriate fastening

devices.

1 MonthOn 12/02/2017:

Corrected.10/01/2017 Corrected Corrected

Page 14 of 20MAGPIE KNIT WEAR LTD

Page 15: ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th … KNIT WEAR … · Within 1 month On 28/02/2015: Corrected. Corrected at 1st follow-up inspection 31/12/2015 Corrected Corrected

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th)

Item

No

Accord

Inspection

Observation

Accord Action Plan

(Recommendation )

Accord Time line

(given in report )

Comments from Accord

(After Physical Inspection )

Final Timeline

(Approved

timeline )

Final Action Plan (Factory)

Progress Status

(On the date of

inspection )

Pictorial Evidence

42

New Finding:

Substation

/Boiler room has

inadequate

ventilation

Adequate ventilation must

be maintained in sub-

station/ Boiler room.

Cross/forced ventilation

must be ensured. For

exhaust fan, the fan

diameter must not be less

than 18 inch.

2 Months

On 12/02/2017:

Not corrected.

On 18/05/2017:

Not Corrected. Exhaust

fan installed but still

inadequate ventilation.

On 18/09/2017:

Not Corrected.

On 12/11/2017:

Corrected

10/02/2017We are working on this

issue.Corrected

43

New Finding:

(i) Cable

duct/channels are

filled with fluffs

(Lint/dust).

(ii) Generator

output terminal

box's bottom plate

removed to allow

cable entry.

(i) Cable channels/ducts

must be kept neat and

clean; these must be sealed

properly thus no scope of

ingression of fluffs.

(ii) Seal bottom of the

terminal box and use cable

glands for

holding/supporting cables.

1 Month

On 12/02/2017:

Not corrected.

On 18/05/2017:

Not Corrected. Cable

channel is clean.

On 18/09/2017:

Not Corrected.

On 12/11/2017:

Corrected

10/01/2017We are working on this

issue.Corrected

44

New Finding:

Hazardous lights

in store room /

storage areas are

uncovered.

hazardous lights in store

room / storage areas shall

be covered by proper type

material; or non-hazardous

lights shall be installed in

these areas.

1 MonthOn 12/02/2017:

Corrected.10/01/2017 Corrected Corrected

Page 15 of 20MAGPIE KNIT WEAR LTD

Page 16: ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th … KNIT WEAR … · Within 1 month On 28/02/2015: Corrected. Corrected at 1st follow-up inspection 31/12/2015 Corrected Corrected

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th)

Item

No

Accord

Inspection

Observation

Accord Action Plan

(Recommendation )

Accord Time line

(given in report )

Comments from Accord

(After Physical Inspection )

Final Timeline

(Approved

timeline )

Final Action Plan (Factory)

Progress Status

(On the date of

inspection )

Pictorial Evidence

45

New Finding:

(i) Heat source (or

exposed steam line)

is adjacent to

electrical

installations (cable

channel/duct).

(ii) No cover or

insulation is used

for power and signal

cable attached to

boiler.

(i) Heat source (or steam line)

must be kept at least 0.9 meter

apart from any electrical

installation. In unavoidable

case, heat source shall be

covered by proper and

adequate insulator.

(ii) Power and signal cable for

boilers shall be distributed

using proper type insulator to

avoid damage of cables.

1 MonthOn 12/02/2017:

Corrected.10/01/2017 Corrected Corrected

46

New Finding:

(i) Control panel

left open, and

control device are

not mount with

within the

panel/base

properly.

(ii) Lead acid battery

terminals are left

open

(i) Control device shall be

fixed with properly within

panel/base, and enclosure

shall be closed to avoid

ingression of any foreign

particles.

(ii) Lead acid battery

terminals must be

covered/capped and rust

must be checked and

cleaned.

1 MonthOn 12/02/2017:

Corrected.10/01/2017 Corrected Corrected

47

New Finding:

(i) Loop connection

has been used

powering multiple

circuits through

MCB/MCCBs.

(ii)Multiple cables

(came from

different electrical

consumers)

terminated at

MCCB terminals/

Busbar.

(i) Any kind of looped

power connection must be

avoided from electrical

installation.

(ii) Each electrical circuit

must be terminated at

single MCB/MCCB

terminals.

1 MonthOn 12/02/2017:

Corrected.10/01/2017 Corrected Corrected

Page 16 of 20MAGPIE KNIT WEAR LTD

Page 17: ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th … KNIT WEAR … · Within 1 month On 28/02/2015: Corrected. Corrected at 1st follow-up inspection 31/12/2015 Corrected Corrected

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th)

Item

No

Accord

Inspection

Observation

Accord Action Plan

(Recommendation )

Accord Time line

(given in report )

Comments from Accord

(After Physical Inspection )

Final Timeline

(Approved

timeline )

Final Action Plan (Factory)

Progress Status

(On the date of

inspection )

Pictorial Evidence

48

New Finding:

Cables are not

protected and

supported.

Power cables entering to cable

trench must be protected.

Covered cable trench must be

equal to working floor height. If

not, extended area must be

sloped at both sides to avoid

obstacle.

(ii) Power cables must be

supported by cable tray (ladder-

where needed). Outdoor

arrangement must be covered

1 Month

On 12/02/2017:

Not corrected.

On 18/05/2017:

Not Corrected

On 18/09/2017:

Corrected.

10/01/2017 Corrected Corrected

49

New Finding:

Insulation

resistance test of

all electrical

power cables is

not performed

Insulation resistance test of

all the cables (but not less

than 25 sq.mm) must be

performed once every 2

years cycle and recorded

(this must require a

complete power shut off)

1 MonthOn 12/02/2017:

Corrected.10/01/2017 Corrected Corrected

50

New Finding:

(i) Electrical Panel

boards do not have

any/permanent

marking.

(ii) List of circuit or

SLD of existing

circuits are not

available in each

electrical panel

board.

(iii) Circuits do not

have identification.

(i) Panel board shall have

permanent identification as

per SLD.

(ii) List of circuit or SLD of

existing circuits shall be

available for each electrical

panel board.

(iii) Provide circuit

identification as per circuit

directory.

1 Month

On 12/02/2017:

Not corrected.

On 18/05/2017:

Not Corrected

On 18/09/2017:

Corrected.

10/01/2017 Corrected Corrected

Page 17 of 20MAGPIE KNIT WEAR LTD

Page 18: ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th … KNIT WEAR … · Within 1 month On 28/02/2015: Corrected. Corrected at 1st follow-up inspection 31/12/2015 Corrected Corrected

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th)

Item

No

Accord

Inspection

Observation

Accord Action Plan

(Recommendation )

Accord Time line

(given in report )

Comments from Accord

(After Physical Inspection )

Final Timeline

(Approved

timeline )

Final Action Plan (Factory)

Progress Status

(On the date of

inspection )

Pictorial Evidence

51

New Finding:

Lighting circuits

and sockets are

not separated in

the electrical

system

Lighting circuits and

sockets shall be installed

separately (should have no

interconnections)

1 Month

On 12/02/2017:

Corrected. No such issue

has found.

10/01/2017 Corrected Corrected

52

New Finding:

(i) Cables in service

are joined (splicing)

between

terminations.

(ii) Unterminated

wire is kept inside

the electrical

panel/cable tray.

(i)Splicing in the power

cables shall be avoided; in

unavoidable cases splicing

must be made following

proper guidance.

(ii) All unterminated wires

shall be removed

1 Month

On 12/02/2017:

Not corrected.

On 18/05/2017:

Not Corrected

On 18/09/2017:

Corrected.

10/01/2017 Corrected Corrected

53

New Finding:

Panel doors are

not connected

with earth.

All metal installation which

are part electrical system

must be connected with

earth to avoid electrical

shock or electrocution.

1 MonthOn 12/02/2017:

Corrected.10/01/2017 Corrected Corrected

Page 18 of 20MAGPIE KNIT WEAR LTD

Page 19: ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th … KNIT WEAR … · Within 1 month On 28/02/2015: Corrected. Corrected at 1st follow-up inspection 31/12/2015 Corrected Corrected

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th)

Item

No

Accord

Inspection

Observation

Accord Action Plan

(Recommendation )

Accord Time line

(given in report )

Comments from Accord

(After Physical Inspection )

Final Timeline

(Approved

timeline )

Final Action Plan (Factory)

Progress Status

(On the date of

inspection )

Pictorial Evidence

54

New Finding:

(i) Electric safety

training program

does not have any

influence on site.

(ii) Electrical

personnel do not

use Personal

Protective

Equipment (PPE) at

the time of

maintenance and

operation electrical

apparatus/system.

(iii) Uninsulated

electrical tools are

used by

maintenance

personnel in the

factory

(i) Electrical safety training

is a periodic task which

factory has to continue to

improve overall electrical

safety situation for the

staffs.

(ii) Personal Protective

Equipment (PPE) shall be

used at the time of

electrical work for the

safety of electrical

personnel.

(iii) For maintenance

purposes all the electrical

tools shall be properly

insulated and these

insulations shall be checked

periodically.

1 MonthOn 12/02/2017:

Corrected.10/01/2017 Corrected Corrected

55

New Finding:

Indicator light/

Voltmeter/Amm

eter are found

not operational

All meter shall be

operational.1 Month

On 12/02/2017:

Not corrected.

On 18/05/2017:

Not Corrected.

On 18/09/2017:

Not Corrected.

10/01/2017 Corrected Corrected

56

New Finding:

Hot Spots were

observed at

several points.

Hot spots must be

eliminated from entire

electrical system and shall

be always carried forward.

1 Month

On 18/09/2017:

Not Corrected.

New committed time line

is given till 30/10/2017 to

close this issue.

On 12/11/2017:

Not corrected

30/10/2017We are working on this

issue.In Progress

Page 19 of 20MAGPIE KNIT WEAR LTD

Page 20: ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th … KNIT WEAR … · Within 1 month On 28/02/2015: Corrected. Corrected at 1st follow-up inspection 31/12/2015 Corrected Corrected

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (10th)

Item

No

Accord

Inspection

Observation

Accord Action Plan

(Recommendation )

Accord Time line

(given in report )

Comments from Accord

(After Physical Inspection )

Final Timeline

(Approved

timeline )

Final Action Plan (Factory)

Progress Status

(On the date of

inspection )

Pictorial Evidence

57

New Finding:

1.Multiple cables

(came from

different electrical

consumers)

terminated at

MCCB terminals.

2.Loop connection

has been used

powering multiple

circuits through

MCB/MCCBs.

1.Each electrical circuit must be

terminated at single

MCB/MCCB terminals.

2.No loop connection shall be

used; each single cable shall be

terminated using cable lug

(flat/I) at each terminal.

Combo bus bar may be used

(but incoming cable size must

meet the rated capacity)

1 MonthOn 18/09/2017:

Corrected. 05/07/2017 Corrected Corrected

58

New finding:

Hazardous lights

in store room /

storage areas are

uncovered.

Hazardous lights in store

room / storage areas shall

be covered by proper type

material; or non-hazardous

lights shall be installed in

these areas.

1 MonthOn 18/09/2017:

Corrected. 05/07/2017 Corrected Corrected

59

New Finding:

MCCBs are not

adjusted per load

demand.

All the MCCBs must be

adjusted per cable current

ampacity/load current; if

adjustment is not possible,

replacement will be the

only way.

1 MonthOn 18/09/2017:

Corrected. 05/07/2017 Corrected Corrected

Page 20 of 20MAGPIE KNIT WEAR LTD