Electrical Integration. CM38 Steve Griffiths & Ian Mullacrane. Contents. Decay Solenoid Power Supply replacement QD System Upgrade Rack Room 2 Infrastructure AC Electrical Distribution UPS System Cooling Channel Control racks Cooling Channel Power Supply racks FC and SS QD Systems - PowerPoint PPT Presentation

Citation preview

Page 1: Electrical Integration

Electrical Integration

CM38Steve Griffiths & Ian Mullacrane

Page 2: Electrical Integration

S A Griffiths & I D Mullacrane CM38 Feb 2014

Contents

• Decay Solenoid• Power Supply replacement• QD System Upgrade

• Rack Room 2• Infrastructure• AC Electrical Distribution• UPS System• Cooling Channel Control racks• Cooling Channel Power Supply racks• FC and SS QD Systems

• Compressor and Vacuum rack• Diffuser and Tracker Control rack

2

Page 3: Electrical Integration

S A Griffiths & I D Mullacrane CM38 Feb 2014

Decay Solenoid Power Supply & QD System Upgrade

3Existing PSI Power Supply & QD System

in MICE Hall

• Existing Power Supply is electrically noisy and unreliable. Causing QD system to trip at currents below 150A.

• New Power Supply from FuG was procured and delivered in Sept 2013.

• Failure of a Solenoid - current lead has delayed the installation.

• Power Supply installation and commissioning is planned for April 2014.

• A new DL QD system has been installed and final commissioning is planned for March 2014.

• The DL QD system has been operated with existing Power Supply up to 150A.

• A Quench Data Logger system will be constructed to monitor the Solenoid during initial operations.

Page 4: Electrical Integration

S A Griffiths & I D Mullacrane CM38 Feb 2014

Decay Solenoid Power Supply Replacement

4

FuG - Superconducting Magnet Power Supply - 10V, 1000A

FuG - Superconducting Magnet Power Supply - 8V, 1000A

Discharge Resistors

Rectifier & SmoothingCapacitors

Transistor Bank forOutput Regulation

Main DC contactor

Page 5: Electrical Integration

S A Griffiths & I D Mullacrane CM38 Feb 2014

Quench Detection System Upgrade

5

• Existing system contains obsolete components.

• Combines the reliable PSI philosophy with a modern modular design.

• Tripping points are set at 20mV for most of the voltage taps except for channel 4 which is set at 40mV.

• The Voltage taps from the magnet are arranged in sets of three with overlap along the length of the solenoid.

• Not all of the voltage taps are used.

DL Quench Detection System

Page 6: Electrical Integration

S A Griffiths & I D Mullacrane CM38 Feb 2014

Rack Room 2 – Step IV Equipment Layout

6

• Room infrastructure progressing well, handover planned for cable management installation in March 2014.

Proposed extended MCR?

• Allocation and position of racks and equipment for Step IV agreed and finalised.• QD & QP system for SS – layout / position to be confirmed.

Page 7: Electrical Integration

S A Griffiths & I D Mullacrane CM38 Feb 2014

Rack Room 2 – Infrastructure

7

New Door Access

Cable Managementfrom Hall

Cable Managementunder stairs

Cable Access into RR2

Page 8: Electrical Integration

S A Griffiths & I D Mullacrane CM38 Feb 2014

Rack Room 2 – AC Electrical Distribution

8

Main AC Supply for Critical Loads via UPS

Main AC Supply forGeneral Distribution

Lighting replaced and main AC feeder installed

208V Transformer

Page 9: Electrical Integration

S A Griffiths & I D Mullacrane CM38 Feb 2014

AC Distribution for RR2 up to Step VI

9

AC Distribution separated into Critical systems and General distribution

All Critical systems are fed via the 30KVA UPS with 1 hour autonomy.

General distribution includes DC magnet power supplies, A/C conditioning and lighting.

Critical systems includes instrumentation, controls system and cooling water for SS energy absorbers

208V Transformer

Main Hall Board

Page 10: Electrical Integration

S A Griffiths & I D Mullacrane CM38 Feb 2014

Rack Room 2 – UPS Inverter and Batteries

10

UPS for Critical Loads

Riello UPS – Sentry unit3 Phase - Double Conversion Technology

As the total load will be significantly lower than 30KVA the autonomy will be >1hour

Page 11: Electrical Integration

S A Griffiths & I D Mullacrane CM38 Feb 2014

Rack Room 2 – Cooling Channel Racks Step IV

11

FC & SS Power Supplies,

Instrumentation and Control

RacksRacks allocated up to Step VI

Page 12: Electrical Integration

S A Griffiths & I D Mullacrane CM38 Feb 2014

Cooling Channel Rack Configuration

12

• All 7 Cooling Channel Control & PSU racks to be located in RR2 are designed and assembled as far as possible.

• RR2 installation is scheduled for May 2014.

Cooling Channel Control Rack

Spectrometer #1&2 Control & Instrumentation

Rack

FC Control & Instrumentation

Rack

FC Power Supply Rack

Spectrometer #1 Power Supply

Rack

Spectrometer #2 Power Supply

Rack

Spectrometer #1&2 Discharge

Circuit Rack

Blister Front Back

Page 13: Electrical Integration

Focus Coil & Spectrometer Solenoid Control Racks

13

Cooling Channel Control Racks - Step IV

• These 3 racks have been designed, assembled and partially commissioned.• Awaiting procurement / delivery of instrumentation to fully populate.

Racks allocated for Step V & VI

Spare

Page 14: Electrical Integration

Focus Coil & Spectrometer Solenoid Control Racks

14

Racks viewed from rear

Cooling Channel Control – VME crates, CANBUS modules, ADC, DAC and serial interfaces.

FC & SS Control - He level gauges, temperature indicators / controllers, pressure indicators and interfacing.

Page 15: Electrical Integration

Focus Coil & Spectrometer Solenoid PSU Racks

15

Cooling Channel PSU Racks - Step IV Racks allocated for Step V & VI

• These 4 racks are all designed.• Assembly is completed apart from SS#2 PSU rack.

Page 16: Electrical Integration

Focus Coil & Spectrometer Solenoid PSU Racks

16

• Assembly and commissioning can only be completed after procurement / delivery of instrumentation (SS#2 PSU rack requires DC contactors).

• Racks are partially commissioned.

FC PSU Rack-Front FC PSU Rack-Rear SS PSU Rack-Rear SS PSU Rack-Front

Page 17: Electrical Integration

Spectrometer Solenoid Energy Absorber Rack

17

• Upstream SS energy absorber have been upgraded and thermally tested.• Cooling water circuits have been modified and flow indication added.• Downstream SS energy absorbers will be delivered once Solenoid training

complete. (May 2014)

Energy Absorber Rack-Rear with and without DC Cables

Items Required

Page 18: Electrical Integration

S A Griffiths & I D Mullacrane CM38 Feb 2014

Instrumentation required for FC & SS Racks

18

• Racks will be populated once testing of the Spectrometer Solenoids is complete. Availability of FC instrumentation depends on training schedule.

• There are still power supplies and instrumentation to be procured for Step IV for both FC and SS.

• A list is being compiled of the remaining items for the SS, funding needs to be agreed for these and DC magnet / controls cables.

Control & Instrumentation racks operational at WANG and RAL R9

Page 19: Electrical Integration

S A Griffiths & I D Mullacrane CM38 Feb 2014

Rack Room 2 – QD & QP Systems

19

3 Racks allocated for the QD & QP systems for FC,

SS & RFCC

SS QD & QP System

FC QD & QP System

All Step IV systems fully installed and commissionedby Nov 2014

Page 20: Electrical Integration

S A Griffiths & I D Mullacrane CM38 Feb 2014

Quench Detection & Protection Racks

20

SS QD / QPSystem rack

FC QD / QPSystem rack

RFCC QD / QPSystem rack

• The location of the FC QD systems is agreed. (for all 3 focus coils)

• Tests are being conducted to ensure reliable operation with 36m voltage tap cable lengths.

• Two FC QD systems are assembled and tested.

• One system is currently being used for training the FCs.

• The location for SS QD systems is being discussed.

• A second SS QD system is to be assembled, tested and installed before Nov 2014.

• Integration of the data logging for both systems needs to be finalised.

Page 21: Electrical Integration

Diffuser and Tracker Control Rack

21

• The rack design is being developed with the work package managers.• The rack will be assembled ready for population with equipment by

Summer 2014.

Cooling Chanel Control Racks for Step IV

Page 22: Electrical Integration

S A Griffiths & I D Mullacrane CM38 Feb 2014

Compressor & Vacuum Control Rack

22

• The control system requirements for the compressors are agreed and the rack physically assembled.

• The vacuum control and instrumentation have been reviewed and equipment ordered.

• Control philosophy needs to be finalised with Vacuum specialists

Page 23: Electrical Integration

S A Griffiths & I D Mullacrane CM38 Feb 2014

Summary

• Project Plan for Step IV Electrical & Controls is fully developed and linked to the master plan.

• Resource priorities are focused on the Step IV milestones and this may affect other work packages such as RF systems.

• Electrical & Control requirements for Step IV are progressing well.

• Installation & commissioning is dependent on key milestones such as installation of South PRY, FC and downstream SS.

• Peak resource loading will occur between July and November 2014 and will need to be carefully co-ordinated.

23