2019 Energy Storage Technologies and Applications Conference, Riverside, California
Electric Vehicles and Energy Storage:
Impacts on Distribution Grid Operations
Farrokh Albuyeh, Ph.D.
Senior Vice President, Smart Grid Projects
Open Access Technology International, Inc.
UC Riverside
April 11-12, 2019
2019 Energy Storage Technologies and Applications Conference, Riverside, California
Trade SecretThis document and attachments contain confidential and
proprietary information of Open Access Technology
International, Inc. This information is not to be used,
disseminated, distributed, or otherwise transferred without the
expressed written permission of Open Access Technology
International, Inc.
Proprietary NoticeAll OATI products and services listed are trademarks and service
marks of Open Access Technology International, Inc. All rights
reserved.
2019 Energy Storage Technologies and Applications Conference, Riverside, California
• Current Trends – Electric Vehicles (EVs) and Energy
Storage
• Impacts on Electric Power Industry Operations and
Bottom Line
• Smart Inverters
• Provision of Grid Services
• Case Studies
• Questions
Topics
2019 Energy Storage Technologies and Applications Conference, Riverside, California
• Focus on the Environment
• Federal Energy Regulatory Commission (FERC) Order 841
• De-carbonization of Power and Transportation Sectors
– Example: U.K. de-carbonization plan
• Objective: cut residential, industrial, transportation, and power
sector greenhouse gas emissions
• $210 million in Research and Development, $4.7 billion to upgrade
around 1 million homes, and $5.9 billion to support low carbon heat
technologies in homes and businesses between 2016 and 2021
• Higher taxes on diesel engines, 25% subsidy on the cost of new plug-in
vehicles, 12,000 charging points (2017)
Industry in Transition
2019 Energy Storage Technologies and Applications Conference, Riverside, California
– Example: Volvo will sell only Plug-in Hybrid Electric
Vehicles (PHEVs), introducing electric trucks
– Example: The California Public Utilities Commission (PUC)
approved $750 million for proposals from the state’s
investor-owned utilities to expand EV infrastructure and
rebate programs
Industry in Transition (Continued)
2019 Energy Storage Technologies and Applications Conference, Riverside, California
• Lithium-Ion Batteries
– Increasing demand
– Lowering of prices - $70/kWh by 2030
• EVs
– Government incentive programs
– Tightening fuel economy standards
– Commitments from auto makers: Volkswagen, Volvo,
Daimler, and Nissan
– Growing commitment to invest in charging infrastructure
Sourc
es:
Blo
om
berg
New
Energ
y F
inance
Nic
hola
s S
chool of
Busin
ess o
f th
e E
nvironm
ent/D
uke U
niv
ers
ity
Battery Storage Systems and EVs
2019 Energy Storage Technologies and Applications Conference, Riverside, California
EVs - O&M/TCO
90km/day – 110kWh
E-bus range
200km/day – 250kWh
E-bus range
300km/day – 350kWh
e-bus range
Small city
Annual mileage
Medium city
Annual mileage
Large city
Annual mileage
Note: Diesel price at $2.5/gallon, electricity price at $0.10/kWh
Source: Bloomberg NEF
Source: eMotorWerks
2019 Energy Storage Technologies and Applications Conference, Riverside, California
• Reverse Power Flows
• Voltage Fluctuations
• Phase Imbalances
• Frequency Fluctuations
Impact on Distribution System
21 MVASubstation
-Three Phase Commercial Lateral 2 MVA
50 kVA12.47kV/220V
Three Phase Resident ial Lateral 2MVA
Single- Phase Res idential Lateral
-
Microgird
Fleet
Community Solar
©2019 OATI, Inc.
2019 Energy Storage Technologies and Applications Conference, Riverside, California
Impact on the Utility Business
©2019 OATI, Inc.
Source: Bloomberg New Energy Finance
2019 Energy Storage Technologies and Applications Conference, Riverside, California
• Develop EV Rate Options
• Enhance Charging Infrastructure
• Manage Charging Stations
• Enable Delivery of Grid Services
Utility’s Role
2019 Energy Storage Technologies and Applications Conference, Riverside, California
• CA Rule 21, IEEE 1547.a, IEEE 2003.5,
IEC 61850, UL 1741, UL 1998, and SEP 2
and DNP 3.0
• New Regulations and Requirements for
Smart Inverters
– Real and reactive power control
– Operating regions with differing behaviors
– Low/high voltage and frequency ride
through
Delivering Services - Smart Inverters
P (Active Power Production)
Q (Reactive Power Consumption)
III
III IV
P Active Power injected
Q R
eact
ive
Pow
er In
ject
ed
Unused capacityAt unity Power Factor
Q (Reactive Power Production)
P (Active Power Consumption)
2019 Energy Storage Technologies and Applications Conference, Riverside, California
• Measure Local/Terminal Variables (Voltage, Frequency,
Active Power, and Reactive Power)
• Local Control Decisions based on Pre-set Thresholds and
Parameters
• Addresses Local Issues
• Fast Response (Cycles-Sub Second)
• No Requirements for Sophisticated Communications and
Remote Control
Modes of Operations – Autonomous
2019 Energy Storage Technologies and Applications Conference, Riverside, California
• Measures and Communicates Local/Terminal Variables
(Voltage, Frequency, Active Power, Reactive Power)
• Control Instructions from the Distributed Energy
Resource Management System (DERMS)
• Addresses System-wide Issues in Concert with Other
Resources
• Response in Near Real-Time (RT) (seconds/minutes)
• Requires Communications and Control Infrastructure
Modes of Operations – Remote Control/
On Demand
2019 Energy Storage Technologies and Applications Conference, Riverside, California
• Vehicle to Building (V2B)/Vehicle to Home (V2H)
– Improved economics
– Improved resiliency
• Vehicle to Grid (V2G)
– Improved resiliency
– Provision of grid services (capacity, energy, frequency
response, regulation, reserves, and voltage support)
– Non-wires alternatives, deferment of capital
expenditures
Delivering Services
2019 Energy Storage Technologies and Applications Conference, Riverside, California
Focus on Grid Services
Spinning Reserves
Non-Spinning Reserves
Supplemental Reserves
0 4 Sec 10 Sec 1 min 5 Min 10 Min 30 Min
Dispatch during normal conditions Dispatch during Contingency conditions
Source: NERC, DOE
Load/Generation
FollowingRegulating
Services
Frequency
Response
©2018 OATI, Inc.
Autonomous
Controls Operator DispatchAutomated Controls
©2019 OATI, Inc.
2019 Energy Storage Technologies and Applications Conference, Riverside, California
Case Study - HECO
Control Center
OATI DERMS
Control
4 Seconds
TelemetryModeling
Aggregation
Forecasting
Registration
Disaggregation
Controls
Monitoring
4 Seconds AGC
Available Capacity
Minneapolis
Maui Oahu©2019 OATI, Inc.
2019 Energy Storage Technologies and Applications Conference, Riverside, California
Case Study - HECO (Continued)
-100
-80
-60
-40
-20
0
20
40
60
80
100
05
:00
:19
.65
:01
:16
5:0
2:1
25
:03
:08
5:0
4:0
45
:05
:00
5:0
5:5
65
:06
:52
5:0
7:4
85
:08
:44
5:0
9:4
05
:10
:36
5:1
1:3
25
:12
:28
5:1
3:2
45
:14
:20
5:1
5:1
65
:16
:12
5:1
7:0
85
:18
:04
5:1
9:0
05
:19
:56
5:2
0:5
25
:21
:48
5:2
2:4
45
:23
:40
5:2
4:3
65
:25
:32
5:2
6:2
85
:27
:24
5:2
8:2
05
:29
:16
5:3
0:1
25
:31
:08
5:3
2:0
45
:33
:00
5:3
3:5
65
:34
:52
5:3
5:4
85
:36
:44
5:3
7:4
05
:38
:36
5:3
9:3
25
:40
:28
5:4
1:2
45
:42
:20
5:4
3:1
65
:44
:12
5:4
5:0
85
:46
:04
5:4
7:0
05
:47
:56
5:4
8:5
25
:49
:48
5:5
0:4
45
:51
:40
5:5
2:3
65
:53
:32
5:5
4:2
85
:55
:24
5:5
6:2
05
:57
:16
5:5
8:1
25
:59
:08
6:0
0:0
46
:01
:00
6:0
1:5
66
:02
:52
6:0
3:4
86
:04
:44
6:0
5:4
06
:06
:36
6:0
7:3
26
:08
:28
6:0
9:2
46
:10
:20
6:1
1:1
66
:12
:12
6:1
3:0
86
:14
:04
6:1
5:0
06
:15
:56
6:1
6:5
26
:17
:48
6:1
8:4
46
:19
:40
6:2
0:3
66
:21
:32
6:2
2:2
86
:23
:24
6:2
4:2
06
:25
:16
6:2
6:1
26
:27
:08
6:2
8:0
46
:29
:00
6:2
9:5
66
:30
:52
6:3
1:4
86
:32
:44
6:3
3:4
06
:34
:36
6:3
5:3
26
:36
:28
6:3
7:2
46
:38
:20
6:3
9:1
66
:40
:12
6:4
1:0
86
:42
:04
6:4
3:0
06
:43
:56
6:4
4:5
26
:45
:48
6:4
6:4
46
:47
:40
6:4
8:3
66
:49
:32
6:5
0:2
86
:51
:24
6:5
2:2
06
:53
:16
6:5
4:1
26
:55
:08
6:5
6:0
46
:57
:00
6:5
7:5
6kW
Aggregated Response of a fleet of EV Chargers to AGC Signal
AGC Signal VPP Response
-100
-80
-60
-40
-20
0
20
40
60
80
100
20
:00
:07
20
:01
:03
20
:01
:59
20
:02
:55
20
:03
:51
20
:04
:47
20
:05
:43
20
:06
:39
20
:07
:35
20
:08
:31
20
:09
:27
20
:10
:23
20
:11
:19
20
:12
:15
20
:13
:11
20
:14
:07
20
:15
:03
20
:15
:59
20
:16
:55
20
:17
:51
20
:18
:47
20
:19
:43
20
:20
:39
20
:21
:35
20
:22
:31
20
:23
:27
20
:24
:23
20
:25
:19
20
:26
:15
20
:27
:11
20
:28
:07
20
:29
:03
20
:29
:59
20
:30
:55
20
:31
:51
20
:32
:47
20
:33
:43
20
:34
:39
20
:35
:35
20
:36
:31
20
:37
:27
20
:38
:23
20
:39
:19
20
:40
:15
20
:41
:11
20
:42
:07
20
:43
:03
20
:43
:59
20
:44
:55
20
:45
:51
20
:46
:47
20
:47
:43
20
:48
:39
20
:49
:35
20
:50
:31
20
:51
:27
20
:52
:23
20
:53
:19
20
:54
:15
20
:55
:11
20
:56
:07
20
:57
:03
20
:57
:59
20
:58
:55
20
:59
:51
21
:00
:47
21
:01
:43
21
:02
:39
21
:03
:35
21
:04
:31
21
:05
:27
21
:06
:23
21
:07
:19
21
:08
:15
21
:09
:11
21
:10
:07
21
:11
:03
21
:11
:59
21
:12
:55
21
:13
:51
21
:14
:47
21
:15
:43
21
:16
:39
21
:17
:35
21
:18
:31
21
:19
:27
21
:20
:23
21
:21
:19
21
:22
:15
21
:23
:11
21
:24
:07
21
:25
:03
21
:25
:59
21
:26
:55
21
:27
:51
21
:28
:47
21
:29
:43
21
:30
:39
21
:31
:35
21
:32
:31
21
:33
:27
21
:34
:23
21
:35
:19
21
:36
:15
21
:37
:11
21
:38
:07
21
:39
:03
21
:39
:59
21
:40
:55
21
:41
:51
21
:42
:47
21
:43
:43
21
:44
:39
21
:45
:35
21
:46
:31
21
:47
:27
21
:48
:23
21
:49
:19
21
:50
:15
21
:51
:11
21
:52
:07
21
:53
:03
21
:53
:59
21
:54
:55
21
:55
:51
21
:56
:47
21
:57
:43kW
Aggregated Response of a fleet of EV Chargers to AGC Signal
AGC Signal VPP Response
2 Hours Test Results – 15 EVs
2 Hours Test Results – 23 EVs
©2019 OATI, Inc.
2019 Energy Storage Technologies and Applications Conference, Riverside, California
Case Study - HECO (Continued)
15-Jun 20-Jun 22-Jun 27-Jun 29-Jun Average
Number of EVs 15 16 15 23 18 17.4
Accuracy 96.6 96.0 93.4 97.0 93.5 95.3
Delay 100.0 100.0 100.0 100.0 100.0 100.0
Precision 96.6 93.9 91.6 90.0 94.6 93.3
Composite 97.7 96.6 95.0 95.7 96.0 96.2
©2019 OATI, Inc.
2019 Energy Storage Technologies and Applications Conference, Riverside, California
Case Study - METI
©2019 OATI, Inc.
2019 Energy Storage Technologies and Applications Conference, Riverside, California
Case Study - METI (Continued)
-100
-80
-60
-40
-20
0
20
40
60
80
100
2:30
:08
PM
2:32
:06
PM
2:34
:04
PM
2:36
:02
PM
2:38
:00
PM
2:39
:57
PM
2:41
:56
PM
2:43
:54
PM
2:45
:53
PM
2:47
:51
PM
2:49
:48
PM
2:51
:47
PM
2:53
:44
PM
2:55
:42
PM
2:57
:39
PM
2:59
:36
PM
3:01
:37
PM
3:03
:34
PM
3:05
:32
PM
3:07
:29
PM
3:09
:27
PM
3:11
:24
PM
3:13
:23
PM
3:15
:20
PM
3:17
:18
PM
3:19
:15
PM
3:21
:13
PM
3:23
:11
PM
3:25
:11
PM
3:27
:08
PM
3:29
:05
PM
3:31
:03
PM
3:32
:59
PM
3:34
:57
PM
3:36
:55
PM
3:38
:53
PM
3:40
:52
PM
3:42
:49
PM
3:44
:46
PM
3:46
:44
PM
3:48
:42
PM
3:50
:40
PM
3:52
:38
PM
3:54
:37
PM
3:56
:34
PM
3:58
:32
PM
4:00
:32
PM
4:02
:30
PM
4:04
:29
PM
4:06
:26
PM
4:08
:24
PM
4:10
:21
PM
4:12
:18
PM
4:14
:15
PM
4:16
:13
PM
4:18
:11
PM
4:20
:09
PM
4:22
:06
PM
4:24
:03
PM
4:26
:00
PM
4:27
:58
PM
4:29
:56
PM
4:31
:53
PM
4:33
:51
PM
4:35
:50
PMkW
Frequency Regulation Test - December 25th, Event 2
Control Signal VPP Response ©2019 OATI, Inc.
2019 Energy Storage Technologies and Applications Conference, Riverside, California
Impacts on Battery Life
Source: EPRI
2019 Energy Storage Technologies and Applications Conference, Riverside, California
Questions
2019 Energy Storage Technologies and Applications Conference, Riverside, California
Thank You!Farrokh Albuyeh, Ph.D.
763.201.2000