Topics for Today• What is “The Grid?”• Things that affect reliability• Renewables and reliability• The Need for dispatchable Local Generation

Page 3: Electric System Reliability in a Post SONGS World

3

Preliminary Points• Generation output must match demand• We operate at 60 Cycles PS. If demand causes a

drop to 59.6, we drop load. • Impacts to any part of the system will affect our

ability to deliver power• Some impacts can be anticipated, others can be

hard to predict• Time for recovery following an event depends on

the nature of the impact• Time of year/weather will play a part on what we

do for recovery since demand varies

Page 4: Electric System Reliability in a Post SONGS World

4

Generation• Hydro Generation• Old Steam Generation• Combined Cycle• Single Cycle Gas Turbines• Renewable• Small Hydro• Wind • Geothermal or biomass• Solar

Page 5: Electric System Reliability in a Post SONGS World

Large Hydro: Not Considered renewable

5

Page 6: Electric System Reliability in a Post SONGS World

Small Hydro Generation• RPS Standard Generally less than 30 MW• Many of these are run of the river: No reservoir

Page 7: Electric System Reliability in a Post SONGS World

7

Natural Gas Fired Generation• Combined Cycle• Start with a gas turbine (think big jet engine) This spins one

generator• Exhaust gases (which are real hot) are used to heat water into

steam which in turn spins more generators• Not well suited for peaker power

• Peakers• Single Cycle Gas Turbine• Spins a generator

Page 8: Electric System Reliability in a Post SONGS World

8

Renewable• Wind• Wind must be within a certain range of velocity• Peak Wind Generation in SCE territory is midnight to

6:00 a.m.• Solar• Only works in sunlight• Requires large land area

• Project 500 MW on 4500 acres

• Geothermal• Small Hydro• Storage technology is needed to deal with the variable nature

of renewable generation

Page 9: Electric System Reliability in a Post SONGS World

Transmission• Transmitting large amounts of power over long distances• Different voltages• 500 KV• 230KV• 66KV

• Some older systems• 115KV• 33KV

Page 10: Electric System Reliability in a Post SONGS World

Substations• Grid Control• Outages• Reduce voltages from transmission levels down to distribution

levels• Components:• Switch Yard• Transformers• Reactors or condensers• Capacitors

Page 11: Electric System Reliability in a Post SONGS World

Distribution• Delivers power to customers• 12 KV• Original system design was for the power to flow in one

direction

Page 12: Electric System Reliability in a Post SONGS World

Why can’t we just have generation in the desert?• Loss of transmission will result in blackouts• Transmission lines are only capable of carrying a

certain amount of power• Regulatory Restrictions• Physical Limitations

• There must be balance in the system with a certain amount of generation in the load center

Page 13: Electric System Reliability in a Post SONGS World

Impacts to Reliability• Impacts to Transmission• Fires • Floods• Wind

• Impacts at Substations• Catastrophic Failures

• Transformers• Collateral Damage• Long Term Reconstruction• Environmental damage

• Capacitors• Potential PCB issue

• Distribution• Wind and Fire

Page 14: Electric System Reliability in a Post SONGS World

Oh Boy

Page 15: Electric System Reliability in a Post SONGS World

Renewables can create problems in reliability• Small Hydro=run of the river…not reliable

when the streams are down• Geothermal: Not enough• Solar: Intermittent•Wind: Intermittent

Page 16: Electric System Reliability in a Post SONGS World

What is a mother, or SCE, to do?SONGS is out. This can’t be fixed

Page 17: Electric System Reliability in a Post SONGS World

When does 2200=500

• SONGS was about 2200 MW of generation Capacity• It was baseload generation which means it ran at

near 100% capacity factor• But…for the near term, SCE is looking at a need

for around 500 MWs of gas fired generation in Los Angeles area. This is a contingency back up to…• Preferred resources of Energy Efficiency, DR,

Storage

Page 18: Electric System Reliability in a Post SONGS World

Factors that resulted in the drop

• Energy efficiency programs• Demand response• Transmission upgrades• There has been a substantial increase in renewable generation

which is, to a certain extent, offsetting the need for fossil generation. But remember there are problems created by renewables

• This only a near term forecast; long term we will need greater capacity

• California Independent System Operator is looking at at a possible need for over 3000 MWs

• So what?

Page 19: Electric System Reliability in a Post SONGS World

There is still a need for new gas fired generation• This generation is dispatchable• It can fill in the “gaps” created by renewable generation• Also needed for voltage support• But we need some reform of the NSR Requirements• In the South Coast Air Basin we are in attainment for PM10• Offsets are still required by SCAQMD Regulations• Cannot change that unless there is a change to SB 288• This will require a programmatic approach that is achievable: