UTILITY INFORMATION
EMAIL: [email protected]
PHONE: (423) 648-3257
CONTACT: David Henderson
Chattanooga, Tennessee 37402
10 W. Martin Luther King Blvd.
Electric Power Board of Chattanooga JOB NUMBER:
DESIGNED:
DRAWN:
CHECKED:
SCALE DATE
9.07.2018NONE
42027.04
RAY
JDS
JLM
ESTIMATED QUANTITIES AND DRAWING INDEX
FIBEROPTIC RELOCATION
OF CHATTANOOGA
ELECTRIC POWER BOARD
(865) 521-6777 (866) 539-7192
KNOXVILLE, TENNESSEE 37922
SUITE 120
2095 LAKESIDE CENTRE WAY
PROJECT NO.SHEET
NO.TYPE YEAR
CONST. 2018 U8-1STP-317(17)
33070-2233-14 HAMILTON COUNTY
INDEX OF DRAWINGS
CONSTRUCTION ASSEMBLY DETAILSU8-22
CONSTRUCTION ASSEMBLY DETAILSU8-21
FIBER OPTIC INSTALLATION NOTESU8-20
TO END OF CONSTR.
FIBER OPTIC RELOCATION TALLANT ROAD. STA. 14+75U8-19
FIBER OPTIC RELOCATION STA. 254+00 TO STA. 266+50U8-18
FIBER OPTIC RELOCATION STA. 243+00 TO STA. 254+00U8-17
FIBER OPTIC RELOCATION STA. 233+00 TO STA. 243+00U8-16
FIBER OPTIC RELOCATION STA. 221+00 TO STA. 233+00U8-15
FIBER OPTIC RELOCATION STA. 211+00 TO STA. 221+00U8-14
FIBER OPTIC RELOCATION STA. 200+00 TO STA. 211+00U8-13
FIBER OPTIC RELOCATION STA. 188+00 TO STA. 200+00U8-12
FIBER OPTIC RELOCATION STA. 177+25 TO STA. 188+00U8-11
FIBER OPTIC RELOCATION STA. 166+50 TO STA. 177+25U8-10
FIBER OPTIC RELOCATION STA. 155+50 TO STA. 166+50U8-9
FIBER OPTIC RELOCATION STA. 145+25 TO STA. 155+50U8-8
FIBER OPTIC RELOCATION STA. 133+00 TO STA. 145+25U8-7
FIBER OPTIC RELOCATION STA. 122+00 TO STA. 133+00U8-6
FIBER OPTIC RELOCATION STA. 109+00 TO STA. 122+00U8-5
FIBER OPTIC RELOCATION BEGIN PROJECT TO STA. 109+00U8-4
GENERAL NOTESU8-3
VICINITY MAP AND LEGENDU8-2
ESTIMATED QUANTITIES AND DRAWING INDEXU8-1
PROP. RETAINING WALL 8
PR
OP. R
ETAININ
G W
ALL 4
PROP. RETAINING WALL 9
PROP. RETAINING WA
LL 3
PROP. RETAINING WALL 1
WITH PARAPET & GLARE SCREEN
PROP. RETAINING WALL 2
PROP. RE
TAINING
WALL 5
PROP. RETAINING WALL 7
PROP. RETAINING WALL 9
PR
OP. R
ETAININ
G W
ALL N
O. 10
OW 1-CKT 182'
OW 1-C
KT 1
12'
OW 1-CKT 126'
OW 1-CKT 215'
OW 1-CKT 215'
OW 1-C
KT 240'
OW 1-CKT 220'
OW 1-CKT 237'
OW 1-CKT 228'
OW 1-CKT 281'
OW 1-CKT 139'
UR
D 1-P
H 2
11'
OW 1-C
KT 153'
OW 1-C
KT 1
40'
OW 1-C
KT 2
20'
OW 1-C
KT 2
94'
OW 1-C
KT 275'
OW 1-C
KT 271'
OW 1-C
KT 262'
OW 1-C
KT 167'
OW 1-
CKT 12
9'
OW 1-
CKT 2
50'
OW 1-
CKT 2
50'
OW 1-C
KT 2
76'
OW 1-C
KT 1
18'
OW 1-C
KT 226'
138'
OW 1-CKT 195'
OW 1-CKT 200'
SC 2-CKT 200'
SC 2-CKT 200'
SC 2-CKT 216'
SC 2-CKT 215'
OW 1-C
KT 1
76'
SC 1-C
KT 1
95'
SC 1-C
KT 1
95'
SC 1-C
KT 2
20'
SC 1-C
KT 2
63'
SC 2-CKT 172'
SC 2-CKT 200'
SC 2-CKT 200'
SC 2-CKT 200'
SC 2-CKT 200'
SC 2-CKT 200'
SC 2-CKT 220'
OW 1-C
KT 156'
141'
SC 3-CKT 315'
OW 1-C
KT 128'
OW 1-C
KT 18
0'
OW 1-C
KT 13
6'
OW 1-C
KT 15
7' SC 3-CKT 236'
SC 3-CKT 251'
SC 3-CKT 220'
SC 3-CKT 220'
SC 3-CKT 194'
SC 2-CKT 74'
SC 1-CKT 76'
SC 3-CKT 194'
OW 1-C
KT 1
20'
OW 1-C
KT 1
35'
OW 1-CKT 224'
OW 1-C
KT 2
28'
OW 1-C
KT 1
74'
OW 2-CKT 131' OW 2-CKT 131'
UR
D 1-C
KT 1
44'
OW 2-CKT 210'
OW 2-CKT 240'
OW 2-CKT 240'
OW 2-CKT 240'
OW 2-CKT 213'
OW 1-CKT 213'
OW 1-C
KT 2
04'
OW 1-C
KT 1
34'
OW 1-C
KT 220'
OW 1-C
KT 220'
OW 1-C
KT 220'
OW 1-C
KT 220'
OW 1-CKT 223'
OW 1-C
KT 203'
OW 1-C
KT 2
50'
OW 1-CKT 220'
OW 1-CKT 220'
OW 1-CKT 220'
OW 1-CKT 220'
OW 1-C
KT 1
75'
OW 1-C
KT 6
7'
OW 1-C
KT 162'
OW 1-C
KT 162'
OW 1-C
KT 1
77'
OW 1-C
KT 142'
OW 1-C
KT 169'
OW 1-C
KT 95'
OW 1-C
KT 210'
OW 1-
CKT 9
8'
LEGEND
U8-10
U8-19
U8-11
U8-12
U8-13
U8-14
U8-15
U8-16
U8-17
U8-18
N HAMILTON COUNTY
TO EAST OF LAYTON LANE
FROM S.R. 321 (OOLTEWAH RINGGOLD ROAD)
STATE ROUTE 317
JOB NUMBER:
DESIGNED:
DRAWN:
CHECKED:
SCALE DATE
9.07.2018NONE
42027.03
RAY
RKC
JLM
OF CHATTANOOGA
ELECTRIC POWER BOARD
(865) 521-6777 (866) 539-7192
KNOXVILLE, TENNESSEE 37922
SUITE 120
2095 LAKESIDE CENTRE WAY
PROJECT NO.SHEET
NO.TYPE YEAR
CONST. 2018 STP-317(17)
33070-2233-14 HAMILTON COUNTY
U8-4 U8-5
U8-6
U8-7
U8-8U8-9
U8-2
VICINITY MAP AND LEGEND
FIBEROPTIC RELOCATION
GENERAL CONSTRUCTION NOTES
STANDARDS.
HAVE INSPECTORS ON-SITE TO VERIFY SAFETY AND QUALITY OF WORK IS CONSISTENT WITH UTILITY OWNER'S
CONSTRUCTION OF THE PROJECT AND VERIFIED BY THE UTILITY OWNER / ENGINEER. THE UTILITY OWNER WILL
OF THE UTILITY CONTRACTOR. ANY CORRECTIONS THAT ARE REQUIRED SHALL BE DONE DURING THE
GROUND AND AERIAL INSPECTION OF INSTALLED FACILITIES ONCE COMPLETED SHALL BE THE RESPONSIBILITY18.
PROMPTLY REPORT SUCH COMPLAINTS TO THE UTILITY OWNER AS TO WHETHER OR NOT IT HAS BEEN RESOLVED.
ALSO BE RESPONSIBLE FOR RESOLVING ALL COMPLAINTS THAT MAY ARISE FROM ITS ACTIVITIES, AND SHALL
IN AREAS OUTSIDE OF TDOT ROW ALONG THE LENGTH OF THE PROJECT. THE UTILITY CONTRACTOR SHALL
THE UTILITY CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY DAMAGE CAUSED BY ITS EMPLOYEES17.
BE REQUIRED TO FURNISH THE EQUIPMENT NECESSARY TO COMPLETE THE WORK.
EQUIPMENT IS REQUIRED TO WORK OVER AND AROUND EXISTING UTILITIES, THE UTILITY CONTRACTOR SHALL
UTILITIES FROM DAMAGE DURING THE CONSTRUCTION OF THE PROJECT. IN THE EVENT THAT SPECIAL
THE UTILITY CONTRACTOR SHALL PROVIDE ALL NECESSARY PROTECTIVE MEASURES TO SAFEGUARD EXISTING16.
SOME EXISTING UTILITIES CAN BE LOCATED BY CALLING TENNESSEE ONE-CALL SYSTEMS, INC. AT "811".15.
EVENT.
EXISTING FACILITIES, THE PRIME CONTRACTOR WILL BE RESPONSIBLE FOR ANY COST INCURRED FROM THE
UTILITY OWNER PRIOR TO DIGGING. IN THE EVENT THAT THERE IS ANY DAMAGE TO OR INTERRUPTION OF
EXISTING UNDERGROUND UTILITIES. THE PRIME CONTRACTOR IS ALSO REQUIRED TO NOTIFY ANY EXISTING
THE TDOT PRIME CONTRACTOR WILL BE RESPONSIBLE FOR ANY EXCAVATION WORK REQUIRED TO LOCATE14.
PRIOR TO BEGINNING ANY CONSTRUCTION IN THE AREA OF THE UTILITIES IN QUESTION.
THE UTILITY CONTRACTOR SHALL REQUEST UTILITY LOCATIONS A MINIMUM OF THREE (3) BUSINESS DAYS13.
UTILITY ON THE GROUND.
OF THE UTILITIES AND REQUEST THAT THE UTILITY OWNERS PROPERLY LOCATE AND MARK THEIR PERSPECTIVE
THE UTILITY CONTRACTOR SHALL NOTIFY EACH UTILITY OWNER OF HIS PLAN OF OPERATION IN THE AREA
PROVIDED BY TDOT, AND SHALL BE VERIFIED BY THE UTILITY CONTRACTOR PRIOR TO CONSTRUCTION.
THE LOCATIONS OF EXISTING UTILITIES SHOWN WITHIN THESE DRAWINGS ARE BASED ON INFORMATION12.
GUIDELINES AS REQUIRED.
THE UTILITY CONTRACTOR SHALL COMPLY WITH ALL TDOT REGULATIONS, PERMITS AND TRAFFIC CONTROL11.
ISSUES SO THAT CONSTRUCTION CAN CONTINUE.
DESIGNED, THE UTILITY CONTRACTOR WILL COORDINATE WITH THE UTILITY OWNER / ENGINEER TO RESOLVE THE
IF FIELD CONDITIONS ARISE WHICH PREVENT THE CONSTRUCTION ON THE PROJECT FROM PROCEEDING AS10.
SPECIFICATIONS. LARGE SCALE OUTAGES ARE NOT ALLOWED.
HANDLED IN ACCORDANCE WITH SECTION 01 1113E "SUMMARY OF WORK" IN THE CONSTRUCTION TECHNICAL
UNINTENTIONAL OUTAGES TO THE CUSTOMERS ALONG THE PROJECT. ALL PLANNED OUTAGES MUST BE
THE UTILITY CONTRACTOR IS TO PERFORM ALL REQUIRED WORK IN SUCH A MANNER AS TO NOT CAUSE9.
BE RELEASED AT THE END OF EACH WORKDAY.
ORDERS AND TO INFORM THE UTILITY WHAT PORTION OF THE WORK IS GOING TO BE DONE. CAUTION ORDERS MUST
CENTER BY 5PM (EST) THE DAY BEFORE THEY BEGIN WORK ON THE PROJECT IN ORDER TO OBTAIN ANY CAUTION
CENTER USING TELEPHONE COMMUNICATIONS. THE UTILITY CONTRACTOR MUST CONTACT THE CONTROL
THE UTILITY CONTRACTOR IS REQUIRED TO MAINTAIN COMMUNICATION WITH THE UTILITY OWNER'S CONTROL8.
IS RESPONSIBLE FOR ANY LOST, STOLEN OR DAMAGED MATERIALS ON THE PROJECT.
LOCATION OF MATERIALS ON THE PROJECT SITE MUST BE A SECURE ENVIRONMENT. THE UTILITY CONTRACTOR
NO MATERIAL SUBSTITUTIONS ARE ALLOWED WITHOUT THE PRIOR CONSENT OF THE UTILITY OWNER. STORAGE
SHALL BE SUBMITTED TO THE UTILITY OWNER AS NOTED IN THE TECHNICAL SPECIFICATIONS FOR THE PROJECT.
MUST BE APPROVED BY THE UTILITY OWNER PRIOR TO PURCHASE OR USE. A PROPOSED LIST OF MATERIALS
ALL MATERIALS TO BE USED BY THE UTILITY CONTRACTOR ON THE PROJECT MUST BE NEW MATERIALS AND7.
MUST BE ADHERED TO DURING ALL PHASES OF CONSTRUCTION.
UTILITY CONSTRUCTION DRAWINGS ARE INCLUDED AS PART OF THE DRAWING PACKET AND6.
FACILITIES BEING RELOCATED.
THAT ARE NECESSARY TO PROVIDE A COMPLETE AND FUNCTIONAL INSTALLATION OF THE UTILITY
INTEGRAL MATERIALS OUTLINED IN THE UTILITY CONSTRUCTION DRAWINGS AND THE TECHNICAL SPECIFICATIONS
IN GENERAL, THE UTILITY CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MATERIALS, METHODS, AND/OR6.
THEIR FACILITIES UNTIL SUCH CONDITIONS ARE CORRECTED.
IF SUCH REGULATIONS ARE VIOLATED, THE UTILITY OWNER SHALL MAINTAIN THE RIGHT TO STOP WORK ON
ENSURE THAT THEY ABIDE BY ALL STATE, FEDERAL AND LOCAL REGULATIONS REGARDING SAFE WORK PRACTICES.
THE UTILITY CONTRACTOR SHALL BEAR THE RESPONSIBILITY FOR THE SAFETY OF ITS EMPLOYEES AND SHALL5.
TOOL INSPECTIONS, ADEQUATE SUPERVISION, ETC.).
ELECTRICAL LINES (e.g. RUBBER GOODS INSPECTIONS, GROUNDING OF LINES AND VEHICLES / EQUIPMENT,
THE UTILITY CONTRACTOR SHALL EXERCISE ALL STANDARD SAFETY PRACTICES WHEN WORKING ON ENERGIZED4.
PERFORMED AS PART OF THIS CONTRACT.
OTHER STATE AND LOCAL CODES THAT ARE REQUIRED FOR THE TYPE OF UTILITY RELOCATION THAT IS BEING
SAFETY CODES, INCLUDING, BUT NOT LIMITED TO, THE NATIONAL ELECTRICAL SAFETY CODE (NESC), AND ANY
AND ALL APPLICABLEPLAN SHEETS, CONSTRUCTION DETAILS AND TECHNICAL SPECIFICATIONS AS WELL AS ANY
ALL WORK SHALL BE DONE IN A SAFE, THOROUGH AND WORKMAN-LIKE MANNER IN ACCORDANCE WITH THE3.
THE SATISFACTION OF THE UTILITY.
ACCEPT THE PROJECT AT IT'S COMPLETION UNTIL SUCH TIME AS ANY DEFICIENCIES ARE CORRECTED TO
FOLLOW THESE CONDITIONS AS LISTED WILL RESULT IN REFUSAL OF ACCEPTANCE BY THE UTILITY OWNER TO
TAKING PLACE ON THE PROJECT. FAILURE BY THE UTILITY CONTRACTOR OR SUBCONTRACTORS TO
ANY DEVIATION OF THE CONDITIONS LISTED MUST BE APPROVED BY THE UTILITY PRIOR TO THE DEVIATION2.
THE INSTALLATION OF THE ELECTRICAL FACILITIES ALONG THIS PROJECT.
THE CLEARING/CUTTING OF REQUIRED AREAS OUTSIDE OF THE TDOT RIGHT-OF-WAY WHEN REQUIRED FOR
OF THE ELECTRICAL FACILITIES ALONG THIS PROJECT, AS WELL AS THE CONTRACTOR RESPONSIBLE FOR
THE FOLLOWING INFORMATION APPLIES TO THE UTILITY CONTRACTOR RESPONSIBLE FOR THE RELOCATION1.
OWNER / ENGINEER PRIOR TO BIDDING ON THE PROJECT.
CONCERNING INFORMATION SHOWN IN THE CONTRACT DOCUMENTS SHALL BE ADDRESSED TO THE UTILITY
SPECIFICATIONS FOR THE RELOCATION OF FACILITIES PRIOR TO BIDDING THE PROJECT. ANY QUESTIONS
THE UTILITY CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL CONSTRUCTION DRAWINGS AND TECHNICAL27.
ANY AND ALL CHANGES THAT WERE MADE TO THE FACILITIES DURING CONSTRUCTION.
MARKED "AS-BUILT" DRAWINGS AT THE COMPLETION OF THE PROJECT. THESE DRAWINGS SHALL REFLECT
THE UTILITY CONTRACTOR SHALL PROVIDE THE UTILTY OWNER WITH ONE (1) SET OF CLEAN, CLEARLY26.
BY THE UTILITY OWNER DURING CONSTRUCTION. BOLTS SHALL NOT EXTEND MORE THAN TWO (2) INCHES FROM NUTS.
LOCKNUTS SHALL BACK UP ALL NUTS ON THREADED BOLTS. EXISTENCE OF LOCKNUTS WILL BE CLOSELY EXAMINED25.
FOR ANY CHANGES IN ELEVATION THAT EXIST ALONG THE PROJECT.
THE DISTANCES THAT ARE SHOWN ON THE DRAWINGS ARE HORIZONTAL DISTANCES ONLY, AND DO NOT ALLOW24.
TO THE TDOT PROJECT SUPERVISOR FOR APPROVAL PRIOR TO BEGINNING WORK.
RIGHT-OF-WAY, THE UTILITY CONTRACTOR SHALL SUBMIT A PROPOSED EROSION AND SEDIMENT CONTROL PLAN
WHERE EROSION CONTROL MEASURES ARE NEEDED FOR THE UTILITY WORK OCCURING OUTSIDE THE STATE23.
RELOCATED WITHIN THE PROJECT.
THE TDOT PRIME CONTRACTOR IS RESPONSIBLE FOR THE LAYOUT OF ALL UTILITY FACILITIES THAT ARE TO BE22.
REDUCE UNFAMILIAR PERSONNEL TO BE WORKING ON THE FACILITIES OF THE UTILITY OWNER.
PERSONNEL CHANGES ARE TO BE KEPT TO A MINIMUM DURING THE CONSTRUCTION OF THE PROJECT AS TO21.
WILL BE THE RESPONSIBILITY OF THE TDOT PRIME CONTRACTOR.
THESE DRAWINGS AND THAT ARE NOT ADDRESSED AND COORDINATED PRIOR TO CONSTRUCTION OF THE PROJECT
AT "FINAL GRADE" AS SHOWN. ANY TEMPORARY INSTALLATIONS THAT ARE NOT SPECIFICALLY NOTED WITHIN
THE UTILITY CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL FACILITIES INDICATED WITHIN THESE DRAWINGS20.
THE CONSTRUCTION OF THE PROJECT.
OF THE TDOT PRIME CONTRACTOR TO ENSURE THAT ALL UTILITY COORDINATION BE ADDRESSED DURING
BE DONE CONCURRENTLY WITH THE OPERATIONS OF OTHER UTILITY CONTRACTORS. IT IS THE RESPONSIBILITY
WHILE SOME WORK MAY ONLY BE REQUIRED "AROUND" OTHER UTILITY FACILITIES, SOME WORK MAY NEED TO19.
JOB NUMBER:
DESIGNED:
DRAWN:
CHECKED:
SCALE DATE
9.07.2018NONE
42027.03
RAY
RKC
JLM
OF CHATTANOOGA
ELECTRIC POWER BOARD
(865) 521-6777 (866) 539-7192
KNOXVILLE, TENNESSEE 37922
SUITE 120
2095 LAKESIDE CENTRE WAY
PROJECT NO.SHEET
NO.TYPE YEAR
CONST. 2018 STP-317(17)
33070-2233-14 HAMILTON COUNTY
GENERAL NOTES
FIBEROPTIC RELOCATION
U8-3
RW
CB
MH
MH
MH
CB
CB
MHMH
CB
CB
MH
CB
CB CB
CB
CB
CB
MH
CB
MH
MH
MH
MH
CB
EW
MH
CB
CB
CB
CB
CB
CB
MH
MH MH
MH
MH
MB
CB
CONC. DITCH
MH
MH
MB
MH
MH
CB
CB
MH
EW
CB
CO
NC.
DITC
H
CB
GA
TE
CB
EW
EW
CB
MBMB
EPH-3
WWC-3/
W.M.
W.M.
W.V.
W.V.
W.V.
20' PERMANENT SEWER EASEMENT
3-W.V.
CANOPYBANK
SUNTRUST
NEW
2-W.M.
2-W.V.
PETROLEUM
WWC-1/EPH-1
WWC-2/EPH-2
STRIP MALL1-S-BL
BAKERY STORE
LITTLE DEBBIE
1-S-BR
UNION
CREDIT
MCKEE
1-S-BR
CONC S/W
SIGNS/W
GR
AS
S
SIGN
SI
GN
CAR WASH
1-S-BL
CHAINLINK
CONC S/W
ST
RI
P
MA
LL
1-
S-
BL
RI
TE
AI
D
PH
AR
MA
CY
1-
S-
BL
1-
S-
BL
ST
RI
P
MA
LL
1-
S-
BL
ST
AT
E
FA
RM
1-
S-
ST
UC
CO
EXXON
1-S-BR
PU
MP
S
VALVES
FUEL
CROSSING
APISON
1-S-BL
REGIONS BANK
1-S-F
•"
•"
STAND PIPEWATER VAULT
MARKER
GAS
"V" DITCH
"V"
DI
TC
H48"
RC
P
@ 107
L.
F.
STATION 250+22.82 =
E 2247873.27
N 265697.77
255
S.R. 321 NORTH STA. 285+47.25
S.R. 317 (APISON PIKE)
P1
P2
OW71335OW71334OW71331 OW71332
OW71333
CONV. ENCLOSURE
REMOVE: SUS,(2)LOOP(144F-D),
INSTALL: DE,SPLICE
REMOVE: DE
TEMP: DE
SPLICE,(2)144-D LOOP
INSTALL: DDE,CONV. ENCLOSURE,
INSTALL: SUSA
R:(1)144F-L - 289'R:(1)144F-L - 345'
'982 - L-F441)1(:I
R:(1)144F-L - 133'
'331 - L-F441)1(:I
R:(1)144F-L - 194'
'543 - L-F441)1(:I'491 - L-F441)1(:I
I:(1)144F-L,(1)144F-D - 127'
R:(1)144F-L,(1)144F-D - 204'
I:(1)144F-L,(1)144F-D - 182'
N
OO
LTE
WA
H RIN
GO
LD R
D 3
21
APISON PK 317
MA
TC
H LIN
E S
TA. 1
09+00 S
EE S
HE
ET N
O. U
8-5
JOB NUMBER:
DESIGNED:
DRAWN:
CHECKED:
SCALE DATE
9.07.20181"=50'
42027.04
RAY
JDS
JLM
BEGIN PROJ. TO STA. 109+00
FIBER OPTIC RELOCATION
OF CHATTANOOGA
ELECTRIC POWER BOARD
(865) 521-6777 (866) 539-7192
KNOXVILLE, TENNESSEE 37922
SUITE 120
2095 LAKESIDE CENTRE WAY
PROJECT NO.SHEET
NO.TYPE YEAR
CONST. 2018 U8-4STP-317(17)
33070-2233-14 HAMILTON COUNTY
R:(1)144F-L,(1)144F-D,(1)336F - 204'
FIBER OPTIC TRANSFERS
POND
MH
EPH-3
WWC-3/
CONC DITCH
MARKER
LINE
GAS
CONC WALLW.V.
W.M.
OF 16'
AT
&T
EA
SE
ME
NT
AP
PR
OXI
MA
TE
LO
CA
TI
ON
PETROLEUM
PLANTATION PIPELINE
WTL-2
PETROLEUM
PLANTATION PIPELINE
WTL-1
CO
NC S/
W
GARAGE
POWER
FAUSTOR
1-S-BL
1-S-F
SIGN
GR
AV
EL
WOOD RAIL
CO
NC S/
W
SILT FENCE
EIP
‚"
CABLE
BURIED
MARKER
OPTIC
FIBER
MARKER
OPTIC
FIBER
MARKER
OPTIC
FIBER
"V" DITC
H
"V"
DITC
H
"V" DITCH
"V" DITC
H
"V" DITCH
"V" DITCH
"V" DITCH
"V" DITCH
"V" D
ITCH
"V" DIT
CH
"V" DITCH
"
V"
DIT
CH
"V" DITCH
"V" DITCH
18"
RC
P
120
15
115
110
REMOVE: DROP
INSTALL: SUS
P3
P4
P5
INSTALL: SUS
INSTALL: SUSA
OW4108
OW4141
OW4111
R:(1)
DROP - 47'
R:(1)D
RO
P - 1
45'
R:(1)DROP - 125'
P6
CONV. ENCLOSURE,(3)DROP
REMOVE: SUS,(2)LOOP(144F-L),NAP ENCLOSURE,
I:(1)14
4F-L,(1
)144F-
D - 32
2'
R:(1)1
44F-L,(
1)144F
-D - 32
2'
R:(1)144F-L,(1)1
44F-D - 336'
I:(1)144F-L,(1)1
44F-D - 309'
R:(1)144F-L,(1)144F-D,DROP - 372'
I:(1)144F-L,(1)144F-D - 238'
I:(1)144F-L,(1)144F-D - 215'
R:(1)144F-L,(1)144F-D - 377'
I:(1)144F-L,(1)144F-D - 215'
INSTALL: DDE
REMOVE: SUSA,LOOP(336F),DROP
PROP. RETAINING WALL 1
N
APISON PK 317
APISON PK
317
COLLEGED
ALE PKWY.
MA
TC
H LIN
E S
TA. 109+00 S
EE S
HE
ET N
O.
U8-4
MA
TC
H LIN
E S
TA. 122+00 S
EE S
HE
ET N
O.
U8-6
JOB NUMBER:
DESIGNED:
DRAWN:
CHECKED:
SCALE DATE
9.07.20181"=50'
42027.04
RAY
JDS
JLM
STA. 109+00 TO STA. 122+00
FIBER OPTIC RELOCATION
OF CHATTANOOGA
ELECTRIC POWER BOARD
(865) 521-6777 (866) 539-7192
KNOXVILLE, TENNESSEE 37922
SUITE 120
2095 LAKESIDE CENTRE WAY
PROJECT NO.SHEET
NO.TYPE YEAR
CONST. 2018 U8-5STP-317(17)
33070-2233-14 HAMILTON COUNTY
MH
RW
MH
MARKER
GAS
MARKER
PETROLEU
M
MARKER
AT&T
WTL-2
PLANTATION PIPELIN
E
PETROLEUM
STONE
CONC S/W
MARKER
OPTIC
FIBER
MARKER
OPTIC
FIBER
GAS MARKER
1"PIPE
"V" DITCH
"V" DITCH
"V" DITCH
"V" DITCH
"V" DI
TCH
"V" DI
TCH
125130
2025
PROP. RETAINING WALL 1
WITH PARAPET & GLARE SCREEN
PROP. RETAINING WALL 2
REMOVE: SUS
REMOVE: SUS
INSTALL: SUSINSTALL: SUS
OW4138
OW4077
OW4112 OW4114
INSTALL: SUS
INSTALL: SUSA
P7
P8
P9P11
P10
REMOVE: SUSA
REMOVE: SUS,LOOP(144F-D),LOOP(336F)
I:(1)144F-L,(1)144F-D - 139'
'371 -
D-F44
1)1(,L-F4
41)1(:R
I:(1)144F-L,(1)144F-D - 282'
R:(1)144F-L,(1)144F-D - 302'
R:(1)144F-L,(1)144F-D - 301'
I:(1)144F-L,(1)144F-D - 228'I:(1)144F-L,(1)144F-D - 237'
R:(1)144F-L,(1)1
44F-D - 315'
I:(1)144F-L,(1)144F-D - 220'
INSTALL: DDE
N
APISON PK 317
COLLEGEDALE PKWY.
MA
TC
H LIN
E S
TA. 1
22+00 S
EE S
HE
ET N
O. U
8-5
MA
TC
H LIN
E S
TA. 1
33+00 S
EE S
HE
ET N
O. U
8-7
100' 336 loop
JOB NUMBER:
DESIGNED:
DRAWN:
CHECKED:
SCALE DATE
9.07.20181"=50'
42027.04
RAY
JDS
JLM
STA. 122+00 TO STA. 133+00
FIBER OPTIC RELOCATION
OF CHATTANOOGA
ELECTRIC POWER BOARD
(865) 521-6777 (866) 539-7192
KNOXVILLE, TENNESSEE 37922
SUITE 120
2095 LAKESIDE CENTRE WAY
PROJECT NO.SHEET
NO.TYPE YEAR
CONST. 2018 U8-6STP-317(17)
33070-2233-14 HAMILTON COUNTY
MH
EW
MH
MH
MB
CB
CURB
EW
CU
RB
EW
RW
CU
RB
MBMB
MB
MB
RW
MB
CU
RB
MBMBMB
RW
RW
RW
RW
RW
RW
PED.
TELE.
MARKER
PETROLEUM
MARKER
PETROLEUM
AP
AR
TM
EN
TS
3-
S-
BR
AP
AR
TM
EN
TS
3-S-
BR
MARKER
AT&T
WW
C-5/
EP
H-5
PLANTATION PIPELINE
CO
W.M.
CONC
MARKER
GAS
STONE
APARTMENTS
3-S-BR
AP
AR
TM
EN
TS
3-
S-
BR
AP
AR
TM
EN
TS
3-
S-
BR
AP
AR
TM
EN
TS
3-
S-
BR
2-S-FR
CONC
2-S-FR
R.R.TIES
AP
AR
TM
EN
TS
3-
S-
BR
DISH
SATELLITE
CHAINLINK
2-TE
LE.
PED.
MARKER
FIBER
AT&T
4-W.M.MB
4-
MB
4-W.M.
5-W.M.
DITC
HST
ONE
AT&T MARKER
W.M.
RAILROAD R.O.W.
MAR
KER
PETR
OLE
UM
AT
&T
MAR
KER
EIP
1"PIPE
•"
•"
•"
†"
•"
•"
•"
MAR
KER
OPTIC
FIBER
PERENNIAL
STR-1
WWC-4/EPH-4
AT&T MARKER
ELEC.
BOX
MARKER
PETROLEUMMARKER
PETROLEUM
2' "T" D
ITCH
2' "
T" DIT
CH
2' "T" DIT
CH
2' "T" DITCH
"V"
DITC
H
"V" DITCH
"V"
DITC
H
135 145
30
15PROP. RETAINING WALL 3
REMOVE: SUSA
OW4066
OW4024
OW4069
OW4063
OW4025
OW5720
OW5721
OW4398
'9
51 -
D-
F4
41)
1(,L-
F8
2)1(,
F8)
1(:I
I:(1)8
F,(1)2
8F-L,(1)1
44F-D - 2
10'
'8
81 -
F
8)1(:I
'0
91 -
F
8)1(:I
INSTALL: DE,RISER
R:(1)8
F,(1)2
8F-L,(1)1
44F-D - 2
00'
P12
P13
R:(1)8
F,(1)2
8F-L,(1)1
44F-D - 1
73'
'6
82 -
L-
F8
2)1(:I
'6
82 -
L-
F8
2)1(:
R
OW4023
INSTALL: DDE,MULTI-TAP ENCLOSURE,SPLICE,RISER
REMOVE: SUS,NAP ENCLOSURE,LOOP(144F-D),RISER
'0
91 -
F
8)1(:
R
'8
81 -
F
8)1(:
R
REMOVE: LOOP(336F)
R:(1)28F-L,(1)144F-L,(1)144F-D - 375'
I:(1)28F-L,(1)144F-L,(1)144F-D - 375'
R:(1)144F-L - 291'I:(1)144F-L - 291'
R:(1)144F-L - 180'I:(1)144F-L - 180'
'132 -
L-F44
1)1(:R
'132 -
L-F44
1)1(:I
'453 - L-F441
)1(:R
'453 - L-F441
)1(:I
INSTALL: DDE,CONV. ENCLOSURE,SPLICE
REMOVE: SUS,LOOP(28F-L),LOOP(144F-D)
REMOVE: MULTI-TAP ENCLOSURE
OW51063 OW5725
'453 - L-F441
)1(:R
'453 - L-F441
)1(:I
REMOVE: LOOP(336F)
I:(1)144F-L - 215'
R:(1)144F-L - 244'
I:(1)144F-L - 244'
'512 - L-F441)1(:R
MH
OW4143
OW4142
'632 - L-F82)1(:
R
REMOVE: LOOP(28F-L)INSTALL: SPLICE
REMOVE: LOOP(28F-L)
'632 - L-F82)1(:
I
'352 - L-F82)1(:R
'352 - L-F82)1(:I
MB
CURB
EW
CURB
MH
CURB CU
RB
DI
SH
SA
TE
LLI
TE
•"
N
APISON PK
317
COLLEGEDALE PKWY.
SPALDING DR.
SP
AL
DIN
G D
R.
MA
TC
H LIN
E S
TA. 133+00 S
EE S
HE
ET N
O.
U8-6 M
AT
CH LIN
E S
TA. 1
45+25 S
EE S
HE
ET N
O. U
8-8
SEE S
HEET N
O. U
8-8
ST
A. 1
5+75
MATC
H LIN
E
INSET 1
SE
E I
NS
ET 1 T
HIS S
HE
ET
MA
TC
H LIN
E
INS
ET #
1 M
AT
CH LIN
E
SE
E I
NS
ET O
N S
HE
ET U
8-8
MA
TC
H LIN
E
INSET #2 MATCH LINE
INS
ET #
2 M
AT
CH LIN
E
INSET 2
336 loop
150'
336 loop
150'
JOB NUMBER:
DESIGNED:
DRAWN:
CHECKED:
SCALE DATE
9.07.20181"=50'
42027.04
RAY
JDS
JLM
STA. 133+00 TO STA. 145+25
FIBER OPTIC RELOCATION
OF CHATTANOOGA
ELECTRIC POWER BOARD
(865) 521-6777 (866) 539-7192
KNOXVILLE, TENNESSEE 37922
SUITE 120
2095 LAKESIDE CENTRE WAY
PROJECT NO.SHEET
NO.TYPE YEAR
CONST. 2018 U8-7STP-317(17)
33070-2233-14 HAMILTON COUNTY
MH
CO
NC.
DI
TC
H
MH
RW
SO
CC
ER
FI
EL
D
GROUND OBSCURED
DECK
MARKER
OPTIC
FIBER
MARKER
OPTIC
FIBER
WWC-5/EPH-5
STR-2 PERENNIAL
PL
AN
TA
TI
ON
PI
PE
LI
NE
2-
S-
FR
ASPHALT
BARBEDWIRE
SI
GN
GR
AVEL
CHAINLINK
W.V.
PE
RE
NNI
AL
ST
R-1
PERE
NNI
AL
STR-3
PERENNIAL
STR-3
CABLE
BURIED
MA
RK
ER
PE
TR
OL
EU
M
MA
RK
ER
PE
TR
OL
EU
M
MA
RK
ER
PE
TR
OL
EU
M
AT
&T
MA
RK
ER
GA
S
MA
RK
ER
CA
BL
E
BU
RI
ED
CA
BL
E
BU
RI
ED
MA
RK
ER
GA
SM
AR
KE
R
PE
TR
OL
EU
M
MA
RK
ER
GA
S
BARBED WIRE
MA
RK
ER
GA
S
15
0
15
5
15
STA. 20+00.00 { SPALDING DR.
STA. 10+00.00 { TUCKER RD.=
STA. 148+50.00 { S.R. 317 =
20
PR
OP. R
ET
AININ
G W
ALL 4
@116 L
.F.36" R
CP
RCP30"
@ 16 L
.F.
236 L.F.
24" RCP
@
61 L.F.
36" RCP
@
2' "
T"
DI
TC
H2' "
T"
DI
TC
H
2' "
T"
DI
TC
H
DI
TC
H2' "
T"
DITC
H
2'"T"
"V"
DI
TC
H
3' "
T"
DI
TC
H
3' "T" DITCH
3' "
T"
DI
TC
H
3' "T" DITCH
3' "T" DITCH
"V"
DI
TC
H
2' "
T"
DI
TC
H
"V"
DI
TC
H
3' "T" DITCH"V" DITCH
"V"
DITC
H
DITCH BLOCK
DITCH BLOCK
"V" DITCH
BLOCK
DITCH
OW52467
P14
OW52467
EX:6F
GU
F6 .
XE
PO
RD .
XE
EX:MULTI-TAP ENCLOSURE,(2)DROP
EX:RISER,(2)DROP
I:(1)144F-L - 170'
R:(1)144F-L - 170'
I:(1)144F-L - 275'
R:(1)144F-L - 275'
INSTALL: DDE,DE,LOOP(336F),SPLICE
REMOVE: DDE,DE,LOOP(336F),LOOP(144F-L)
EX. MULTI-TAP ENCLOSURE,DROP
RW
RW
RW
MH
GR
OU
ND
C & G
W.V.
OW5726
OW5955
OW5001OW5578
GU
F4
2 .
XE
R:(1)1
44F-L - 2
03'
I:(1)1
44F-L - 2
03'
R:(1)144F-L - 136'
I:(1)144F-L - 136'
R:(1)1
44F-L - 2
73'
I:(1)1
44F-L - 2
73'
R:(1)144F-L - 170'
I:(1)144F-L - 170'
REMOVE: CONV. ENCLOSURE,
EXISTING: LOOP(28F-L)
REMOVE: LOOP(114F-L)
N
APIS
ON P
K 317
TUCKER RD
SP
AL
DIN
G D
R
TUCKER RD
TUCKER R
D
SP
ALDIN
G D
R
SEE SH
EET NO. U8
-7STA. 15
+75MATCH
LINE
MATCH LINE STA. 145+25 SEE SHEET NO. U8-7
MATCH LINE STA. 155+50 SEE SHEET NO. U8-9
INS
ET M
AT
CH LIN
E
SEE INSET SHEET U8-7
MATCH LINE
MA
TC
H LIN
E S
EE I
NS
ET T
HIS S
HE
ET
INSET
336 loop
100'
336 loop
100'
JOB NUMBER:
DESIGNED:
DRAWN:
CHECKED:
SCALE DATE
9.07.20181"=50'
42027.04
RAY
JDS
JLM
STA. 145+25 TO STA. 155+50
FIBER OPTIC RELOCATION
OF CHATTANOOGA
ELECTRIC POWER BOARD
(865) 521-6777 (866) 539-7192
KNOXVILLE, TENNESSEE 37922
SUITE 120
2095 LAKESIDE CENTRE WAY
PROJECT NO.SHEET
NO.TYPE YEAR
CONST. 2018 U8-8STP-317(17)
33070-2233-14 HAMILTON COUNTY
GR
OU
ND
OB
SC
UR
ED
GR
OU
ND
OB
SC
UR
ED
GROUND OBSCURE
D
GROUND OBSCURED
GR
OU
ND
OB
SC
UR
ED
GROUND OBSCURE
D
GROUND
OBSCURED
OBSCURED
OBSCURED
GROUND OBSCURED
GROUND
GROUND
CONC.
DITCH
DECK
MHMH
RW
MH
CB
MB
RW
CB
GROUND OBSCURE
D
DECK
MARKER
GAS
G.V.
TA
NK
PR
OP
AN
E
TELE. PED
2-W.M.
MA
RK
ER
OP
TI
C
FI
BE
R
MARKER
OPTIC
FIBER
TEL. PED.
2-G.V.
D.B. 3713 PG. 416
AGREEMENT
AND MAINTENANCE
JOINT USE DRIVE
SPG-1
ST
R-2 P
ER
EN
NI
AL
PLAN
TATI
ON PIP
ELIN
E
CONC
CONC S/W
OPTI
C
FI
BE
ROPTIC
FIBER
WALL
ST
ONE
1-S-BR
LANDSCAPING
SH
ED
1-
S-
F
SH
ED
1-
S-
F
SIGN
WALL
STONE
PED
TELE.
3-W.M.
RAILROAD R.O.W.
RAILROAD R.O.W.
•"
•"
1"PIPE
1"PIPE
PE
RE
NNI
AL
ST
R-4
WTL-3
WTL-
4
PE
RE
NNI
AL
ST
R-1
PERE
NNI
AL
STR-3
PE
RE
NNI
AL
ST
R-3
CONC
PB
MARKER
PETROLEUM
MARKER
GAS
MARKER
GAS
"V" DITCH
"V" DITCH
"V" DITCH
160
165
STA. 10+00.00 { UNIVERSITY DR.
STA. 158+31.16 { S.R. 317 =
1010
15
5
PROP. RETAINING WALL 5
REMOVE: (5)DROP
154'
151'
134'
OW5863
OW51136
95'
116'
124'
'861 -
D-
F441)2(,F27)1(,
F84)1(,F6)2(:
R
I:(6)D
RO
P - 1
19'
R:(5
)DR
OP - 1
71'
I:(1)
DROP - 227'
I:(2)D
RO
P - 2
73'
R:(2)D
RO
P - 2
67'
'031 - PORD)5(,D-F441)2(,F27)1(,F84)1(:R
INSTALL: (5)DROP
INSTALL: SUS
REMOVE: SUS
INSTALL: SUS
REMOVE: SUS
P19
P18P20
P21
P22
P22-1
'513 - F633)1(,L-F441)1(,D-F441)2(,F27)1(,F84)1(:R
'861-F633)1(,L-
F441)1(,D-
F441)2(,F27)1(,
F84)1(:I
,L-F441)1(,D-F441)2(,F27)1(,F84)1(:I
'031 - PORD)6(,F633)1(
R:(2)6F,(1)144F-L - 275'
'572 - L-F441)1(:I
R:(2)6F,(1)144F-L - 272'
I:(1)144F-L - 272'
R:(2)6F,(1)144F-L - 263'
I:(1)144F-L - 263'
INSTALL: SUSA,NAP ENCLOSURE,(6)DROP
REMOVE: SUSA,NAP ENCLOSURE,(5)DROP
INSTALL: SUS,(6)DROP
REMOVE: SUS,(5)DROP
(2)CONV. ENCLOSURE,SPLICE
INSTALL: DDE,LCP ENCLOSURE,
REMOVE: SUS
N
APISON PK 317
UNIV
ER
SIT
Y D
R
TUCKER RD 2
MA
TC
H LIN
E S
TA. 1
55+50 S
EE S
HE
ET N
O. U
8-8
MA
TC
H LIN
E S
TA. 166+50 S
EE S
HE
ET N
O.
U8-1
0
COLLEGEDALE PKWY 2
JOB NUMBER:
DESIGNED:
DRAWN:
CHECKED:
SCALE DATE
9.07.20181"=50'
42027.04
RAY
JDS
JLM
STA. 155+50 TO STA. 166+50
FIBER OPTIC RELOCATION
OF CHATTANOOGA
ELECTRIC POWER BOARD
(865) 521-6777 (866) 539-7192
KNOXVILLE, TENNESSEE 37922
SUITE 120
2095 LAKESIDE CENTRE WAY
PROJECT NO.SHEET
NO.TYPE YEAR
CONST. 2018 U8-9STP-317(17)
33070-2233-14 HAMILTON COUNTY
GROUND OBSCURED
OBSCURED
GROUND OBSCURED
GROUND
RW
DECK
MB
MB
DEC
K
CU
RB
MB
RW
DECK
MARKER
OPTIC
FIBER
MARKER
OPTIC
FIBER
TA
NK
PR
OP
AN
E
TELE. PE
D
TELE.
PED
2-W.M.
PED
TELE.
W.M.
RAILROAD R
.O.W.
RAILROAD R.O.W
.
D.B. 3
713
PG.
416
AGRE
EMEN
T
AND
MAIN
TENA
NCE
JOIN
T US
E DRIV
E
•"EIP
WTL-5
PERENNIAL
STR-1
PERENNIAL
STR-5
INTERMITTENT
STR-6
CORPORATION
RETAINED BY MCKEE FOODS
50' R.O.W. EASEMENT
OPTIC
FIBER
OPTI
CFI
BER
1-S-
BR
1-
S-
F
SH
ED
1-
S-
F
GA
RA
GE
1-S-F
1-
S-
F
SH
ED
1-S-
BR
SH
ED
1-S-
F
CONC S/W
GR
AV
EL
CO
NC
2-S-
F
CO
NC S/
W
3-W.M.
SIGN
PED
TELE.
TE
LE.P
ED
DISC
DISC
EIP
•"
1"PIPE
1"PIPE
BENT
1"PIPE
•"
MARKER
OPTIC
FIBERMARKER
OPTIC
FIBER
UTILITYBOX
5.5X3.5
CO
NC
CO
NC
BOX
ELEC
"V" DITCH
"V" DITCH
"V" DITCH
"V" DITCH
"V" DITCH
"V"
DI
TC
H
1
@ 10'
X 5'
RC
BCG
reen
way
Underpass
1
@ 16'
X 10'
RC
BC
175
170
PROP. RETAINING WALL 7
REMOVE: (4)DROP
REMOVE: DROP
INSTALL: DROP
REMOVE: DROP
REMOVE: DROP
INSTALL: SUS
REMOVE: SUS
INSTALL: SUS
INSTALL: SUS
INSTALL: SUS
OW5584OW5823
OW5824
OW5799
OW5590
OW5585
OW5586
OW5587
OW51067
OW52505
OW51519
OW51070
OW51071
'162 -
D-F441)2(,F27)1(,F84)1(:
R
'971 -
D-F441)2(,F27)1(,F84)1(:
R
R:(1)DROP - 68'R:(2)DROP - 86'
R:(1)D
RO
P - 5
9'
R:(1)D
ROP - 1
74'
I:(1)D
RO
P - 9
9'
R:(1)D
RO
P - 9
8'
I:(1)D
RO
P - 2
27'
R:(1)D
RO
P - 6
9'
R:(1)D
ROP - 66'
R:(1)D
RO
P - 1
34'
I:(1)DROP - 122'
'202 - F633)1(,L-F441)1(,D-F441)2(,F27)1(,F84)1(:R
'441
- F633)1(,L-F441)1(,D-F441)2(,F27)1(,F84)1(:R
R:(1)24F,(1)144F-L,(1)3
36F - 234'
R:(1)24F,(1)144F-L,(1)336F - 284'
297'
R:(1)24F,(1)144F-L,(1)336F -
P23
P24
P25
P26
P27
INSTALL: SUS
INSTALL: DDE,DROP
R:(1)48F,(1)72F,(2)144
F - 2
47'
'062 -
F441)2(,F27)1(,F84)1(:R
REMOVE: SUS
P22-2
'513 - F633)1(,L-F441)1(,D-F441)2(,F27)1(,F84)1(:R
(4)DROP
REMOVE: SUS,NAP ENCLOSURE,
(2)LOOP(144F-D),LOOP(144F-L)
ENCLOSURE,LOOP(24F),LOOP(48F),LOOP(72F),
REMOVE: SUSA,LCP ENCLOSURE,(3)CONV.
REMOVE: SUS
REMOVE: SUS,LOOP(336F)
REMOVE: SUS,LOOP(336F)
REMOVE: SUS,(2)LOOP(144F-D),LOOP(72F)
LOOP(48F),LOOP(24F),RISER
REMOVE: SUS,CONV. ENCLOSURE,
I:(1)48
F,(1)72F,(2)144
F-D,(1)144
F-L,(1)336
F - 2
51'
I:(1)48
F,(1)72F,(2)144
F-D,(1)144
F-L,(1)336
F - 2
51' '691 -
F633)1(,L-F441)1(,D-F441)
2(,F27)1(,F84)1(:I
I:(1)48F,(1)72F,(2)144F-D,(1)144F-L,(1)336F - 200'I:(1)48F,(1)72F,(2)144F-D,(1)144F-L,(1)336F - 200'
N
APISON PK 317
MA
TC
H LIN
E S
TA. 1
66+50 S
EE S
HE
ET N
O. U
8-9
MA
TC
H LIN
E S
TA. 177+25 S
EE S
HE
ET N
O.
U8-1
1
SEE S
HEET N
O. U
8-19
STA. 2
7+50
MATC
H LIN
E
TALL
ANT
RD
APISON P
K 317
336 loop
150'
336 loop
100'?
JOB NUMBER:
DESIGNED:
DRAWN:
CHECKED:
SCALE DATE
9.07.20181"=50'
42027.04
RAY
JDS
JLM
STA. 166+50 TO STA. 177+25
FIBER OPTIC RELOCATION
OF CHATTANOOGA
ELECTRIC POWER BOARD
(865) 521-6777 (866) 539-7192
KNOXVILLE, TENNESSEE 37922
SUITE 120
2095 LAKESIDE CENTRE WAY
PROJECT NO.SHEET
NO.TYPE YEAR
CONST. 2018 U8-10STP-317(17)
33070-2233-14 HAMILTON COUNTY
EW
EW
RW
RW
RWRW
RW
RW
CURB
MB
CURB
MB
MB
RW
RW
RW
3-WM
WTL-6
WTL-7
WTL-8
PERENNIAL
STR-1
STR-5 PERENNIAL
INTERMITTENT
STR-6
DUPLE
X
1-S-F
DUPLE
X
2-S-F
2-S-F
SH
ED
SH
ED
2-WM
RAILROAD R.O.W.
RAILROAD R.O.W.
•"
•"
•"
POST
FENCE
METAL
MARKER
OPTIC
FIBER
W.V.
MARKER
GAS
"V" DITCH "V" DITCH
"V" DITCH
"V"
DI
TC
H
185
PROP. RETAINING WALL 8
INSTALL: SUS,DE INSTALL: SUS
INSTALL: SUSA
INSTALL: SUS
REMOVE: SUSA
INSTALL: SUSINSTALL: SUS
OW51072
OW51838
OW51073
OW52695
OW51161
'3
62 -
D-
F4
41)
2(,
F2
7)1(,
F8
4)1(,
F4
2)2(:I
'122
-
D-F4
41)2
(,F2
7)1(,
F84)
1(,
F42)
2(:I
I:(2)24F,(1)48F,(1)72F,(2)144F-D,(1)144F-L,(1)336F - 172' I:(2)24F,(1)48F,(1)72F,(2)144F-D,(1)144F-L,(1)336F - 200' I:(2)24F,(1)48F,(1)72F,(2)144F-D,(1)144F-L,(1)336F - 200'
R:(1)24F,(1)144F-L,(1)336F - 297'
R:(1)24F,(1)144F-L,(1)336F,(1)DR
OP - 303'
R:(1)24F,(1)144F-L,(1)336F,(1)DRO
P - 159'
R:(1)24F,(1)144F-L,(1)336F - 211'
(1)336F - 84'
R:(1)24F,(1)1
44F-L,
P28 P29
P30
P30-2
P30-3
P31 P32
I:(1)1
2F-L - 1
77'
'8
4 -
L-
F2
1)1(:I
'3
41 -
L-
F2
1)1(:I
INSTALL: SUS,DE
OW51355OW51074
R:(1)24F,(1)144F-L,(1)336F - 148'
REMOVE: SUS
REMOVE: SUS,LOOP(336F),DROP
REMOVE: SUS,LOOP(114F-L)
I:(1)48F,(1)72F,(2)144F-D,
(1)144F-L,(1)336F - 200' '712 - F633)1(,L-F441)1(,D-F441)2(,F27)1(,F84)1(:I '512 - F633)1(,L-F441)1(,D-F441)2(,F27)1(,F84)1(:I
'852 - L-F21)1(:I
INSTALL: SUS
REMOVE: SUS,DE,LOOP(12F),DROP
48'
R:(1)1
2F-L
R:(1)1
2F-L - 1
43'
R:(1)12F-L - 258'
OW52446
N
APISON PK 317
MA
TC
H LIN
E S
TA. 177+25 S
EE S
HE
ET N
O.
U8-1
0
SEE S
HEET N
O. U8-1
9
ST
A. 14+75
MATC
H LIN
E
MA
TC
H LIN
E S
TA. 188+00 S
EE S
HE
ET N
O.
U8-1
2
TALLA
NT R
D
APISON PK 317
336 loop
150'
JOB NUMBER:
DESIGNED:
DRAWN:
CHECKED:
SCALE DATE
9.07.20181"=50'
42027.04
RAY
JDS
JLM
STA. 177+25 TO STA. 188+00
FIBER OPTIC RELOCATION
OF CHATTANOOGA
ELECTRIC POWER BOARD
(865) 521-6777 (866) 539-7192
KNOXVILLE, TENNESSEE 37922
SUITE 120
2095 LAKESIDE CENTRE WAY
PROJECT NO.SHEET
NO.TYPE YEAR
CONST. 2018 U8-11STP-317(17)
33070-2233-14 HAMILTON COUNTY
EW
RW
CB
CB
MH
RW
RW
CB
CBCBCBCB
CB
CBMHRW
RW
RW
RW
RW
EIP
•"
TELE. PED
PED
TELE.
TELE. PED
W.V.
W.V.
EASEMENT
DRAINAGE
EXISTING
EASEMENT
DRAINAGE
EXISTING
WTL-9
WTL-8
PERENNIAL
STR-1
PERENNIAL
STR-7
R/
R
SI
GN
AL
W/
BA
SE
ME
NT
2-
S-
F
W/
BA
SE
ME
NT
2-
S-
F
W/ B
ASEM
ENT2-
S-F
CATV PED
CONTROL
R/R
SIGNAL
R/RCONTROL
R/R
CONTROL
R/R
GAS MARKER
RAILROAD R.O.W.
•"
•"
•"
•"
MARKER
GASMARKER
GAS
MARKER
GAS
BOX
CONTROL
GAS
CABLE
BURIED
CABLE
BURIED
R/R SWTCH
PERENNIAL
STR-8
DITCH
"V"
DITCH
"V"
@ 144
L.
F.
54"
RC
P
190 195 200
40
PROP. RETAINING WALL 9
OW5510
OW5509
INSTALL: SUS
INSTALL: SUS
INSTALL: SUS
REMOVE: SUS,DROP
REMOVE: SUSA,DROP
REMOVE: SUS
OW52318OW52317
OW52313OW52315
OW52316
OW52676
INSTALL: SUS INSTALL: SUS INSTALL: SUS
OW5507
I:(2)24F,(1)48F,(1)72F,(2)144F-D,(1)144F-L,(1)336F - 200' I:(2)24F,(1)48F,(1)72F,(2)144F-D,(1)144F-L,(1)336F - 200' I:(2)24F,(1)48F,(1)72F,(2)144F-D,(1)144F-L,(1)336F - 200' I:(1)24F,(1)144F-L,(1)336F - 200' I:(1)24F,(1)144F-L,(1)336F - 220'
I:(1)24F,(1)144F-L,(1)336F - 315'
'0
81 -
F
61
2)1(,
L-F
21)
1(:I
'7
31 -
F
61
2)1(,
L-F
21)
1(:I
'8
51 -
F
61
2)1(,
L-F
21)
1(:I
'921
- F
441)
1(:I
R:(1)24F,(1)144F-L,(1)336F,(1)DRO
P - 283'
R:(1)24F,(1)144F-L,(1)336F,(1)DROP
- 246' R:(1)24F,(1)144F-L,(1)336F - 237'
R:(1)2
16F - 1
03'
R:(1)2
16F - 2
37'
'2
61 -
F
44
1)1(:
R
(1)216F,(1)336F - 252'
R:(1)24F,(1)144F-L,(1)144F-D,
P33 P34 P35 P36 P37
P38
INSTALL: SUS,NAP ENCLOSURE
P38-1
P38-2
P38-3
NAP ENCLOSURE,DROP
REMOVE: SUS,LOOP(336F),LOOP(24F),
R:(1)24F,(1)144F-L,(1)336F - 241'
REMOVE: DDE,SUS,LOOP(144F-L),LOOP(216F)
INSTALL: DE,RISER,CONV. ENCLOSURE
REMOVE: DE,RISER,LOOP(144F-D)LOOP(72F),CONV. ENCLOSURE,
GU F27,F4 .XE
GU
F4)
2(,
F2 .
XE
F6
12,
F8 .
XE
F6
12 .
XE
INSTALL: DDE,CONV. ENCLOSURE,SPLICE
INSTALL: SUS,DDE
N
APISON PK 317
CO
LLE
GE D
R
MA
TC
H LIN
E S
TA. 188+00 S
EE S
HE
ET N
O.
U8-1
1
MA
TC
H LIN
E S
TA. 200+00 S
EE S
HE
ET N
O.
U8-1
3
336 loop
150'216 loop
150'
JOB NUMBER:
DESIGNED:
DRAWN:
CHECKED:
SCALE DATE
9.07.20181"=50'
42027.04
RAY
JDS
JLM
STA. 188+00 TO STA. 200+00
FIBER OPTIC RELOCATION
OF CHATTANOOGA
ELECTRIC POWER BOARD
(865) 521-6777 (866) 539-7192
KNOXVILLE, TENNESSEE 37922
SUITE 120
2095 LAKESIDE CENTRE WAY
PROJECT NO.SHEET
NO.TYPE YEAR
CONST. 2018 U8-12STP-317(17)
33070-2233-14 HAMILTON COUNTY
EW
RW
RW
RW
RW
DE
CK
RW
MB
DE
CK
DE
CK
DE
CK
DE
CK
MB
MB
RW
RW
RW
RW
MB
6-W.M.
PED
TELE.
W.V.
EASEMENT
DRAINAGE
EXISTING
BOARD EASEMENT
ELECTRIC POWER
30'
25'
CO
NE
RL
Y
EA
SE
ME
NT
WWC-7/EPH-7
W/ B
ASEM
ENT
2-S-
F
W/ B
ASEM
ENT
2-S-
F
1-S-
BL
W/
BAS
EM
EN
T
2-S-F
W/
BAS
EM
EN
T
2-S-F
W/
BAS
EM
EN
T
2-S-F
W/
BAS
EM
EN
T
2-S-F
W/
BAS
EM
EN
T
2-S-F
W/
BAS
EM
EN
T
2-S-F
W/
BA
SE
ME
NT
2-
S-
F
W/
BASE
ME
NT
2-S-F
TRAN
SFOR
MER
TRAN
SFOR
MER
TRAN
SFOR
MER
TRAN
SFOR
MER
TR
ANSF
OR
ME
R
1-S-
BR
1-S-
BR
1-S-
BR
1-S-
BR
1-S-
BR
1-S-F
1-
S-
BR
1-
S-
BR
W/
BA
SE
ME
NT
1-
S-
BR
AS
PH
AL
T
1-S-
BL
SIGN
CATV PED
BLOC
K
PED
TELE.
W.M.
RAILROAD R.O.W.
4-
W.M.
EPB DISC
EPB DISC
•"
1"PIPE
BENT
•"
PERENNIAL
STR-7
PERENNIAL
STR-7
MARKER
GAS
CABLE
BURIED
CABLE
BURIED
BOX
ELEC
BENCH
WOODENBOX
ELEC
BURIED CABLE
BOX
ELECTRICAL
GAS MARKER
PED
2-TELE.
PED
TELE.
DITC
H
"V"
"V"
DI
TC
H
"V"
DI
TC
H
"T" DITCH
2'
DITC
H
"V"
DITC
H
"V"
DITC
H
"V"
"V"
DITC
H
DITCH
"V"
"V" DITCH
"T" DITCH
2'
DITCH
"V"
200
205
210
15
PROP. RETAINING WALL 9
56'
OW5616
OW5867
REMOVE: (3)DROP
REMOVE: (3)DROP
INSTALL: (3)DROP
REMOVE: SUS
INSTALL: SUS
INSTALL: SUS
REMOVE: SUS,LOOP(336F)
REMOVE: SUS
OW52312
OW52311OW52310
OW51684
OW52308
OW5067
OW5764
'632 - F633)1(,F612)1(,L-F441)1(,F42)1(:I
'252 - F633)1(,F612)1(,L-F441)1(,F42)1(:I
'022 - F63
3)1(,F612)1(,L
-F441)1(,F42)
1(:I
'022 - F63
3)1(,F612)1(,L
-F441)1(,F42)
1(:I
I:(1)24F,(1)144F-L,(1)216F,(1)336F - 194'
R:(1)24F,(1)144F-L,(1)144F-D,(1)216F,(1)33
6F - 269'
R:(1)24F,(1)144F-L,(1)144F-D,(1)216F,(1)336F - 230'
R:(1)24F,(1)144F-L,(1)144F-D,(1)216F,(1)336F - 229'(1)216F,(1)336F - 135'
R:(1)24F,(1)144F-L,(1)144F-D,
R:DROP - 57'
R:DROP - 86'
R:D
RO
P - 3
7'
R:12F,(7)D
ROP - 1
16'
I:(2)DR
OP - 2
24'
R:(2)D
ROP - 12
4'
R:(1)12F,(7)D
ROP -
I:(1)D
ROP - 5
8'
I:(1)DROP - 90'
R:(1)D
RO
P - 7
4'
I:(1)D
RO
P - 8
8'
R:(1)6
F - 7
0'
'5
31 -
F
6)1(:I 335'
(1)144F-D,(1)216F,(1)336F
R:(1)8F,(1)24F,(1)144F-L,
P39
P40
P41
P42
P42-2
P42-3
P42-1
P43
INSTALL: SUSA
INSTALL: DDE
I:12F,(4)D
RO
P - 1
20'
REMOVE: SUS,LOOP(216F),LOOP(24F)
F6 .
XE
'2
31 -
F
21:I
'3
22 -
F
21:I
'4
01 -
F
21:I
INSTALL: SPLICE
INSTALL: SUSA,(4)DROP
REMOVE: DE,(4)DROP
OW51238
OW5766
'2
81 -
F
21:I
OW5767
LOOP(336F),DROP
NAP ENCLOSURE,
REMOVE: SUS,DE,
NAP ENCLOSURE,(6)DROP
INSTALL: SUS,DE,
R:12F - 2
23'
R:12F - 1
82'
R:12F - 1
32'
PR
OP. R
ET
AININ
G W
ALL 1
0
N
APISON PK 317
CHESTN
UT C
REE
K R
D
EASTVIE
W TE
RRACE
MA
TC
H LIN
E S
TA. 2
00+00 S
EE S
HE
ET N
O. U
8-1
2
MA
TC
H LIN
E S
TA. 211+00 S
EE S
HE
ET N
O.
U8-1
4
336 loop
150'216 loop
150'
336 loop
150'
JOB NUMBER:
DESIGNED:
DRAWN:
CHECKED:
SCALE DATE
9.07.20181"=50'
42027.04
RAY
JDS
JLM
STA. 200+00 TO STA. 211+00
FIBER OPTIC RELOCATION
OF CHATTANOOGA
ELECTRIC POWER BOARD
(865) 521-6777 (866) 539-7192
KNOXVILLE, TENNESSEE 37922
SUITE 120
2095 LAKESIDE CENTRE WAY
PROJECT NO.SHEET
NO.TYPE YEAR
CONST. 2018 U8-13STP-317(17)
33070-2233-14 HAMILTON COUNTY
MB
RW
MBMB
PED.
TELE.
W.M.
MARKER
OPTIC
FIBER
W.V.
BOARD EASEMENT
ELECTRIC POWER
30'
25'
CO
NE
RL
Y
EA
SE
ME
NT
WWC-7/EPH-7
WWC-8/EPH-8
WWC-7/EPH-7
1-
S-
BR
1-
S-
BR
1-
S-
BR
GR
AV
EL
1-S-BR
SHE
D
SI
GN
LA
NDS
CAPI
NG
R/R SIGNAL
W.M.
PED.
TELE.
MARKER
OPTIC
FIBER
RAILROAD R.O.W.
RAILROAD R.O.W.
4-
W.M.
MARKER
OPTIC
FIBER
MARKER
OPTIC
FIBER
EPB DISC
EPB DISC
EPB DISC
•"
•"
POST
FENCE
6"WOOD
PERENNIAL
STR-7
CABLE
BURIED
2
CABLE
BURIED
CABLE
BURIED
CABLE
BURIED
BOX
ELECTRIC
2.5'X4'
PULL BOX
ELECTRIC
1'X2'
W.V.
VAULT
WATERCABLE
BURIED
CLEANOUT
WWC-7/EPH-7
2
2
BOX
ELECTRIC
GAS MARKER
PED
2-TELE.
PED
TELE.
DI
TC
H
"V"
DITCH
"V"
DI
TC
H"
V"
2' "T" D
ITCH
2' "T" DITCH
"V" DITCH
"T" DITCH
2'
60"
RCP
215
220
PROP. RETAINING WALL NO. 10
81'
'47
76'
REMOVE: SUS REMOVE: SUSA,DE
REMOVE: SUSA
REMOVE: SUSA,DE
INSTALL: SUS
INSTALL: SUS
INSTALL: SUS
CONV. ENCLOSURE(83605)
REMOVE: RISER,336F-LOOP,
OW52305
OW52304
OW52306
OW5592
OW52303
OW51393
I:(1)24F,(1)144F-L,(1)216F,(1)336F - 194'
(1)216F,(1)336F -
I:(1)24F,(1)144F-L,
(1)216F,(1)336F -
I:(1)24F,(1)144F-L,
I:(1)DR
OP - 90'
I:(1)D
RO
P - 8
8'
335'
(1)144F-D,(1)216F,(1)336F
R:(1)8F,(1)24F,(1)144F-L,
(1)144F-D,(1)216F,(1)336F
R:(1)8F,(1)24F,(1)144F-L,
81'
(1)144F-D,(1)216F,(1)336F
R:(1)8F,(1)24F,(1)144F-L,
R:(1)8F,(1)24F,(1)144F-D - 241' R:(1)24F,
(1)144F-D
,(1)336F - 1
77'
R:(1)24F,(
1)144F-D,(
1)336F - 24
8'
248'R:(1)24F,
(1)144F-D
,(1)336F -
143'
I:(1)1
2F-L,(1)2
4F,(1)1
44F-D,(1)2
16F,(1)3
36F -
I:(1)12F-L,
(1)24F,(1)1
44F-D,(1)33
6F - 210'
(1)336F - 2
40'I:(2)12F-L,
(1)24F,(1)1
44F-D,
P42-3
P44
P45
P46
P49
P50
R:(1)8F,(1)24F,(1)144F-D - 179'
R:(1)8
F,(1)3
36F - 9
5'
44'
R:(1
)8F,(1
)336F
I:(1)12F-L,(1
)24F,(1)216
F,(1)336F -
270'
INSTALL: SUS
REMOVE: SUS,LOOP(144F-D),LOOP(336F)
(3)CONV. ENCLOSURE
REMOVE: RISER,LOOP(216F),LOOP(336F),
INSTALL: DDE,RISER
INSTALL: PULLBOX
INSTALL: PULLBOX
'4
71 -
F
63
3)1(,
F6
12)
1(,
L-F
44
1)1(,
F4
2)1(:I
132'
- F633)1(,F612)1(,L-F441)1(,F42)1(:I
INSTALL: SUS
INSTALL: DDE
- F633)1(,F612)1(,L-F441)1(,F42)1(:I
132'
INSTALL: DDE
N
APISON P
K 317
MA
TC
H LIN
E S
TA. 211+00 S
EE S
HE
ET N
O.
U8-1
3
MA
TC
H LIN
E S
TA. 2
21+00 S
EE S
HE
ET N
O. U
8-1
5
336 loop
150'
336 loop
150'
216 & 336 loop
150'
JOB NUMBER:
DESIGNED:
DRAWN:
CHECKED:
SCALE DATE
9.07.20181"=50'
42027.04
RAY
JDS
JLM
STA. 211+00 TO STA. 221+00
FIBER OPTIC RELOCATION
OF CHATTANOOGA
ELECTRIC POWER BOARD
(865) 521-6777 (866) 539-7192
KNOXVILLE, TENNESSEE 37922
SUITE 120
2095 LAKESIDE CENTRE WAY
PROJECT NO.SHEET
NO.TYPE YEAR
CONST. 2018 U8-14STP-317(17)
33070-2233-14 HAMILTON COUNTY
CONC.
DITC
H
EW
RW
MB
EW
EW
EW
EW
EW
TELE. PEDPED.
TELE.
W.M. TELE. PED.
W.M.
WWC-9/EPH-9
WWC-7/EPH-7
1-S-BR
SH
ED
SI
GN
LA
NDS
CAPI
NG
VAULT
WATER
2-S-BR
SIGN
CONC
VAULT
WATER
PED.
TELE.
PED.
TELE.
•"
•"
POST
FENCE
6"WOOD
BOX
ELECTRIC
2-W.M.
BOX
SOUTH
BELL
W.M.
VAULT
WATER
BOX
SOUTH
BELL
WATER VAULT
BOX
UTILITY
UNKNOWN
2'X3'
MARKER
GAS
W.V.
W.V.
W.V.
W.V.
MARKER
OPTIC
FIBER
"V"
DI
TC
H
"V"
DI
TC
H
2' "T" DITCH
2' "T"
DITCH
2' "T" D
ITCH
RCP
42"
225
230
INSTALL: SUS
REMOVE: SUS
REMOVE: SUSA,DE,LOOP(336F)
OW51448
OW51449
OW51451OW52047
OW51453
OW51763
248'R:(1)24F
,(1)144F-D,(1
)336F -
R:(1)24F,(1)14
4F-D,(1)336F
- 269'
R:(1)24F,(1)14
4F-D,(1)336F
- 243'
I:(1)24F - 1
34'
R:(2)24F,(1)144F-D,(1)336F - 161'
R:(1)24F,(1)144F-D,(1)336F - 193'
R:(1)144F-D,(1)336F - 266'
R:(2)2
4F - 1
43'
(1)336F - 240
'I:(2)12F-L,(1)
24F,(1)144F-
D,
I:(2)12F-L,(1)24
F,(1)144F-D,(1
)336F - 237'
I:(2)12F-L,(1)
24F,(1)144F-
D,(1)336F - 24
0' I:(1)12F-L,(1)24F,(1)144F-D,(1)336F - 214'
I:(1)144F-D,(1)336F - 215'
I:(1)144F-D,(1)336F - 220'
P51
P52
P53 P54
P54-2
P55
REMOVE: SUSA
INSTALL: SUSA
INSTALL: DDE
REMOVE: SUS
INSTALL: SUSA,LOOP(336F)
REMOVE: SUS,LOOP(24F)
LOOP(24F)
NAP ENCLOSURE,REMOVE: SUS,
INSTALL: SUS
F4
2)2(
.X
E
NAP ENCLOSUREINSTALL: SUS,DE,
N
APISON PK
317
ME
RC L
N
MA
TC
H LIN
E S
TA. 2
21+00 S
EE S
HE
ET N
O. U
8-1
4 MA
TC
H LIN
E S
TA. 233+00 S
EE S
HE
ET N
O.
U8-1
6
336 loop
150'
JOB NUMBER:
DESIGNED:
DRAWN:
CHECKED:
SCALE DATE
9.07.20181"=50'
42027.04
RAY
JDS
JLM
STA. 221+00 TO STA. 233+00
FIBER OPTIC RELOCATION
OF CHATTANOOGA
ELECTRIC POWER BOARD
(865) 521-6777 (866) 539-7192
KNOXVILLE, TENNESSEE 37922
SUITE 120
2095 LAKESIDE CENTRE WAY
PROJECT NO.SHEET
NO.TYPE YEAR
CONST. 2018 U8-15STP-317(17)
33070-2233-14 HAMILTON COUNTY
EW
EW
EW
EW
EW
DI
TC
H
MB
CO
NC.
TR
AI
L
MB
TELE.
PED
TELE. PED
PED
TELE.
TELE. PED.
W.V.
1-S-F
1-S-
F
CO
NC
S/
W
SH
ED
1-S-BL
VAULT
WATER
W.M.
EIP•"
MARKER
OPTIC
FIBERMARKER
OPTIC
FIBER
VALVE
BLOW OFF
VALVE
INDICATOR
POST
BURIED CABLE
PED.
TELE.
"V"
DI
TC
H
2' "T" DITCH
2' "T" DITCH
"V"
DI
TC
H
240
235
REMOVE: SUS
INSTALL: SUS
REMOVE: SUS
INSTALL: SUS
REMOVE: SUS
INSTALL: SUS
OW51454
OW52459
OW52460
OW52461
OW52462
I:(1)144F-D,(1)336F - 220'
I:(1)144F-D,(1)336F - 201'
R:(1)144F-D,(1)336F - 220'
I:(1)144F-D,(1)336F - 220'
R:(1)144F-D,(1)336F - 201'
R:(1)144F-D,(1)336F - 214'
'312 - F633)1(,D-F441)1(:RI:(1)144F-D,(1)336F - 220'
'322 - F633)1(,D-F441)1(:I
203'
F633)1(,F27)2(:I
'482 - F633)1(,F27)2(:R
P56
P57P58
P59
P60
REMOVE: SUSA
INSTALL: SUS
LCP ENCLOSURE,
CONV. ENCLOSURE,
LOOP(144F-D),LOOP(336F),
REMOVE: SUS,(2)LOOP(72F),
CONV. ENCLOSURE
INSTALL: SUSA,LCP ENCLOSURE,
N
APISON PK 317
MA
TC
H LIN
E S
TA. 233+00 S
EE S
HE
ET N
O.
U8-1
5
MA
TC
H LIN
E S
TA. 2
43+00 S
EE S
HE
ET N
O. U
8-1
7
336 loop
150'
JOB NUMBER:
DESIGNED:
DRAWN:
CHECKED:
SCALE DATE
9.07.20181"=50'
42027.04
RAY
JDS
JLM
STA. 233+00 TO STA. 243+00
FIBER OPTIC RELOCATION
OF CHATTANOOGA
ELECTRIC POWER BOARD
(865) 521-6777 (866) 539-7192
KNOXVILLE, TENNESSEE 37922
SUITE 120
2095 LAKESIDE CENTRE WAY
PROJECT NO.SHEET
NO.TYPE YEAR
CONST. 2018 U8-16STP-317(17)
33070-2233-14 HAMILTON COUNTY
EW
EW
MB
MH
RW
EW
DI
TC
H
MB
CO
NC.
MH
MH
MB
MB
MB
MB
MB
1"PIPE
TELE. PED
PED.
TELE.
W.M.
PED.
TELE.W.V.
W.M.
TELE.
MAR
KER
WWC-10/EPH-10
INTERMITTENT
STR-9
WWC-11/EPH-11
INTER
MITTE
NT
STR-9
8'WIDE
CULVERT
STONE
1-S-F
1-S-F
1-S-F
CO
NC
S/
W
SHE
D
SH
ED SH
ED
1-S-
MTL
1-S-MT
L
1-S-MT
L
1-
S-
F
1-
S-
F
1-
S-
F
SHED
SHED
1-S-F
1-
S-
F
2-S-F
1-
S-
MT
L
1-S-BL
1-S-F
1-S-
MTL
1-S-MT
L
1-S-MT
L
1-
S-
F
1-
S-
F
1-
S-
F
SHED
TELE. PED.
PED.
TELE.
EIP
EIP
•"
•"
BENT
•"
•"
ƒ"
•"
•"
POST
FE
NCE
MET
AL
WTL-10
CABLE
BURIED
ELEC BOX
STATION
PUMP
CL
EA
NO
UT
BURIED CABLE
Exist. "
V"
DI
TC
H
"V"
DI
TC
H
2' "T" DITCH 2' "T" DITCH 2' "T" DITCH
2' "T" DITCH
@130
L.
F.
36"
RC
P
250
245
(3)DROP
REMOVE: DDE,
INSTALL: SUS,(3)DROP
REMOVE: SUS,(2)DROP
INSTALL: SUS,(2)DROP
REMOVE: SUS,DEREMOVE: SUS,(2)DROP
INSTALL: SUSA,DE
OW52463
OW51038
OW51039
OW5207 OW5206
OW52670
OW52669
OW5205(1)72F,(1)336F,(2)DROP - 220'
'302 -
F633)1(,F27)2(:I
R:(1)7
2F - 1
65'
'5
61 -
F
27)
1(:
R
'482 - F633)1(,F27)2(:R
'462 - F633)1(,F27)1(:R'
59 -
P
OR
D)1(:I
'8
41 -
P
OR
D)1(:
R I:(1)7
2F,(2)D
ROP - 6
8'
'6
71 -
P
OR
D)3(,
F2
7)1(:I
I:(1)D
ROP - 2
4'
'09 - PORD)1(:I
'2
01 -
P
OR
D)1(:
R
'022 - PORD)1(,F633)1(,F27)1(:I
'111 - PORD)2(,F633)1(:R
I:(1)336F - 162'R:(1)7
2F,(4)D
RO
P - 2
18'
'0
21 -
P
OR
D)1(:
R
P61 P62 P63
P64
P65
P65-1INSTALL: SUS,DROPINSTALL: SUS,(2)DROP
INSTALL: DDE,NAP ENCLOSURE,(3)DROP
'711
- P
ORD)
1(:R'
15
2 -
F
27)
1(:I
'022 - F633)1(,F27)1(:I
'162 - PORD)1(,F633)1(,F27)1(:R
I:(1)72F,(1)336F,(2)DROP - 220'
'192 - PORD)2(,F633)1(,F27)1(:R
P65-2
(4)DROP
REMOVE: SUSA,DE,LOOP(336F),
REMOVE: SUS,NAP ENCLOSURE,(4)DROP(2)DROP
INSTALL: SUSA,DE,REMOVE: SUSA
N
APISON PK 317
BESS M
OO
RE R
D
SIL
VE
R L
N
MA
TC
H LIN
E S
TA. 243+00 S
EE S
HE
ET N
O.
U8-1
6
MA
TC
H LIN
E S
TA. 254+00 S
EE S
HE
ET N
O.
U8-1
8
336 loop
150'
JOB NUMBER:
DESIGNED:
DRAWN:
CHECKED:
SCALE DATE
9.07.20181"=50'
42027.04
RAY
JDS
JLM
STA. 243+00 TO STA. 254+00
FIBER OPTIC RELOCATION
OF CHATTANOOGA
ELECTRIC POWER BOARD
(865) 521-6777 (866) 539-7192
KNOXVILLE, TENNESSEE 37922
SUITE 120
2095 LAKESIDE CENTRE WAY
PROJECT NO.SHEET
NO.TYPE YEAR
CONST. 2018 U8-17STP-317(17)
33070-2233-14 HAMILTON COUNTY
3-
MB
MB
MB
EW
RW
EW
MB
MB
RW
RW
RW
PO
OL
POOL
W.M.
TELE. PED.
TELE. PED
W.M.
PED.
TELE.
W.M.
TELE.MARKER
STR-5
WTL-11
WWC-11/EP
H-11
INTERMITTENT
STR-9
8'
WI
DE
CUL
VERT
ST
ONE
2-S-F
SHACK
1-S-F
1-S-MTL
1-S-
F
SHED
2-S-BR
1-S-F
1-S-BR
GARAGE
1-S-BL
GARAGE
1-S-F
1-S-F
1-S-BR
1-S-F
1-
S-
F
GA
RA
GE
1-
S-
F
SHED
SHED
WOOD
1-S-BR
1-
S-
BR
1-
S-
F
1-S-BR
PED.
TELE.
W.V.
W.M.
PED.
TELE.TELE. PED.
W.M.
•"
POST
FENCE
METAL
POST
FENCE
•"
•"
PED.TELE.
CABLE
BURIE
D
2-W.M.'S
FIBER OPTIC MARKER
2' "T" DITCH
2' "T" DITCH
TO R
EMAI
N
EXIS
T. 3
6" R
CP
260
255
OW5204
OW5227OW5203
OW51407
OW5228
OW5229
OW5230
OW5202OW5200I:
(1)336F -
162'
'021 - P
ORD)1(:R
'592
-
F84)
1(:I
'8
9 -
F
84)
1(:I
'7
9 -
F
84)
1(:
R
R:(1)48F
- 295'
'871 -
F633)
1(:I
I:(1)48F,(1)336F - 170''341 - F633)1(,F84)1(:I
'7
01 -
P
OR
D)1(:
R
P66
P67
P68 P69
P70
'171 - F633)1(:R'922 - F633)1(,F84)1(:R
'022 - PORD)2(,F633)1(,F84)1(:R
'012 - PORD)1(,F633)1(,F84)1(:I
R:(1)DROP - 92'
'38 -
P
OR
D)1(:
R
'813 - F633)1(:ROW5200
'5
9 -
P
OR
D)2(:I
R:(2)D
RO
P - 7
2'
STA. 261+87.24 { S.R. 317
END PROJECT STP-317(17)
N
APISON PK 317
LAYTO
N LN
HIC
KO
RY HIL
L L
N
SH
OR
T C
UT R
D
MATC
H LIN
E S
TA. 2
54+00 S
EE S
HEET N
O. U
8-1
7
JOB NUMBER:
DESIGNED:
DRAWN:
CHECKED:
SCALE DATE
1"=50'
42027.04
RAY
JDS
JLM
STA. 254+00 TO STA. 266+50
FIBER OPTIC RELOCATION
OF CHATTANOOGA
ELECTRIC POWER BOARD
(865) 521-6777 (866) 539-7192
KNOXVILLE, TENNESSEE 37922
SUITE 120
2095 LAKESIDE CENTRE WAY
9.07.2018
PROJECT NO.SHEET
NO.TYPE YEAR
CONST. 2018 U8-18STP-317(17)
33070-2233-14 HAMILTON COUNTY
CURB
MB
CURB
MB
RW
MH
CURB
MB
MH
CURB
CURB
MH
CU
RB
CU
RB
W.M.
W.V.
MH
CU
RB
MB
W.M.
MB
MB
MB
MB
MB MB
CURB
MB
BBG
W.M.
MB
MB
MB
MB
RW
RW
RW
W.M.
MB
CU
RB
DE
CK
CURB
MB
W.M.
RW
CURB
RW
EW
MHW.M.
MB
MB
CURB
EW
RW
CURB
MB
RW
RW
RW
MB
MB
MB
MB
MB
RW
RW
MB
CURB
DEC
K
PO
OL
RW
CURB
MB
RW
MB
MB
MB
RW
CU
RB
MB
CU
RB
CU
RB
MB
WW
C-6/
UP
L-6
3-WM
TELE. PE
D
w/C
AP
•"EIP
EIP
•"
EIP
•"
EIP
•"
EIP
•"
EIP
•" EIP
†"
PIPE
1"PINCH
1"SPIKE
W.M.
W.M.
2-TELE.PE
D.
2-TELE.PE
D.
PULL
BO
X
TELE. PED.
PED.
TELE.
W.M.
W.M.
•"EIP
1"PIPE
WTL-7
INTERMITTENT
STR-6
2-S-F
2-WM
POST
FENCE
METAL
W.M.
W.M.
TELE.PE
D.
EL
EC
W.M.
W.M.
INTERMITTENT
STR-6
PED.
TELE.
W.M.
IN
V-791.78
MARKER
OPTIC
FIBER
OPTICFIBER
OPTIC
FIBER
W.V.
OPTIC
FIBER
ELEC. B
OX
CO
NC
CO
NC
PI
V
ASP
BOX
ELEC
3
2
2-
2
W.V.
TE
LE. P
ED.
PE
D.
TE
LE.
2-
MB
"V"
DIT
CH
"V"
DITC
H
"V"
DI
TC
H
"V"
DITC
H
"V"
DITC
H
"V"
DITC
H
"V" DITCH
2' "
T"
DI
TC
H
2'"
T"
DI
TC
H
Exist.
Ditch
Exist.
Ditch
DITC
H
2'"T"
Exist.
Ditch
Exist.
Ditch
RCP
24"
1
@ 8'
X 4'
RC
BC
20
25
15
15
REMOVE: SUS,DE
REMOVE: SUS,(2)DROP
INSTALL: SUS
OW51311
OW5625
OW5626
OW51331
OW5980
OW5591
'591
-
D-F4
41)2
(,F2
7)1(,
F84)
1(,
F42)
2(:I
'591
-
D-F4
41)2
(,F2
7)1(,
F84)
1(,
F42)
2(:I
'9
91 -
D-
F4
41)
2(,F
27)
1(,F
84)
1(,F
42)
2(:I
R:(1)D
ROP - 1
03'
I:(1)DROP - 60'
'071 -
F6)2
(:I
'352
-
F6)2
(:R
P30-4
INSTALL: SUS,NAP ENCLOSURE,DROP
'392 -
F42)1(:R
I:(1)24
F - 2
00'
R:(1)72F,(2)144
F - 2
67'
I:(1)48
F,(1)144
F - 2
59'
R:(1)72F,(1)144F - 348'
R:(2)6
F,(1)7
2F,(1)1
44F - 166'
R:(2)6
F,(1)72F,(1)144F,(1)D
ROP - 174'
'7
42 -
D-
F4
41)
2(,F
27)
1(,F
84)
1(,F
42)
2(:I
P73
P71
P72
P74
LOOP(48F),LOOP(24F),RISE
RREMOVE: SUS,CONV. E
NCLOSURE,
INSTALL: DE,RISER,CONV. ENCLOSURE
INSTALL: SPLICE
'161
-
F441:I
F441:I
'15
'4
02 -
D-
F4
41)
2(,F
27)
1(,F
84)
1(,F
42)
2(:I
I:(1)7
2F,(1)1
44F-D - 204'
INSTALL: DDE
144F-LOOP,DROP
ENCLOSURE,
REMOVE: SUS,NAP
INSTALL: DDE
REMOVE: SUS
'15
R:144F
R:144F
- 161'
INSTALL: DDE,(2)DE
INSTALL: SUS,DE
REMOVE: SUS,DE
N
SEE S
HEET N
O. U
8-10
STA. 27+
50
MATC
H LIN
E
MATC
H LIN
E ST
A.1
4+75 SEE S
HEET N
O. U8-1
1
TA
LL
AN
T R
D
AS
HER L
N
LOBLO
LLY LN
ASHER LN
COLLE
GE VIE
W D
R
ASHER VILLIAGE DR
MEN
DOZA P
L
JOB NUMBER:
DESIGNED:
DRAWN:
CHECKED:
SCALE DATE
1"=50'
42027.04
RAY
JDS
JLM
TALLANT RD. STA. 14+75 TO END OF CONSTR.
FIBER OPTIC RELOCATION
OF CHATTANOOGA
ELECTRIC POWER BOARD
(865) 521-6777 (866) 539-7192
KNOXVILLE, TENNESSEE 37922
SUITE 120
2095 LAKESIDE CENTRE WAY
9.07.2018
PROJECT NO.SHEET
NO.TYPE YEAR
CONST. 2018 U8-19STP-317(17)
33070-2233-14 HAMILTON COUNTY
PROJECT NO.SHEET
NO.TYPE YEAR
CONST. 2018 U8-20STP-317(17)
33070-2233-14 HAMILTON COUNTY
JOB NUMBER:
DESIGNED:
DRAWN:
CHECKED:
SCALE DATE
9.07.20181"=50'
42027.04
RAY
JDS
JLM
FIBER OPTIC INSTALLATION NOTES
FIBER OPTIC RELOCATION
OF CHATTANOOGA
ELECTRIC POWER BOARD
(865) 521-6777 (866) 539-7192
KNOXVILLE, TENNESSEE 37922
SUITE 120
2095 LAKESIDE CENTRE WAY
JOB NUMBER:
DESIGNED:
DRAWN:
CHECKED:
SCALE DATE
1"=50'
42027.04
RAY
JDS
JLM
CONSTRUCTION ASSEMBLY DETAILS
FIBER OPTIC RELOCATION
OF CHATTANOOGA
ELECTRIC POWER BOARD
(865) 521-6777 (866) 539-7192
KNOXVILLE, TENNESSEE 37922
SUITE 120
2095 LAKESIDE CENTRE WAY
9.07.2018
PROJECT NO.SHEET
NO.TYPE YEAR
CONST. 2018 U8-20STP-317(17)
33070-2233-14 HAMILTON COUNTY
R
NO DATE BY REVISION
APPROVED:
DATE DRAWN BY CHECKED BY
FIBER STANDARDS & DESIGN
NO.
STRAND DEADEND
DE
DESCRIPTIONQTY.ID
1
3
AS REQ'D
1
#4 CU. GROUND WIRE (LENGTH AS REQUIRED)
K-2 BONDING CLAMP
3
4
5
1 5/8" x REQUIRED LENGTH MACHINE BOLT W/ LOCKNUT
1 THIMBLEYE NUT
1 GUYING BRACKET
5
4
2
INTERPRETATION, USE GUY TAIL AND K-2 BONDING CLAMP.
IF BOND BETWEEN STRAND AND DOWN GUY IS REQUIRED BY SPECIFIC LOCAL 2.
INTO GUY STRAP.
1. PREFORMED DEADEND MUST BE PROPER OVAL SHAPE AND FIT COMPLETELY
NOTES:
MIN.
2
STRAND TAIL
4"
R
NO DATE BY REVISION
APPROVED:
DATE DRAWN BY CHECKED BY
FIBER STANDARDS & DESIGN
NO. FDE
FALSE DEADEND-LIMITED TENSION
ARMORED FIBER OPTIC CABLE
R
NO DATE BY REVISION
APPROVED:
DATE DRAWN BY CHECKED BY
FIBER STANDARDS & DESIGN
NO. SUS
STRAIGHT LINE ATTACHMENT
LASHED ARMORED FIBER OPTIC CABLE R
NO DATE BY REVISION
APPROVED:
DATE DRAWN BY CHECKED BY
FIBER STANDARDS & DESIGN
NO. SUSA
LASHED ARMORED FIBER OPTIC CABLE
JOB NUMBER:
DESIGNED:
DRAWN:
CHECKED:
SCALE DATE
1"=50'
42027.04
RAY
JDS
JLM
CONSTRUCTION ASSEMBLY DETAILS
FIBER OPTIC RELOCATION
OF CHATTANOOGA
ELECTRIC POWER BOARD
(865) 521-6777 (866) 539-7192
KNOXVILLE, TENNESSEE 37922
SUITE 120
2095 LAKESIDE CENTRE WAY
9.07.2018
PROJECT NO.SHEET
NO.TYPE YEAR
CONST. 2018 U8-22STP-317(17)
33070-2233-14 HAMILTON COUNTY
R
NO DATE BY REVISION
APPROVED:
DATE DRAWN BY CHECKED BY
FIBER STANDARDS & DESIGN
NO. BOND
WITH BOND
STRAIGHT LINE CONSTRUCTION
DESCRIPTIONQTY.ID
1
2
3
AS REQ'D
1
1
#6 GROUND WIRE (LENGTH AS REQUIRED)
3-BOLT SUSPENSION CLAMP ASSEMBLY
K-1 BONDING CLAMP
3 2
1
BONDING CLAMP.
GROUND WIRE MUST NOT EXTEND OUT OF THE END OF THE K-1 2.
EXTENDER LOCATIONS.
1. BOND AT EVERY GROUND, EXCEPT FOR AMPLIFIER AND LINE
NOTES:
EXISTING NEUTRAL
GROUND
EXISTING POWER
40"
MIN.
R
NO DATE BY REVISION
APPROVED:
DATE DRAWN BY CHECKED BY
FIBER STANDARDS & DESIGN
NO. DDE
DOUBLE DEADEND
ARMORED FIBER OPTIC CABLE R
NO DATE BY REVISION
APPROVED:
DATE DRAWN BY CHECKED BY
FIBER STANDARDS & DESIGN
NO. FOSS
DESCRIPTIONQTY.ID
2
3
1
ANTEC FIBERLOOP MODEL FOSS-2
FIBER (LENGTH AND SIZE AS REQUIRED)
FIBEROPTIC SPLICE ENCLOSURE
1
1
3
2
SPECIFICATIONS.
STRAND STORAGE IS TO BE INSTALLED PER MANUFACTURER'S 2.
FIBEROPTIC STRAND STORAGE IS ANTEC* FIBERLOOP* MODEL FOSS-2. 1.
NOTES:
1
SPLICE ENCLOSURE
FIBER OPTIC
FIBEROPTIC STRAND STORAGE
R
NO DATE BY REVISION
APPROVED:
DATE DRAWN BY CHECKED BY
FIBER STANDARDS & DESIGN
NO.
WITH BOND
STRAIGHT LINE CONSTRUCTION
ENCLOSURE
R
NO DATE BY REVISION
APPROVED:
DATE DRAWN BY CHECKED BY
FIBER STANDARDS & DESIGN
NO. RISER
RISER ASSEMBLY
DESCRIPTIONQTY.
1
2
3
AS REQ.
1
10' JOINT 1-1/2" SCH. 40 PVC CONDUIT
ELL'S 1-1/2" RIGID 90 DEGREE
4 STAND OFF BRACKETS
4 1-1/2" STRAP KITS
4
4
2 2
1 1
3
NOTES:
1. ALL RISERS SHOULD HAVE A SEALED 36" METAL SWEEP FROM TRENCH LEVEL
TO POLE OR BUILDING AND SEVERAL INCHES ABOVE GROUND LEVEL.
2. A MINIMUM OF 1/16" THICK, 6' LONG U GUARD WITH LAG BOLTS SHOULD BE
USED ON POLES FROM GROUND LEVEL.
3. ON BUILDINGS, A U GUARD OR MOLDING SHOULD BE USED FROM GROUND
LEVEL TO AT LEAST 5' ABOVE, AND BE ADEQUATE TO PROTECT FROM LAWN
MOWER AND OTHER IMPACT.
4. ALL RISERS WILL USE 4" STAND-OFF BRACKETS ON POWER POLES.