Copyright 2018 Baker Hughes, a GE company, LLC (“BHGE”). All rights reserved.The information contained in this document is company confidential and proprietary property of BHGE and its affiliates. It is to be used only for the benefit of BHGE and may not be distributed, transmitted, reproduced, altered or used for any purpose without the express written consent of BHGE.
Effizienzsteigerung in der Erdöl- und Erdgasindustrie durch den Einsatz neuer Technologien
November 22, 2018
Niedersächsische Energietage am 20.-21.11.2018 in Hannover
Prof. Dr.-Ing. Sven Krüger
RECOVERYIMPROVED
WELLSEFFICIENT
PRODUCTIONOPTIMIZED
28,000EMPLOYEES
BHGE Oilfield Services
120+ COUNTRIES IN WHICH WE OPERATE
R.C. Baker Howard Robard Hughes, Sr.
Copyright 2018 Baker Hughes, a GE company, LLC (“BHGE”). All rights reserved.
Global technology and research centers
3
THE WOODLANDS TECHNOLOGY CENTERThe Woodlands, Texas, USA
HOUSTON TECHNOLOGY CENTERHouston, Texas, USA
CENTER FOR TECHNOLOGY AND INNOVATIONHouston, Texas, USA
CELLE TECHNOLOGY CENTER Celle, Lower Saxony, Germany
ARTIFICIAL LIFT RESEARCH AND TECHNOLOGY CENTERClaremore, Oklahoma, USA
DHAHRAN TECHNOLOGY CENTER Dhahran, Eastern Province, KSA
GINN CENTERSugar Land, Texas, USA
OIL & GAS TECHNOLOGY CENTEROklahoma City, Oklahoma, USA
November 22, 2018
Copyright 2018 Baker Hughes, a GE company, LLC (“BHGE”). All rights reserved.
Crude Oil Prices since 1988
Long Beach CA., Shoreline
Drilling (1930’s)
Oil Sands Magazine
Iraq invades Kuwait
Global Financial Crisis
Strong non-OPEC production
Asia driving demand
Copyright 2018 Baker Hughes, a GE company, LLC (“BHGE”). All rights reserved.
Falling Production Cost through use of new Technologies
Copyright 2018 Baker Hughes, a GE company, LLC (“BHGE”). All rights reserved.
New Technology Changes Market Dynamics
Copyright 2018 Baker Hughes, a GE company, LLC (“BHGE”). All rights reserved.
November 22, 2018 7
THE PRODUCTION/INEFFICIENCY GAP
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Offshoredeepwater
Offshore midwater
Offshore shelf
Oil sands
Shale/Tight oil
ConventionalOnshore
Gas Proven (Bcf)
1.5
TR
ILLION
RECOVERY FACTOR
PRODUCTION INEFFICIENCY(NON-PRODUCTIVE TIME AND
INVISIBLE LOST TIME)
PR
OV
EN
RE
SE
RV
ES
Source: Rystad Energy, 2016
TECHNOLOGY AND INDUSTRY PERFORMANCE
•FASTER DRILLING AND COMPLETIONS
•BETTER WELL PERFORMANCE
• LONGER LATERALS
Copyright 2018 Baker Hughes, a GE company, LLC (“BHGE”). All rights reserved.
Rotary Steerable Systems
• High build rate, fully integrated land-based
drilling system
• Increases drilling performance vs.
conventional motor systems
– Eliminates orienting / sliding for steering
– Saves trips to change bottomhole assembly
for different directional profiles
Rotary Steerable Drilling Systems
Copyright 2018 Baker Hughes, a GE company, LLC (“BHGE”). All rights reserved.
The early days of modern drilling..1920s
Long Beach CA., Shoreline
Drilling (1930’s)
Copyright 2018 Baker Hughes, a GE company, LLC (“BHGE”). All rights reserved.
Today
Pier J
Grissom
White
ChaffeeFreeman
Copyright 2018 Baker Hughes, a GE company, LLC (“BHGE”). All rights reserved.
Directional Drilling
Chaffee
White
Freeman
Grissom
Pier J
Belmont
Copyright 2018 Baker Hughes, a GE company, LLC (“BHGE”). All rights reserved.
13
ROTARY STEERABLE CLOSED-LOOP SYSTEM
SELF-ADAPTING DRILL BIT
AUTOMATED ESP MONITORING SYSTEM
Copyright 2018 Baker Hughes, a GE company, LLC (“BHGE”). All rights reserved.
14
WELL PLACEMENTEXACT
HOLE QUALITYSUPERIOR
PERFORMANCEFAST AND RELIABLE
Landed thousands of complex wells flawlessly
Drilled 120+ million feet of quality hole
Established numerous drilling records worldwide
Copyright 2018 Baker Hughes, a GE company, LLC (“BHGE”). All rights reserved.
15
TORQUEMINIMAL
TOOL FAILURESFEWER
DRILLINGFASTER
Generated 35% lower surface torque
Completed entire run with zero NPT
Improved ROP by 27%
PERFORMANCEMORE CONSISTENT
Reduced torque variation 90%
Copyright 2018 Baker Hughes, a GE company, LLC (“BHGE”). All rights reserved.
16
OPEXLOWER
FAILURESFEWER
PERFORMANCEFAST AND RELIABLE
$800K USD monthly savings
Zero ESP shutdowns
25% production increase
Copyright 2018 Baker Hughes, a GE company, LLC (“BHGE”). All rights reserved.
Geothermal Drilling Example Germany
Geothermal Wells in BavariaDuerrnhaar and Kirchstockach KST GT2
AutoTrak Express BHAWell path example of Geothermal Well in Molasse Basin
• Central Well places
• Cost ~ 25 Mill EUR
• High build rate 8 ½“ hole to secure 125 – 140 l/s production rate
• BHGE Drilling Service enables ~80 % increase in drilling efficiency,saving 16 days of KST GT2
• 8 days saved for completion of welldue to high wellbore quality
Copyright 2018 Baker Hughes, a GE company, LLC (“BHGE”). All rights reserved.
75% Cost Reduction of Operating Costs for Geothermal Pumps
Neuentwicklung der Pumpenlagerund Dichtungssysteme:
• Laufzeitverlängerung von durchschnittlich 60 auf 500 Tage
• Kosteneinsparungen von durchschnittlich 75%
Dürrnhaar: 141°C Sauerlach: 146°C Unterhaching: 125°C
Lau
fze
it [
Ta
ge
]
neue Pumpen-
lager
neue Dichtungs-
konfiguration
Aktuelle Laufzeiten (seit 2012)Duerrnhaar 175T
Kirchstockach 499TOberhaching 723T
Sauerlach 600TTraunreut 455T
Unterhaching 260T
Weltrekord bei 146°C!