Upload
derek-decker
View
81
Download
4
Tags:
Embed Size (px)
DESCRIPTION
EEE368. By: Madam Siti Aishah Che Kar Room: 1110 Sarjana blok [email protected]. eee368. wordpress.com. Final year project blog. Assessment. Important!. Log book Binding Individual Type of book & format – ask supervisor Attendance form Kept by supervisor. - PowerPoint PPT Presentation
Citation preview
Final year project blog
SupervisorFinal report 20%
Logbook 20%
Technical report & project 20%
Panels Project prototype 25%
Project presentation 15%
Total 100%
Log bookBinding
- Individual- Type of book & format – ask supervisor
Attendance form- Kept by supervisor
Schedule
Will be held on 8.7.2012 – 12.7.2012Expected outcome:
1. Schematic 2. Simulation 3. PCB layout (OrCAD) 4. Slide power point (progress work)
5. first draft technical paper 6. first dfart hard cover report
Will be held on 26.8.2012 – 30.6.2012Expected outcome:
1. PCB board ( complete : etching and soldering)
2. sample of prototype 3.Slide power point (progress work)
4. second draft technical paper 5. second draft hard cover report
Will be held on 15.1.2011 – 19.1.2012Expected outcome:
1. complete final project ( including prototype)
2. poster
PCB session -weekdays (Sunday to Thursday)Office hour-Proper attire ( no slippers & t-shirts without
collar)-limitation up to 8 students per session- early in morning
Elektronik ON40, Jalan Tok Lam
20100 Kuala TerengganuTel: 09 - 6220362Fax: 09 – 6227362
(SuburTek)Kuala Terengganu Branch:Lot 18, Tingkat 2,
Plaza Kuala Terengganu,Jalan Tok Lam,
20100 Kuala Terengganu,PIC: Mr. Ismail
Mobile : 012-4740541Fax : 09-6228300
E-mail : [email protected]
www.rsmalaysia.com (M) (free shipping:component)
www.cytron.com(M) (component, sample project)www.suburtek.com (M)(component)www.robotshop.us (US)(robotic component)www.mikroe.com(US) (sample
project,componet,etc)www.blitzlogic.com(M) (sample project)http://my.farnell.com (M)(component)www.mikrochip.com (US) (sensor, ic,etc)