UNIVERSIDAD CENTROAMERICANA “JOSE SIMEON CAÑAS”
Prácticas de Especialidad II
Lic. Mauricio Quevedo
Grupo: #4GO-NET
Fany Vanessa Meléndez Dueñas
Alberto Sánchez Pérez
Jacqueline Iveth Portillo Rivera
Karina Yossibel Márquez Hernández
Viernes 19 de Noviembre de 2010
2010
Fase de Elaboración – Web Site ArtBambucm
8/18/2019 Edert Tadeo Fase de Construccion
2/22
ÍNDICE
METODOLOGÍ A ---------------------------------------------------------------------------------------------------------------------------------------- 1
FASE DE INICIO --------------------------------------------------------------------------------------------------------------------------------------- 1 FASE DE ELABORACIÓN ---------------------------------------------------------------------------------------------------------------------------- 2 FASE DE CONSTRUCCIÓN -------------------------------------------------------------------------------------------------------------------------- 3
PRUEBAS DE LOS SISTEMAS ------------------------------------------------------------------------------------------------------------------- 4
MÉTRICAS ----------------------------------------------------------------------------------------------------------------------------------------------- 4
CONCLUSIONES -------------------------------------------------------------------------------------------------------------------------------------- 0
CORRECCIONES DE LA ETAPA ANTERIOR -------------------------------------------------------------------------------------------------- 1
ACTUALIZACIÓN DE LA PLANEACIÓN Y CRONOGRAMA DEL PROYECTO ------------------------------------------------------ 2
DIAGRAMAS DE GANTT ---------------------------------------------------------------------------------------------------------------------------- 4
GRÁFICA DE GANTT - FASE INICIO ---------------------------------------------------------------------------------------------------------------- 4
G
RÁFICA DE
G
ANTT
-
F
ASE
E
LABORACIÓN ------------------------------------------------------------------------------------------------------ 5
GRÁFICA DE GANTT - FASE CONSTRUCCIÓN ---------------------------------------------------------------------------------------------------- 6
DIAGRAMA TIEMPO ESTIMADO VRS TIEMPO REAL ------------------------------------------------------------------------------------ 7
ANEXOS -------------------------------------------------------------------------------------------------------------------------------------------------- 8
8/18/2019 Edert Tadeo Fase de Construccion
3/22
Web Site ArtBambucm Fase Construcci
METODOLOG
Í A
Múltiples metodologías para la elaboración de aplicaciones se han desarrollado a lo largo de losúltimos años, el principal objetivo que persiguen es el de lograr que los usuarios finales puedanrealizar su trabajo de la mejor manera.
En la realización del presente trabajo se estipulo que la metodología a seguir por parte del grupoGO-NET, en la creación de la página web para la tienda de artesanías Artbambucm, seria RUP.
La metodología RUP, descompone su ciclo de vida en cuatro fases secuenciales de las cuales sehace una breve descripción:
FASE DE INICIO En donde se establece el caso de negocio para el sistema y delimita el alcance del proyecto.
Ya en nuestro proyecto establecimos en la fase de inicio:
• ArtBambucm es una empresa productora y comercializadora de productos artesanales ymanualidades hechos en El Salvador.
• Diseñaremos un sitio web, que provea a ArtBambucm de una herramienta informáticacomo elemento de comunicación y publicidad, con un diseño profesional que facilite lainteracción con los clientes tanto nacionales como internacionales, ofreciendo así unaforma rápida de dar a conocer sus diferentes productos por medio del uso de latecnología.
• Se buscara tener la opción de organizar los productos por categorías y sub-categorías.
• El contenido de la pagina web se podrá visualizar únicamente en dos idiomas (inglés y
español)
• La página web no contara con ninguna funcionalidad relacionada a la contabilidad deArtbambucm.
• Los visitantes de la página no podrán hacer compras si no están previamente registrados enel sistema.
• Los visitantes se identificaran a través de su dirección de correo electrónico y contraseña.
• Del usuario se guardará información acerca de su nombre, apellido, documento deidentificación, teléfono, empresa, domicilio, teléfono de contacto, país de origen.
• En caso de olvidar la contraseña se podrá solicitar el envío de una nueva contraseña al e-mail.
• Antes de realizar el pago en el proceso de la compra se mostrara un resumen de los costosfinales del pedido y la dirección de envío.
• Durante la compra se mantendrá visible el carrito con los productos comprados, suscantidades y el costo total de los productos.
8/18/2019 Edert Tadeo Fase de Construccion
4/22
Web Site ArtBambucm Fase Construcci
• Los productos mostrados en la página web dispondrán de código, material (sub-categoría), precio, cotización (para compras por mayor), peso, foto pequeña, foto grande.
• El pago de las compras efectuadas por un cliente se harán en una simulación por mediode Paypal, el cual tiene la ventaja de tener servidores de prueba para poder hacer los testde venta, dado que en la empresa Artbambucm, no han realizado los trámites legales paracrear una cuenta real.
• Se necesito de tres iteraciones con el cliente.
FASE DE ELABORACIÓN Se analiza el dominio del problema, se establece una fundación arquitectónica sana, se desarrollael plan del proyecto, y se eliminar los elementos del riesgo más alto del proyecto.
Ya en nuestro proyecto establecimos en la fase de elaboración:
• Contaremos con tres agentes (visitante, cliente y administrador)
Visitante: usuario que navega de forma anónima por la web.
Cliente: usuario registrado e identificado por el sistema. Se trata de una especialización delusuario visitante, por lo que heredará todas sus relaciones.
Administrador: persona con acceso al gestor de contenidos que administrará la web.
• Establecimos los diagramas de casos de uso para cada uno de los agentes.
• Definimos la arquitectura del sistema la cual consiste en una arquitectura separada en trescapas (con patrón MVC): capa de presentación, capa de negocio y capa de datos. Estonos permitirá tener un sistema bien estructurado, donde cada capa es independiente del
resto y sólo interactuará con sus capas colindantes. Con ello se consigue un sistemaestandarizado, reutilizable y con un bajo acoplamiento, a costa de perder algo deeficiencia debido a la delegación de operaciones en capas intermedias.
• La plataforma de trabajo a utilizar será Visual Basic 2008 y se utilizaran MySQL para crear labase de datos.
• Se creó el diagrama de clases, el diagrama de Entidad-Relación y Relacional.
• Se diseñó la Base de Datos a utilizar.
• Se creó el Diccionario de Datos y el Diccionario de Relaciones.
• Establecimos los esquemas estéticos de las pantallas básicas del sistema.
• Se llego al acuerdo de que nada más se hará una simulación del pago de los productospor medio de la empresa Paypal, por razones de tiempo. Y se escogió este servicio porquetiene la ventaja de poseer los servidores para hacer dichos test.
• Se necesito de dos iteraciones con el cliente.
8/18/2019 Edert Tadeo Fase de Construccion
5/22
Web Site ArtBambucm Fase Construcci
FASE DE CONSTRUCCIÓN Un proceso de fabricación donde el énfasis se pone en manejar los recursos y controlar lasoperaciones para optimizar costos, tiempos y calidad.
Ya en nuestro proyecto establecimos en la fase de construcción:
• Aseguramos que el software estará disponible para los usuarios finales.
• Se modifico la base de datos.
• A través de los manuales capacitaremos a los usuarios para asi proveerles el soportetécnico necesario para usar el sistema.
• Se necesito de dos iteraciones con el cliente.
8/18/2019 Edert Tadeo Fase de Construccion
6/22
Web Site ArtBambucm Fase Construcci
PRUEBAS DE LOS SISTEMAS
Se refieren a la ejecución de una aplicación, o un trozo de código, para identificar uno o varioserrores, con el objetivo de verificar la funcionalidad del sistema a través de sus interfaces externascomprobando que dicha funcionalidad sea la esperada en función de los requisitos del sistema.
En nuestro trabajo empleamos las pruebas de Caja Negra, las cuales se centran en los requisitos o
resultados del software y específicamente en las pruebas Dinámicas, en donde se puede probar elsoftware sin tener un conocimiento de los detalles del código fuente. Es dinámica porque elprograma se está ejecutando mientras se está probando y es caja negra porque se prueba sintener un conocimiento exacto de cómo trabaja.
PRUEBA RESULTADO ESPERADO RESULTADO OBTENIDORegistrarse en el sistema El sistema muestra el formulario
y lleva acabo la acciónCORRECTO
Registrarse sin introducir todoslos datos
El sistema coloca (*) dondehacen falta datos.
CORRECTO
Identificarse en el sistema con
nombre de usuario ycontraseña correctos.
El sistema permite acciones
restringidas a usuariosregistrados.
CORRECTO
Identificarse en el sistema connombre y contraseña
incorrectos.
El sistema no permite estaacción, y manda un mensaje
al usuario.
CORRECTO
Realizar pago vía paypal Nos envía a la página dePaypal
CORRECTO
Enviar contraseña olvidada porel usuario registrado en el
sistema
El sistema manda un correo alcorreo del usuario con el cual
se ha registrado.
CORRECTO
M
ÉTRICAS
Son las aplicaciones continuas de mediciones basadas en técnicas para el proceso de desarrollodel software y sus productos para suministrar información relevante a tiempo, así el administrador junto con el empleo de estas técnicas mejorarán el proceso y sus productos. Las métricas desoftware proveen la información necesaria para la toma de decisiones técnicas.
Las métricas Técnicas se centran en las características de software, midiendo la estructura delsistema y definiendo el cómo está hecho. En ellas hemos basado nuestro proyecto, donde elobjetivo es construir una aplicación Web que proporcione una combinación de contenido y
funcionalidad al usuario final.
Si se compara nuestro software con alguna otra aplicación web tendrían que tomarse en cuentalas siguientes medidas:
• Número de páginas web estáticas• Número de páginas web dinámicas• Número de vínculos internos de la página• Número de objetos de datos persistentes• Número de sistemas externos en interfaz• Número de objetos de contenido estático• Número de objetos de contenido dinámico• Número de funciones ejecutables.
8/18/2019 Edert Tadeo Fase de Construccion
7/22
Web Site ArtBambucm Fase Construcci
Las cuales tendrían como objetivo:
• Asegurar una métrica bien definida basándose en las metas del cliente.• Eliminar malentendidos.• Comunicar necesidades.• Proveer un informe de requerimiento.•
Sirve para evaluar el software de nuestros productos, procesos y servicios con respecto a losestándares y metas establecidas.• Pueden ayudarnos a entender más acerca de nuestros productos, procesos y servicios de
software.• Pueden proveer la información que nosotros necesitamos para controlar recursos y
procesos utilizados en la producción de nuestro software.• Pueden ser usadas para predecir los atributos de las entidades de software en el futuro.
NUMERO DE LINEAS DE CODIGO
Para contar las líneas de código de nuestro sistema se utilizo el programa: Practiline Source Code
Line Counter.
Generando una tabla con todos los detalles.
8/18/2019 Edert Tadeo Fase de Construccion
8/22
Source Code Lines Source Code Lines (%) Comment LinesComment Lines(%) Blank Lines Blank Lines (%) Mixed Lines Mixed Lines (%) Total Lines
142 79.33% 0 0.00% 37 20.67% 0 0.00% 179
70 82.35% 1 1.18% 13 15.29% 1 1.18% 85
140 65.42% 42 19.63% 29 13.55% 3 1.40% 214
309 79.23% 27 6.92% 42 10.77% 12 3.08% 390
4 100.00% 0 0.00% 0 0.00% 0 0.00% 4
5 100.00% 0 0.00% 0 0.00% 0 0.00% 5
12 100.00% 0 0.00% 0 0.00% 0 0.00% 12
86 85.15% 0 0.00% 15 14.85% 0 0.00% 101
98 66.67% 18 12.24% 31 21.09% 0 0.00% 147
124 81.05% 0 0.00% 29 18.95% 0 0.00% 153
109 80.15% 3 2.21% 20 14.71% 4 2.94% 136
128 80.50% 0 0.00% 31 19.50% 0 0.00% 159
109 80.15% 3 2.21% 20 14.71% 4 2.94% 136
155 82.01% 0 0.00% 34 17.99% 0 0.00% 189
81 82.65% 1 1.02% 15 15.31% 1 1.02% 98
175 82.55% 0 0.00% 36 16.98% 1 0.47% 212
81 82.65% 1 1.02% 15 15.31% 1 1.02% 98
87 76.99% 4 3.54% 18 15.93% 4 3.54% 113
100 82.64% 0 0.00% 21 17.36% 0 0.00% 121
70 76.92% 1 1.10% 19 20.88% 1 1.10% 91
34 75.56% 0 0.00% 11 24.44% 0 0.00% 45
13 76.47% 0 0.00% 4 23.53% 0 0.00% 17
194 81.51% 3 1.26% 41 17.23% 0 0.00% 238
217 74.06% 41 13.99% 32 10.92% 3 1.02% 293
193 82.48% 3 1.28% 38 16.24% 0 0.00% 234
218 74.66% 41 14.04% 30 10.27% 3 1.03% 292
103 82.40% 0 0.00% 22 17.60% 0 0.00% 125
70 76.92% 1 1.10% 19 20.88% 1 1.10% 91
101 74.81% 0 0.00% 34 25.19% 0 0.00% 135
70 81.40% 1 1.16% 14 16.28% 1 1.16% 86
103 74.10% 0 0.00% 35 25.18% 1 0.72% 139
70 81.40% 1 1.16% 14 16.28% 1 1.16% 86
13 68.42% 0 0.00% 6 31.58% 0 0.00% 19
202 64.33% 64 20.38% 41 13.06% 7 2.23% 314
807 89.37% 28 3.10% 63 6.98% 5 0.55% 903
8/18/2019 Edert Tadeo Fase de Construccion
9/22
Web Site ArtBambucm Fase Construcción
395 50.25% 237 30.15% 133 16.92% 21 2.67% 786
1446 81.01% 49 2.75% 289 16.19% 1 0.06% 1785
21 46.67% 21 46.67% 3 6.67% 0 0.00% 45
14 100.00% 0 0.00% 0 0.00% 0 0.00% 14
14 82.35% 0 0.00% 3 17.65% 0 0.00% 17
192 62.95% 64 20.98% 42 13.77% 7 2.30% 305
25 83.33% 0 0.00% 5 16.67% 0 0.00% 30
30 63.83% 9 19.15% 8 17.02% 0 0.00% 47
105 75.00% 0 0.00% 35 25.00% 0 0.00% 140
136 75.14% 4 2.21% 33 18.23% 8 4.42% 181
108 75.00% 0 0.00% 36 25.00% 0 0.00% 144
136 75.98% 4 2.23% 31 17.32% 8 4.47% 179
178 78.76% 0 0.00% 48 21.24% 0 0.00% 226
79 49.38% 46 28.75% 35 21.88% 0 0.00% 160
139 79.43% 0 0.00% 36 20.57% 0 0.00% 175
70 82.35% 1 1.18% 13 15.29% 1 1.18% 85
100 74.07% 0 0.00% 34 25.19% 1 0.74% 135
86 81.13% 1 0.94% 18 16.98% 1 0.94% 106
103 74.64% 0 0.00% 34 24.64% 1 0.72% 138
86 81.90% 1 0.95% 17 16.19% 1 0.95% 105
144 84.21% 0 0.00% 27 15.79% 0 0.00% 171
128 87.67% 3 2.05% 14 9.59% 1 0.68% 146
145 84.80% 0 0.00% 26 15.20% 0 0.00% 171
129 87.16% 3 2.03% 15 10.14% 1 0.68% 148
206 87.29% 0 0.00% 29 12.29% 1 0.42% 236
118 62.77% 26 13.83% 31 16.49% 13 6.91% 188
195 85.90% 0 0.00% 31 13.66% 1 0.44% 227
118 61.78% 26 13.61% 34 17.80% 13 6.81% 191
104 85.25% 0 0.00% 18 14.75% 0 0.00% 122
103 63.58% 25 15.43% 34 20.99% 0 0.00% 162
67 83.75% 2 2.50% 11 13.75% 0 0.00% 80
115 71.88% 16 10.00% 27 16.88% 2 1.25% 160
67 85.90% 2 2.56% 9 11.54% 0 0.00% 78
115 73.25% 16 10.19% 24 15.29% 2 1.27% 157
9710 76.46% 840 6.61% 2012 15.84% 138 1.09% 12700
Total Lineas 25400
8/18/2019 Edert Tadeo Fase de Construccion
10/22
CONCLUSIONES
1. Debido a los casos de uso la metodología RUP se puede concluir que está más enfocada
hacia el cliente.
2. La metodología ha sido puesta en práctica con éxito en la implementación de nuestro
sistema; sin embargo ya que el proyecto no era tan extenso, probablemente hubiese sido
más conveniente el modelo de CASCADA.
3. La metodología RUP, es más apropiada para proyectos grandes ya que requiere de
administrar procesos muy complejos en varias etapas, necesitando de un equipo de
profesionales muy grande y es posible que no se puedan cubrir los costos de estos.
4. Las pruebas de nuestro sistema están basadas en las pruebas de caja Negra Dinámicas ya
se iban realizando al mismo tiempo que se iban creando el código por personas ajenas a
nuestro software.
5. Las métricas buscan maximizar la calidad del software o minimizar su coste, para ello se
debe de establecer una serie de métricas, aplicar medidas sobre el código, etc. Así que
para poder establecer la calidad de nuestro software se tendría que comparar la pagina
web de Artbambucm con algún otro software existente.
8/18/2019 Edert Tadeo Fase de Construccion
11/22
Web Site ArtBambucm Fase Construcción
CORRECCIONES
DE
LA
ETAPA
ANTERIOR
Modificaciones de la Fase Elaboración para la Fase de Construcción
Fecha Cambios Fase Elaboración Fase Construcción
Lunes 25-10-10Martes 26-10-10 Se estableció el cambio en el sistema para nadamas dos idiomas (ingreso y español) E R
Miércoles 27-10-10Jueves 28-10-10Viernes 29-10-10
Se logro la autogeneración de los países a travésde System.Globalization, con que cuenta el Net
Framework
E R
I= InicioE= ElaboraciónR= Refinamiento
8/18/2019 Edert Tadeo Fase de Construccion
12/22
Web Site ArtBambucm Fase Construcción
ACTUALIZACIÓN DE LA PLANEACIÓN Y CRONOGRAMA DEL PROYECTO
Nombre de Tarea ResponsableHoras
EstimadasHorasReales Semana de trabajo
Fase de Inicio
- Descripción general del problema desde la perspectiva del usuario Fany, Karina 6h 4h Del 09 -09-2010 al 12-09-2010
- Especificar Objetivos General y Específicos Equipo 3h 2h Del 10 -09-2010 al 13-09-2010
- Especificar los alcances y limites del sistema Karina, Fany 4h 3h Del 16 -09-2010 al 19-09-2010
- Identificar los principales casos de usos (preliminares) Alberto 8h 6h Del 16 -09-2010 al 19-09-2010
- Especificar diagrama de clases Jacqueline 8h 4h Del 16 -09-2010 al 19-09-2010
- Creación Cronograma Fase Inicio Equipo 5h 2.5h Del 17 -09-2010 al 19-09-2010
Iteraciones
1ª Propuestas del cliente sobre los proyectos que necesitaba y selección del que como grupo vamos a desarrollar.
2
03-09-2010
2º Obtención de requerimientos sobre el proyecto seleccionado. 10-09-2010
Fase de Elaboración
- Actualización de los Casos de Uso Equipo 6h 8h Del 27-09-2010 al 30-09-2010
- Especificación de la Arquitectura del Sistema Equipo 3h 4h Del 27-09-2010 al 29-09-2010
- Elaboración del diagrama Entidad-Relación del sistema Equipo 10h 8h Del 27-09-2010 al 08-10-2010
- Actualización diagrama de Clase Equipo 8h 4h Del 04-10-2010 al 08-10-2010
- Elaboración del diagrama Relacional del sistema Alberto 10h 6h Del 11-10-2010 al 15-10-2010
- Creación diccionario de datos Alberto, Karina 10h 6h Del 11-10-2010 al 16-10-2010
- Documentar correcciones de la Fase de Inicio Karina 8h 4h Del 11-10-2010 al 17-10-2010
- Esquemas estéticos de las pantallas básicas de los principales módulos del sistema Fany, Jacqueline 15h Del 11-10-2010 al 17-10-2010
Iteraciones
3ª Mostrar la documentación de la Fase de Inicio de l a elaboración de su sistema.
2
24 – 09 – 2010
4ª Reunión con el Cliente para realizar observaciones sobre los aspectos estéticos del sistema. 08 – 10 – 201030h
Fase de Construcción
- Corrección de la etapa anterior Equipo 10h 7h Del 25-10-2010 al 29-10-2010
- Inserción de nuevos campos en la base de datos para texto en inglés. Karina, Fany 20h 18h Del 25-10-2010 al 29-10-2010
- Modificación en ciertas pantallas del sistema según observaciones realizadas anteriormente. Equipo 8h 12h Del 8-11-2010 al 12-11-2010
- Instalación de herramientas a utilizar en el desarrollo del sistema. Equipo 18h 16h Del 8-11-2010 al 12-11-2010
8/18/2019 Edert Tadeo Fase de Construccion
13/22
Web Site ArtBambucm Fase Construcción
- Investigación y presentación sobre las Métricas del SW Fany 10h 8h Del 8-11-2010 al 12-11-2010
- Integración de actualizaciones de componentes del modulo de Cliente.Alberto,
Jacqueline 15h 12h Del 8-11-2010 al 12-11-2010
- Codificación del modulo del administradorJacqueline,
Alberto 20h 48h Del 8-11-2010 al 12-11-2010
- Continuar con la codificación del modulo del administrador Alberto, Karina 25h 12h Del 15-11-2010 al 19-11-2010
- Elaboración del manual de usuario Karina 20h 24h Del 15-11-2010 al 19-11-2010
- Documentar correcciones de la Fase de Elaboración Fany 10h 12h Del 15-11-2010 al 19-11-2010
Iteraciones
5ª Mostrar la documentación de la Fase de Elaboración de su sistema, y las pantallas del sistema según lo solicitadoen la reunión 4º.
1
05-11-2010
8/18/2019 Edert Tadeo Fase de Construccion
14/22
Web Site ArtBambucm Fase Construcción
DIAGRAMAS
DE
GANTT
GRÁFICA DE GANTT - FASE INICIO
Tarea Fecha Inicio Fecha Fin Duración Días Rango de gráfica
- Descripción general del problema desde la perspectiva del usuario 09/09/2010 12/09/2010 3 Inicio Fin
- Especificar Objetivos General y Específicos 10/09/2010 13/09/2010 3 01/09/2010 20/09/2010
- Especificar los alcances y limites del sistema 16/09/2010 19/09/2010 3
- Identificar los principales casos de usos (preliminares) 16/09/2010 19/09/2010 3
- Especificar diagrama de clases 16/09/2010 19/09/2010 3
- Creación Cronograma Fase Inicio 17/09/2010 19/09/2010 2
1-Sep 3-Sep 5-Sep 7-Sep 9-Sep 11-Sep 13-Sep 15-Sep 17-Sep 19-Sep
- Descripción general del problema desde laperspectiva del usuario
- Especificar Objetivos General y Específicos
- Especificar los alcances y limites del sistema
- Identificar los principales casos de usos(preliminares)
- Especificar diagrama de clases
- Creación Cronograma Fase Inicio
8/18/2019 Edert Tadeo Fase de Construccion
15/22
Web Site ArtBambucm Fase Construcción
G
RÁFICA DE
G
ANTT
-
F
ASE
E
LABORACIÓN
Tarea Fecha Inicio Fecha Fin Duración Días Rango de gráfica
- Actualización de los Casos de Uso 27/09/2010 30/09/2010 3 Inicio Fin
- Especificación de la Arquitectura del Sistema 27/09/2010 29/09/2010 2 20/09/2010 19/10/20
- Elaboración del diagrama Entidad-Relación del sistema 27/09/2010 14/10/2010 17
- Actualización diagrama de Clase 04/10/2010 08/10/2010 4
- Elaboración del diagrama Relacional del sistema 11/10/2010 14/10/2010 3
- Creación diccionario de datos 11/10/2010 16/10/2010 5
- Documentar correcciones de la Fase de Inicio 11/10/2010 17/10/2010 6
- Esquemas estéticos de las pantallas básicas de los principales módulos del sistema 11/10/2010 17/10/2010 6
20-Sep 25-Sep 30-Sep 5-Oct 10-Oct 15-Oct
- Actualización de los Casos de Uso
- Especificación de la Arquitectura del Sistema
- Elaboración del diagrama Entidad-Relación delsistema
- Actualización diagrama de Clase
- Elaboración del diagrama Relacional del sistema
- Creación diccionario de datos
- Documentar correcciones de la Fase de Inicio
- Esquemas estéticos de las pantallas básicas de losprincipales módulos del sistema
8/18/2019 Edert Tadeo Fase de Construccion
16/22
Web Site ArtBambucm Fase Construcción
G
RÁFICA DE
G
ANTT
-
F
ASE
C
ONSTRUCCIÓN
Tarea Fecha Inicio Fecha Fin Duración Días
- Corrección de la etapa anterior 15/11/2010 19/10/2010 5
- Inserción de nuevos campos en la base de datos para texto en inglés. 05/11/2010 17/11/2010 12
- Modificación en ciertas pantallas del sistema según observaciones realizadas anteriormente. 08/11/2010 12/11/2010 4
- Instalación de herramientas a utilizar en el desarrollo del sistema. 01/11/2010 07/11/2010 7
- Investigación y presentación sobre las Métricas del SW 08/11/2010 12/11/2010 4
- Integración de actualizaciones de componentes del modulo de Cliente. 08/11/2010 12/11/2010 4
- Codificación del modulo del administrador 08/11/2010 19/11/2010 11
- Continuar con la codificación del modulo del administrador 15/11/2010 19/11/2010 5
- Elaboración del manual de usuario 18/11/2010 19/11/2010 2
- Documentar correcciones de la Fase de Elaboración 17/11/2010 19/11/2010 3
25-Oct 30-Oct 4-Nov 9-Nov 14-Nov 19-Nov- Corrección de la etapa anterior
- Inserción de nuevos campos en la base de datos para texto en…
- Modificación en ciertas pantallas del sistema según…
- Instalación de herramientas a utilizar en el desarrollo del…
- Investigación y presentación sobre las Métricas del SW
- Integración de actualizaciones de componentes del modulo de…
- Codificación del modulo del administrador
- Continuar con la codificación del modulo del administrador
- Elaboración del manual de usuario
- Documentar correcciones de la Fase de Elaboración
8/18/2019 Edert Tadeo Fase de Construccion
17/22
Web Site ArtBambucm Fase Construcción
DIAGRAMA
TIEMPO
ESTIMADO
VRS
TIEMPO
REAL
Desviación de la Etapa de Construcción:
148
150
152
154
156
158
160
162
164
166
168
170
Estimado Real
156
169
Tiempo Estimado vrs Real
Fase Construcción
Estimado
Real
8.33
8/18/2019 Edert Tadeo Fase de Construccion
18/22
Web Site ArtBambucm Fase Construcci
ANEXOS
8/18/2019 Edert Tadeo Fase de Construccion
19/22
Web Site ArtBambucm Fase Construcci
8/18/2019 Edert Tadeo Fase de Construccion
20/22
Web Site ArtBambucm Fase Construcci
8/18/2019 Edert Tadeo Fase de Construccion
21/22
Web Site ArtBambucm Fase Construcci
8/18/2019 Edert Tadeo Fase de Construccion
22/22
Web Site ArtBambucm Fase Construcci