Economics of 220 TPA Mushroom Project

Dr B Vijay

DMR Solan

The unit has been designed as per the latest technology of

mushroom growing. The following main structures are

proposed.

1. Prewettng area (Lagoon)

2. Composting yard

3. Spawn lab

4. Phase one bunkers

5. Bulk Chamber

6. Cropping rooms

7. Casing pasteurization room

8. Miscellaneous structures: Office, laboratory,

tanks ,etc.

1. Lagoon (prewetting area): 60 x40 ft. saucer shaped

structure with simple cement flooring for dumping and wetting

the ingredients and will not be covered.

2. Composting yard: 40x40x15ft. (Height), concrete flooring,

G.I. roof on RCC pillars. 3’ high wall on two sides. One goody

pit is also provided.

3. Spawn lab: A total built in area of 60' x 25' x 12' (h) should

be good enough to house the entire spawn unit. This area will

be divided into different work areas like boiling/autoclaving

room, inoculation room, incubation room (insulated and with

AC), cold room (heavily insulated with chilling facilities), store,

office, etc.

4. Phase one bunkers (2 nos.): 55x10x10 ft. required for phase one

phase of the composting. Simple structure with walls on three sides,

while front portion is kept open. It has a ventilation duct, which is

served by a small blower (¼ the capacity of the phase-II fan) with a

timer.

5. Bulk Chamber (1 no.): One bulk chamber of 40x10x12ft.

dimensions. Insulated on all the sides with 2” thick thermocole

sheets. Two doors, one towards compost shed and other toward

spawning area. Blower and ducting as per the design enclosed.

Spawning area of 20x20x12 ft of general construction.

6. Cropping rooms: Eight cropping rooms of 48X 21X 15 ft. (h). 4 each

on one side of the gallery of 12ft width. Walls and ceiling of the growing

rooms to be insulated (2” thermocole sheets). Two vents of 15”x15” are to

be provided on the back walls. Provision for light and water supply in

each room. Each room will have one air-handling unit (AHU) above the

door for climate control inside the room, including cooling, heating,

humidifying and for introducing fresh air. AHU’s are connected with

central cooling plant consisting of chiller, compressor, and condenser and

cooling tower.

Bad area: 44 x 13.5x 6 tiers = 3564 sq.ft.

Compost 7.5 kg /ft2 = 26730 kg or say 26.00 tons

(Cultivation proposed in bags and hence more

compost per unit area.)

7. Casing pasteurization room: 20 x 12 x 8 ft.

Insulated, grated floor, steam jets in the plenum along with

centrifugal blower.

8. Office : 200 sq ft. For sitting of the staff and manager.

9. Cold storage: Modular 8x8x8ft fitted with product

cooler.

10. Utilities: One room each of 24x21x12 ft for central

AC unit /chilling station and for packing mushrooms. 3

rooms of 15x12x11ft dimensions for housing generator,

boiler and tools. Total area 1600 sq.ft.

COST OF PROJECT

Rs in lakhs

1: Land and site development 10.00

2 Building 70.92

3 Plant and Machinery 99.20

4 Misc. fixed assets 17.00

5 Contingencies 19.71

6 Margin money for working capital 9.90

-----------------------

Total Rs. 226.73

------------------------

1. Land and site development 2.0 acre of land will

be required for the project. It will be leveled and

developed including boundary wall/barbed wire making

the total cost of Rs. 10.00 lacks. (Annexure –A)

1. Buildings: (Rs.70.92 lakhs

2. Plant and machinery: Cost Rs. 99.20 lakhs

3. Miscellaneous fixed assets: Rs 17.00 lakhs

4. Contingencies: A provision of contingencies at the rate of 10% of

the land, building, machinery and misc. fixed assets, which works

out to be Rs 19.711lakhs.

5. Margin money for working capital: Working capital is 18.50

lakhs and margin money Rs. 9.90 lakhs

PROFITABILITY PROJECTIONS:

ASSUMPTINS FOR PRODUCTION AND PROFITABILITY

8 cropping rooms of 26 tons composting handling capacity

6 crops will be taken as per availability of advanced hybrids, which

give optimum production (18-20kg/100kg compost) in 30 days of one

cropping cycle.

3. Annual production = 26 tons x 8 rooms x6 crops x 0.18 ton = 224

tons

Accepted = 220 tons

Rate of interest on term loan 12 % and on working capital 15%

Depreciation: 5 % on buildings, 10 % on machinery and

miscellaneous fixed assets.

SALES PROJECTIONS

Installed capacity 220 TPA

Sales 220 TPA fresh

a. Sale of fresh mushrooms:

220 tons @ 70,000 /- ton 154 lakhs

LAND AND SITE DEVELOPMENT

Rs. In lakhs

1. Sufficient land available with the promoter

-

2. Land leveling and site development 2.00

3. Gate and boundary wall. 8.00

Total Rs. 10 .00 lakhs

Buildings

ANNEXURE –B

BUILDINGS

SN.

Facility

Area sq.ft.

Unit cost

(RS.)

Total cost

( in lakhs)

1.

Growing rooms

(Inclusive of insulation)

8064

500

40.32

2.

Bulk chamber

(Inclusive of insulation)

400

500

2.00

3.

Spawning area

400

400

1.60

4.

Lagoon

2400

50

1.20

5

Composting Yard

1600

150

2.40

6

Bunkers

1100

200

2.20

7.

Service room

100

400

0.40

8.

Casing soil room

180

500

0.90

9.

Spawn Lab

1500

500

7.50

9

Office

400

500

2.00

10.

Utilities

1600

400

6.40

11.

Misc.like bore well, workers room, canteen, etc.

1000

4000

4.00

Total

70.92

Plant & Machinery

ANNEXURE – C

PLANT AND MACHINERY

Sn.

Particulars

Price

(Lakhs)

1

Central chilling station (75 TR x 2) including 8 AHU’S

Including ducting, piping, and controllers, complete in all respect.

45.0

2.

Boiler 1no. 200 kg steam generation capacity

3.50

3.

Blowers for the tunnels and casing chamber 4 nos.

1.5

4

Tunnel ventilation system

0.5

5

Temp. & Humidity controllers for growing rooms 8 sets

0.80

6

Multi channel thermometers

0.30

7

Steel racks for the 8 growing rooms & gratings for the tunnel

20.0

8

Insulated doors 20 nos.

4.00

9

Front End Loader

9.50

10

Tunnel Filling line

3.00

10

Modular cold room (8x8x8ft)

1.50

11

Paddy straw cutter

0.60

12

Laminar flow system

1.00

13

Autoclaves 2nos.

2.00

14

Boiling Kettles 2nos 40 liters capacity

1.00

15

BOD incubator 12cft

1.00

16

N analyses

0.25

17

PH and conductivity meter

0.25

18

Air conditioners. 2nos

1.00

19

Refrigerator 300 liters capacity

0.50

20

Misc. equipments

2.00

Total

99.20

MISCELLANEOUS FIXED ASSETS

Rs. in lakhs

1. Electric fittings 2.00

2. Furniture’s and fixtures 1.00

3. Sprayers system 2.00

4. Transformer 200HP 4.00

5 DG set 100 KVA 8.00

Total: 17.00

Raw MAterials

ANNEXURE – E

RAW MATERIALS

(For one crop for one cropping room)

Sn.

Materials

Quantity

Rate

Amount

(Rs.)

1.

Wheat& paddy straw

10 tons

3000/ton

30,000

2.

Chicken manure

7 tons

800/ton

5600

5.

Urea

0.15 tons

4500/ ton

675

6.

Gypsum

0.4 tons.

1500/ ton

600

7.

Casing material

4.0 tons

1500/ton

6000

8

Spawn ( prepared self)

0.2 tons

25 000/ton

5000

8.

Polythene bags

2500nos.

2/ bag

5000

15.

Chemicals

Items

--

1000

16

Miscellaneous

Items

--

1000

TOTAL

54875

Total cost of raw materials required for 48 crops (8 rooms x6 crops) = 26.34 lakhs

Total cost of raw materials required for 48 crops (8 rooms x6 crops) = 26.34 lakhs

WAGES AND PERKS

Sn.

Particulars

No.

Monthly

Salary

Total/year

1.

Manager

1

15,000

1.80

2.

Supervisor

1

6000

0.72

7.

Watch Man

1

4000

0.48

9.

Boiler Attendant

1

5000

0.60

10

Electrician

1

5000

0.60

11

Driver

1

5000

0.60

11

Labourers

23

4000

11.00

Total

15.80

ENERGY, FUEL,AND OTHER OVERHEADS (PER MONTH)

Rs. in Lakhs

1. Energy 1.70

2. Fuel 0.25

---------------------

-

Total for one month 2.00

---------------------

Total for 12 months 24.00 lakhs

PRPFITABILITY PROJECTIONS

A. COSTS (Rs in lakhs)

1. Raw materials 26.34

2. Power and fuel 24.00

3. Salary and wages 15.80

4. Interest on term loan

(12 % of 197.12 lakhs) 23.65

5. Interest on working capital

(15 % of 19.71 lakhs) 2.95

6. Depreciation

a. Plant and Machinery (10 % of 99.20 lakhs) 9.92

b. Buildings (5% of 70.92 lakhs) 3.54

c. Misc assets (10 % of 17.00 lakhs) 1.70

Total 107.90

B. SALES Rs, 154.00 lakhs

C. PROFIT = (B – C) = Rs. 46.10 lakhs

Project would be having full-fledged ultramodern spawn

lab. and will be selling additional spawn to the growers.

Minimum profit envisaged is Rs. 5.0 lakhs.

Project would be generating around 1000 tons of spent

compost annually, which is very good manure for field

crops. An additional profit of Rs. 5.0 lakhs is envisaged on

its sale to the growers.

Directorate of Mushroom Research (Indian Council of Agricultural Research)

Chambaghat, Solan – 173213 (HP) INDIA

Phone : 01792-230767, 230451

Fax : 01792-231207

Email: [email protected]

Website : www.nrcmushroom.org