EcoMobil VenturesTo Create Energy Infrastructure
for countries in an environmentallyfriendly manner.
Renewable Energy:
WTE
Waste to Energy
Wind Power for
Presentation to Indonesia
September 2010
8/8/2019 EcoMobil
2/22
A n
1. RenewableWastetoEnergySystemsfortheCn ones a nc u escap a pro ec un ng
EcoMobil VenturesWastetoEnergy
OurGasificationTechnologies
Technology PlantCapabilities
ControlSystems
Data
Acquisition
WasteInputs
HarnessingPowerforIndonesia
PlantCosts(5MW 1module)
Summary
NextSteps
2. VentureWindTurbineMobileTowerApplication
8/8/2019 EcoMobil
3/22
EcoMobil Ventures - Overview
EcoMobil Venturesan
engineering
&
consulting
firm
with
offices
i
Israel
Wedevelopturnkeywastetoenergysolutionsfor privateandG
Sectors.
EveryCityandGovernmentsfaceproblemsofWasteDisposalsan
getridoftheWastes.WTEplantsoffermajoradvantagesaslisted
Thequantity
of
wastes
is
reduced
by
nearly
60%90%,
depending
compositionandtechnologyadopted.
t esswastesto sposeo ,t e eman or an s sre uce
land,whichisalreadyscarceincities.
Costoftransportationofwastestofarawaylandfillsitesisreduce
reduced.
Energyisobtainedfromthewaste.
andCement.
8/8/2019 EcoMobil
4/22
EcoMobil Ventures - Overview
SubstantialOpportunity Significant Competitive SuperAdvantage
Helpingcommunities
converttheirtrashtopower
Costeffectiveandproven
solutions
Expe
manag
wor
Reclaiminglandfills Modular
and
scalable
designs Top
t
partne
Providegreenjobsbackto
thecommunity
Flexibleoutputoptions Gove
Longtermrevenuestream CompellingROI Finan
nves
8/8/2019 EcoMobil
5/22
Plant Overview: EcoMobil WTE Gasifica
PlantCharacteristics:
Gasification=theconversionofhydrocarbonbasedfeedstock
consistingofCarbon,HydrogenandOxygenmolecularchains
gas(syngas)inanaturalthermochemicalreactionthroughth
controlofheatandoxygen(orair).Airisusedforpartialcomb
as cat onprocess nvo vesre uct ono an to
8/8/2019 EcoMobil
6/22
Our WTE Gasification: Highlights
Ourgasification
technology
produces
clean,renewableenergythroughthe
combustionofMunicipalSolidWaste
(MSW)equippedwiththemost
Trashvolume
is
reduced
upto 90
95%
Selfsustainin ower lantwith
automatedcontrolengineeringwithno
additionalfuelsourcerequiredto
Proventechnology
that
is
highly
profitablewithpredictableReturnon
Investment
8/8/2019 EcoMobil
7/22
Available Waste Inputs
WASTEINPUTS allofthefollowingmaterialsinanycomaresuitable:
MunicipalSolidWaste(MSW)
Biogarbage,restaurant/foodprocessingwaste
Sewagesludge
Animalmanure/other
animal
wastes
Anyagriculturalbiomasswaste
an was e m xe
Manufacturingsludge
Paperrecyclingrefuse
Hospital/medical waste
Tires(veryhighcalorificvalue)
8/8/2019 EcoMobil
8/22
Pictures of a WTE plant - ILLUSTRATIV
Boiler Room Control RoomFurnace Towers Inputs
Primary Turbineand Generator
Dry ScrubberBag House
Boiler & Water Softener
Storage Pit Fly AshStorage Bin
8/8/2019 EcoMobil
9/22
EcoMobils WTE solution is proven
ModularModular~
sustainedelectricity(dependentonfeedstockqualityandconsistency)
EnergyEfficient/ScalableEnergyEfficient/Scalable composedfrom112standardmodulesi.e.,atypical1modu
generate45MWofelectricitytoamaximum12moduleplan
approx.50 60MW
nv ronmen a y r en ynv ronmen a y r en y 5MWplantrequires5acresofland.Eachadditionalmoduler
BuilttoLastBuilttoLast AverageLifeofPlant40AverageLifeofPlant4045years45years
CapacityCapacity
25,000households*
*developing nation household will use between 200 to 300 kilowatts/hour
8/8/2019 EcoMobil
10/22
Seamless Control Systems: WTE
Seamless
Operation
of
the
Entire
Plant
HRSG/BOPHRSG/BOP
TurbineTurbine
HRSG:HeatRecov
BOP:BalanceofP
8/8/2019 EcoMobil
11/22
Integrated Data Sources:
Fully Integrated Turbine, Boile r and BOP Controlswith comm on look and feel
Menu System :
Turbine
BOP
Other Plant
Integ rated Alarms:
Turbine
BOP
Orig ina l Time Tag
8/8/2019 EcoMobil
12/22
Financial Estimates: 5MW WTE Facil
ActivityDescription CostEM
SOFTCOSTS FeasibilityStudy
ng neer ng es gn rogram anagemen
Financing(Others)
TotalSoftCosts:HARDCOSTS SitePreparation(Survey) SiteDevelopment(Civil,Mechanical,Electrical)
P antEquipmentan Construction Fa rication
Commissioning
TotalHardCosts*TotalCAPITALCOSTS* $27Mil*Capital Costs will be finalized after Feasibility Study
8/8/2019 EcoMobil
13/22
Return on Investment (ROI): Revenue
ActivityDescription RG
RevenuesParameters: TonsofMaterialSolidWaste da PutIn 300
DumpingFees/ton
MinimumPrice
for
Electricity
per
KWH 10
c
DAILYINCOME: TippingFeesDaily Electricitysolddaily
$3,000
$10,100
YearlyIncome $4.75MPa backwitha1Moduleof5MWinstalledcapacity
8/8/2019 EcoMobil
14/22
Pro ect A roach
ECOMOBIL VENTURESWTE Ener Pro ram Stud
Material So(Tipping Fee Number of
Technical
Feasibility
Environme
Incentives ( Permitting
Economic Capital Costs Economic Ana
Financing O&M RECs $ / kWh Market PricProject
Feasibility
8/8/2019 EcoMobil
15/22
Patented,SafeTechnology
ap mo u arcons ruc onan are a ve ysma oo pr n
Locallaborandgoodswouldbeutilizedintheconstruction
Each200~300TPDproducesaminimumof5MWofelectrenhancedmetalrecyclingprogram
Abilityto
use
steam
for
co
generation
or
clean
water
produc
Systemeasilyexpandedaswastevolumesincrease
Processmeetsthetoughestairemissionsstandards
ProcesscreatesNOeffluent,pollutantsorheavymetals
Creation
of
a
significant
number
of
new
jobs,
including
many Sourceofcarboncredits isanimportantincomestream
8/8/2019 EcoMobil
16/22
Next Steps
Planning: ApprovalsforFeasibilityStudy(LettersofInterest/Int
IdentifyCOREteamfromGovt.ofIndonesia
Developthebudgetsforinitialpowerrequirements
na ze oca ons pprove an a oca on o ro ec
InvestmentFinalization:
Build Own Operate Transfer(BOOT)
PresentationofProjectPlanandSignoff
ContractFina ization: Power
Purchase
Agreement
(PPA)
BankConfirmations
8/8/2019 EcoMobil
17/22
EcoMobil will provide the change forimproving the quality of life for the
citizenry and develop the green economy
Thank Youwww.ecomobilve
info@ecomobilve
8/8/2019 EcoMobil
18/22
EcoMobilTM
Powered by Action
Driven by Excellence
Venture WindMobile Phone Tower
Application
Overview
June 2010
8/8/2019 EcoMobil
19/22
Venture Wind TurbineMobile Tower Application
Eco-Friendly Material Mast / Blades & Struts with Shielded Generator
Design features:3 blade (or 4 blade)
Catches Wind in all directions Easy Mounting Designs
Made out of eco-friendly materials No RF interference 3 phase shielded generator Operates @low wind speeds (5 m/s) Offer complete converter / charger /inverter for mobile equipment
Value Proposition:
Low cost Easy installation
Low maintenance Long Life Custom Design Up to 5-7KW/hr Turnkey Solution
www.ecomobilventures.com [email protected]
http://www.ecomobilventures.com/mailto:[email protected]:[email protected]://www.ecomobilventures.com/8/8/2019 EcoMobil
20/22
Venture Wind TurbineMobile Tower Application
TECHNICAL SPECIFICATIONS:
No. of Blades3/4
No. of Turbines2
Blade Height 2.5 to 7 m
Power Producing Speed 5-8 m/s
Max Power 5-10 KW/hr
Brake System Disc BrakeRotor speed control Variable
Safety Self Generator Control
Warranty - 5 year Limited
Generator Branded Async Generator
Installation Custom Mounted
Venture wind
Turbine
(low speeds)
CUSTOM DESIGN PROCESS:
Site Survey / Wind data / Tower Design Load Factors / Power Needs
8/8/2019 EcoMobil
21/22
Venture Wind MobilePhone Tower Application
Objective: Mobile Phone Towers in remote places are
powered by generators
Cost of diesel is increasing in developing
countries Mobile Phone Towers have to run 24/7/365 with
continuous power and the price / kwh is very
expensive running diesel generators
Value Proposition EcoMobil has designed and developed a cost
effective venture wind mill turbine for powering
mobile phone towers
Patent pending technology offers:
5-7 KW of power
Easy maintenance and can be used a co-
generation for alternate energy
Integrates with power management solutions for
cross-over to generator when winds are low (can
operate at less 2 miles/hr)
4
8/8/2019 EcoMobil
22/22
Project Approach
TechnicalFeasibility
EconomicAnalysis
ECOMOBILVenture Wind MobilePhone Application Level I & Level II
Screening Wind Speed
Power Usage Accessibility Electric Load Interconnection Environmental Permitting
Site Energy Potential
Performance Energy storage Invertors
Capital Costs Economic Analysis
O&M
Rs. Kwh comparison ROI Analysis Project Plan
ProjectManagement