  • Ecodesign in ORONA

  • ECODESIGN IN THE ORONA PRODUCT

    To ensure compliance with ORONA's commitment to the environment, and taking the ISO 14006standard as reference, work has been performed on defining a procedure on the design and developmentof products which sets forth the system to be used to incorporate the environmental variable in each ofthe design and development phases. In 2007 the certification process for this management system wasstarted and in June 2008 ORONA became the first company in the Lift sector, throughout the world, tobe certified in Ecodesign.. .

    As such, during the design phase, and by using ecoindicators, there is an exhaustive assessment of theproduct's environmental implications, correcting possible environmental gaps whilst always seeking anoverall improvement in the environmental impact, and taking into account the product's complete lifec y c l e . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . … … … … … … . .

    .Through the environmental improvement of theproduct, we have also managed to optimise itsquality based on factors such as functionality,comfort, reliability, durability or the possibility ofrepair and modernisation.

    … … … … … … … … … … … … … … … … … … … .

    .

    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . … … … … … … . .Through the environmental improvement of theproduct, we have also managed to optimise itsquality based on factors such as functionality,comfort, reliability, durability or the possibility ofrepair and modernisation.

    … … … … … … … … … … … … … … … … … … … . .

  • ECODESIGN IN THE ORONA PRODUCT

    As a result of this commitment to the environment, the following ecoefficient lift models have been designed, as well as other Eco components and kits which contribute to obtaining maximum energy efficiency in Orona lifts:

    •TECHNICAL SOLUTION ORONA 3G X15•TECHNICAL SOLUTION ORONA 3G X10•KIT – ORONA 3G SERIES DOMO AND PUBLIC CAR•KIT – COMPACT REGENERATIVE SYSTEM•KIT – G-02 COMPETITIVE MACHINE•KIT – ECO LIGHTING FLUORESCENTS•KIT – ECO LIGHTING LED PANELS•KIT – ECO LIGHTING MIXED•KIT – ECO LIGHTING LED SPOTLIGHTS

    TECHNICAL SOLUTION ORONA 3G X15 AND TECHNICAL SOLUTION ORONA 3G X10

    These are lift models without a machine room, with direct drive machine without reducer. …………………………………………………………These new models are indicative of a technological leap. Thanks to their innovative design, they achieve a reduction in energy consumption compared to a conventional 2-speed lift and also compared to a hydraulic lift of between 50% and 70% respectively. …………………………………………………………All of this has been achieved with reduced space requirements and a higher level of features and comfort.

    KIT – ORONA 3G SERIES DOMO AND PUBLIC CAR

    This is a new car generation which improves the conventional car model in various ways:

    •New lighter car structure with a material saving of 5% compared with the conventional model

    •Minimalist and modern aesthetics

    •Energy saving during the use phase of 43% in start mode and 100% in standby mode, thanks to the efficient lighting system with the automatic switch off functionality.

    … … … … … … … … … … … … … … … … … … … . .

  • KIT – ECO LIGHTING

    Low consumption and long life efficient lighting solutions with the option of automatic switch off.

    The innovative technology of these lighting systems allows obtaining an energy saving of between 35.5%-85% in the lift's start mode and zero energy consumption in standby mode compared to the conventional lighting system.

    KIT – COMPACT REGENERATIVE SYSTEM

    Compact and competitive regenerative system solution aimed at new lift facilities and existing lift facilities.

    The compact regenerative system is designed to make maximum use of space and contributes to obtaining an energy saving of 24% in a conventional lift with standard resources.

    KIT – G-02 COMPETITIVE MACHINE

    New compact machine design with excellent features.

    The innovative manufacturing process of the motor allows obtaining machine efficiency of more than 89% and a saving in the motor material of 34% for the magnet, 29% for steel and 22% for copper.

    ECODESIGN IN THE ORONA PRODUCT

  • End-of-life handling of the ORONA ecodesigned product

  • Batteries

    Electronic Boards

    Other metalsCu, Al

    Steel, ironand sheet metal

    Oils

    Plastics

    Glass

    Lighting

    TECHNICAL SOLUTIONS ORONA 3G X15 AND ORONA 3G X10

  • LIFT END OF LIFE

    When the lift's service life comes to an end ORONA will be responsible for its dismantling.

    The destruction/reuse of the material will be done in accordance with the legislation in force at the time of the dismantling.

    MaterialWaste/Recycled

    Manager

    Steel, iron and sheet metal R Authorised waste manager

    Other metals: Cu, Al R Authorised waste manager

    Plastics R Authorised waste manager

    Wood R Authorised waste manager

    Glass R Authorised waste manager

    Oils (HW) D Authorised waste manager

    Lighting (Fluorescents, LEDs) (HW)

    D Authorised waste manager

    Electronic boards (HW) D Authorised waste manager

    Batteries (HW) D Authorised waste manager

  • KIT – ORONA 3G SERIES DOMO AND PUBLIC CAR

    Wood

    Steel, iron and sheet metal

    Electronic boards

    Other metals: Cu, Al

    Plastic

    Other metals: Cu, Al

    Glass

    Lighting

  • END OF LIFE OF THE KIT – ORONA 3G SERIES DOMO AND PUBLIC CAR

    When the car's service life comes to an end ORONA will be responsible for its dismantling.

    The destruction/reuse of the material will be done in accordance with the legislation in force at the time of the dismantling.

    MaterialWaste/Recycled

    Manager

    Steel, iron and sheet metal R Authorised waste manager

    Other metals: Cu, Al R Authorised waste manager

    Plastics R Authorised waste manager

    Wood R Authorised waste manager

    Glass R Authorised waste manager

    Lighting (Fluorescents, LEDs) (HW)

    D Authorised waste manager

    Electronic boards (HW) D Authorised waste manager

  • KIT – ECO LIGHTING FLUORESCENTS

    Steel, iron and sheet metal

    Other metals: Cu, Al Steel, iron and sheet

    metal

    Lighting

  • END OF LIFE OF THE KIT – ECO LIGHTING FLUORESCENTS

    When the lighting system's service life comes to an end ORONA will be responsible for its dismantling.

    The destruction/reuse of the material will be done in accordance with the legislation in force at the time of the dismantling.

    MaterialWaste/Recycled

    Manager

    Steel, iron and sheet metal R Authorised waste manager

    Other metals: Cu, Al R Authorised waste manager

    Plastics R Authorised waste manager

    Lighting (Fluorescents, LEDs) (HW)

    D Authorised waste manager

  • KIT – ECO LIGHTING MIXED

    Steel, iron and sheet metal

    Plastics

    Steel, iron and sheet metal

    Lighting

  • END OF LIFE OF THE KIT – ECO LIGHTING MIXED

    When the lighting system's service life comes to an end ORONA will be responsible for its dismantling.

    The destruction/reuse of the material will be done in accordance with the legislation in force at the time of the dismantling.

    MaterialWaste/Recycled

    Manager

    Steel, iron and sheet metal R Authorised waste manager

    Plastics R Authorised waste manager

    Lighting (Fluorescents, LEDs) (HW)

    D Authorised waste manager

  • KIT – ECO LIGHTING LED PANELS

    Steel, iron and sheet metal

    Steel, iron and sheet metal

    Lighting

  • END OF LIFE OF THE KIT – ECO LIGHTING LED PANELS

    When the lighting system's service life comes to an end ORONA will be responsible for its dismantling.

    The destruction/reuse of the material will be done in accordance with the legislation in force at the time of the dismantling.

    MaterialWaste/Recycled

    Manager

    Steel, iron and sheet metal R Authorised waste manager

    Plastics R Authorised waste manager

    Lighting (Fluorescents, LEDs) (HW)

    D Authorised waste manager

  • KIT – ECO LIGHTING LED SPOTLIGHTS

    Steel, iron and sheet metal

    Steel, iron and sheet metal

    Lighting

  • END OF LIFE OF THE KIT – ECO LIGHTING LED SPOTLIGHTS

    When the lighting system's service life comes to an end ORONA will be responsible for its dismantling.

    The destruction/reuse of the material will be done in accordance with the legislation in force at the time of the dismantling.

    MaterialWaste/Recycled

    Manager

    Steel, iron and sheet metal R Authorised waste manager

    Plastics R Authorised waste manager

    Lighting (Fluorescents, LEDs) (HW)

    D Authorised waste manager

  • KIT – COMPACT REGENERATIVE SYSTEM

    Electronic boards and plastics

    Iron, Cu

    Cu, iron and plastics

    Aluminium

    Cu and plastics

  • END OF LIFE OF THE KIT – COMPACT REGENERATIVE SYSTEM

    When the regenerative system's service life comes to an end ORONA will be responsible for its dismantling.

    The destruction/reuse of the material will be done in accordance with the legislation in force at the time of the dismantling.

    MaterialWaste/Recycled

    Manager

    Iron R Authorised waste manager

    Other metals: Cu, Al R Authorised waste manager

    Plastics R Authorised waste manager

    Electronic boards (HW) D Authorised waste manager

  • KIT – G-02 COMPETITIVE MACHINE

    Cu, steel and magnets

  • END OF LIFE OF THE KIT – G-02 COMPETITIVE MACHINE

    When the machine's service life comes to an end ORONA will be responsible for its dismantling.

    The destruction/reuse of the material will be done in accordance with the legislation in force at the time of the dismantling.

    MaterialWaste/Recycled

    Manager

    Steel. R Authorised waste manager

    Other metals: Cu R Authorised waste manager

    Magnets R Authorised waste manager

  • 10

    Alta eficiencia para edificios residenciales.Óptima ocupación del espacio y última tecnología de accionamiento directo (gearless).La solución a medida. Máxima flexibilidad con mayores prestaciones.

    1015

    Carga 320 a 1000 kg

    Capacidad 4 a 13 personas

    velocidad 1 - 1,6 m/s

    Recorrido máximo 50 - 60 m

    número máximo de paradas 16 - 21 paradas

    Embarques Simple embarque / Doble embarque 1800

    Sistema de accionamiento Eléctrico Directo

    Maniobra Sistema de control ARCA ii, multiprocesador de bajo consumo

    Tipos de puerta Automáticas de apertura lateral / Automáticas de apertura central

    Luz de puerta Desde 600 a 1500 mm (en intervalos de 100 mm)

    Altura de puerta 2000 / 2100 / 2200 / 2300

    Dimensiones de cabina Dimensiones de cabina paramétricas

    Altura interior de cabina 2100 / 2200 / 2300 / 2400

    Estéticas disponiblesDR1 / DR2 / DR3 / DR4 / DR5 / DR6 / DR7 / DR8 DS1 / DS2 / DS3 / DS4 / DS5 / Orona 3G Domo Plus

    Estándar Opcional

    PaRaMéTRicO/ FlEXiBlE

    El producto paramétrico permite la posibilidad de adaptar el ascensor a la mayoría de las necesidades de espacio que se puedan plantear (opcional).

    TRÁnSiTO BaJO FOSOAdaptable a edificios donde se requiere el paso de personas bajo foso (opcional).

    PuERTaSCon motor compacto de imanes permanentes, que permite movimientos de apertura y cierre rápidos, precisos y silenciosos, elevando el estándar actual de presentaciones, con apertura anticipada y/o cortina fotoeléctrica. Puerta Solid opcional para situaciones de tráfico intenso.

    acciOnaMiEnTOMáquina eléctrica regulada, compacta, silenciosa, sin engranajes, de alta eficiencia energética con motor de imanes permanentes.

    EcOEFiciEncia cOnTROl Y SEGuRiDaDDiSEÑO Y accESiBiliDaDaDaPTaBiliDaD al EDiFiciO

    1 2 3 4

    1 5

    2

    7

    8

    9

    4

    6

    3

    Características generales

    Soluciones eléctricas gearless sin sala de máquinas (MRLG)

    REnDiMiEnTO DE huEcO

    Ascensores diseñados especialmente para aprovechar el máximo espacio en el hueco, obteniendo una buena relación entre el espacio disponible y la cantidad de pasajeros a transportar.

    SiSTEMa DE EVacuaciÓn auTOMÁTica

    Aunque incorpora de serie un sistema de rescate semiautomá-tico en planta para garantizar una evacuación rápida, segura y eficaz, opcionalmente, se ofrece un sis-tema de evacuación automático orientado principalmente al caso de corte de suministro eléctrico.

    cOMunicaciÓn BiDiREcciOnal

    Entre la cabina y el Centro de Servicio 24 horas, según En 81-28.

    ElEMEnTOS DE TRacciÓn

    que sustituyen a los tradicionales cables de acero. Su menor peso y una mayor vida y flexibilidad posibilitan la utilización de una máquina más compacta, con un motor más eficiente y ecológico.

    huEcO REDuciDOSistema opcional que permite reducir el espacio necesario en la última planta del edificio. Garantizando la máxima seguridad y protección a los técnicos de mantenimiento.

    5 6 7 8 9

    Orona 3G

  • PL

    11

    1 Paso de personas bajo foso (Paracaídas en contrapeso) añadir 115 mm al AH

    2 Fondo hueco con puertas apoyadas 60 mm en el forjado

    3 Fondo hueco con puertas apoyadas 40 mm en el forjado

    4 HF reducida opcional 830 mm

    5 HUP mínima para altura interior de cabina (HC) de 2100 mm (HUP=HC+1300) HUP reducida opcional (HUP=HC+900). Consultar disponibilidad de dimensiones de cabina

    * Hueco sin desplomes

    Dimensiones estándares

    AH

    PL

    FCFH

    ACCuadro maniobra en última parada:

    277 x 152 mm.

    Ubicación flexible opcional.

    PL

    Configuración

    Dimensiones de cabina personalizadas

    1 EMbARqUE 2 EMbARqUES 180° DETALLE CUADRO DE MAniObRA

    DETALLE PUERTA MARCO AnCHO

    SECCiÓn vERTiCAL

    AH

    PL1

    PL2

    FCFH

    AC

    Carga / capacidad CabinaHueco *

    Puertas apertura lateral

    Puertas apertura central

    velocidad

    Personas

    q Carga

    AC Ancho

    fC fondo

    PL Luz

    EmbarquesAH1

    Ancho

    fH2 fondo

    AH Ancho

    fH3 fondo

    Hf foso

    HUP Ult. PlantaAccesibilidad nº de embarques

    1 m/s

    4 320 kg 825 1100 7001

    13001350

    1000(830)4

    3400(3050)5

    2x1800 1500

    6 450 kg 1000 1250 8001

    14501500

    17251450

    2x1800 1650 1550

    8 630 kg 1100 1400 9001

    16001675

    19251625

    2x1800 1850 1750

    10 800 kg 1350 1400 9001

    18251675

    19251625

    2x1800 1850 1750

    13 1000 kg1600 1400 1000

    12075

    16752150

    16252x1800 1850 1750

    1100 2100 10001

    17752375

    21252300

    2x1800 2550 2400

    1,6 m/s

    4 320 kg 825 1100 7001

    13251350

    1120 3550

    2x1800 1500

    6 450 kg 1000 1250 8001

    14751500

    17251450

    2x1800 1650 1550

    8 630 kg 1100 1400 9001

    16251675

    19251625

    2x1800 1850 1750

    10 800 kg 1350 1400 9001

    18501675

    19251625

    2x1800 1850 1750

    13 1000 kg1600 1400 1000

    12100

    16752175

    16252x1800 1850 1750

    1100 2100 10001

    17752375

    21252300

    2x1800 2550 2400

    HF

    HU

    P

    HPU

    Ancho de cabina

    Luz de puertaFondo de cabina

    13 12 1600

    13 13 11 1500

    13 13 12 11 10 1400

    13 12 11 10 9 8 1300

    13 13 12 11 10 9 9 8 6 1200

    13 13 12 11 11 10 9 8 8 7 6 5 1100

    12 12 11 10 10 9 8 7 7 6 5 5 1000

    11 10 10 9 8 8 7 7 6 5 5 4 900

    6 6 5 5 4 4 800

    2100 2000 1900 1800 1700 1600 1500 1400 1300 1200 1100 1000 600 700 800 900 1000 1100 1200 1300 1400 1500

    Nota: Ancho y fondo de cabina variable, en incrementos de 5 mm.

    Por simplificación, la tabla muestra incrementos de 100 mm.

  • DS1

  • DS2

  • DS3

  • DS4

  • DS5

  • DS5

    ©O

    RON

    A co

    pyri

    ght

  • De serie // En opción

    Pasamanos

    Material botonera y/o falso techo y/o puertas (cabina y piso)

    Suelos

    Techos e Iluminaciones

    Pulsadores de cabina

    Pulsadores de piso

    Señalización de cabina

    Señalización de piso

    Espejos

    Zócalos

    Paredes de cabina

    DS5Pack Selection

    SC - PVC High ACABADOS DE SUELOS

    OPCIONES DE SUELOS-Preparado para granito -Preparado para PVC

    SC05 Grey Silver

    HR02

    MT (Espejo 3/4 estrecho)

    -01 BlancoACABADO DE ESPEJO

    -SK01 Anodized Aluminium (St St finish)

    Pared fondoF

    F L

    Pared lateral opuesto panel de mandosL

    RECUBRIMIENTOSPanel inox

    ST01 St St Base

    ST02 St St Plus

    Modelo circular Orona

    -Pulsador de cierre de puertas-Pulsador Braille-Pulsador con llave (Orona o eurocilindro)

    -Anulación de llamadas exteriores

    -Pulsador con llave (Orona o eurocilindro)-Botonera en pared y/o compartida

    Botonera universal (1 pulsador)

    Botonera selectiva (2 pulsadores)

    -ST01 St St Base-ST02 St St Plus

    -Flechas direccionales en embocadura-Gong en cabina

    Flechas de dirección en cabina

    Indicador de sobrecarga (acústico y luminoso)

    Síntesis de voz

    Matriz puntos

    Matriz puntos

    -Flechas próxima partida en piso-Gong en piso

    UP37 - Focos LedApagado automático iluminación

    -ST01 St St Base-ST02 St St Plus

    ILUMINACIÓN MODELO

    ILUMINACIÓN MATERIAL TECHO

    OTRAS OPCIONES-Ventilador

    ©O

    RON

    A co

    pyri

    ght

  • SCALA ASCENSORES S.A.S.

    CLIENTE:

    PROYECTO:

    ACTIVIDAD:

    SUMINISTRO E INSTALACION DE ASCENSORES

    1 FABRICACION DEL EQUIPOS

    2 TRANSITO DE PUERTO DE ORIGEN A PUERTO COLOMBIANO Y NACIONALIZACION

    3 NACIONALIZACION EN ZONA FRANCA DE BOGOTA

    4 DESCARGUE DE MATERIALES EN OBRA E INVENTARIOS

    5 INSTALACION DE ANCLAJES Y GUIAS

    6 INSTALACIÓN DE BANCADA, MAQUINA Y CONTROL EN CUARTO DE MAQUINAS

    7 ARMADO DE CHASIS DE CABINA Y CONTRAPESO, COLGADO DE GUAYAS

    8 INSTALACIÓN DE MARCOS DE PUERTAS DE PISO

    9 ARMADO DE CABINA Y ELEMENTOS DE CUARTO DE MAQUINAS

    10 INSTALACION OPERADOR DE PUERTAS Y PUERTAS DE CABINA

    11 ALAMBRADO GENERAL, POZO Y CABINA

    12 AJUSTE FINAL (A partir de la existencia de Energia Definitiva)

    NOTAS

    C R O N O G R A M A D E A C T I V I D A D E S

    MESES

    oct-18 nov-18 dic-18 ene-19 feb-19 mar-19 abr-19 may-19jul-18

    Los tiempos del presente cronograma inician a partir de la firma del contrato, elección acabados y recibo del anticipo.

    may-19ITEM A C T I V I D A D

    jun-18 ago-18 sep-18