ECMA-328 2nd editionInvitation for open review

For Ecma’s comments and dispositions to DIS in ISO/IEC JTC 1’s fast track procedure

Ecma/GA/2006/074

Page 2: ECMA-328 2 nd edition Invitation for open review For Ecmas comments and dispositions to DIS in ISO/IEC JTC 1s fast track procedure Ecma/GA/2006/074

Rue du Rhône 114 - CH-1204 Geneva - T: +41 22 849 6000 - F: +41 22 849 6001 - www.ecma-international.org 2

Open-328review procedure overview

ECMA-328, 1st edition, 2001

RAL-UZ 122, Annex 2, 2006

Final Draft ECMA-328March 2006

ISO/IEC 2xxxx

IEC/TC 111 review

Ecma’s Technical Comments +

Proposed Dispositions

IEC/TC 108 review

IEC/ISO JTC 1 SC 28 review

Open-328@Ecma-

International.org

ECMA-328 2nd Edition, June ‘06

ISO/IEC JTC 1Fast track procedure

TC38-TG1Drafting

BAM

TC38-TG1 review

TC38 finalisation

Ecma General Assembly

vote

Page 3: ECMA-328 2 nd edition Invitation for open review For Ecmas comments and dispositions to DIS in ISO/IEC JTC 1s fast track procedure Ecma/GA/2006/074

Rue du Rhône 114 - CH-1204 Geneva - T: +41 22 849 6000 - F: +41 22 849 6001 - www.ecma-international.org 3

Open-328 review procedure

Invitation to help: • Review the final draft ECMA-328 2nd edition; Solicit technical comments; • Draft, review and compile dispositions until one month before JTC 1’s end-of-ballot.Thereafter:

Ecma will issue technical comments and dispositions to ISO/IEC JTC 1‘s fast track to be addressed in the Ballot Resolution Meeting.

How to comment:

Send (ISO/IEC formatted) comments to mailto:[email protected]; Open-328 archive contains final draft.

Who:

Experts from ISO/IEC/JTC 1 SC28, IEC/TC 108 and IEC/TC 111 who register at http://www.Ecma-International.org/memento/TC38-TG1-M.htm; Mr. Van Heiningen, Océ, International Editor, TC38-TG1 convenor, coordinates.

Page 4: ECMA-328 2 nd edition Invitation for open review For Ecmas comments and dispositions to DIS in ISO/IEC JTC 1s fast track procedure Ecma/GA/2006/074

Rue du Rhône 114 - CH-1204 Geneva - T: +41 22 849 6000 - F: +41 22 849 6001 - www.ecma-international.org 4

JTC 1 Fast-Track Procedure Submitter

Submitter:

• is a JTC 1 P-member or JTC 1 Class A-liaison holder

• is the only party that decides to submit to JTC 1’s Fast-Track; not a JTC 1 decision.

• may submit a published standard, amendment or Technical Report

• may solicit advance informal comments from SC’s

• either directly or via the JTC 1 Secretariat

• recommends assignment of the publication to an SC

• identifies an International editor

Page 5: ECMA-328 2 nd edition Invitation for open review For Ecmas comments and dispositions to DIS in ISO/IEC JTC 1s fast track procedure Ecma/GA/2006/074

Rue du Rhône 114 - CH-1204 Geneva - T: +41 22 849 6000 - F: +41 22 849 6001 - www.ecma-international.org 5

JTC 1 Fast-Track ProcedureITTF

ITTF:

• Settles copyright and trademark situation;

• Registers the Fast-Track proposal;

• Includes DIS number allocation

• Helps assignment to an SC or JTC 1 itself;

• JTC 1 Secretariat assigns

• Starts the 30-day review period;

• May result in perceived contradictions that ITTF settles

• Starts the 5-month letter ballot;

• Publishes Final DIS text as ISO/IEC publication.

Page 6: ECMA-328 2 nd edition Invitation for open review For Ecmas comments and dispositions to DIS in ISO/IEC JTC 1s fast track procedure Ecma/GA/2006/074

Rue du Rhône 114 - CH-1204 Geneva - T: +41 22 849 6000 - F: +41 22 849 6001 - www.ecma-international.org 6

JTC 1 Fast-Track ProcedureSC

Upon assignment to an SC:

• The SC administers the new project in its work programme and maintenance list;

SC Secretariat:

• Distributes ballot results to the SC’s NBs and all voters

• Within two months after ballot closure

• Calls the ballot resolution meeting, appoints the Convener

• Required in case of “disapprove” votes and/or contentious technical comments, but not earlier than 2,5 months after ballot closure

• Appoints the international Editor

• Who drafts the (proposed and) final DIS text and (proposed and) final Disposition of Comments report within 1 month after ballot resolution meeting

Page 7: ECMA-328 2 nd edition Invitation for open review For Ecmas comments and dispositions to DIS in ISO/IEC JTC 1s fast track procedure Ecma/GA/2006/074

Rue du Rhône 114 - CH-1204 Geneva - T: +41 22 849 6000 - F: +41 22 849 6001 - www.ecma-international.org 7

JTC 1 Fast-Track Procedure Voting and Voters

Two-staged:

• 30-day review period, to determine perceived contradictions;

• 5-month letter ballot (DIS or DAM), which is a combined voting process.

Voters, one per country:

• all NBs of ISO may vote;

• all NCs of IEC may vote;

• all P-members JTC 1’s shall vote.

Page 8: ECMA-328 2 nd edition Invitation for open review For Ecmas comments and dispositions to DIS in ISO/IEC JTC 1s fast track procedure Ecma/GA/2006/074

Rue du Rhône 114 - CH-1204 Geneva - T: +41 22 849 6000 - F: +41 22 849 6001 - www.ecma-international.org 8

JTC 1 Fast-Track Procedure Ballot criteria

Ballot pass criteria:

• 1/2 of JTC 1’s P-members voted (approve, disapprove or abstain) and

• 2/3 of JTC 1’s P-member “approve” and

• Three or more “approve” votes per “disapprove” vote cast by all voters.

Disapproval:

• On technical grounds only;

• Must include justification;

• Should include proposed fix for identified technical problem;

• Requires attendance of ballot resolution meeting.

Page 9: ECMA-328 2 nd edition Invitation for open review For Ecmas comments and dispositions to DIS in ISO/IEC JTC 1s fast track procedure Ecma/GA/2006/074

Rue du Rhône 114 - CH-1204 Geneva - T: +41 22 849 6000 - F: +41 22 849 6001 - www.ecma-international.org 9

JTC 1 Fast-Track ProcedureBallot resolution meeting

Ballot resolution meeting:

• SC shall call a ballot resolution meeting in case of negative votes or contentious technical comments;

• NO-voters must attend;

• To turn NO-votes into YES-votes.

• By approving disposition of comments; Preferably by consensus, otherwise by majority vote.

• NB or NC shall confirm their vote change to “approve” to ITTF in writing.

Within one month following the meeting, the International Editor drafts:

• the final DIS text; and Disposition of Comments report from proposal versions (as modified and approved in the meeting).

Page 10: ECMA-328 2 nd edition Invitation for open review For Ecmas comments and dispositions to DIS in ISO/IEC JTC 1s fast track procedure Ecma/GA/2006/074

Rue du Rhône 114 - CH-1204 Geneva - T: +41 22 849 6000 - F: +41 22 849 6001 - www.ecma-international.org 10

Rue du Rhône 114CH-1204 GenevaT: +41 22 849 6000 F: +41 22 849 6001

www.Ecma-international.org