January 2011 reported in February 2011 East Valley Operations

East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

January 2011 reported in February 2011

East Valley Operations

Page 2: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

2

Table of Contents

2

Observations & Issues 4Fixed Route Operations 5Dial-a-Ride Operations 87RideChoice 119Maintenance Activities 135Facility Activities 153

Page 3: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

3

Significant Highlights

Page 4: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

4

Observations and Issues

Operations

• Local on-time performance decreased from 94.58% in December10 to93.91 % in January11.

• High Passenger loads continue to occur on Routes 30, 40, 45, 61,533, 535, and 542.

• Ridership on the Arizona Avenue Link is total only due to issues withthe farebox and the bus stop database. See slides 13.

• Missed miles increased from 55.43 in December 10 to 90.74 inJanuary 11.

• EVDAR ADA on-time increased from 97.20 % in December 10 to97.50% in January 11.

Page 5: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

5

Fixed Route Operations

Page 6: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

6

Fixed Route Performance ResultsJanuary 2011

A-Level B-Level C-Level D-Level F-Level JanuaryJanuary

Grade

On-Time

% of trips operated on time

Local 94.5% + 93.8% - 94.4% 93.0% - 93.7% 92.0% - 92.9% <91.9% 93.91% B $3,188

Indicator Value $6,375 $3,188 $0 -$1,593 -$3,187

Preventable Accidents

Preventable Accidents per 100,000 miles <.5 .51 - .90 .91 - 1.4 1.41 - 1.9 > 1.91 0.17 A $8,500

Indicator Value $8,500 $4,250 $0 -$2,124 -$4,249

Customer Service

Total Complaints per 100,000 boardings <23 24-30 31-37 38-44 45+ 30.70 C $0

Indicator Value $6,375 $3,188 $0 -$1,593 -$3,187

$21,250 $10,626 $0 -$5,310 -$10,623 $11,688

Page 7: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

7

Fixed Route-Total Passenger Boardings

July 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 June11

Total 533,190 635,819 674,286 667,834 644,255 612,194 637,184 0 0 0 0 0

Local 463,713 557,964 599,440 595,831 571,915 541,509 558,116 0 0 0 0 0

Express 30,191 34,271 33,343 31,045 29,120 28,284 31,938 0 0 0 0 0

LINK 25,454 27,223 24,668 23,676 25,029 25,569 28,556 0 0 0 0 0

BUZZ 13,832 16,361 16,835 17,282 18,191 16,832 18,574 0 0 0 0 0

Monthly Target 676,718 676,718 676,718 676,718 676,718 676,718 676,718 676,718 676,718 676,718 676,718 676,718

050,000

100,000150,000200,000250,000300,000350,000400,000450,000500,000550,000600,000650,000700,000750,000

Pa

ss

en

ge

rB

oa

rdin

gs

.

Page 8: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

8

Fixed Route-Boardings Per Mile

July 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 June11

Total 1.11 1.41 1.55 1.51 1.57 1.40 1.45 0.00 0.00 0.00 0.00 0.00

Local 1.18 1.51 1.68 1.63 1.68 1.51 1.54 0.00 0.00 0.00 0.00 0.00

Express 0.63 0.75 0.77 0.72 0.74 0.65 0.77 0.00 0.00 0.00 0.00 0.00

BUZZ 1.56 1.80 1.94 1.94 2.29 1.98 2.18 0.00 0.00 0.00 0.00 0.00

LINK 0.87 1.04 0.98 0.94 1.10 1.02 1.02 0.00 0.00 0.00 0.00 0.00

0.00

0.50

1.00

1.50

2.00

2.50

Bo

ard

ing

s/M

ile

Page 9: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

9

Express Load Factor

July 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 June11

#511 14.8% 9.2% 6.7% 7.3% 7.6% 9.6% 5.6%

#531 49.0% 62.2% 62.9% 60.6% 63.0% 84.5% 66.4%

#532 43.7% 41.8% 42.4% 59.1% 45.5% 69.0% 44.1%

#533 71.2% 69.5% 71.5% 61.3% 65.6% 71.6% 72.9%

#535 49.9% 63.0% 66.6% 61.2% 60.1% 96.6% 73.6%

#536 7.6%

#540 51.2% 52.3% 51.3% 46.9% 49.8% 56.8% 49.8%

#541 48.9% 55.3% 58.4% 58.7% 56.9% 76.1% 64.2%

#542 57.5% 71.6% 77.3% 71.0% 76.0% 80.3% 76.7%

0.0%

20.0%

40.0%

60.0%

80.0%

100.0%

120.0%

Page 10: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

10

Fixed Route Service Summary

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY 11 533,190 635,819 674,286 667,834 644,255 612,194 637,184 0 0 0 0 0

FY 10 524,269 576,083 626,010 665,720 605,834 597,953 601,385 605,051 667,765 659,328 589,307 560,975

400,000

450,000

500,000

550,000

600,000

650,000

700,000

Pa

ss

en

ge

rB

oa

rdin

gs

Page 11: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

11

Total Local Boardings

30 40 45 61 96 104 112 120 128 136 156 184Az AveLink

Main StLink

Buzz

Jul 10 52,625 56,126 84,147 116,969 51,192 27,374 23,999 8,712 6,508 12,412 23,649 0 0 25,454 13,832

Aug 10 66,668 56,194 103,828 153,894 56,803 32,189 28,610 9,495 7,917 17,262 25,104 0 0 27,223 16,361

Sept 10 71,997 59,626 110,389 168,301 62,871 33,468 29,622 9,224 7,560 19,735 26,647 0 0 24,668 16,835

Oct 10 71,233 63,050 107,953 166,052 61,911 32,573 29,708 9,640 7,275 18,839 27,597 0 0 23,676 17,282

Nov 10 65,799 62,419 106,821 159,075 58,039 30,211 28,022 8,939 7,197 18,473 26,920 0 0 25,029 18,191

Dec 10 60,438 59,690 99,729 149,338 53,402 30,110 28,097 9,541 7,381 17,406 26,377 0 0 25,569 16,832

Jan 11 62,205 59,969 106,632 156,154 53,987 29,021 28,468 9,256 7,246 18,297 26,347 534 2,714 25,842 18,574

Feb 11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Mar 11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Apr 11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

May 11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Jun 11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0

20,000

40,000

60,000

80,000

100,000

120,000

140,000

160,000

180,000

Pas

seng

erBoa

rdings

Page 12: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

12

Total Express Boardings

511 531 532 533 535 536 540 541 542

Jul 10 870 5,562 2,617 6,833 2,428 346 3,315 4,321 3,899

Aug 10 437 6,514 2,758 7,542 3,189 0 3,660 4,680 5,491

Sept 10 315 6,340 2,624 7,346 3,161 0 3,443 4,628 5,486

Oct 10 345 6,022 2,645 6,283 2,958 0 3,064 4,492 5,236

Nov 10 308 5,621 2,557 6,009 2,608 0 2,843 4,102 5,072

Dec 10 216 5,544 2,338 6,206 2,705 0 2,479 4,139 4,657

Jan 11 241 6,124 2,505 6,930 3,135 0 2,981 4,767 5,255

Feb 11 0 0 0 0 0 0 0 0 0

Mar 11 0 0 0 0 0 0 0 0 0

Apr 11 0 0 0 0 0 0 0 0 0

May 11 0 0 0 0 0 0 0 0 0

Jun 11 0 0 0 0 0 0 0 0 0

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

Pas

seng

erBoa

rdin

gs

Page 13: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

13

Arizona Avenue Link- All Cities

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 0 0 0 0 0 0 2151

Saturday 0 0 0 0 0 0 386

Sunday 0 0 0 0 0 0 177

Total 0 0 0 0 0 0 2714

0

500

1,000

1,500

2,000

2,500

3,000

Page 14: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

14

Chandler Monthly Boardings Comparison

96 104 112 136 156 511 540 541 542

Jan 11 10,274 6,726 8,022 1,223 21,415 0 458 1,584 2,619

Jan 10 12,411 6,782 8,591 0 22,312 330 679 1,632 1,223

0

5,000

10,000

15,000

20,000

25,000

Mo

nth

To

talB

oar

din

gs

Page 15: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

15

Chandler Boardings - Year to Date Comparison

96 104 112 136 156 511 540 541 542

FY11 82,940 51,280 57,617 5,789 149,639 336 4,834 10,781 17,413

FY10 93,282 50,313 65,485 0 155,403 3,371 6,719 10,401 12,420

0

20,000

40,000

60,000

80,000

100,000

120,000

140,000

160,000

180,000

Tota

lBoard

ings

Page 16: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

16

Route 96- Chandler

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 10,474 11,211 11,385 10,481 9,659 8,911 8,743 0 0 0 0 0

Saturday 1,647 991 960 1,122 785 746 876 0 0 0 0 0

Sunday 824 422 699 465 1,109 775 655 0 0 0 0 0

Total 12,945 12,624 13,044 12,068 11,553 10,432 10,274 0 0 0 0 0

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

Page 17: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

17

Route 104 - Chandler

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 6,921 7,329 7,422 8,413 6,409 8,060 6,726 0 0 0 0 0

FY10 6,816 6,527 7,053 7,560 7,253 8,322 6,782 7,327 8,902 8,390 6,752 6,523

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

Tota

lBoard

ings

Page 18: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

18

Route 112- Chandler

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 7,553 8,398 8,597 8,748 8,452 7,847 8,022 0 0 0 0 0

FY10 9,175 9,113 10,043 10,419 9,602 8,542 8,591 9,902 9,457 9,281 8,109 7,843

0

2,000

4,000

6,000

8,000

10,000

12,000

Tota

lBoard

ings

Page 19: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

19

Route 136 - Chandler

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 9 121 195 1,400 1,595 1,112 1,172 0 0 0 0 0

Saturday 0 7 5 42 52 28 51 0 0 0 0 0

Total 9 128 200 1,442 1,647 1,140 1,223 0 0 0 0 0

0

250

500

750

1,000

1,250

1,500

1,750

Pass

enger

Board

ings

Page 20: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

20

Route 156- Chandler

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 15,561 17,480 18,458 18,678 17,529 17,953 16,688 0 0 0 0 0

Saturday 2,422 1,740 1,902 2,495 1,825 1,554 2,389 0 0 0 0 0

Sunday 1,413 1,478 1,598 1,615 2,447 2,076 2,338 0 0 0 0 0

Total 19,396 20,698 21,958 22,788 21,801 21,583 21,415 0 0 0 0 0

0

4,000

8,000

12,000

16,000

20,000

24,000

Pass

enger

Board

ings

Page 21: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

21

Route 540 - Chandler

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 1,066 874 930 595 449 462 458 0 0 0 0 0

FY10 1,003 1,203 1,115 983 875 861 679 873 1,067 488 1,143 1,437

0

200

400

600

800

1,000

1,200

1,400

1,600

Tota

lBoard

ings

Page 22: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

22

Route 541 - Chandler

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 1,409 1,621 1,624 1,524 1,526 1,493 1,584 0 0 0 0 0

FY10 4,046 3,886 2,742 3,101 2,494 1,930 1,974 2,116 1,614 1,657 0 0

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

TotalB

oard

ings

Page 23: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

23

Route 542- Chandler

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 1,734 2,817 2,797 2,597 2,467 2,382 2,619 0 0 0 0 0

FY10 2,617 2,223 1,623 1,628 1,495 1,611 1,223 1,260 2,451 2,484 2,319 2,355

0

500

1,000

1,500

2,000

2,500

3,000

Page 24: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

24

Gilbert Monthly Boardings Comparison

136 156 184 531

Jan 11 5,162 3,586 9 1,740

Jan 10 5,050 3,842 0 1,478

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

Month

Tota

lB

oard

ings

Page 25: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

25

Gilbert Boardings - Year to Date Comparison

136 156 184 531

FY11 39,303 25,874 9 11,114

FY10 37,983 28,258 0 12,904

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

TotalB

oardings

Page 26: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

26

Route 136 - Gilbert

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 3,666 5,925 6,880 5,148 5,280 5,117 4,709 0 0 0 0 0

Saturday 396 351 326 459 345 248 453 0 0 0 0 0

Total 4,062 6,276 7,206 5,607 5,625 5,365 5,162 0 0 0 0 0

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

Pass

enger

Board

ings

Page 27: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

27

Route 156- Gilbert

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 3,101 3,071 3,189 3,069 3,191 3,131 2,977 0 0 0 0 0

Saturday 328 242 265 424 450 226 292 0 0 0 0 0

Sunday 123 220 187 231 431 409 317 0 0 0 0 0

Total 3,552 3,533 3,641 3,724 4,072 3,766 3,586 0 0 0 0 0

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

Pass

engerB

oard

ings

Page 28: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

28

Route 184 - Gilbert

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 0 0 0 0 0 0 6 0 0 0 0 0

Saturday 0 0 0 0 0 0 0 0 0 0 0 0

Sunday 0 0 0 0 0 0 3 0 0 0 0 0

Total 0 0 0 0 0 0 9 0 0 0 0 0

0

20

40

60

80

100

Pass

enger

Board

ings

Page 29: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

29

Route 531 - Gilbert

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 1,514 1,432 1,592 1,618 1,631 1,587 1,740 0 0 0 0 0

FY10 2,549 1,712 1,517 2,033 1,804 1,811 1,478 1,358 1,224 1,117 1,351 1,624

0

500

1,000

1,500

2,000

2,500

3,000

Tota

lBoard

ings

Page 30: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

30

Mesa Monthly Boardings Comparison

30 40 45 61 96 104 112 120 128 136 156 184 531 532 533 535 536 541 Link Buzz

Jan 11 35,85 38,26 37,20 61,35 39,00 22,29 20,44 9,256 7,246 11,91 1,346 525 1,513 1,180 3,692 1,834 0 1,099 25,84 18,57

Jan 10 32,48 34,83 34,59 54,59 37,46 23,53 18,79 8,725 7,535 9,320 954 0 1,178 1,276 4,089 1,243 403 927 29,02 16,23

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

Mo

nth

To

tal

Bo

ard

ing

s

Page 31: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

31

Mesa Boardings – Year to Date Comparison

30 40 45 61 96 104 112 120 128 136 156 184 531 532 533 535 536 541Main St

LinkBuzz

FY11 246,306 269,559 252,012 426,836 285,606 163,666 138,909 64,807 51,084 77,332 7,128 525 10,609 9,354 24,612 12,569 198 6,179 177,461 117,907

FY10 238,763 237,156 240,716 391,748 245,398 166,912 136,174 59,362 48,745 61,230 8,378 0 7,215 8,863 30,300 9,253 3,244 5,951 182,878 119,066

0

50,000

100,000

150,000

200,000

250,000

300,000

350,000

400,000

450,000

To

talB

oa

rdin

gs

Page 32: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

32

Route 30 - Mesa

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 27,099 33,824 34,951 35,138 33,001 31,634 33,087 0 0 0 0 0

Saturday 2,704 2,163 2,491 2,931 2,682 1,832 2,769 0 0 0 0 0

Total 29,803 35,987 37,442 38,069 35,683 33,466 35,856 0 0 0 0 0

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

Pas

seng

erB

oard

ings

Page 33: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

33

Route 40 - Mesa

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 29,426 32,495 32,699 33,991 30,753 31,362 29,785 0 0 0 0 0

Saturday 6,551 6,009 6,627 8,902 7,002 5,473 8,484 0 0 0 0 0

Sunday 3,759 6,124 6,715 6,747 10,755 9,981 8,376 0 0 0 0 0

Total 35,977 38,504 39,326 42,893 37,755 36,835 38,269 0 0 0 0 0

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

50,000

Page 34: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

34

Route 45- Mesa

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 29,540 34,052 35,319 34,869 31,924 32,547 34,226 0 0 0 0 0

Saturday 3,023 2,298 2,803 3,649 2,605 2,182 2,975 0 0 0 0 0

Total 32,563 36,350 38,122 38,518 34,529 34,729 37,201 0 0 0 0 0

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

Page 35: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

35

Route 61 - Mesa

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 41,979 54,815 63,172 60,341 54,297 54,684 54,256 0 0 0 0 0

Saturday 5,473 5,682 6,045 8,069 6,086 4,841 7,096 0 0 0 0 0

Sunday 2,724 3,277 3,735 3,524 5,683 4,727 4,735 0 0 0 0 0

Total 47,452 60,497 69,217 68,410 60,383 59,525 61,352 0 0 0 0 0

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

Pass

enger

Board

ings

Page 36: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

36

Route 96 - Mesa

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 30,915 36,537 41,845 40,097 36,354 34,176 34,160 0 0 0 0 0

Saturday 4,704 4,014 4,297 5,789 4,452 3,421 4,845 0 0 0 0 0

Sunday 2,628 3,628 3,685 3,957 5,680 5,373 4,708 0 0 0 0 0

Total 35,619 40,551 46,142 45,886 40,806 37,597 39,005 0 0 0 0 0

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

50,000

Pass

engerB

oard

ings

Page 37: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

37

Route 104 - Mesa

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 18,747 23,252 24,456 22,125 22,229 20,846 20,555 0 0 0 0 0

Saturday 1,706 1,608 1,590 2,035 1,573 1,204 1,740 0 0 0 0 0

Total 20,453 24,860 26,046 24,160 23,802 22,050 22,295 0 0 0 0 0

0

4,000

8,000

12,000

16,000

20,000

24,000

28,000

Pa

sse

ng

er

Bo

ard

ing

s

Page 38: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

38

Route 112 - Mesa

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 16,446 20,212 21,025 20,960 19,570 20,250 20,446 0 0 0 0 0

FY10 17,215 18,306 20,478 21,884 19,439 20,058 18,794 18,924 20,985 20,614 18,331 18,441

0

5,000

10,000

15,000

20,000

25,000

Tota

lBoard

ings

Page 39: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

39

Route 120 – Mesa

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 8,132 8,981 8,703 8,927 8,364 9,092 8,705 0 0 0 0 0

Saturday 580 514 521 713 575 449 551 0 0 0 0 0

Total 8,712 9,495 9,224 9,640 8,939 9,541 9,256 0 0 0 0 0

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

Pass

engerB

oard

ings

Page 40: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

40

Route 128 - Mesa

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 5,793 7,319 6,958 6,431 6,595 6,903 6,630 0 0 0 0 0

Saturday 715 598 602 844 602 478 616 0 0 0 0 0

Total 6,508 7,917 7,560 7,275 7,197 7,381 7,246 0 0 0 0 0

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

Pass

enger

Board

ings

Page 41: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

41

Route 136 - Mesa

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 7,704 10,183 11,515 10,700 10,441 10,229 10,982 0 0 0 0 0

Saturday 637 675 814 1,090 760 672 930 0 0 0 0 0

Total 8,341 10,858 12,329 11,790 11,201 10,901 11,912 0 0 0 0 0

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

Pass

enger

Board

ings

Page 42: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

42

Route 156 - Mesa

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 568 734 884 892 899 670 1,103 0 0 0 0 0

Saturday 65 72 54 92 54 98 160 0 0 0 0 0

Sunday 68 67 110 101 94 260 83 0 0 0 0 0

Total 701 873 1,048 1,085 1,047 1,028 1,346 0 0 0 0 0

0

200

400

600

800

1,000

1,200

1,400

Pa

sse

ng

erB

oa

rdin

gs

Page 43: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

43

Route 184 - Mesa

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 0 0 0 0 0 0 499 0 0 0 0 0

Saturday 0 0 0 0 0 0 8 0 0 0 0 0

Sunday 0 0 0 0 0 0 18 0 0 0 0 0

Total 0 0 0 0 0 0 525 0 0 0 0 0

0

100

200

300

400

500

600

700

800

Pas

seng

erBoa

rdin

gs

Page 44: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

44

Route 531 - Mesa

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 1,319 1,948 1,743 1,528 1,264 1,294 1,513 0 0 0 0 0

FY10 965 1,041 1,017 1,233 849 932 1,178 1,612 2,145 2,224 1,780 1,590

0

500

1,000

1,500

2,000

2,500

Tot

alBoa

rdin

gs

Page 45: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

45

Route 532 - Mesa

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 1,229 1,454 1,425 1,416 1,463 1,187 1,180 0 0 0 0 0

FY10 1,346 1,239 1,204 1,280 1,253 1,265 1,276 1,317 1,577 1,439 1,218 1,347

0

200

400

600

800

1,000

1,200

1,400

1,600

1,800

Tota

lBoard

ings

Page 46: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

46

Route 533 - Mesa

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 3,332 3,947 3,763 3,141 3,379 3,358 3,692 0 0 0 0 0

FY10 4,871 4,736 4,279 4,546 3,774 4,005 4,089 3,343 4,241 4,175 3,334 3,422

0

1,000

2,000

3,000

4,000

5,000

6,000

To

talB

oa

rdin

gs

Page 47: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

47

Route 535 – Mesa

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 1,381 2,260 2,276 1,893 1,274 1,651 1,834 0 0 0 0 0

FY10 1,600 1,244 1,459 1,368 1,172 1,167 1,243 944 1,087 1,292 1,371 1439

0

500

1,000

1,500

2,000

2,500

To

talB

oa

rdin

gs

Page 48: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

48

Route 541 - Mesa

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 824 925 921 970 691 749 1,099 0 0 0 0 0

FY10 695 959 894 851 821 804 927 737 931 1,088 764 925

0

200

400

600

800

1,000

1,200

Tota

lBoard

ings

Page 49: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

49

LINK - Mesa

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 23,119 27,223 24,668 23,676 25,029 25,569 25,842 0 0 0 0 0

Saturday 1,296 0 0 0 0 0 0 0 0 0 0 0

Sunday 1,039 0 0 0 0 0 0 0 0 0 0 0

Total 25,454 27,223 24,668 23,676 25,029 25,569 25,842 0 0 0 0 0

0

5,000

10,000

15,000

20,000

25,000

30,000

Page 50: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

50

BUZZ - Mesa

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 12,526 15,193 15,546 15,897 16,994 15,859 16,936 0 0 0 0 0

Saturday 1,306 1,168 1,289 1,385 1,197 973 1,638 0 0 0 0 0

Total 13,832 16,361 16,835 17,282 18,191 16,832 18,574 0 0 0 0 0

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

18,000

20,000

Page 51: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

51

Scottsdale Monthly Boardings Comparison

511

Jan 11 138

Jan 10 212

0

50

100

150

200

250

300

Month

Tota

lB

oard

ings

Page 52: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

52

Scottsdale Boardings – Year to Date Comparison

511

FY11 1,165

FY10 1,779

0

200

400

600

800

1,000

1,200

1,400

1,600

1,800

2,000

Tota

lBoard

ings

Page 53: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

53

Route 511- Scottsdale

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 219 220 150 167 172 99 138 0 0 0 0 0

FY10 258 254 275 297 256 227 212 274 305 298 301 303

0

100

200

300

400

To

talB

oard

ing

s

Page 54: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

54

Tempe Monthly Boardings Comparison

30 40 45 61 511 532 536 540

Jan 11 17,688 13,324 30,667 38,610 103 197 0 482

Jan 10 17,613 14,898 27,451 34,974 172 253 342 354

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

Month

Tota

lB

oard

ings

Page 55: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

55

Tempe Boardings – Year to Date Comparison

30 40 45 61 511 532 536 540

FY11 138,337 90,919 208,978 268,491 1,231 1,647 148 2,442

FY10 129,463 101,094 192,731 232,097 1,007 1,772 2,674 2,682

0

40,000

80,000

120,000

160,000

200,000

240,000

280,000

Tota

lBoard

ings

Page 56: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

56

Route 30 - Tempe

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 13,141 18,998 21,881 20,146 17,322 15,086 14,985 0 0 0 0 0

Saturday 1,521 1,432 1,563 2,314 1,443 1,121 1,766 0 0 0 0 0

Sunday 408 684 791 718 1,174 906 937 0 0 0 0 0

Total 15,070 21,114 24,235 23,178 19,939 17,113 17,688 0 0 0 0 0

0

2,500

5,000

7,500

10,000

12,500

15,000

17,500

20,000

22,500

25,000

Pass

enger

Board

ings

Page 57: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

57

Route 40 - Tempe

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 9,334 8,954 10,745 10,005 9,769 9,316 9,270 0 0 0 0 0

Saturday 1,686 1,211 1,289 1,743 1,505 1,196 1,651 0 0 0 0 0

Sunday 1,231 1,401 1,551 1,662 2,635 2,362 2,403 0 0 0 0 0

Total 12,251 11,566 13,585 13,410 13,909 12,874 13,324 0 0 0 0 0

0

2,500

5,000

7,500

10,000

12,500

15,000

Page 58: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

58

Route 45- Tempe

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 20,076 26,507 28,204 26,369 25,899 23,702 25,526 0 0 0 0 0

Saturday 2,711 2,323 2,343 3,088 2,485 1,862 2,797 0 0 0 0 0

Sunday 1,442 1,821 1,863 1,929 3,158 2,529 2,344 0 0 0 0 0

Total 24,229 30,651 32,410 31,386 31,542 28,093 30,667 0 0 0 0 0

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

Page 59: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

59

Route 61 - Tempe

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 24,781 33,758 36,449 33,421 32,962 30,655 31,566 0 0 0 0 0

Saturday 3,092 3,459 3,461 3,984 2,983 2,365 3,680 0 0 0 0 0

Sunday 1,675 2,804 2,748 3,174 4,497 3,613 3,364 0 0 0 0 0

Total 29,548 40,021 42,658 40,579 40,442 36,633 38,610 0 0 0 0 0

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

Pa

sse

ng

erB

oa

rdin

gs

Page 60: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

60

Route 511- Tempe

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 315 217 165 178 136 117 103 0 0 0 0 0

FY10 131 141 139 161 132 131 172 254 297 248 327 336

0

50

100

150

200

250

300

350

TotalB

oard

ings

Page 61: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

61

Route 532 - Tempe

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 230 235 253 239 262 231 197 0 0 0 0 0

FY10 275 276 276 236 207 249 253 259 321 368 274 252

0

50

100

150

200

250

300

350

400

Tota

lBoard

ings

Page 62: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

62

Route 540 - Tempe

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 303 388 267 314 337 351 482 0 0 0 0 0

FY10 493 279 266 407 512 371 354 301 398 740 339 379

0

100

200

300

400

500

600

700

800

Tota

lBoard

ings

Page 63: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

63

Phoenix Monthly Boardings Comparison

30 40 45 61 156 531 532 533 535 540 541 542

Jan 11 8,661 0 38,768 51,457 0 2,871 1,128 3,238 1,301 2,041 2,084 2,636

Jan 10 6,911 4,820 35,736 45,210 0 2,912 1,165 3,248 1,103 2,295 2,338 2,957

0

10,000

20,000

30,000

40,000

50,000

60,000

Month

Tota

lB

oard

ings

Page 64: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

64

Phoenix Boardings – Year to Date Comparison

30 40 45 61 156 531 532 533 535 540 541 542

FY11 66,322 4,139 258,513 346,051 0 20,004 7,043 22,537 7,615 14,509 14,169 17,683

FY10 51,007 35,834 246,680 327,996 3,850 19,837 8,857 22,209 7,571 15,307 16,764 18,129

0

25,000

50,000

75,000

100,000

125,000

150,000

175,000

200,000

225,000

250,000

275,000

300,000

325,000

350,000

375,000

400,000

To

tal

Bo

ard

ing

s

Page 65: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

65

Route 30 - Phoenix

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 7,104 8,733 9,588 8,978 8,978 8,910 7,756 0 0 0 0 0

Saturday 460 546 488 648 759 545 553 0 0 0 0 0

Sunday 188 288 244 360 440 404 352 0 0 0 0 0

Total 7,752 9,567 10,320 9,986 10,177 9,859 8,661 0 0 0 0 0

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

11,000

Pass

enger

Board

ings

Page 66: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

66

Route 45- Phoenix

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 23,146 32,279 35,026 32,539 33,912 31,399 32,142 0 0 0 0 0

Saturday 2,808 2,613 2,695 3,162 3,010 2,254 3,263 0 0 0 0 0

Sunday 1,401 1,935 2,136 2,348 3,828 3,254 3,359 0 0 0 0 0

Total 27,355 36,827 39,857 38,049 40,750 36,907 38,764 0 0 0 0 0

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

Page 67: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

67

Route 61 - Phoenix

Jul 10 Aug 10 Sept 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Weekday 31,114 43,087 45,233 45,143 43,626 39,649 42,133 0 0 0 0 0

Saturday 4,029 3,682 4,051 5,037 3,597 3,466 4,671 0 0 0 0 0

Sunday 2,102 3,330 3,407 3,359 5,344 5,338 4,653 0 0 0 0 0

Total 37,245 50,099 52,691 53,539 52,567 48,453 51,457 0 0 0 0 0

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

50,000

55,000

Pa

sse

ng

er

Bo

ard

ing

s

Page 68: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

68

Route 531- Phoenix

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 2,729 3,134 3,005 2,876 2,726 2,663 2,871 0 0 0 0 0

FY10 2,729 3,140 3,061 2,895 2,406 2,694 2,912 3,022 3,553 3,335 2,658 2,958

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

To

talB

oa

rdin

gs

Page 69: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

69

Route 532 - Phoenix

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 1,158 1,069 946 990 832 920 1,128 0 0 0 0 0

FY10 1,356 1,321 1,413 1,315 1,129 1,158 1,165 1,253 1,367 1,430 1,196 1,197

0

200

400

600

800

1,000

1,200

1,400

1,600

Tota

lBoard

ings

Page 70: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

70

Route 533- Phoenix

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 3,501 3,595 3,583 3,142 2,630 2,848 3,238 0 0 0 0 0

FY10 2,712 3,226 3,476 3,163 2,999 3,385 3,248 2,610 3,061 3,624 3,651 3,911

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

Tota

lBoard

ings

Page 71: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

71

Route 535 - Phoenix

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 1,047 929 885 1,065 1,334 1,054 1,301 0 0 0 0 0

FY10 1,205 1,114 1,111 1,105 939 994 1,103 973 1,253 1,255 1,168 1,164

0

200

400

600

800

1,000

1,200

1,400

Tot

alB

oard

ings

Page 72: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

72

Route 540 - Phoenix

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 1,946 2,398 2,246 2,155 2,057 1,666 2,041 0 0 0 0 0

FY10 2,545 2,259 2,027 2,328 1,931 1,922 2,295 2,148 2,746 2,743 1,991 1,826

0

500

1,000

1,500

2,000

2,500

3,000

Tota

lBoard

ings

Page 73: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

73

Route 541 - Phoenix

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 2,088 2,134 2,083 1,998 1,885 1,897 2,084 0 0 0 0 0

FY10 2,615 2,535 2,453 2,468 2,243 2,112 2,338 2,187 2,268 2,293 2,284 2,448

0

500

1,000

1,500

2,000

2,500

3,000

Tota

lBoard

ings

Page 74: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

74

Route 542 - Phoenix

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 2,165 2,674 2,689 2,639 2,605 2,275 2,636 0 0 0 0 0

FY10 2,142 2,317 2,800 2,885 2,530 2,498 2,957 2,997 2,469 2,295 2,175 2,562

0

500

1,000

1,500

2,000

2,500

3,000

3,500

Tot

alB

oar

din

gs

Page 75: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

75

Fixed Route Total Revenue Miles

July 10 Aug 10 Sept 10 Oct10 Nov10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 June 11

Local Service 394,283.5 370,428.6 356,497.8 365,333.1 339,717.7 358,832.3 362,869.7 0.0 0.0 0.0 0.0 0.0

Express Service 47,747.8 45,458.3 43,405.3 43,405.3 39,268.5 43,405.3 41,338.4 0.0 0.0 0.0 0.0 0.0

LINK 29,316.9 26,268.8 25,074.8 25,061.5 22,682.0 25,074.8 28,130.6 0.0 0.0 0.0 0.0 0.0

BUZZ 8,876.9 9,071.2 8,691.3 8,886.4 7,934.6 8,499.4 8,512.4 0.0 0.0 0.0 0.0 0.0

Total Service 480,225.1 451,226.8 433,669.2 442,686.4 409,602.9 435,811.8 440,851.2 0.0 0.0 0.0 0.0 0.0

0.0

100,000.0

200,000.0

300,000.0

400,000.0

500,000.0

600,000.0

Re

ve

nu

eM

iles

Page 76: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

76

Vehicle Exchanges by Route-Local

Jul 10 Aug 10 Sep 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May11 Jun 11

30 20 17 13 10 26 15 21

40 18 19 34 15 21 23 24

45 38 29 32 49 30 29 31

61 55 42 42 48 32 33 31

96 27 17 14 18 12 14 17

104 13 16 12 18 7 10 14

112 14 7 10 6 10 3 4

120 6 1 2 2 2 5 8

128 6 7 2 4 2 4 1

136 9 7 12 11 10 8 15

156 18 10 22 9 10 12 7

184 1

AZ Ave LINK 0

Main St LINK 13 19 15 15 12 7 14

BUZZ 7 17 18 9 3 2 2

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160Vehicleexchangesbyroute-Local

Page 77: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

77

Vehicle Exchanges by Route-Express

Jul 10 Aug 10 Sep 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May11 Jun 11

511 2 0 0 2 0 4 0

531 8 4 3 2 6 5 3

532 1 2 4 3 2 5 2

533 4 0 3 3 2 1 0

535 1 4 4 1 2 2 3

536 1

540 3 2 1 2 1 1 1

541 6 3 5 2 1 2 1

542 1 6 0 3 2 2 5

0

4

8

12

16

Page 78: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

78

Vehicle Exchanges

Jul Aug Sep Oct Nov Dec Jan Feb Mar April May June

FY11 271 229 248 232 193 187 205

FY10 264 204 172 168 168 186 201 178 333 270 246 247

0

50

100

150

200

250

300

350

Ve

hic

leE

xch

an

ge

s

Page 79: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

79

Missed Miles by Route- Local

Jul 10 Aug 10 Sep 10 Oct10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May11 Jun 11

30 22.3 9.52 5.73 4.79 7.52 8.44 0

40 26.22 12.03 15.69 0 6 1.02 9.71

45 10.09 8.52 36.25 43.28 22.06 13.91 21.39

61 46.48 31.1 24.24 13.54 46.97 16.79 20.43

96 33.77 7.7 11.11 0 2.11 0 8.47

104 0 3.27 2.78 2.49 0 0 4.22

112 0 5.04 0 0 5.02 0 3

120 3.2 0 0 0 0 0 3.16

128 0 3.12 0 0 2.49 0 0

136 5.13 5.13 0.93 0 0 1.43 0

156 2.13 0 0 0 4.38 13.84 1.08

184 7.4

AZAve LINK 0

BUZZ 12.44 0 3 2.83 5.93 0 0

0

10

20

30

40

50

60

70

80

90

100

110

MissedMiles-Local

Page 80: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

80

Missed Miles by Route- Express

Jul 10 Aug 10 Sep 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May11 Jun 11

511 0 13.96 0 0 0 0 0

531 0 0 0 0 2.96 0 0

532 0 0 0 0 0 0 0

533 0 0 0 0 0 0 0

535 0 0 0 0 0 0 0

536 0

540 0 0 0 0 0 0 0

541 1.82 0 0 0 0 0 0

542 0 0 0 0 0 0 0

0

4

8

12

16

20Miss

edMiles-Ex

press

Page 81: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

81

Total Missed Miles

July Aug Sep Oct Nov Dec Jan Feb Mar Apr May

FY11 175.68 99.39 99.73 80.20 110.17 55.43 90.74

FY10 120.23 113.67 155.78 75.69 143.84 114.89 256.09 146.68 91.97 179.22 136.41 63.05

0

50

100

150

200

250

300

Mis

se

dM

iles

Page 82: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

82

Total Missed Trips

Jul Aug Sep Oct Nov Dec Jan Feb Mar April May June

FY11 4 0 0 0 0 0 1

FY10 0 0 0 0 1 2 3 1 0 2 0 0

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

Mis

sed

Trip

s

Page 83: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

83

Fixed Route On-Time PerformanceLocal

Jul 10 Aug 10 Sep 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May 11 Jun 11

Local 93.96% 94.51% 93.95% 93.80% 94.26% 94.58% 93.91%

A Level - % or greater 94.5% 94.5% 94.5% 94.5% 94.5% 94.5% 94.5% 94.5% 94.5% 94.5% 94.5% 94.5%

B Level - % or greater 93.8% 93.8% 93.8% 93.8% 93.8% 93.8% 93.8% 93.8% 93.8% 93.8% 93.8% 93.8%

C Level - % or greater 93.0% 93.0% 93.0% 93.0% 93.0% 93.0% 93.0% 93.0% 93.0% 93.0% 93.0% 93.0%

D Level - % or greater 92.0% 92.0% 92.0% 92.0% 92.0% 92.0% 92.0% 92.0% 92.0% 92.0% 92.0% 92.0%

F Level - % or less 91.9% 91.9% 91.9% 91.9% 91.9% 91.9% 91.9% 91.9% 91.9% 91.9% 91.9% 91.9%

Measure 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90%

84.00%

86.00%

88.00%

90.00%

92.00%

94.00%

96.00%

98.00%

100.00%

Pe

rce

nta

ge

of

Tim

ely

Se

rvic

eT

rip

s

Page 84: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

84

Fixed Route Accidents Per 100,000 Miles

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

AFR 11 0.58 0.61 0.79 0.31 0.68 0.80 0.17 0.00 0.00 0.00 0.00 0.00

AFR 10 0.39 0.54 0.42 0.67 0.14 0.13 0.29 0.31 0.41 0.29 0.15 0.77

A Level - or less 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5

B Level - or less 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90

C Level - or less 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40

D Level - or less 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90

F Level - or greater 1.91 1.91 1.91 1.91 1.91 1.91 1.91 1.91 1.91 1.91 1.91 1.91

0.00

0.50

1.00

1.50

2.00

2.50

Accid

en

tsp

er

10

0,0

00

Mile

s

Page 85: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

85

Number of Passenger CommentsPer 100,000 Boardings

Jul 10 Aug 10 Sep 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May11 Jun 11

Comments per 100,000 Boardings 7.7 3.3 2.1 2.4 27.8 24.3 30.6 0.0 0.0 0.0 0.0 0.0

A Level - or less 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5

B Level - or less 10.5 10.5 10.5 10.5 10.5 10.5 10.5 10.5 10.5 10.5 10.5 10.5

C Level - or less 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0 13.0

D Level - or less 17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0 17.0

F Level - or greater 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1 17.1

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

Com

ments

per100,0

00

Board

ings

Page 86: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

86

Fixed Route Complaint Types

Jul 10 Aug 10 Sep 10 Oct 10 Nov 10 Dec 10 Jan 11 Feb 11 Mar 11 Apr 11 May11 Jun 11

Operator-Policy 19 19 30 20 23 20 28

Operator-Attitude 22 35 34 28 38 28 32

Operator-No Show 9 6 7 9 8 6 7

Operator-late/Early 35 39 47 49 40 40 58

Operator-Pass By 67 58 57 67 65 56 56

Operator-Hazardous 25 17 33 32 28 15 27

Operator-ADA 0 1 1 1 2 0 3

Operator-Injury 0 0 0 0 0 0 0

Detours/No Category 21 16 17 10 20 11 21

Kudos 14 15 23 24 11 18 18

Operator-Title VI 0 1 0 0 0 1 0

0

20

40

60

80

100

Num

berofC

omplaints

Page 87: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

87

Dial-a-RideOperations

Page 88: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

88

Dial-a-Ride Performance ResultsJanuary 2011

A-Level B-Level C-Level D-Level F-Level Results Grade

Increase or

(Decrease)

On-Time

ADA 96.0% + 93.6% - < 95.9%

91.5% - >

93.5% 90.0% - < 91.49% <89.9% 97.5% A $6,375

Indicator Value $6,375 $3,188 $0 ($1,593) ($3,187) $6,375

Productivity

Passengers per Hour 1.94+ 1.90-1.939 1.82-1.89 1.77-1.819 <1.769 1.79 D ($1,883)

Indicator Value $7,537 $3,769 $0 ($1,883) ($3,768) ($1,883)

Customer Service

# Valid complaints/1,000 passengers <.50 .51-1.09 1.11-1.50 1.59-2.00 >2.01 0.21 A $3,188

Indicator Value $3,188 $1,594 $0 ($796) ($1,593) $3,188

Preventable Accidents

Accidents per 100,000 miles <.50 .51-1.00 1.01-1.60 1.61-2.20 >2.21 0.00 A $4,150

Indicator Value $4,150 $2,075 $0 ($1,037) ($2,074) $4,150

$21,250 $10,625 $0 ($5,309) ($10,621) 11,830$

Page 89: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

89

Dial-a-Ride Revenue Hours

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 10,114 10,354 10,485 10,524 10,133 10,325 10,813 0 0 0 0 0

FY10 11,572 10,834 10,916 11,144 10,515 11,304 10,560 10,216 11,182 10,755 10,110 10,059

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

Re

ven

ue

Ho

urs

Page 90: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

90

Dial-a-Ride Revenue Hours by Jurisdiction

Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11

Chandler 1,571 1,490 1,536 1,573 1,575 1,554 1,649

Gilbert 952 1,160 1,153 1,201 1,094 1,185 1,317

Mesa 4,169 4,141 4,160 4,085 3,929 4,112 4,090

Scottsdale 1,758 1,712 1,784 1,863 1,803 1,754 1,914

Tempe 1,664 1,851 1,852 1,803 1,732 1,720 1,843

0

1,000

2,000

3,000

4,000

5,000

Re

ven

ue

Ho

urs

Page 91: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

91

Dial-a-Ride Total Boardings

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY 07 17,417 19,427 18,205 19,489 18,272 17,770 18,992 18,062 20,540 19,148 19,706 19,022

FY 08 18,794 20,510 18,778 21,639 19,623 18,740 20,321 19,728 20,156 20,509 19,514 19,021

FY 09 20,953 21,051 21,362 23,198 20,120 21,705 21,377 20,356 22,704 22,055 20,884 21,928

FY 10 21,894 21,038 20,948 20,921 19,288 20,770 19,468 19,039 21,208 20,580 19,283 19,513

FY 11 18,916 19,739 20,013 19,482 18,932 18,852 19,357

11,000

13,000

15,000

17,000

19,000

21,000

23,000

25,000

Pa

sse

ng

erB

oa

rdin

gs

Page 92: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

92

Dial-a-Ride Boardings by Jurisdiction

Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11

Chandler 2,768 2,908 2,957 2,954 2,857 2,827 3,059

Gilbert 1,642 1,921 1,928 2,019 1,969 2,017 2,147

Mesa 7,927 8,144 8,306 7,770 7,588 7,777 7,775

Scottsdale 3,328 3,359 3,380 3,376 3,339 3,156 3,207

Tempe 2,843 3,093 3,041 2,976 2,807 2,766 2,810

0

2,000

4,000

6,000

8,000

10,000

12,000

Pa

sse

ng

erB

oa

rdin

gs

Page 93: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

93

ADA Dial-a-Ride Boardings by Jurisdiction

Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11

Chandler 1,661 1,698 1,744 1,870 1,791 1,795 1,904

Gilbert 1,586 1,860 1,876 1,954 1,924 1,965 2,087

Mesa 7,499 7,706 7,928 7,386 7,242 7,466 7,428

Scottsdale 1,620 1,825 1,862 1,847 1,882 1,849 1,884

Tempe 1,790 1,941 1,886 1,857 1,723 1,717 1,772

01,0002,0003,0004,0005,0006,0007,0008,0009,000

AD

AP

as

se

ng

ers

by

Cit

y

Page 94: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

94

Dial-a-Ride non ADA Boardings byJurisdiction

Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11

Chandler 1,107 1,210 1,213 1,084 1,066 1,032 1,155

Gilbert 56 61 52 65 45 52 60

Mesa 428 438 378 384 346 311 347

Scottsdale 1,708 1,534 1,518 1,529 1,457 1,307 1,323

Tempe 1,053 1,152 1,155 1,119 1,084 1,049 1,038

0

200

400

600

800

1,000

1,200

1,400

1,600

1,800

Non-A

DA

Pass

engers

by

City

Page 95: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

95

Percentage of Trips Taken by ADA Certified

Chandler Gilbert Mesa Scottsdale Tempe EVDAR

FY 08 88.4% 92.9% 99.4% 78.1% 83.7% 91.8%

FY 09 81.9% 86.1% 98.9% 71.4% 77.8% 87.6%

FY 10 80.0% 94.3% 99.1% 63.7% 75.5% 86.4%

FY 11 80.6% 99.2% 98.9% 75.4% 73.3% 88.2%

50.0%

55.0%

60.0%

65.0%

70.0%

75.0%

80.0%

85.0%

90.0%

95.0%

100.0%

Tri

ps

by

AD

AC

ert

Page 96: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

96

Dial-a-Ride ADA Boardings by JurisdictionChandler

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 1,661 1,698 1,744 1,870 1,791 1,795 1,904

FY10 2,128 1,980 1,984 2,074 1,860 2,108 1,977 1,830 2,106 2,002 1,793 1,768

0

500

1,000

1,500

2,000

2,500

Board

ings

Page 97: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

97

Dial-a-Ride non ADA Boardings by JurisdictionChandler

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 1,107 1,210 1,213 1,084 1,066 1,032 1,155

FY10 1,123 1,184 1,089 1,071 952 1,063 1,014 953 1,115 1,143 1,028 1,057

0

200

400

600

800

1,000

1,200

1,400

Bo

ard

ing

s

Page 98: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

98

Monthly Trips Non-ADA Certified-Chandler

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May June

Avg Daily- FY11 13.77 14.59 14.73 13.19 16.91 14.82 15.76

FY11 342 345 350 316 415 359 425

0

50

100

150

200

250

300

350

400

450#

Month

lyT

rips

Page 99: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

99

Average Weekday Trips Non-ADA Certified- Chandler

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May June

Avg Daily-FY11 13.77 14.59 14.73 13.19 16.91 14.82 15.76

0

5

10

15

20

25

30A

ve

rag

eW

ee

kd

ay

Tri

ps

Page 100: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

100

Dial-a-Ride ADA Boardings by JurisdictionGilbert

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 1,586 1,860 1,876 1,954 1,924 1,965 2,087

FY10 1,683 1,640 1,669 2,020 1,875 2,104 1,982 1,857 1,991 1,841 1,833 1,749

0

500

1,000

1,500

2,000

2,500

Bo

ard

ing

s

Page 101: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

101

Dial-a-Ride non ADA Boardings by JurisdictionGilbert

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 56 61 52 65 45 52 60

FY10 665 615 613 99 95 85 75 65 99 104 80 70

0

100

200

300

400

500

600

700

Board

ings

Page 102: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

102

Dial-a-Ride ADA Boardings by JurisdictionMesa

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 7,499 7,706 7,928 7,386 7,242 7,466 7,428

FY10 8,481 8,539 8,530 8,764 7,853 8,619 7,866 7,961 8,960 8,648 7,998 8,185

0

2,000

4,000

6,000

8,000

10,000

Bo

ard

ing

s

Page 103: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

103

Dial-a-Ride non ADA Boardings by JurisdictionMesa

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY 11 428 438 378 384 346 311 347

FY 10 649 606 672 479 602 498 491 389 440 396 481 360

0

100

200

300

400

500

600

700

800

Board

ings

Page 104: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

104

Dial-a-Ride ADA Boardings by JurisdictionScottsdale

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 1,620 1,825 1,862 1,847 1,882 1,849 1,884

FY10 2,165 1,837 1,873 1,858 1,656 1,762 1,681 1,63 1,768 1,819 1,58 1,710

0

500

1,000

1,500

2,000

2,500

Bo

ard

ing

s

Page 105: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

105

Dial-a-Ride non ADA Boardings by JurisdictionScottsdale

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 1,708 1,534 1,518 1,529 1,457 1,307 1,323

FY10 1,675 1,534 1,533 1,541 1,649 1,641 1,654 1,549 1,760 1,664 1,705 1,713

0

200

400

600

800

1,000

1,200

1,400

1,600

1,800

Bo

ard

ing

s

Page 106: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

106

Dial-a-Ride ADA Boardings by JurisdictionTempe

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 1,790 1,941 1,886 1,857 1,723 1,717 1,772

FY10 2,197 2,051 2,002 1,972 1,811 1,914 1,734 1,791 1,918 1,939 1,809 1,893

0

500

1,000

1,500

2,000

2,500

Bo

ard

ing

s

Page 107: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

107

Dial-a-Ride non ADA Boardings by JurisdictionTempe

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY11 1,053 1,152 1,155 1,119 1,084 1,049 1,038

FY10 1,128 1,052 983 1,043 935 976 994 1,01 1,051 1,024 970 1,008

0

200

400

600

800

1,000

1,200

1,400

Bo

ard

ing

s

Page 108: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

108

Dial-a-Ride Passengers Per Hour

July Aug Sept Oct Nov Dec Jan Feb March April May June

FY 11 1.87 1.91 1.91 1.85 1.87 1.83 1.79

FY 10 1.93 1.97 1.95 1.91 1.87 1.87 1.88 1.90 1.93 1.95 1.94 1.98

A Level 1.94 1.94 1.94 1.94 1.94 1.94 1.94 1.94 1.94 1.94 1.94 1.94

B Level 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90

C Level 1.69 1.69 1.69 1.69 1.69 1.69 1.69 1.69 1.69 1.69 1.69 1.69

D Level 1.77 1.77 1.77 1.77 1.77 1.77 1.77 1.77 1.77 1.77 1.77 1.77

F Level 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76

1.50

1.60

1.70

1.80

1.90

2.00

2.10

Pa

sse

ng

ers

Pe

rHo

ur

Page 109: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

109

Dial-a-Ride Boardings Per Revenue Hourby Jurisdiction

Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11

Chandler 1.76 1.95 1.93 1.88 1.81 1.82 1.86 0.00 0.00 0.00 0.00 0.00

Gilbert 1.73 1.66 1.67 1.68 1.80 1.70 1.63 0.00 0.00 0.00 0.00 0.00

Mesa 1.90 1.97 2.00 1.90 1.93 1.89 1.90 0.00 0.00 0.00 0.00 0.00

Scottsdale 1.89 1.96 1.89 1.81 1.85 1.80 1.68 0.00 0.00 0.00 0.00 0.00

Tempe 1.71 1.67 1.64 1.65 1.62 1.61 1.52 0.00 0.00 0.00 0.00 0.00

Measure 1.78 1.78 1.78 1.78 1.78 1.78 1.78 1.78 1.78 1.78 1.78 1.78

0.00.20.40.60.81.01.21.41.61.82.02.2

Bo

ard

ing

sp

erR

ev.

Ho

ur

Page 110: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

110

Dial-a-Ride ADA On Time Performance

Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11

ADA 97.9% 96.6% 94.6% 96.2% 97.1% 97.2% 97.5%

A Level 96.0% 96.0% 96.0% 96.0% 96.0% 96.0% 96.0% 96.0% 96.0% 96.0% 96.0% 96.0%

B Level 93.6% 93.6% 93.6% 93.6% 93.6% 93.6% 93.6% 93.6% 93.6% 93.6% 93.6% 93.6%

C Level 91.5% 91.5% 91.5% 91.5% 91.5% 91.5% 91.5% 91.5% 91.5% 91.5% 91.5% 91.5%

D Level 90.0% 90.0% 90.0% 90.0% 90.0% 90.0% 90.0% 90.0% 90.0% 90.0% 90.0% 90.0%

Measure 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90%

0.80

0.82

0.84

0.86

0.88

0.90

0.92

0.94

0.96

0.98

1.00

Pe

rce

nta

ge

ofT

imle

yTr

ips

Page 111: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

111

Dial-a-Ride non-ADA on Time Performance

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

FY 2011 98.9% 97.7% 97.1% 97.9% 97.6% 98.8% 98.7%

FY 2010 98.7% 97.9% 98.6% 98.3% 98.6% 98.5% 98.8% 98.1% 98.5% 98.5% 98.1% 98.4%

FY 2009 96.5% 95.8% 95.2% 95.1% 95.6% 96.2% 97.0% 97.9% 98.0% 97.9% 98.7% 98.0%

0.80

0.82

0.84

0.86

0.88

0.90

0.92

0.94

0.96

0.98

1.00

Pe

rce

nta

ge

ofT

imle

yTr

ips

Page 112: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

112

Dial-a-Ride ADA On Time by Jurisdiction

Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11

Chandler 97.8% 96.5% 95.1% 96.5% 98.1% 98.1% 97.4%

Gilbert 97.5% 96.9% 95.7% 96.8% 97.9% 98.1% 97.7%

Mesa 98.5% 97.3% 95.4% 96.8% 97.9% 97.8% 98.0%

Scottsdale 96.9% 95.0% 91.9% 95.0% 94.0% 95.0% 96.3%

Tempe 96.9% 95.0% 92.7% 94.8% 95.3% 95.4% 96.6%

EVDAR 97.9% 96.6% 94.6% 96.2% 97.1% 97.2% 97.5%

80.0%82.0%84.0%86.0%88.0%90.0%92.0%94.0%96.0%98.0%

100.0%

AD

AO

n-T

ime

by

City

Page 113: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

113

Dial-a-Ride non ADA On Time by Jurisdiction

Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11

Chandler 99.2% 98.1% 97.8% 98.4% 98.8% 99.3% 98.9%

Gilbert 100.0% 94.8% 98.0% 95.2% 100.0% 100.0% 100.0%

Mesa 99.5% 98.6% 98.6% 98.9% 98.2% 99.3% 99.4%

Scottsdale 98.6% 97.1% 96.2% 97.6% 96.9% 98.6% 98.5%

Tempe 98.7% 98.0% 97.1% 97.8% 96.9% 98.2% 98.5%

EVDAR 98.9% 97.7% 97.1% 97.9% 97.6% 98.8% 98.7%

80%

82%

84%

86%

88%

90%

92%

94%

96%

98%

100%

Non-A

DA

On-T

ime

by

City

Page 114: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

114

Dial-a-Ride Complaints Per 1,000 Boardings

July Aug Sept Oct Nov Dec Jan Feb March April May June

FY 11 0.2 0.2 0.5 0.2 0.4 0.1 0.2

FY 10 0.3 0.2 0.2 0.3 0.2 0.1 0.3 0.1 0.2 0.3 0.4 0.2

A Level 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50

B Level 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09

C Level 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50

D Level 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00

0.0

0.5

1.0

1.5

2.0

2.5

Com

pla

ints

per1

,000

Board

ings

Page 115: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

115

Dial-a-Ride Ride Time

July Aug Sept Oct Nov Dec Jan Feb March April May June

FY 08 94.7% 94.9% 94.6% 94.7% 93.8% 96.2% 94.3% 94.6% 94.3% 93.8% 94.3% 94.8%

FY 09 94.7% 94.5% 94.0% 94.2% 94.5% 95.1% 95.1% 94.1% 94.2% 94.5% 94.2% 95.1%

FY 10 95.4% 94.3% 93.7% 94.2% 94.7% 94.8% 95.3% 94.1% 93.8% 94.5% 94.7% 95.4%

FY 11 96.1% 95.6% 94.1% 95.2% 97.0% 95.4% 95.3%

83%

86%

89%

92%

95%

98%

Rid

eTi

me

Sta

nd

ard

Me

t

Page 116: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

116

Dial-a-Ride Appointment on Time

July Aug Sept Oct Nov Dec Jan Feb March April May June

FY 07 91.2% 88.8% 85.5% 88.4% 90.0% 90.7% 91.1% 94.3% 94.2% 92.8% 92.5% 92.6%

FY 08 94.1% 94.4% 93.8% 94.3% 92.8% 94.2% 92.6% 92.3% 94.2% 93.3% 94.4% 95.3%

FY 09 95.8% 94.8% 93.2% 93.7% 93.3% 95.2% 95.2% 94.0% 95.5% 97.1% 97.1% 97.3%

FY 10 97.1% 95.5% 96.2% 96.3% 94.7% 95.4% 97.0% 96.1% 96.7% 97.4% 95.1% 91.0%

FY 11 97.7% 97.1% 96.1% 97.1% 95.5% 97.5% 96.9%

83%

86%

89%

92%

95%

98%

Ap

po

intm

en

tOn

Tim

eS

tan

da

rdM

et

Page 117: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

117

Dial-a-Ride Accidents Per 100,000 Miles

July Aug Sept Oct Nov Dec Jan Feb March April May June

FY 11 1.07 0.00 0.49 0.00 1.05 0.25 0.00

FY 10 0.00 0.60 0.00 0.60 0.00 0.50 0.50 0.00 0.29 0.26 0.00 0.27

A Level 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50

B Level 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

C Level 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60

D Level 2.20 2.20 2.20 2.20 2.20 2.20 2.20 2.20 2.20 2.20 2.20 2.20

0.0

0.5

1.0

1.5

2.0

2.5

Acc

ide

nts

pe

r10

0,0

00

mile

s

Page 118: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

118

Non-ADA Denials by City

Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11

Chandler 38 67 27 33 90 87 64

Gilbert 1 7 0 0 9 8 5

Mesa 17 55 6 5 63 49 53

Scottsdale 41 155 67 121 252 175 189

Tempe 44 71 36 57 83 91 57

Phx/PV/County 5 16 1 0 6 6 2

0

20

40

60

80

100

120

140

160

180

200

220

240

260

Non

-AD

AD

enia

lsby

City

Page 119: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

119

Ride Choice

Page 120: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

120

Chandler- Cab Coupon Trips

July Aug Sept Oct Nov Dec Jan Feb Mar April May June

FY 07 1 16 9 17 31 14 47 13 29

FY 08 10 0 41 40 57 48 24 46 41 49 54 74

FY 09 108 138 91 73 97 87 83 119 94 89 118 119

FY 10 137 76 50 115 140 169 122 113 136 102 142 157

FY 11 125 139 119 121 114 204 159

50

100

150

200

250

300

Page 121: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

121

Chandler- Cab Coupon Books Distributed

July Aug Sept Oct Nov Dec Jan Feb Mar April May June

FY 07 2 22 12 24 42 19 64 18 40

FY 08 55 42 12 42 48 48 26 36 46 56 56 137

FY 09 162 84 147 161 90 106 153 130 121 72 118 129

FY 10 74 136 220 161 194 177 162 135 143 174 148 296

FY 11 170 194 160 168 194 208 231

50

100

150

200

250

300

Page 122: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

122

Chandler Voucher Cab Trips

July Aug Sept Oct Nov Dec Jan Feb Mar April May June

FY 10 34 77 113 101 97 96 134 107 91 190 157

FY 11 217 194 218 178 258 272 254

0

50

100

150

200

250

300

Page 123: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

123

Gilbert- Cab Coupon Trips

July Aug Sept Oct Nov Dec Jan Feb Mar April May June

FY 07 31 41 54 29 41

FY 08 31 55 72 102 66 104 61 52 88 58 123 117

FY 09 169 163 91 150 203 207 145 165 222 208 189 212

FY 10 157 199 248 206 191 248 225 215 261 282 214 269

FY 11 386 357 423 252 497 592 477

0

100

200

300

400

500

600

Page 124: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

124

Gilbert- Cab Coupon Books Distributed

July Aug Sept Oct Nov Dec Jan Feb Mar April May June

FY 07 31 41 54 29 41

FY 08 31 55 72 102 66 104 61 52 88 58 123 117

FY 09 189 268 170 188 231 160 224 285 235 208 191 296

FY 10 301 298 291 302 334 270 326 271 300 442 416 390

FY 11 508 478 525 535 526 576 590

0

100

200

300

400

500

600

Page 125: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

125

Gilbert Voucher Cab Trips

July Aug Sept Oct Nov Dec Jan Feb Mar April May June

FY 10 245 305 263 204 399 333 388 - - - - -

FY 11 298 357 305 251 451 374 440

0

100

200

300

400

500

Page 126: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

126

Mesa- Cab Coupon Trips

July Aug Sept Oct Nov Dec Jan Feb Mar April May June

FY 07 465 482 490 484 506 480 492 438 748 756 702 863

FY 08 825 816 1,743 1,505 1,376 1,389 1,351 1,408 1,498 1,025 1,427 1,759

FY 09 2,015 1,776 1,723 1,670 1,709 2,169 1,643 1,644 2,035 1,828 1,947 2,241

FY 10 1,762 1,645 1,702 1,837 1,722 2,096 1,757 1,645 1,771 1,777 1,955 2,362

FY 11 1,861 1,690 1,727 1,987 2,008 2,132 2,740

0

500

1000

1500

2000

2500

Page 127: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

127

Mesa- Cab Coupon Books Distributed

July Aug Sept Oct Nov Dec Jan Feb Mar April May June

FY 07 639 663 674 665 696 660 670 602 1029 1039 965 1187

FY 08 1,148 1,122 1,081 1,357 1,118 1,366 1,188 1,174 1,219 1,445 1,590 1,599

FY 09 1,658 1,634 1,608 1,584 1,470 1,553 1,894 1,664 1,517 1,467 1,776 1,932

FY 10 2,193 1,715 1,621 1,574 1,708 2,075 1,846 1,614 1,532 1,863 2,016 2,407

FY 11 2,095 1,924 2,067 2,016 2,120 2,189 2,358

0

500

1000

1500

2000

2500

Page 128: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

128

Mesa- Reimbursement Trips

July Aug Sept Oct Nov Dec Jan Feb Mar April May June

FY 07 2,105 2,319 2,410 2,392 2,471 2,260 2,270 1,971 2,583 2,352 2,409 2,418

FY 08 2,285 2,241 1,879 2,275 2,916 2,913 2,307 2,415 2,710 2,410 2,348 2,422

FY 09 2,561 2,995 2,886 3,150 3,636 3,490 3,422 3,413 3,553 3,351 3,729 3,478

FY 10 4,085 3,802 3,817 4,561 4,040 4,450 4,542 3,904 4,276 4,496 4,249 4,174

FY 11 4,320 4,132 4,784 5,438 4,868 5,294 5,207

2000

3000

4000

5000

6000

Page 129: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

129

Mesa- Miles Reimbursed

July Aug Sept Oct Nov Dec Jan Feb Mar April May June

FY 07 11,869 12,837 13,072 13,084 14,440 13,145 12,998 11,313 14,057 13,582 14,099 13,358

FY 08 13,074 12,032 12,025 13,649 18,157 18,157 14,586 15,697 18,325 15,741 16,084 17,017

FY 09 17,761 20,091 19,478 21,504 24,231 22,922 24,201 24,007 24,948 24,414 25,771 25,227

FY 10 29,048 28,687 26,987 32,192 31,405 33,440 34,175 30,313 32,983 34,324 32,674 32,012

FY 11 33,150 30,721 37,622 39,769 39,263 40,547 39,098

10000

15000

20000

25000

30000

35000

40000

45000

Page 130: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

130

Mesa Voucher Cab Trips

July Aug Sept Oct Nov Dec Jan Feb Mar April May June

FY 09 208 175 122 166 169 115 178 112 380 113 253 219

FY 10 360 305 310 241 488 403 500 739 897 664 779 1,007

FY 11 1,026 940 779 759 1,070 757 1,315 0 0 0 0 0

0

300

600

900

1200

Page 131: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

131

Mesa- Average Miles Per Trip Reimbursed

July Aug Sept Oct Nov Dec Jan Feb Mar April May June Aver

FY 07 5.64 5.54 5.42 5.47 5.84 5.82 5.73 5.74 5.44 5.77 5.85 5.52 5.65

FY 08 5.72 5.37 6.40 6.00 6.23 6.23 6.32 6.50 6.76 6.53 6.85 7.03 6.34

FY 09 6.94 6.71 6.75 6.83 6.66 6.57 7.07 7.03 7.02 7.29 6.91 7.25 6.92

FY 10 7.11 7.55 7.07 7.06 7.77 7.51 7.52 7.76 7.71 7.63 7.69 7.67 7.51

FY 11 7.67 7.43 7.86 7.31 8.07 7.66 7.51 0.00 0.00 0.00 0.00 0.00 7.64

4.50

5.00

5.50

6.00

6.50

7.00

7.50

8.00

8.50

Page 132: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

132

Tempe- Cab Coupon Trips

July Aug Sept Oct Nov Dec Jan Feb Mar April May June Aver

FY 08 0 13 8 2 23 12 26 16 25 22 29 47 19

FY 09 46 26 27 34 41 43 92 71 68 130 90 67 61

FY 10 73 119 92 81 79 106 115 136 138 161 217 177 125

FY 11 183 266 237 245 256 316 213 245

0

100

200

300

400

Page 133: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

133

Tempe- Cab Coupon Books Distributed

July Aug Sept Oct Nov Dec Jan Feb Mar April May June Aver

FY 08 0 18 35 21 21 26 30 30 25 60 49 64 32

FY 09 48 88 80 76 144 126 116 116 162 108 102 106 106

FY 10 116 160 122 129 138 199 201 226 208 299 292 305 200

FY 11 383 343 403 379 343 383 303 362

0

50

100

150

200

250

300

350

400

450

Page 134: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

134

Tempe Voucher Cab Trips

July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June Aver

FY 10 75 124 60 208 111 125 138 138 161 150 128 129

FY 11 126 101 98 104 188 192 189 143

0

50

100

150

200

250

300

Page 135: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

135

Maintenance Activities

Page 136: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

136

Maintenance Performance ResultsJanuary 2011

A-Level B-Level C-Level D-Level F-Level

Maintenance

Scoring Weight Score TotalMiles between Roadcalls

Fixed Route 30,000+ 25,000 - 29,999 25,000 - 20,001 20,000 - 15,001 <15,000 30513 A $3,984

Dial-a-Ride 34,000+ 28,000 - 33,999 21,999 - 27,999 22,000 - 15,999 <15,998 31040 B $1,993

Fixed Route $3,984 $1,993 $0.00 -$996 -$1,993

Dial-a-Ride $3,984 $1,993 $0.00 -$996 -$1,993

Deferred Maintenance

Defferred work lines not complete by next PMI cycle. 0 - 35 36 - 72 73 - 110 111 - 147 148> 9.0 A $23,907

$23,907 $17,930 $0.00 -$8,965 -$17,930

Measure Values $31,875 $15,938 $0 ($7,969) ($15,938) Total $29,884

Page 137: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

137

Road Call Parts and Labor

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May June

FY11 $5,562 $3,195 $4,175 $2,213 $2,641 $3,327 $2,570

FY10 $8,182 $4,943 $7,200 $4,403 $6,380 $3,760 $3,333 $2,947 $5,771 $3,635 $3,830 $3,816

FY09 $9,287 $11,503 $6,857 $4,752 $5,655 $5,578 $5,578 $3,907 $6,431 $6,946 $6,016 $4,773

$0

$2,000

$4,000

$6,000

$8,000

$10,000

$12,000

$14,000

$16,000

Ro

ad

Ca

lls

Page 138: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

138

Total Fixed Route Miles

July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June

FY11 637,120 611,684 585,194 590,850 493,753 576,211 549,232

FY10 715,885 690,623 674,230 693,722 646,938 714,819 643,142 594,765 682,331 677,334 639,023 651,964

0

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,000

Mile

s

Page 139: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

139

Total Dial-a-Ride Miles

July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June

FY11 179,195 181,055 173,032 169,798 134,978 191,540 186,239

FY10 218,169 205,983 204,740 205,167 190,665 213,637 198,615 190,418 218,608 197152 182,834 186,173

0

50,000

100,000

150,000

200,000

250,000

Mile

s

Page 140: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

140

Maintenance Labor Hours

July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June

PM FY10 1,176 1,267 1,210 1,399 1,156 1,135 1,389 1,322 1,414 1,508 1,480 1,450

Repair FY10 3,278 3,204 2,993 4,486 2,605 2,588 3,439 3,184 3,602 3,541 3,717 3,481

PM FY11 1,121 1,427 1,337 1,243 1,260 1,231 1,330

Repair FY11 4,859 4,954 4,610 3,838 3,652 3,859 3,972

0

1,000

2,000

3,000

4,000

5,000

6,000

Page 141: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

141

Maintenance Labor Costs

July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June

PM FY10 $56,325 $67,583 $59,927 $65,564 $52,065 $50,931 $62,113 $60,861 $66,103 $66,978 $67,553 $67,585

Repair FY10 $171,205 $225,141 $162,790 $238,887 $169,942 $152,450 $162,579 $154,494 $189,811 $168,543 $164,499 $184,725

PM FY11 $53,014 $72,356 $65,647 $60,455 $62,005 $54,504 $61,488

Repair FY11 $230,843 $269,247 $247,344 $203,731 $179,266 $206,454 $195,992

$0

$50,000

$100,000

$150,000

$200,000

$250,000

$300,000

Page 142: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

142

Maintenance Parts Transactions

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May June

FY11 7,639 8,744 8,285 7,252 6,876 7,308 7,966

FY10 9,215 10,267 9,818 9,552 8,761 8,441 8,574 8,437 8,812 9,066 3,349 8,732

FY09 8,074 8,431 8,783 9,421 8,511 8,492 8,341 7,427 9,710 9,074 9,103 9,771

0

2,000

4,000

6,000

8,000

10,000

12,000

Pa

rts

Iss

ue

d

Page 143: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

143

Maintenance Parts Costs

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May June

FY11 $285,371 $313,849 $272,974 $236,110 $185,899 $214,224 $207,028

FY10 $241,830 $242,063 $235,283 $267,385 $222,006 $196,671 $220,315 $208,388 $232,542 $211,874 $205,461 $225,326

FY09 $197,440 $219,819 $242,515 $238,294 $234,755 $170,025 $174,871 $153,150 $206,188 $198,002 $222,524 $241,418

$10,000

$60,000

$110,000

$160,000

$210,000

$260,000

$310,000

$360,000

Pa

rts

Co

st

Page 144: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

144

Buzz Circulator Maintenance Cost Per Mile

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May June

FY11 $0.76 $1.41 $1.57 $0.97 $0.61 $0.21 $0.43

FY10 $0.46 $0.44 $0.33 $0.48 $0.77 $0.57 $0.98 $0.61 $0.76 $0.57 $1.00 $0.98

FY09 $0.66 $0.85 $0.25 $0.41 $0.31 $0.48

$0.00

$0.20

$0.40

$0.60

$0.80

$1.00

$1.20

$1.40

$1.60

$1.80

Cost

s

Page 145: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

145

2001 CNG NABI Cost Per Mile

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May June

FY11 $1.45 $1.76 $1.58 $0.87 $1.67 $1.71 $1.30

FY10 $1.38 $0.95 $1.22 $0.92 $0.97 $1.03 $1.26 $1.63 $1.19 $1.22 $0.92 $1.17

$0.00

$0.20

$0.40

$0.60

$0.80

$1.00

$1.20

$1.40

$1.60

$1.80

$2.00

Co

sts

Page 146: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

146

2006 New Flyer Cost Per Mile

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May June

FY11 $0.83 $0.87 $0.94 $0.68 $0.59 $0.53 $0.87

FY10 $0.58 $0.67 $0.64 $0.76 $0.79 $0.49 $0.68 $0.66 $0.54 $0.65 $0.68 $0.60

FY09 $0.42 $0.36 $0.48 $0.66 $0.56 $0.46 $0.54 $0.06 $0.51 $0.46 $0.61 $0.53

$0.00

$0.10

$0.20

$0.30

$0.40

$0.50

$0.60

$0.70

$0.80

$0.90

$1.00

Co

sts

Page 147: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

147

2008 CNG New Flyer Cost Per Mile

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May June

FY11 $0.48 $0.52 $0.48 $0.57 $0.52 $0.51 $0.59

FY10 $0.34 $0.63 $0.31 $0.23 $0.28 $0.24 $0.33 $0.31 $0.35 $0.30 $0.38 $0.41

FY09 $0.00 $0.19 $0.21 $0.21 $0.28 $0.22 $0.23 $0.25 $0.25 $0.26 $0.34 $0.38

$0.00

$0.10

$0.20

$0.30

$0.40

$0.50

$0.60

$0.70

Co

sts

Page 148: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

148

2008 Diesel New Flyer BRT Cost Per Mile

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May June

FY11 $0.48 $0.74 $0.62 $0.60 $0.82 $0.56 $0.63

FY10 $0.20 $0.26 $0.30 $0.33 $0.25 $0.32 $0.41 $0.43 $0.43 $0.38 $0.38 $0.47

FY09 $0.40 $0.13 $0.15 $0.19 $0.22 $0.38 $0.33

$0.00

$0.10

$0.20

$0.30

$0.40

$0.50

$0.60

$0.70

$0.80

$0.90

Co

sts

Page 149: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

149

2006 CNG NABI Artic Cost Per Mile

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May June

FY11 $1.61 $1.44 $1.69 $1.16 $1.05 $2.17 $1.39

FY10 $0.58 $1.13 $1.07 $1.07 $1.74 $0.93 $0.88 $2.00 $1.04 $0.95 $0.86 $0.88

FY09 $0.90 $1.01 $0.94 $0.81 $1.07 $1.15 $1.19 $1.01 $1.45 $1.38 $2.45 $1.68

$0.00

$0.50

$1.00

$1.50

$2.00

$2.50

$3.00

Co

sts

Page 150: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

150

2009 CNG New Flyer Cost Per Mile

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May June

FY11 $0.36 $0.41 $0.35 $0.33 $0.40 $0.38 $0.28

FY10 $0.28 $0.14 $0.14 $0.21 $0.20 $0.20 $0.23 $0.20 $0.26 $0.26 $0.24 $0.27

$0.00

$0.05

$0.10

$0.15

$0.20

$0.25

$0.30

$0.35

$0.40

$0.45

Co

sts

Page 151: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

151

Fuel Costs

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May June

CNG FY11 $154,932 $153,064 $144,275 $133,098 $119,381 $126,900 $104,421

Diesel FY11 $115,038 $100,092 $99,987 $105,932 $133,269 $135,275 $112,752

CNG FY10 $139,167 $115,798 $134,757 $121,324 $131,695 $117,323 $118,708 $109,363 $120,113 $114,248 $119,261 $148,294

Diesel FY10 $93,750 $123,063 $101,868 $89,531 $97,211 $113,865 $77,144 $95,455 $118,186 $82,801 $99,355 $97,866

CNG FY09 $183,576 $204,555 $257,012 $255,898 $278,035 $215,592 $176,873 $128,497 $56,855. $17,341 $18,401 $160,929

Diesel FY09 $288,077 $160,983 $153,267 $147,585 $82,702 $82,168 $84,672 $91,920 $76,702. $96,775 $99,266 $130,941

$10,000

$60,000

$110,000

$160,000

$210,000

$260,000

$310,000

Co

sts

Page 152: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

152

Fuel Consumption

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May June

CNG - gge FY11 207,091 199,590 194,304 174,505 135,430 164,542 146,067

Diesel - gallons FY11 44,630 37,546 37,762 37,671 45,583 44,984 37,347

CNG - gge FY10 204,957 192,750 210,022 186,545 189,860 169,134 181,004 168,635 169,020 174,219 194,587 197,557

Diesel - gallons FY10 44,897 52,217 44,846 37,557 37,488 45,288 30,161 37,972 45,297 29,681 37,690 37,637

CNG - gge FY09 155,666 173,018 200,888 191,628 206,806 160,354 155,615 169,423 166,601 170,369 180,808 194,974

Diesel - gallons FY09 67,277 44,576 44,300 52,100 37,562 45,251 45,107 52,615 45,609 52,912 52,527 60,101

30,000

50,000

70,000

90,000

110,000

130,000

150,000

170,000

190,000

210,000

230,000

Ga

llon

s

Page 153: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

153

Facility Activities

Page 154: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

154

KWH East Mesa Facility

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May June

KWH FY11 344,659 333,236 364,025 335,122 353,527 326,043 282,690

KWH FY10 351,573 190,950 214,808 313,387 334,610 299,871 310,108 211,378 203,763 210,384 212,246 202,130

100,000

125,000

150,000

175,000

200,000

225,000

250,000

275,000

300,000

325,000

350,000

375,000

KW

H

Page 155: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

155

Electrical Costs East Mesa Facility

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May June

FY11 $40,114 $35,992 $39,016 $31,860 $30,289 $27,768 $24,656

FY10 $38,001 $33,907 $35,430 $27,495 $26,425 $24,195 $25,185 $26,861 $25,406 $21,227 $36,737 $24,948

$0

$5,000

$10,000

$15,000

$20,000

$25,000

$30,000

$35,000

$40,000

$45,000

Ele

ctr

ica

lCo

st

Page 156: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

156

Natural Gas Consumption East Mesa Facility

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May June

GGE FY11 102 111 139 1,069 9,927 9,476 14,044

GGE FY10 78 78 135 669 6,463 14,097 12,952 14,603 9,407 6,316 1,111 86

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

11,000

12,000

13,000

14,000

15,000

GG

E

Page 157: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

157

Natural Gas Costs East Mesa Facility

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May June

FY11 $127 $139 $303 $1,336 $12,408 $11,845 $17,555

FY10 $212 $210 $280 $907 $7,654 $16,350 $14,552 $18,254 $11,759 $5,098 $1,378 $107

$0

$2,000

$4,000

$6,000

$8,000

$10,000

$12,000

$14,000

$16,000

$18,000

$20,000

Na

tura

lGa

s

Page 158: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

158

Water Per 1,000 Gallons

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May June

FY11 688 647 648 483 386 398 409

FY10 856 876 944 814 685 623 603 419 383 676 688 741

0

100

200

300

400

500

600

700

800

900

1,000

Gallo

ns

X1,0

00

Page 159: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

159

Sewer Costs East Mesa Facility

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May June

FY11 $1,509 $1,371 $1,444 $885 $537 $677 $637

FY10 $2,231 $2,395 $2,299 $2,100 $1,551 $1,371 $1,285 $694 $716 $1,618 $1,410 $1,727

$0

$500

$1,000

$1,500

$2,000

$2,500

$3,000

Se

we

rCo

sts

Page 160: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

160

Refuse Costs East Mesa Facility

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May June

FY11 $684 $686 $692 $696 $700 $702 $700

FY10 $802 $668 $643 $669 $671 $671 $671 $672 $672 $690 $688 $686

$0

$100

$200

$300

$400

$500

$600

$700

$800

$900

Re

fuse

Co

sts

Page 161: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

161

Water Costs East Mesa Facility

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May June

FY11 $1,779 $1,763 $1,740 $1,341 $1,081 $1,111 $1,138

FY10 $2,365 $2,519 $2,754 $2,304 $1,714 $1,571 $1,524 $1,004 $1,016 $1,770 $1,779 $1,962

$0

$500

$1,000

$1,500

$2,000

$2,500

$3,000

Wa

ter

Co

sts

Page 162: East Valley Operations...See slides 13. • Missed miles increased from 55.43 in December 10 to 90.74 in January 11. • EVDAR ADA on-time increased from 97.20 % in December 10 to

162

Repair Costs East Mesa Facility

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May June

FY11 $12,656 $8,603 $7,345 $2,976 $1,524 $2,559 $3,798

FY10 $5,243 $7,152 $13,123 $7,292 $6,305 $3,425 $7,911 $3,158 $3,985 $7,183 $9,077 $10,683

$0

$2,000

$4,000

$6,000

$8,000

$10,000

$12,000

$14,000

Re

pa

irC

os

ts