Earthwork at Chainage 14000 to 14700

Embed Size (px)

Citation preview

  • 8/10/2019 Earthwork at Chainage 14000 to 14700

    1/9

    CONTRACT NO. PWD/HO/B102/2011 APPEN

    2 SITE CLEARING & EARTHWORKS (Deduction)

    2.2 Site Clearingof trees, shrubs, undergrowth and demolishing of

    existing obstructions and removal and disposal of same in

    accordance with specifications.

    5.00 ha 2,500.00 3,375.00 16,875.00

    2.3 Excavation in all materials other than rock along the roadway

    including widening of cuts, trimming of cut slopes, shaping of

    roadside channels and formation of subgrade and use the cut

    materials to form the fill embankment as per specification.

    148,634.99 m3 4.00 5.40 802,628.95

    2.5 Filling of suitable material, spread, compact and trim to form fill

    embankment form stockpile on site including transportation of

    suitable materials.

    74,762.23 m3 3.50 4.73 353,251.54

    2.8 Spot turfing to cut and embankment slopes in accordance with

    drawings and specifications

    33,500.00 m2 5.00 6.75 226,125.00

    1,398,880.48Total Cost For Site Clearing & Earthworks

    PEMBINAAN JALAN BAWANG UBOR/KPG. UKONG, ULU TUBAI, LIMBANG, SARAWAK

    Total

    (RM)Items Description Unit

    Basic

    Rate

    (RM)

    Quantity

    Factored

    Rate

    (RM)

  • 8/10/2019 Earthwork at Chainage 14000 to 14700

    2/9

    CONTRACT NO. PWD/HO/B102/2011 APPEND

    2 SITE CLEARING & EARTHWORKS

    2.1 Survey and setting out of the works as specified 0.725 km 10,000.00 10,000.00 7,250.00

    2.2 Site Clearingof trees, shrubs, undergrowth and demolishing of

    existing obstructions and removal and disposal of same in

    accordance with specifications.

    5.00 ha 2,500.00 3,375.00 16,875.00

    2.3 Excavation in all materials other than rock along the roadway

    including widening of cuts, trimming of cut slopes, shaping of

    roadside channels and formation of subgrade and use the cut

    materials to form the fill embankment as per specification.

    0.00 m3 4.00 5.40 0.00

    2.4 Extra Over - Excavation in Rock (Provisional Quantity =

    10,000m3@ RM 8.00 per m

    3)

    10,000.00 m3 8.00 (tendered

    price)

    80,000.00

    2.5 Filling of suitable material, spread, compact and trim to form fill

    embankment form stockpile on site including transportation of

    suitable materials.

    74,762.83 m3 3.50 4.73 353,254.37

    2.7 Supply, compact and grade road shoulder using selected

    material

    200.00 m3 20.00 27.00 5,400.00

    2.8 Spot turfing to cut and embankment slopes in accordance with

    drawings and specification

    0.00 m2 5.00 6.75 0.00

    4 Gravel Road

    4.1 Supply, spread, grade and compact crushed aggregate road

    base to the dimension as shown in the drawings

    725.00 m3 75.00 101.25 73,406.25

    462,779.37Total Cost For Site Clearing & Earthworks

    Summary of Cost Estimate for Works for Ch 14+000km to Ch 14+725km

    PEMBINAAN JALAN BAWANG UBOR/KPG. UKONG, ULU TUBAI, LIMBANG, SARAWAK

    Items Description Quantity Unit

    Basic

    Rate

    (RM)

    Factored

    Rate

    (RM)

    Total

    (RM)

  • 8/10/2019 Earthwork at Chainage 14000 to 14700

    3/9

    CONTRACT NO. PWD/HO/B102/2011 APP

    Summary of Variation Order

    1 Deduction of current Earthworks

    2 Addition of current Earthworks

    Total Variation to the Cost of Contract #REF!

    (1,398,880.48)

    #REF!

    Items Description Total

    PEMBINAAN JALAN BAWANG UBOR/KPG. UKONG, ULU TUBAI, LIMBANG, SARAWAK

  • 8/10/2019 Earthwork at Chainage 14000 to 14700

    4/9

    2.164

    2.526

    1.404

    1.08

    3.848

    2.656

    1.733

    1.747

    2.303

    2.887

    2.612

    2.929

    3.301

    4.1435.53

    7.34

    6.291

    9.775

    7.993

    0.495

    7.292

    9.143

    6.667

    4.462

    4.704

    6.2355.263

    3.451

    3.463

    3.98

    2.899

    2.888

    1.628

    1.079

    3.997382

    120 8.8 111.2

    113

    2

    226

    1356 169.5

    2712

  • 8/10/2019 Earthwork at Chainage 14000 to 14700

    5/9

  • 8/10/2019 Earthwork at Chainage 14000 to 14700

    6/9

    Road side drain

    Steel 2.88 705.6 18 ####

    rc 93.1 345 ####

    lean concrete 122.5 13.1 1605

    formwork 1274 38 ####

    excavation 245 10 2450

    ####

    397

    Interceptor

    Steel 1.88 282 18 5076rc 35.25 345 ####

    lean concrete 75 13.1 983

    formwork 350 38 ####

    excavation 150 10 1500

    ####

    135

    Interceptor

    Steel 1.6 380.8 18 6854

    rc 52 345 ####

    lean concrete 0 13.1 0

    formwork 445.06 38 ####

    excavation 238 10 2380

    ####

    180

    0.2

    8 1781 8.94

    1400 356.2 1400

    11200 2137.2 12516

  • 8/10/2019 Earthwork at Chainage 14000 to 14700

    7/9

    1781

    #REF!

    36000

    #REF!

    70000 #REF!

    14 2200 30800 #REF!

  • 8/10/2019 Earthwork at Chainage 14000 to 14700

    8/9

    592.65

    3.008 2.085 0.923

    3.007 2.145 0.862

    3.007 2.129 0.878

    3.007 2.077 0.93

    3.006 1.646 1.36

    3.006 1.596 1.41

    3.006 1.622 1.384

    1693 3.005 1.859 1.146

    f 240 3.005 1.829 1.176

    c 612 5.226 2.78 2.446

    pt 150 3.706 2.035 1.671

    sav 170 3.491 1.678 1.813

    as 110 1.33325

    hp 60

    mkn 180

    bb 71100

    580

  • 8/10/2019 Earthwork at Chainage 14000 to 14700

    9/9

    2625 2887.5

    Toe drain length

    0.315 28800 2244.417 33666.25

    0.016 5262 1.057988 15.86982

    33682.12 0.002066

    333366