8/10/2019 Earthwork at Chainage 14000 to 14700
1/9
CONTRACT NO. PWD/HO/B102/2011 APPEN
2 SITE CLEARING & EARTHWORKS (Deduction)
2.2 Site Clearingof trees, shrubs, undergrowth and demolishing of
existing obstructions and removal and disposal of same in
accordance with specifications.
5.00 ha 2,500.00 3,375.00 16,875.00
2.3 Excavation in all materials other than rock along the roadway
including widening of cuts, trimming of cut slopes, shaping of
roadside channels and formation of subgrade and use the cut
materials to form the fill embankment as per specification.
148,634.99 m3 4.00 5.40 802,628.95
2.5 Filling of suitable material, spread, compact and trim to form fill
embankment form stockpile on site including transportation of
suitable materials.
74,762.23 m3 3.50 4.73 353,251.54
2.8 Spot turfing to cut and embankment slopes in accordance with
drawings and specifications
33,500.00 m2 5.00 6.75 226,125.00
1,398,880.48Total Cost For Site Clearing & Earthworks
PEMBINAAN JALAN BAWANG UBOR/KPG. UKONG, ULU TUBAI, LIMBANG, SARAWAK
Total
(RM)Items Description Unit
Basic
Rate
(RM)
Quantity
Factored
Rate
(RM)
8/10/2019 Earthwork at Chainage 14000 to 14700
2/9
CONTRACT NO. PWD/HO/B102/2011 APPEND
2 SITE CLEARING & EARTHWORKS
2.1 Survey and setting out of the works as specified 0.725 km 10,000.00 10,000.00 7,250.00
2.2 Site Clearingof trees, shrubs, undergrowth and demolishing of
existing obstructions and removal and disposal of same in
accordance with specifications.
5.00 ha 2,500.00 3,375.00 16,875.00
2.3 Excavation in all materials other than rock along the roadway
including widening of cuts, trimming of cut slopes, shaping of
roadside channels and formation of subgrade and use the cut
materials to form the fill embankment as per specification.
0.00 m3 4.00 5.40 0.00
2.4 Extra Over - Excavation in Rock (Provisional Quantity =
10,000m3@ RM 8.00 per m
3)
10,000.00 m3 8.00 (tendered
price)
80,000.00
2.5 Filling of suitable material, spread, compact and trim to form fill
embankment form stockpile on site including transportation of
suitable materials.
74,762.83 m3 3.50 4.73 353,254.37
2.7 Supply, compact and grade road shoulder using selected
material
200.00 m3 20.00 27.00 5,400.00
2.8 Spot turfing to cut and embankment slopes in accordance with
drawings and specification
0.00 m2 5.00 6.75 0.00
4 Gravel Road
4.1 Supply, spread, grade and compact crushed aggregate road
base to the dimension as shown in the drawings
725.00 m3 75.00 101.25 73,406.25
462,779.37Total Cost For Site Clearing & Earthworks
Summary of Cost Estimate for Works for Ch 14+000km to Ch 14+725km
PEMBINAAN JALAN BAWANG UBOR/KPG. UKONG, ULU TUBAI, LIMBANG, SARAWAK
Items Description Quantity Unit
Basic
Rate
(RM)
Factored
Rate
(RM)
Total
(RM)
8/10/2019 Earthwork at Chainage 14000 to 14700
3/9
CONTRACT NO. PWD/HO/B102/2011 APP
Summary of Variation Order
1 Deduction of current Earthworks
2 Addition of current Earthworks
Total Variation to the Cost of Contract #REF!
(1,398,880.48)
#REF!
Items Description Total
PEMBINAAN JALAN BAWANG UBOR/KPG. UKONG, ULU TUBAI, LIMBANG, SARAWAK
8/10/2019 Earthwork at Chainage 14000 to 14700
4/9
2.164
2.526
1.404
1.08
3.848
2.656
1.733
1.747
2.303
2.887
2.612
2.929
3.301
4.1435.53
7.34
6.291
9.775
7.993
0.495
7.292
9.143
6.667
4.462
4.704
6.2355.263
3.451
3.463
3.98
2.899
2.888
1.628
1.079
3.997382
120 8.8 111.2
113
2
226
1356 169.5
2712
8/10/2019 Earthwork at Chainage 14000 to 14700
5/9
8/10/2019 Earthwork at Chainage 14000 to 14700
6/9
Road side drain
Steel 2.88 705.6 18 ####
rc 93.1 345 ####
lean concrete 122.5 13.1 1605
formwork 1274 38 ####
excavation 245 10 2450
####
397
Interceptor
Steel 1.88 282 18 5076rc 35.25 345 ####
lean concrete 75 13.1 983
formwork 350 38 ####
excavation 150 10 1500
####
135
Interceptor
Steel 1.6 380.8 18 6854
rc 52 345 ####
lean concrete 0 13.1 0
formwork 445.06 38 ####
excavation 238 10 2380
####
180
0.2
8 1781 8.94
1400 356.2 1400
11200 2137.2 12516
8/10/2019 Earthwork at Chainage 14000 to 14700
7/9
1781
#REF!
36000
#REF!
70000 #REF!
14 2200 30800 #REF!
8/10/2019 Earthwork at Chainage 14000 to 14700
8/9
592.65
3.008 2.085 0.923
3.007 2.145 0.862
3.007 2.129 0.878
3.007 2.077 0.93
3.006 1.646 1.36
3.006 1.596 1.41
3.006 1.622 1.384
1693 3.005 1.859 1.146
f 240 3.005 1.829 1.176
c 612 5.226 2.78 2.446
pt 150 3.706 2.035 1.671
sav 170 3.491 1.678 1.813
as 110 1.33325
hp 60
mkn 180
bb 71100
580
8/10/2019 Earthwork at Chainage 14000 to 14700
9/9
2625 2887.5
Toe drain length
0.315 28800 2244.417 33666.25
0.016 5262 1.057988 15.86982
33682.12 0.002066
333366