Dynamic Infrastucture using IBM X86
Virtualisation, Energy Efficiency, Management & Control
Tikiri Wanduragala
Senior Consultant Server Systems
Overview
Maximise datacenter capacityDeploy less serversDeploy less desktopsUse less energyImprove availabilityReduces Management Service Costs
Doing IT betterDoing IT smarter
Doing IT differently
3
Simplified
Shared
Siloed
Dynamic Dynamic Infrastructure
Dynamic Infrastructure
Consolidation & VirtualizationFrom Silos to Clouds
.…delivers superior business and IT services with agility and speed
Innovation and Technical Leadership - Choice
Source: xSeries Linux Marketing Management & Strategy
Customer value
IBM's best technology
Shared innovation
Faster servers
Improved availability
Faster to market
Investment leverage
Series UniqueTechnologies
z/OS, AIX 5L™, OS/400, Windows Operating System, FICON Express
SharedComponents
BladeCenter, Linux, Processors, I/O Power, Hardware Console, Adapters, Switches,
Power/Mechanical frames
Autonomic Computing
WorkLoad Mgr,Virtualization, Partitioning, Security, Systems Mgmt
System z10 ™
System p6™
System x™System i6™
Enterprise Storage Server™
BladeCenter™
iDataPlex
Customer Driven Market Driven
The real picture from data center input to usage: Where are the Watts consumed ?
Memory; 11%
Fans; 9%
Processor
30%
HVAC,UPS 40%
IT power
60%
Used Resource
20%
= 3,6% of total
Idle;
80%
+1 W equiv. used ressource5 W equiv processor16 W equiv IT power27 W data center
0
20
40
60
80
100
Data Center
Servers Hardware
Server Loads
X1,7 x3 x5
Planar; 4%
PCI; 3%Drives; 6%
Standby; 2%
DC/DC losses; 10%
AC/DC losses; 25%
Need one more W of compute energy ?
Typical Utilization Mainframe 80 – 90%Unix 10 – 20% Wintel 5 – 12%
SPL Sites & Facilities GTS STG Systems Design
STG Lab Services
GTS DC Design – Southbank Ground Floor Lab
Extending the life of an existing data center
• IBM’s Enterprise Computing Model– Projected results– Virtualise 25% of IBM’s server
infrastructure– 80% reduction in energy use– 85% reduction in floor space– Accelerate time-to-value for
clients based on internal IBM process automation
• IBM Lexington – Results– Increased IT capacity by 8
times in same space– Virtualised 70% of baseline
workload– Differed $50m capital
upgrade to datacenter– Avoided $2.4m HW
purchase by re-deploying servers
– Saved $162,000 or 10% annual energy savings
Simple, powerful and easy power management
Trackheat emitted
Compare rackactual power vs.label power
Trend poweruse over time
Compare actual vs. name platepower at system level
View inlet andexhaust temperature
Trend temperatureover time
GREEN
Energy efficiency, can virtualisation help?
• Typical Intel type server utilisation is quite low (15 - 40%)• Tools like VMWare can increase utilisation and unlock new
processing capability for scale up and scale out without adding to power at the rack level
0
500
1000
1500
2000
2500
Idle 25% 50% 75% Max
AC
wat
ts
Virtualisation – The Killer Application
• Benefits– Increase workloads by combining applications– Reduce physical population of servers– SW server – break link with HW
• Concerns– Management
• Must have automated management– “All eggs in one basket”
• Must have disaster recovery• Opportunities / Directions
– Virtualise I/O / Storage– Virtualise Desktops
• Security• Service / Support• Energy Efficiency 150W -> 15W
Target Environments
Transaction Workers, Call centersKnowledge Workers
Remote AccessDeveloper Desktops
Virtualized Hosting Client Infrastructure
• Central management
• Back end storage of Desktop
• Off-line patching of Desktop
• Security policies
• Access to your desktop from virtually any PC at any time
• Highly secure access to enterprise resources and data
• Deploy virtually any application
• Consolidate multiple developer desktops
• Highly secure offshore development
• Centrally manage developer desktop
• Replace desktop environment with virtual environment
• Preserve desktop usability
• Central management of all desktops
• Deploy virtually any application
• Flexible architecture to increase decrease number of seats
Branch Office Workers• Highly secure access to
Banking Applications
• Increased Security by replacing fat clients with thin clients
Choosing Virtualisation Platforms“Virtualisation capacity is a function of how much
memory and I/O bandwidth/capacity one can provide a core/socket at a given energy level”
Energy efficiency
Performance
Reliability
Physical VM Isolation / Granularity
HW/SW Management
Ease of Upgrade
BladeCenterEnterprise eX4
The Total Systems Management ExperienceDelivering innovations throughout the systems management stack
Integrated Management Module (IMM)• Standards-based hardware which combines
diagnostic and remote control
UEFI—next generation BIOS• Richer management experience and future-ready
Hardware and firmware advances which are standard across all new systems
ToolsCenter• Consolidated, integrated suite of management
tools• Powerful bootable media creator
Redesigned system tool portfolio for single-system management and scripting
IBM Systems Director• Platform management that is easy and efficient• Management of physical and virtual resources
across heterogeneous systems
IBM Systems platform solution for System x, BladeCenter, Power Systems, System z and storage
IBM TivoliUpward integration into Tivoli Service Management
Combining Scale Up and Scale OutA Smart, Flexible, Energy Efficient - Computing Platform
StorageBackup
Network
Management & Control
Scale Up/Out CombinationMaximum Flexibility & ChoiceBalance Market & Customer DrivenEnergy & Systems ManagementInvestment/Technology Protection
Scale Up
Scale Out
Portfolio that Covers the Spectrum of Business Needs
BladeCenter
Enterprise eX4
iDataPlex
IBM give you the RIGHT choice for your business needs• Scale Up Enterprise eX4 Rack Servers for Consolidation ,Virtualization and
Database Serving• Scale Out BladeCenter for Infrastructure Simplification and Application
Serving• Scale Out iDataPlex for Internet Scale Applications.
Infrastructure Simplification,
Application Serving
Web 2.0, HPC, Grid
Server Consolidation, Virtualization
Scale OutS
cale
Up
IBM Introduces new x3850/3950 M2 models
Scalability Controller
Memory Controller
Xcel4v Cache
1066 MHz
1066 MHz
1066 MHz
1066 MHz
MemoryInterface
MemoryInterface
MemoryInterface
MemoryInterface
MemoryInterface
MemoryInterface
MemoryInterface
MemoryInterface
5.12 GBps
2.13 GBps
533 MHz
IBM Controls memory and I/O the most important resources for virtualised environments
Industry leader in memory and I/O resources available per socket/core-Better Performance and capacity-Get more out of SW licence per socket/core
Ability to use DDR memory Vs FBD results in 20% performance improvement with 37% reduction in power consumption
4th Generation chipset optimised over 8years for virtualised and database environments
Portfolio that Covers the Spectrum of Business Needs
BladeCenter
Enterprise eX4
iDataPlex
IBM give you the RIGHT choice for your business needs• Scale Up Enterprise eX4 Rack Servers for Consolidation ,Virtualization and
Database Serving• Scale Out BladeCenter for Infrastructure Simplification and Application
Serving• Scale Out iDataPlex for Internet Scale Applications.
Infrastructure Simplification,
Application Serving
Web 2.0, HPC, Grid
Server Consolidation, Virtualization
Scale OutS
cale
Up
IBM BladeCenter HT Ruggedized, high performance
IBM BladeCenter E Best energy efficiency,
best density
IBM BladeCenter H High performance
IBM BladeCenter T Ruggedized
A common set of bladesA common set of industry-standard switches and I/O fabrics
A common management infrastructure
Extend blade benefits to your entire business
IBM BladeCenter S Distributed, small office,
easy to configure
HS21Proc: Xeon Quad CoreMem: 4 DIMM / 16GBHDD: 2
HS21xm/22Proc: Xeon Quad CoreMem: 8 DIMM / 32GBHDD: 1
LS21Proc: Opteron Dual CoreMem: 8 DIMM / 32GBHDD: 1
LS41Proc: Opteron Dual CoreMem: 16 DIMM / 64GBHDD: 2
HC10Proc: Conroe dual core Mem: 4 DIMM/8GBHDD: 1
QS21Proc: Cell BEMem: 2GB (XDR)HDD: 1
JS12/22Proc: PowerPCMem:4 DIMM / 16GB
HDD: 2
“Blades have revolutionised the Data Center”
“BladeCenter S brings the Blade revolution to the
Office/Branch/Shop/School”
IBM BladeCenter S
• Branch / Shop IT Consolidation
• 6 Blades– 2 Server– 2 Desktop Consolidation– 1 Video – Security– 1 VoIP
• Shared Low cost storage
• Office-friendly 240v power
• Centralised Remote Management
• Easy to deploy
• Low cost service
• Low cost upgrade
• Stable flexible platform eg. BladeCenter E 2002 > 2009+
Office / BoxBranch Office / Shop - in a box
RIGHT
Portfolio that Covers the Spectrum of Business Needs
BladeCenter
Enterprise eX4
iDataPlex
IBM give you the RIGHT choice for your business needs• Scale Up Enterprise eX4 Rack Servers for Consolidation ,Virtualization and
Database Serving• Scale Out BladeCenter for Infrastructure Simplification and Application
Serving• Scale Out iDataPlex for Internet Scale Applications.
Infrastructure Simplification,
Application Serving
Web 2.0, HPC, Grid
Server Consolidation, Virtualization
Scale OutS
cale
Up
New ThinkingCustomer Requirements
Optimized CapEx and OpEx
Efficient power and cooling
Usable density
Single point of management
Open infrastructure
Flexible configuration
Rapid scalability
Global deployment
Open infrastructure
Increases Density for Space Savings
Optional Rear Door Heat eXchanger
iDataPlexTypical Enterprise RackFull-fan air depth
Half-fan air depth
42U Enterprise Rack1
42U Enterprise Rack2
• Optimized rack design more than doubles server density per rack
• Air flow efficiency equals power savings of up to 20% and 30-40% lower airflow impedance
• IBM Rear Door Heat eXchanger provides the ultimate in cooling savings
Top-down view
New Efficient Form Factor
PDUs
3U Chassis
2U Chassis
Switches
Rack Management Appliance
iDataPlex Rear Door Heat Exchanger
HPC ServerWeb Server
Storage Drives & Options
I/O TrayStorage Tray
A New Way to Cool the Data Center
• Liquid cooling at the rack is 75%-95% more efficient than air cooling by a CRAC
• Can eliminate rack heat exhaust
• No electrical or moving parts
• No condensation
• Chilled water or evaporative liquid
Provides up to 67% cooling power reduction
A More Intelligent Approach
• 40 servers per rack
• 4 network leaf switches
• 2 enterprise racks
• Configured onsite
Optional Rear Door Heat eXchanger for even greater data center power and cooling efficiency
Traditional Rack
Servers
Internet-Scale iDataPlex
• 138% better density
• 50%+ less floor space
• 75% fewer fans
• 66% less fan power consumption
• $10,148 energy savings per rack
• $1.2M data center energy savings*
• Ships complete, ready to deploy
* For typical Data Center
Blade Deployment Made Easy
Software utility in Advanced Management Module MAC, WWN address assignment and management for initial blade deployment and
re-deployment
Optional standalone utility for advanced functions MAC, WWN Address assignment and management for initial blade deployment and
re-deployment Creates blade failover pools – Event Action Plans Provides I/O parameter and VLAN migration in case of
failover
Embedded switch enhancements Easy to use GUI for switch configuration Switch stacking for network simplification
Introducing Open Fabric Manager
IBM BladeCenterOpen Fabric
Open Fabric Manager Open Fabric Manager in AMM simplifies server deployment and failover
Blade 2 Blade 2
BladeCenter
VLAN B
VLAN D
VLAN A
VLAN C
Ethernet MAC addressesare assigned to blade slot by
AMM
Blade 1 Blade 1
MA
C 1
MA
C 2
Blade 14 Blade 14
MA
C 3
MA
C 4
ManagementModule
ManagementModule
Any switch or pass through
Open Fabric Manager Open Fabric Manager in AMM simplifies server deployment and failover
Blade 1 Blade 1
BladeCenter
VLAN B
VLAN A
Any switch or pass through
MA
C 1
MA
C 2
Blade 2 Blade 2
MA
C 3
MA
C 4
SpareBlade SpareBlade
MA
C 3MA
C 4
ManagementModule
ManagementModule
Blade 14 Blade 14 VLAN D
VLAN C
New blade inherits I/O addressesmove to new blade assigned to
slot
Manage failover across your data center
1) Blade X fails in chassis SIX 3) Blade Y in chassis FORTY receives blade X I/O parameters
2) Failover pool event action plan executes
• 14 down & 10-ports of Uplink bandwidth at less $500 per port• Investment Protected:
– Can connect to 1Gb or 10Gb datacenter infrastructure (1G or 10G uplinks)
– Can support 1Gb or 10Gb adapters– Can support Convergence network traffic
• Throughput performance no longer an issue
– Up to 40 ports (10Gb each) per BladeCenter H chassis– Up to 40Gb per blade server
• The only switch you will ever need
– Serial over LAN & cKVM support
BNT 10 Port 10Gb Ethernet Switch Module
Introducing the 1Gb, 10Gb, and Convergence Ready switch
High on function, low on power, low on cost…
Hypervisor w/ vSwitch
BladeCenter 10Gb switch can create up to 1024 virtual paths today per port assigned to each VM using industry standard VLAN
technology.
10Gb NIC
10Gb Switch
VM 1 VM 2 VM3 VM 4
Industry standard networking practices insure continuity of VLAN path even during network disruptions.
Using vCenter user creates port groups in the vSwitch and assigns to individual VMs
1
Using CLI or SmartConnect* user creates VM groups in the switch
Using vCenter user can assign any bandwidth to each individual VM
2
Map each VM group to port groups in vSwitch
34
Slide has animation*Post GA support
Low cost open solution
The standards-based Integrated Management Module (IMM) gives you better error diagnostics, a virtual presence, and remote control to more easily manage servers from a central location
The new Unified Extensible Firmware Interface (UEFI) provides a intuitive interface allowing you to add features and functions across the all new generation servers quickly
IBM Systems Director 6.1 makes it easy to configure and deploy
IBM ToolsCenter reduces complexity of choosing, finding, and learning platform management tools
Active Energy Manager monitors, measures and controls server energy usage and activity
Systems Management for the new generation servers is a complete end-to-end stack designed to deliver future-proof systems management today
HP OpenView
Improve service with better systems management
Super I/O
CPU Core
Crypto AES
VideoComp.
VideoController
USB 1.1/2.0 Devices
DDR2 Memory
Controller
BMC I/O
IMM
Super I/O
CPU Core
Crypto AES
VideoComp.
VideoController
USB 1.1/2.0 Devices
DDR2 Memory
Controller
BMC I/O
IMM
ToolsCenter
IBM Systems Director
IMM and UEFI
Tivoli Service Management
ToolsCenter
IBM Systems Director
IMM and UEFI
Tivoli Service Management
IBM Systems Director 6.1Platform management that is easy and efficient
Key Features
Customer Benefits
New design to provide unsurpassed ease-of-use and quick time-to-value
• New web-based GUI provides quick response and easy, intuitive access to powerful management functions
• Time-to-value is fast--one hour or less to install and begin use. • Tasks are made easier with an extensive set of wizards, online help and tutorials to
guide customers.• Customers familiar with HP SIM can leverage that knowledge to quickly learn to
manage IBM System x and BladeCenter with Systems Director with the HP SIM transition tool
Delivers broad cross-platform support
• Systems Director 6.1 manages IBM Power Systems, System z and storage, thereby leveraging a customer’s investment in skills, training and tools across a broader set of systems.
• Non-IBM x86 systems can also be managed
Provides new levels of integration
• New integration of virtualization manager means the same tool can be used for virtual as well as physical resources
• Use of a shared, common agent with Tivoli provides simpler integration of Systems Director and select Tivoli products
• Same look-and-feel as ToolsCenter and IMM for a unified platform management experience
• Capabilities can be extended with plug-ins such as Active Energy Manager, Service and Support Manager and BOFM