Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
1
9
12
10
10
11
2
3
8
3
3
3
9
4
5
5
6
CARO
LIN
A ST
REET
4TH STREET
VILLAGE CT
VILL
AGE
CT
7TH STREET
7TH STREET
COURT STREET
SITE LEGEND:
2
3
4
5
6
7
11
8
9
10
1
Landscape
General
Civil
Electrical
These documents and all the ideas, arrangements, designs and plans indicated thereon or presented thereby are owned by and remain the property of SWBR and no part thereof shall be utilized by any person, firm, or corporation for any purpose whatsoever except with the specific written permission of SWBR. All rights reserved. ©
387 East Main Street Rochester NY 14604
585 232 8300 | [email protected]
FIL
E P
AT
H:
SWBR Project Number
Checked By:
Project Manager:
Drawn By:
Revisions
4/1
1/2
019
9:0
0:5
2 A
MC
:\1
-Lo
cal R
evit M
od
els
20
19\1
863
0.0
0 C
FG
B P
ark
s_
Site_W
ate
rfro
nt_
lyn
ann
ew
.rvt
18630.00
JMB
General Notes,Legends & DrawingList
BP
JMB
G-001
Design Development Set
Community Foundation for
Greater Buffalo
City of Buffalo Parks & Buffalo
Public School Facilities Survey &
Design Development
726 Exchange Street, Suite 525Buffalo, NY 14210
03.29.2019
Waterfront
AB Anchor boltA/C Air condition(ing) (ed)ACC AccessibleACCU Air cooled condensing unitACI American Concrete InstituteACT Acoustical ceiling tileACM Asbestos containing materialACOUS PNL Acoustical panelACS PNL Access panelADDL AdditionalADJ Adjustable, adjacentADH AdhesiveAFF Above finished floorAGGR AggregateAHU Air handling unitAISC American Institute of Steel ConstructionAISI American Iron and Steel InstituteALT AlternateALUM AluminumANOD AnodizedAPPROX ApproximateARCH Architect(ural)ARD Auxillary roof drainASD Allowable stress designASTM American Society for Testing and MaterialsAWP Acoustical wall panelAWS American Welding SocietyBAT BattenB/B Back to backB BD Base boardBCNYS Building Code of New York StateBITUM BituminousBD BoardBLDG BuildingBLKG BlockingBM Beam, BenchmarkBOT BottomBR BedroomBRG BearingBRZ BronzeBSMT BasementBTWN BetweenBUR Built up roofingBW Both waysCCTV Closed circuit televisionCAB CabinetCB Catch basin, Corner beadCH BD ChalkboardCEM CementCF Contractor furnishedCFMF Cold-formed metal framingCF/CI Contractor furnished/ Contractor installedCF/OI Contractor furnished/ Owner installedCG Corner guardCH Coat hookCI Cast ironCIP Cast in place, Cast iron pipeCJ Control jointCL CenterlineCLG CeilingCLO ClosetCLR Clear, ColorCMT Ceramic mosaic tileCMU Concrete masonry unitCNTR CounterCO Cleanout, Cased opening, CompanyCOL ColumnCONC ConcreteCONF ConferenceCONN Connect(ion)CONSTR ConstructionCONT Continue(ous)CONTR Contract(or)COORD CoordinateCPT CarpetCSJ Construction jointCSK Counter sunkCT Ceramic tile, Count, Current transformerCTR CenterCW Cold water piping, Casement windowCU CubicCUH Cabinet unit heaterCU YD Cubic yardD Deep, DepthD Penny (nail)db Bar diameterDBL DoubleDEFS Direct-applied exterior finish systemDEG DegreeDEMO DemolitionDEPT DepartmentDET DetailDF Drinking fountainDIA OR ø DiameterDIAG Diagonal, DiagramDIM DimensionDIFF DiffuserDIR DirectionDISP DispenserDIV DivisionDMPF Damp proofingDL Dead loadDN DownDO DittoDR Door, DriveDS DownspoutDW Dishwasher
DWV Drainage waste & ventDWG DrawingDWL DowelE EastEA EachEBCNYS Existing Building Code of New York StateEC Electrical contractorEF Each faceEIFS Exterior insulation and finish systemEJ Expansion jointELAS ElastomericEL ElevationELEC Electric(al)ELEV ElevatorEM Entry mat, Expanded metalEMER EmergencyENCL EnclosureENGR EngineerEOS Edge of slabEP Electric panelEQ EqualEQUIP EquipmentES Emergency showerETC Et ceteraETR Existing to remainEW Each wayEWC Electric water coolerEXIST ExistingEXC Excavation, ExcavateEXP Expand, ExpansionEXT Exterior, External, ExtinguisherF/F Face to faceFAAP Fire alarm annunciator panelFACP Fire alarm control panelFD Floor drainFDTN FoundationFE Fire extinguisherFEC Fire extinguisher cabinetFHC Fire hose cabinetFIN Finish(ed)FIXT FixtureFLASH FlashingFLEX FlexibleFLOUR FluorescentFLG Flooring, flangeFO Finished openingFP Fire protection, FireproofFRTW Fire retardant treated woodFT Foot, FeetFTG FootingFTR Finned tube radiationFURN Furnace, Furniture, FurnishFUT FutureFWC Fabric wall coveringGA GageGAL GallonGALV GalvanizedGB Grab barGC General contract(or)GFRC Glass fiber reinforced concreteGFRG Glass fiber reinforced gypsumGL Glass, Ground levelGL BLK Glass blockGLU LAM Glued laminated beamGR Grade, GrossGWT Glazed wall tileGYP GypsumGYP BD Gypsum boardGYP PLAS Gypsum plasterHB Hose bibbHC Hollow core, Hose cabinetHCP HandicappedHDW HardwareHDWD HardwoodHM Hollow metalHO Hold openHORIZ HorizontalHP High point, HorsepowerHR HourHSS Hollow structural sectionHT HeightHTG HeatingHTR HeaterHVAC Heating, ventilating and air conditioningHW Hot waterHYD HydrantID Inside diameterIN InchesINCL IncludedINCAND IncandescentINFO InformationINSUL InsulationINTERM IntermediateINT InteriorJAN JanitorJST JoistJT JointKIP 1000 PoundsKIT KitchenKO KnockoutKPL Kick plateL Liter, AngleLAM Laminate(d)LAU LaundryLAV LavatoryLB PoundLBL LabelLD LoadLF Linear feet (foot)
LH Left hand, Latent heatLIN LinearLKR LockerLL Live loadLLH Long leg horizontalLLV Long leg verticalLOC LocationLRFD Load & resistance factor designLT LightLTG LightingLWC Light-weight concreteMACH MachineMAINT MaintenanceMAS MasonryMATL MaterialMAX MaximumMC Mechanical contractorMCB Metal corner beadMDO Medium density overlayMDF Medium density fiberboardMECH MechanicalMEP Mechanical, electrical, plumbing and fire protectionMEZZ MezzanineMFR ManufacturerMH ManholeMM MillimeterMIFRC Mastic/intumescent fire-resistive coatingMIN MinimumMISC MiscellaneousMLWK MillworkMO Masonry openingMRK BD Marker boardMTD MountedMTL MetalMULL MullionN NorthNAT NaturalNCOMBL NoncombustibleNIC Not in contractNO OR # NumberNOM NominalNORM NormalNRC Noise reduction coefficientNTS Not to scaleNWC Normal weight concreteO/O Out to outOA Overall, Outside airOC On centerOD Outside diameterOF/CI Owner furnished, Contactor installedOF/OI Owner furnished, Owner installedOFD Overflow drainOFF OfficeOH Opposite handOH DR Overhead (coiling) doorOPNG OpeningOPP OppositeOPT Optional, OptimumOZ OuncePA Public addressPBD ParticleboardPC Plumbing contractor, Portland cementPCC Precast concretePCT Porcelain ceramic tilePED PedestalPEND PendantPER PeriodPERF PerforatedPGBD Peg boardPL Plate, Property linePLF Ponds per linear footPLAM Plastic laminatePLAS PlasterPLB PlumbingPLYWD PlywoodPNL PanelPOL PolishedPORC PorcelainPOS Positive, PositionPPT Pressure-preservative treatedPR PairPREFAB PrefabricatePREFIN PrefinishPREP PreparationPROJ ProjectPROJ SCRN Projection screenPSF Pounds per square footPSI Pounds per square inchPT Paint, Post tensionPTN PartitionPVC Polyvinyl chloride (plastic)PVG PavingQT Quarry tileQTR QuarterQTY QuantityR Riser, Radius, Thermal resistanceRB Rubber base, Resilient baseRCP Reinforced concrete pipe, Reflected ceiling planRD Roof drain, RoadREC RecessedREF RefrigeratorREFL ReflectREG Register, RegulationREINF ReinforcedREQD RequiredRESIL ResilientREV Revision
RF Resilient flooringRFG RoofingRH Right hand, Roof hatchRM RoomRO Rough openingROW Right of wayRTU Roof top unitRV Roof ventRWB Rubber wall baseS SouthSAB Sound attenuation battsSAN SanitarySC Solid core, Shading coefficientSCHED ScheduleSEAL Sealer on floor (finish)SECT SectionSF Square foot, Safety factorSFRM Sprayed fire-resistive
MaterialSGT Structural glazed tileSHT SheetSHR ShowerSIM SimilarSOG Slab on gradeSP Standpipe, Sump pitSPA SpacesSPKR SpeakerSPEC SpecificationSQ SquareSRD Secondary roof drainSS Service sinkSSM Solid surface materialSSP Stainless steel pipeSST Stainless steelST StainSTA StationSTC Sound transmission classSTD StandardSTIFF StiffenerSTL SteelSTOR StorageSTR Straight, StringersSTRUCT StructuralSUSP SuspendedSV Sheet vinylSY Square yardT TreadT/ Top ofT&B Top and bottomT&G Tongue and grooveTEL TelephoneTHRES ThresholdTEMP TemporaryTER TerrazzoTHK Thick(ness)TK BD Tack boardTMPD TemperedTOC Top of concreteTOM Top of masonryTOPO Topography, TopographicTOS Top of steelTOW Top of wallTPD Toilet paper dispenserTSTAT ThermostatTV TelevisionTYP TypicalU Heat transfer coefficientUC UndercutUCL Under cabinet lightingUGND UndergroundUH Unit heaterUL Underwriter's laboratoriesUNEX UnexcavatedUNFIN UnfinishedUON Unless otherwise notedUTIL UtilityUV Unit ventilatorVARN Varnish(ed)VB Vinyl baseVCT Vinyl composition tileVENT VentilationVERT VerticalVEST VestibuleVIF Verify in fieldVIN VinylVOL VolumeVR Vapor retarderVT Vinyl tileV SHT Vinyl sheetVWC Vinyl wall coveringW WestW/ WithWC Water closet, Wall coveringW/O WithoutWD WoodWDW WindowWF Wide flangeWD GD Wood guardWH Water heaterWI Wrought ironWM Wire meshWP Waterproofing, Working pointWR Water repellent, weather resistantW RECPT Waste receptacleWSCT WainscotWT Weight, Watertight, Water tableWWF Welded wire fabricX ByYD Yard
C12A
C12A-XXX
1
4
3
2
X SCALE: X"=1'-0"
Title
1
12
B
A
1
8'-0" AFF
1
Batt insulation
Rigid insulation
Wood blocking (intermittent) Stone
Gravel or crushed stone
Wood framing (continuous)
Finish wood
Steel - large scale
Steel - small scale
Plywood
Concrete
Concrete masonry unit
Brick
(Other metals as noted)
View title
Building / wall section cut
Detail - blow up
Exterior elevation
Interior elevations
101
1
Partition type
Room number
Door numbers
Window type
Revision
OR
OR
Undisturbed earth
001100
A
001
Structural grid
Viewing direction
Detail no.
Drawing no.
Detail no.
Drawing no.
Drawing no.
Elevation no.
Plan key note
Demolition key note
Ceiling type and height
Drawing symbols
(Other metals as noted)
A-XXX
X
A-XXX
X
Gypsum, sand, mortar
A-XXX
X
Drawing no.
Elevation no.
Detail no.
Detail section cut
Detail no.
DRAWING NO.
A-XXX
X
Viewing direction
Accessibility
Accessible unit
V/HAU
Visual / hearing accommodation unit
Material symbols
Architectural / Structural abbreviations
DRAWING LIST - WATERFRONT PARK
General Notes, Legends & Drawing List
Existing Conditions/ Survey Existing Conditions/ Survey
Demolition Plan Site Layout (West) PlanSite Layout (East) Plan
Grading, Drainage & Utility (West) PlanGrading, Drainage & Utility (East) Plan
Electrical Site Plan
G-001
L-000L-001
00L-101L-102
C-101C-102
E-101
Existing Conditions/ Survey Existing Conditions/ Survey
L-00L-00
REPUTED OWNER
CITY OF BUFFALO
REPUTED OWNER
BUFFALO URBAN RENEWAL AGENCY
REPUTED
OWNER
BUFFALO
URBAN
RENEWAL
AGENCY
REPUTED OWNER
CITY OF BUFFALO
REPUTED OWNER
HARBOR VIEW PRESERVATION
REPUTED OWNER
BUFFALO WATERFRONT
S-1 HOMES INCORPORATED
REPUTED OWNER
WATERFRONT LAND ASSOCIATES LLC
REPUTED OWNER
BUFFALO MUNICIPAL HOUSING AUTHORITY
REPUTED OWNERTHE CITY OF BUFFALO
REPUTED OWNER
257 W. GENESEE LLC
C/O THOMAS FENTNER
REPUTED OWNER
CITY OF BUFFALO FIRE HEADQUARTERS
C/O ATTN: WM P MCCAUL
REPUTED OWNER
ST ANTHONYS RC CHURCH
REPUTED OWNER
CITY OF BUFFALO
UBOX
UBOX
DENSE
TREES
SHADOWS
SHADOWS
SHADOWS
SHADOWS
DENSE
TREES
G/O
LINE
G/OLINE
G/OLINE
G/O
LINE
DENSE
TREES
SHADOWS
SHADOWS
SHADOWS
SHADOWS
G/O
LINE
G/O
LINE
G/O
LINE
SHADOWS
SHADOWS
G/OLINE
SHADOWS
DENSE
TREES
DENSE
TREES
G/OLINE
SHADOWS
SHADOWS
SHADOWS
G/O
LINE
G/O LINE
ATHLETIC
COURT
ATHLETIC
COURT ATHLETIC
COURT
ATHLETIC
COURT
PLAYGROUND
ATHLETIC
FIELD
ATHLETIC
FIELD
ATHLETIC
FIELD
ATHLETIC
FIELD
ATHLETIC
FIELD
ATHLETIC
FIELD
ATHLETIC
FIELD
ATHLETIC
FIELD
ATHLETIC
FIELD
ATHLETIC
FIELD
ATHLETIC
FIELD
WALL
CONC
CONC
CONC
CONC
CONC
CONC
CONC
CONC
CONC
CONC
CONC
CONC
580
580
590
585
580
585
590
SIGN
SIGN
SIGN
SIGN
RW
RW
RW
RW
RWBENCH
BLEACHERS
BOULDER
586.87
585.82
584.82
585.45
584.44
589.78
588.79
580.30
578.73
579.21
578.82
579.92
579.90
580.37
580.34
580.79
587.04
586.85
588.23
588.45
588.42
579.90
580.65
580.10
583.15
583.29
583.78
582.20
582.71
582.52
582.50
582.67
581.92
582.15
589.36
588.52
589.13
589.27
589.14
589.41
584.25
581.58
585.22
585.55
584.05
585.16
584.52
586.45
589.12
588.49
586.14
585.99
579.61
580.18
580.34
579.81
582.19
581.34
581.79
581.51
581.65
581.45
581.45
581.48
581.48
583.53
582.89
584.09
583.24
584.18
586.13
587.31
582.55
594.47
592.74
589.82
590.06
589.98
590.21
587.20
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
MAPPINGLIMIT
MAPPINGLIMIT
MAPPINGLIMIT
MAPPINGLIMIT
MAPPING
LIMIT
MAPPI NG
LIMIT
MAPPI NG
LIMIT
MAPPINGLIMIT
RIM =
580.31
RIM =
584.62
RIM =
584.16
RIM =
584.40
RIM =
584.21
RIM =
584.17
RIM =
581.90
RIM =
582.06
RIM =
581.18
RIM =
581.36
RIM = 580.76
SUMP = 568.36
RIM =
581.38
RIM =
581.51
RIM = 581.56
NE INV = 570.86
SE INV = 570.76
RIM =
581.64
RIM =
582.08
RIM = 580.63NW INV = 574.73SE INV = 574.78
ST ANTHONYS RC
CHURCH
12"
12"12"
12"
18"18"
18"
18"
18"
18"
18"
20"
20"
20"
20"
36"10
"
8"CPP
4"CPP
10"CPP
6"RCP
4"CPP 4"CPP
10"CMP
36" RCP
36" RCP
12"CPP
4"CPP
12"CPP
4"CPP
4"CPP 4"CPP
4"CPP 4"CPP
12"
12"
4"CPP 4"CPP
4"PVC
4"CPP
4"CPP
15"24"
8"
15"
36"
24"
12"RCP15"RCP
TG = 580.27
SUMP = 577.07
NO VISIBLE
PIPES
TG = 580.32
N INV = 577.97
SE INV = 578.17
NW INV = 578.02
TG = 581.69
SUMP = 578.54
NO VISIBLE PIPES
TG = 581.73
SUMP = 578.98
NO VISIBLE PIPES
TG = 580.69
SUMP = 577.45
INACCESSI BLE
TG = 580.78
SUMP = 577.23
NO VISIBLE PIPES
TG = 579.61
NO VISIBLE PIPES
TG = 578.54
NW INV = 576.64
SE INV = 575.94
TG = 578.50
SE INV = 576.50
SW INV = 575.95
TG =
578.71TG =
578.74
RIM = 579.47
NE INV = 571.17
SE INV INACCESI BLE
SW INV = 571.27
TG = 581.87FILLED WITH DEBRIS
TG = 582.02FILLED WITHDEBRIS
TG = 580.02SUMP = 576.92±
TG = 580.00SUMP = 576.99±
TG = 579.98SUMP = 577.91±
TG = 579.96SUMP = 576.71
TG = 583.14NE INV = 581.36NE INV = 581.34NW INV = 580.60SW INV = 581.26SW INV = 581.34SE INV = 580.62
TG = 583.31SUMP = 580.96
TG =
583.67
TG = 583.34
SUMP = 582.19
TG = 585.44
FILLED WITH
DEBRIS
TG = 587.57
SUMP = 580.77
TG = 587.19
SUMP = 580.59
TG = 580.85NW INV = 578.95NE INV = 578.45SE INV = 578.95SW INV = 578.28SUMP = 578.25
TG = 580.96NE INV = 578.61SW INV = 578.41SUMP = 578.01
TG = 583.26NE INV = 581.33NE INV = 581.46SE INV = 581.31SE INV = 580.76NW INV = 580.76SW INV = 581.46
CAROLINA
STREET
4THSTREET
STREET
7TH
STREET
COURT
STREET
4THSTREET
VILLAGECOURT
BUSTIAVENUE
VILLAGE
COURT
VILLAGE
COURT
SA
SA
SASA
SA
SA
SA
SASA
SASA
SA
SA
SA
SA
SA
ST
E
W
WV
WV
WV
SA
UBOX
UBOX
CONC
CONC
CONC
CONC
CONC
SIGN
SIGN
SIGN
RW
CB
CB
CB
ST ANTHONYS RC
CHURCH
E
SIGN
RW
CB
UBOX
UBOX
CONC
CONC
CONC
CONC
CONC
SIGN
SIGN
RW
CB
CB
E