-Submittal Transmittal
12/26/2014Due Date:
Detailed, Grouped by Each Number
Skanska USA Building Inc.Alley 111 Apartments Project # 4212049-000
Tel: Fax:
Date: 12/18/2014 Reference Number: 0429
Transmitted To: Transmitted By: Debbie LimScott Bradley
Otis Elevator Company Skanska USA Building Inc.13035 Gateway Dr. #157Seattle, WA 98168Tel: 206-243-8100Fax: 206-248-6401
221 Yale Ave. N., Suite 400Seattle, WA 98109Tel: 206-726-8000Fax: 206-328-9235
Submittal Package No Description Due Date Package ActionQty
Approved as Noted12/26/2014Elevator Shop Drawings (Final For Record)0027 - 142105 - 11
Transmitted For Delivered Via Tracking Number
EmailConstruction
NotesItems DescriptionQty Spec Section Sub Sec.
0001 Elevator Shop Drawings (Final For Record)
1 142105
Remarks
Signature Signed Date
Prolog Manager Printed on: 12/18/2014 6west Page 1
Detailed, Grouped by Each Number
Submittal Transmittal
Skanska USA Building Inc.Alley 111 Apartments Project # 4212049-000
Tel: Fax:
Date: 12/12/2014 Reference Number: 0427
Transmitted To: Transmitted By: Albert MartinKevin Reed
GGLO Skanska USA Building Inc.1301 First Avenue Suite 301Seattle, WA 98101Tel: (206) 467-5828
929 109th Ave NEBellevue, WA 98004
Submittal Package No Description Due Date Package ActionQty
12/26/2014Elevator Shop Drawings (Final For Record)0027 - 142105 - 11
Transmitted For Delivered Via Tracking Number
EmailApproval
Notes Item ActionItems DescriptionQty
0001 Elevator Shop Drawings (Final For Record)
Contact Name Copies NotesCompany NameCc:
Remarks
Please see the attached Final elevator drawings and calculations. L&I requires that the EOR stamp these drawings and note that the structure was designed for the loads imposed by the elevator (review / approval stamp - not their seal). L&I is being very stringent about this requirement. Please have your EOR stamp the drawings and note something similar to: "Reviewed for loads imposed on the primary structure by the elevator and its connections to the primary structure".
Once returned, the stamped drawings and calculations wil be used to apply for Otis' installation permit.
Signature Signed Date
Prolog Manager Printed on: 12/12/2014 6WEST Page 1
SKANSKA USA BUILDING INC.Date Rec'd To Arch From Arch Returned
REVIEWED CORRECTIONS NOTED REVISE AND RESUBMIT
This submittal REVIEW shall not be construed as a Complete check and indicates only that information presented conforms Generally to the Contract Documents. In no case is Subcontractor or Supplier Relieved of full responsibility for adherence to the Contract Document and Satisfactory construction of all work. Submitted to Owner, Architect-Engineer for final approval.
Name: Date:Submittal #:
Albert Martin
10/29/2013 10/29/2013
✔
142105-0027-1 Elevator Shop Drawings12/12/2014
12/12/201412/11/2014
REVIEWED AND NOTED FOR DESIGN INTENT ONLY. DIMENSIONS AND QUANTITIES ARE NOT GUARANTEED.
REVIEWED FOR LOADS IMPOSED ON BASIC STRUCTURE ONLY
NOT REVIEWED
NO EXCEPTIONS TAKEN
NOTE MARKINGS
COMMENTS ATTACHED
REVISE & RESUBMIT
BY _____________________________
DATE ___________________________
SWENSON SAY FAGÉTA STRUCTURAL ENGINEERING COMPANY
2124 Third Avenue - Suite 100 - Seattle, WA 98121ph: 206.443.6212 fax: 206.443.4870www.swensonsayfaget.com
X
X
12162014