DESCRIPTION

DSS Lab October 23, 2003. Input Analyzer. Create text file of data Save text file as: Textfile.dst Open input analyzer Click “new” icon Click “use existing data file” icon Browse for Textfile.dst On “Fit” pull down menu, select “fit all” or a specific distribution. “new” icon. - PowerPoint PPT Presentation

Citation preview

Page 1: DSS Lab October 23, 2003

DSS Lab October 23, 2003

Page 2: DSS Lab October 23, 2003

Input Analyzer

Create text file of data Save text file as:

Textfile.dst Open input analyzer Click “new” icon Click “use existing data file” icon Browse for Textfile.dst On “Fit” pull down menu, select “fit

all” or a specific distribution

“new” icon

“use existing data file” icon

Page 3: DSS Lab October 23, 2003

Problem 7.4

A part arrives every ten minutes to a system having three workstations (A,B, and C), where each workstation has a single machine; the first part arrives at time 0. There are four part types, each with equal probability of arriving. The process plans for the four part types are given on the next slide. The entries for the process times are the parameters for a triangular distribution. Assume that the transfer time between arrival and the first station, between all stations, and between the last station and the system exit is three minutes. Use the Sequence Feature to direct the parts through the system and to assign the processing times at each station. Use the Sets feature to collect cycle times (total times in system ) or each of the part types separately. Animate the model and run for 10,000 minutes.

Page 4: DSS Lab October 23, 2003

Problem 7.4

Part Type Workstation/Process Time

Workstation/Process Time

Workstation/Process Time

Part 1 A5.5,9.5,13.5

C8.5,14.1,19.7

Part 2 A8.9,13.5,18.1

B9,15,21

C4.3,8.5,12.7

Part 3 A8.4,12,15.6

B5.3,9.35,13.7

Part 4 B9.2,12.6,16.0

C8.6,11.4,14.2

Page 5: DSS Lab October 23, 2003

Problem 7.4

Arrival Station

Station CStation A

Station B Exit Station

1

1

1

1

Part 1Part 2Part 3Part 4

2

32 2 2

3

3

34

Page 6: DSS Lab October 23, 2003

Problem 7-4 – Create Arrivals

Page 7: DSS Lab October 23, 2003

Problem 7.4 - Assignments

Page 8: DSS Lab October 23, 2003

Problem 7.4- Arrival Station and Route

Page 9: DSS Lab October 23, 2003

Problem 7-4: Workstation A

Page 10: DSS Lab October 23, 2003

Problem 7-4 Workstations B & C

Define workstations B & C as you did for workstation A

Page 11: DSS Lab October 23, 2003

Problem 7-4: Exit Station

Page 12: DSS Lab October 23, 2003

Problem 7-4: Create SetsAdd the following sets, using “Set” spreadsheet under “Basic Process” Panel. To add members to the sets, click on tab under “Members” for the set of interest. Define the sets as shown.

3 sets to define Cycle Time Set members

Entity Type Set members Picture Set members

Page 13: DSS Lab October 23, 2003

Problem 7-4: Define Advanced SetDefine advanced set using “Advanced Set” under “Advanced Process” Panel.

Advanced Set with members

Page 14: DSS Lab October 23, 2003

Problem 7-4: Define SequencesTo define sequences, double click on “Sequences” under “Advanced Transfer Panel”. If the “Advanced TransferPanel” is not listed under the panels available on left of screen,go to file -> template panel -> attach.

Make sure the names used are the same names you defined in the advanced set.

Page 15: DSS Lab October 23, 2003

Problem 7-4: Part Sequence 1

Steps for partSequence 1

AssignmentMade at step 1

Assignment Made at step 2

Page 16: DSS Lab October 23, 2003

Problem 7-4: Part 2 SequencePart 2 Sequence Steps

Assignment made atStep 1

Assignment made atStep 2

Assignment made atStep 3

Page 17: DSS Lab October 23, 2003

Problem 7-4: Part 3 and Part 4 SequencesComplete similarly to Part 1 and Part 2

Sequences. Refer to chart on p.314 for process time at each step.

Page 18: DSS Lab October 23, 2003

Problem 7-4: Animate

Arrival Station

Entering Workstation B

Entering Workstation CLeaving Workstation C

Exit Station

Entering Workstation ALeaving Workstation A

Leaving Workstation B

Page 19: DSS Lab October 23, 2003

Problem 7-4: Animate Stations and Routes

Station Icon withMenu settings

Route Icon withMenu settings

Page 20: DSS Lab October 23, 2003

Problem 7-4: Animate Resources

Icon for resources animation.Make sure youCheck “seize area”.

Page 21: DSS Lab October 23, 2003

Homework

Problem 7-8 in textbookWork in groups of 2Submit Electronically to

dss_hw5 filename.doeDon’t forget to animate the model as

asked in problem statement.Write down all stats asked for and display

on flowchart page of Arena model/

Page 22: DSS Lab October 23, 2003

Midterm

Total Possible = 100 Max = 99 Min = 30.5 Average = 63.14 Standard Deviation = 15.88 If you need to pick up your test see Chun-Ling.

Page 23: DSS Lab October 23, 2003

Midterm

Theory Graded by Chun-Ling Total Possible = 65 points Max = 65 Min = 26.5 Average =46.97

Arena Graded by Natalie Total Possible = 35 Max = 40 Min = 0 Average = 16.17

Page 24: DSS Lab October 23, 2003

Midterm

Page 25: DSS Lab October 23, 2003

Midterm

Page 26: DSS Lab October 23, 2003

Midterm

Page 27: DSS Lab October 23, 2003

Midterm