ENGINEERING DESIGN & DRAWING MAN-HOUR ESTIMATION { Enter No. of Docs. & Press Total } ( Actual Program is available in Super Civil CD ) DESCRIPTION UNIT MAN-HOURS NO. OF DOCS. TOTAL MAN-HOURS DESIGN DRAWING DESIGN DRAWING GENERAL ENGINEERING PLOT PLAN AREA DEVELOPMENT PLANS PREPARATION OF SOIL TENDER REVIEW OF SOIL REPORT PREPARATION OF SURVEY TENDER REVIEW OF SURVEY TENDER PREPARATION OF CIVIL TENDER + SCHEDULE OF QUANTITIES REVIEW OF CIVIL TENDER BID ANALYSIS CIVIL DESIGN BASIS ARCHITECTURAL DESIGN BASIS BIRDS EYE VIEW CIVIL SCOPE DRAWINGS ENGINEERING DESIGN & DRAWING MAN-HOUR ESTIMATION http://www.supercivilcd.com/MAN_HOUR.htm 1 of 3 30/03/2011 16:11

DSG & DRG MH

Embed Size (px)

DESCRIPTION

Calculation of MF

Citation preview

Page 1: DSG & DRG MH

ENGINEERING DESIGN & DRAWING MAN-HOUR ESTIMATION

{ Enter No. of Docs. & Press Total }( Actual Program is available in Super Civil CD )

DESCRIPTION UNIT MAN-HOURS NO. OFDOCS.

TOTAL MAN-HOURS

DESIGN DRAWING DESIGN DRAWING

GENERAL ENGINEERING

PLOT PLAN

AREA DEVELOPMENTPLANS

PREPARATION OF SOILTENDER

REVIEW OF SOIL REPORT

PREPARATION OF SURVEYTENDER

REVIEW OF SURVEYTENDER

PREPARATION OF CIVILTENDER + SCHEDULE OFQUANTITIES

REVIEW OF CIVIL TENDER

BID ANALYSIS

CIVIL DESIGN BASIS

ARCHITECTURAL DESIGNBASIS

BIRDS EYE VIEW

CIVIL SCOPE DRAWINGS

ENGINEERING DESIGN & DRAWING MAN-HOUR ESTIMATION http://www.supercivilcd.com/MAN_HOUR.htm

1 of 3 30/03/2011 16:11

Page 2: DSG & DRG MH

SUB STRUCTURE

FOUNDATION/PILE CAPLAYOUT

PILE LAYOUT & DETAILS

DETAILS OFFOUNDATION/PILE CAP

DETAILS OF EQUIPMENTFOUND.

LAYOUT & DETAILS OFTRENCHES

ARCHITECTURAL

PLAN, ELEVATIONS &SECTIONS

SUPER STRUCTURE

LAYOUT & RC DETAILSWITH BBS

LAYOUT & RC DETAILSW/O BBS

LAYOUT & STRUCTURALSTEEL DETAILS

LAYOUT & STRUCTURALSTEEL DETAILS FORTRUSSES

LAYOUT & STRUCTURALSTEEL DETAILS FORPIPERACKS

MISCELLANEOUS ITEMS

PREPARATION OFFABRICATION DRAWINGSBY VENDORS

ENGINEERING DESIGN & DRAWING MAN-HOUR ESTIMATION http://www.supercivilcd.com/MAN_HOUR.htm

2 of 3 30/03/2011 16:11

Page 3: DSG & DRG MH

REVIEW OF FABRICATIONDRAWINGS

PREPARATION OF BARBENDING SCHEDULE (BBS)

REVIEW OF VENDORFOUNDATION DETAILS

AS BUILT DRAWINGS

INDEPENDENT DESIGN &DRAWING CHECKING

CALCULATION OF ACTUALQUANTITIES FROMDRAWINGS

TOTAL MAN-HOURS

TOTAL OF DESIGN + DRAWING MAN-HOURS

ADD FOR CO-ORDINATION/OVERHEADS ETC. IN %

GRAND TOTAL OF MAN-HOURS

ENGINEERING DESIGN & DRAWING MAN-HOUR ESTIMATION http://www.supercivilcd.com/MAN_HOUR.htm