1. To discuss different laws that will guide
communities to aid them in integrating DRRM andCCA to their identification of projects.
2. To enable communities move towards greater
participation in the pursuit of developmentthrough DRRM-CCA compliant KALAHI-CIDDSprojects.
3. To impart to the communities the MDRRM Plan
2014-2020 of the local government.
8/12/2019 Drrm-cca Lens Community Driven Projects
4/56
8/12/2019 Drrm-cca Lens Community Driven Projects
5/56
8/12/2019 Drrm-cca Lens Community Driven Projects
6/56
8/12/2019 Drrm-cca Lens Community Driven Projects
7/56
8/12/2019 Drrm-cca Lens Community Driven Projects
8/56
8/12/2019 Drrm-cca Lens Community Driven Projects
9/56
8/12/2019 Drrm-cca Lens Community Driven Projects
10/56
8/12/2019 Drrm-cca Lens Community Driven Projects
11/56
8/12/2019 Drrm-cca Lens Community Driven Projects
12/56
8/12/2019 Drrm-cca Lens Community Driven Projects
13/56
Raising awareness & understanding on DRRM-CCA
factors, concepts and terminologies
8/12/2019 Drrm-cca Lens Community Driven Projects
14/56
8/12/2019 Drrm-cca Lens Community Driven Projects
15/56
8/12/2019 Drrm-cca Lens Community Driven Projects
16/56
8/12/2019 Drrm-cca Lens Community Driven Projects
17/56
Exposed elementHouses 1 & 2 and its occupants
House 1 is more VULNERABLE
(sensitive to flood) than House
no. 2
8/12/2019 Drrm-cca Lens Community Driven Projects
18/56
HAZARDX EXPOSURE X SENSITIVITY
COPING CAPACITY
REDUCED EXPOSURE
8/12/2019 Drrm-cca Lens Community Driven Projects
19/56
HAZARDX EXPOSURE X SENSITIVITY
COPING CAPACITY
8/12/2019 Drrm-cca Lens Community Driven Projects
20/56
HAZARDX EXPOSURE X SENSITIVITY
COPING CAPACITY
8/12/2019 Drrm-cca Lens Community Driven Projects
21/56
HAZARDX EXPOSURE X VULNERABILITY
COPING CAPACITY
8/12/2019 Drrm-cca Lens Community Driven Projects
22/56
8/12/2019 Drrm-cca Lens Community Driven Projects
23/56
WEATHER-CAUSING
PHENOMENA
IN THEPHILIPPINES
AND
ASSOCIATEDHAZARDS
THUNDERSTORMS
MONSOONS
INTERTROPICAL
CONVERGENCE
ZONE (ITCZ)
TROPICAL
CYCLONES
COLD FRONTS
8/12/2019 Drrm-cca Lens Community Driven Projects
24/56
1. TY "Klaring"
(11 to 22 May 1966)
Casualties: 82 dead
Damages :PHP 120
2. TY "Didang"
(12 to 26 May 1976)Casualties: 347Damages :PHP 624.7 M
LEGEND:=>TD (up to 63 kph)=>TS (64 - 117 kph)=>TY (over 117 kph)
8/12/2019 Drrm-cca Lens Community Driven Projects
25/56
8/12/2019 Drrm-cca Lens Community Driven Projects
26/56
8/12/2019 Drrm-cca Lens Community Driven Projects
27/56
8/12/2019 Drrm-cca Lens Community Driven Projects
28/56
8/12/2019 Drrm-cca Lens Community Driven Projects
29/56
8/12/2019 Drrm-cca Lens Community Driven Projects
30/56
8/12/2019 Drrm-cca Lens Community Driven Projects
31/56
8/12/2019 Drrm-cca Lens Community Driven Projects
32/56
8/12/2019 Drrm-cca Lens Community Driven Projects
33/56
8/12/2019 Drrm-cca Lens Community Driven Projects
34/56
8/12/2019 Drrm-cca Lens Community Driven Projects
35/56
8/12/2019 Drrm-cca Lens Community Driven Projects
36/56
8/12/2019 Drrm-cca Lens Community Driven Projects
37/56
8/12/2019 Drrm-cca Lens Community Driven Projects
38/56
8/12/2019 Drrm-cca Lens Community Driven Projects
39/56
SAFE AND DISASTER-RESILIENT
COMMUNITY WITH CAPACITATED
AND CLIMATE CHANGE
ADAPTIVE CITIZENRY THROUGH
EFFECTIVE AND EFFICIENT
GENDER RESPONSIVE POLICIESTOWARDS SUSTAINABLE
DEVELOPMENT.
8/12/2019 Drrm-cca Lens Community Driven Projects
40/56
DRRM STRATEGIC PLAN 2014-2020
RESULTS
PREVENTION/MITIGATION
Impact Level1) Reduced vulnerability & exposure
of communities to all hazardsOUTCOME ACTIVITIES
1) Improved mainstreaming &
integration of DRRM-CCA in
local policies, plan and budget
1) Training on DRRM-CCA integration in CLUP, CDP, Term-
Based Plan and AIP
2) Identification, screening and designation of potential
technical experts to include CSOs
1.2 Enhanced DRRM-CCA
sensitivity of environmental
management program
Environmental & Socialized Housing and Resettlement
Program
Clean, Green and Grow Program
Solid Waste Management Program
DRRM STRATEGIC PLAN 2014 2020
8/12/2019 Drrm-cca Lens Community Driven Projects
41/56
DRRM STRATEGIC PLAN 2014-2020
RESULTS
PREVENTION/MITIGATION
OUTCOME ACTIVITIES
1.2 Enhanced DRRM-CCA
sensitivity of environmental
management program
Integrated Coastal Resource Management Program (ICM)
Formulation of Environment Code
Enactment of DRRM-CCA ordinance
Awareness-raising in watershed coastal and marine
importance
Biodiversity Conservation Management Program
River Management Program
Master Drainage Plan and Drainage enhancement program
Upgrading of Local Roads, bridges and other horizontal
infrastructures
DRRM STRATEGIC PLAN 2014 2020
8/12/2019 Drrm-cca Lens Community Driven Projects
42/56
DRRM STRATEGIC PLAN 2014-2020
RESULTS
PREVENTION/MITIGATION
Impact Level2. Reduced casualties & damages to
infrastructure and agricultural resourcesOUTCOME ACTIVITIES
2.1 Increased resilience of
infrastructure systems
conduct of inventory and assessment of critical
infrastructure
Soil exploration/testing of soil at the Poblacion (Municipal
Compound)
Increased resiliency of
agricultural resources to
disasters
Orientation of agricultural personnel on DRRM-CCA
Encourage farmers for the protection of crops through
insurance (Orientation on appropriate and existing financing
and insurance scheme)
8/12/2019 Drrm-cca Lens Community Driven Projects
43/56
DRRM STRATEGIC PLAN 2014 2020
8/12/2019 Drrm-cca Lens Community Driven Projects
44/56
DRRM STRATEGIC PLAN 2014-2020
RESULTS
PREVENTION/MITIGATION
Impact Level2. Reduced casualties & damages to
infrastructure and agricultural resourcesOUTCOME ACTIVITIES
Community-based scientific
DRRM-CCA assessment,
mapping, analysis and
monitoring
CBMS database with DRRM-CCA indicators updated
Risk and Vulnerability Assessment and Profiling of 37Barangays
8/12/2019 Drrm-cca Lens Community Driven Projects
45/56
DRRM STRATEGIC PLAN 2014 2020
8/12/2019 Drrm-cca Lens Community Driven Projects
46/56
DRRM STRATEGIC PLAN 2014-2020
RESULTS
PREPAREDNESS
Impact LevelScaled up preparedness of the community (anycalamities) =minimal damage/casualties
OUTCOME ACTIVITIES
Increased DRRM-CCA capacity
of local DRRM Councils and
offices and operation center at
all levels
Evacuation Camp Mgt. training to MLGU & Brgys.
Family Kitchen Training for Barangay Volunteers.
Purchase of Rescue Equipments, Supplies and Logistics.
Contingency Plan for all types of Hazard Formulation Training
Workshop.
DRRM STRATEGIC PLAN 2014 2020
8/12/2019 Drrm-cca Lens Community Driven Projects
47/56
DRRM STRATEGIC PLAN 2014-2020
RESULTS
PREPAREDNESS
OUTCOME ACTIVITIES
Develop and implemented
comprehensive local
preparedness & responsepolicies, plans and systems
Conduct of earthquake & fire drills to government offices,
schools, business establishments and communities
Conduct of flood drills to flood prone barangays.
Organize and train ICS team.
Purchase of Mobile Clinic
Outsource fire truck.
Purchase of HE (dump truck, bulldozer, grader, road roller)
Purchase of rescue equipments for flood, typhoon,
earthquake/fire and storm surges.
DRRM STRATEGIC PLAN 2014 2020
8/12/2019 Drrm-cca Lens Community Driven Projects
48/56
DRRM STRATEGIC PLAN 2014-2020
RESULTS
PREPAREDNESS
OUTCOME ACTIVITIES
Develop and implemented
comprehensive local
preparedness & responsepolicies, plans and systems
Purchase of communications and early warning equipments.
Disaster Preparedness & Response Training s
DRRM Protocol for information gathering and reporting
development.
Response assessment tools and mechanism formulation.
DRRM Response Team training/orientation on integrated
response assessment tools and mechanism.
Enhancement of knowledge/skills/attitudes of MDRRMC
members through
trainings/seminars/conferences/symposium/foras/meetings
8/12/2019 Drrm-cca Lens Community Driven Projects
49/56
DRRM STRATEGIC PLAN 2014 2020
8/12/2019 Drrm-cca Lens Community Driven Projects
50/56
DRRM STRATEGIC PLAN 2014-2020
RESULTS
RESPONSE
Impact Level Preserved life and met basic needs
during and immediately after a disasterOUTCOME ACTIVITIES
Well-established disaster
response operations
Mobilization and deployment of trained personnel and
volunteers thru assessment, validation and assistance
Systematic and organized handling and distribution of relief
goods.
Assessment, validation and assistance.
Activation of incident command system.
Activation of relief distribution points/centers
Conduct Rapid Disaster Assessment and Needs Analysis
Interview and Ocular Inspection and creation of reports.
DRRM STRATEGIC PLAN 2014 2020
8/12/2019 Drrm-cca Lens Community Driven Projects
51/56
DRRM STRATEGIC PLAN 2014-2020
RESULTS
RESPONSEOUTCOME ACTIVITIES
Well-established disaster
response operations
Activation of assessment teams at all levels.
Listing and validation of affected families.
Coordination with the office of MDRRMC on the existing
calamity/disaster.
Provide security in the evacuation center/s and Casualties.
Provide assistance on the distribution of relief goods.
Provide assistance to evacuate greatly affected constituents
safely and timely.
Extend full assistance on the actual search, rescue and
retrieval operation.
Evacuate affected community safely and on time
8/12/2019 Drrm-cca Lens Community Driven Projects
52/56
DRRM STRATEGIC PLAN 2014 2020
8/12/2019 Drrm-cca Lens Community Driven Projects
53/56
DRRM STRATEGIC PLAN 2014-2020
RESULTS
RESPONSEOUTCOME ACTIVITIES
Well-established disaster
response operations
Establishment of child-friendly spaces and other learning
areas in the evacuation site.
Identification of standard and ideal relief, shelter and sites.
Mobilization of trained volunteers in Community kitchen and
camp Management.
Provision of tents and other temporary shelter facility.
Provision of breast feeding areas and couples room.
Increase budgetary allocation in emergency needs supplies indisaster.
Provision of medicines to affected individuals
Implementation of WASH (Water and Sanitation and Hygiene)
Organize health personnel in Triage Setting (Prioritization)
DRRM STRATEGIC PLAN 2014 2020
8/12/2019 Drrm-cca Lens Community Driven Projects
54/56
DRRM STRATEGIC PLAN 2014-2020
RESULTS
OUTCOME ACTIVITIES
Economic activities restored,and if possible strengthened or
expanded
Conduct damage assessment and need analysis(Comprehensive)
Presentation and Prioritization of needs
Identification and master listing of Beneficiaries
Coordination with other national Agencies
. Preparation of necessary documents
Release of Farm Inputs (Crops /Farm Rehabilitation)
Orientation and skills training of beneficiaries (LivelihoodProvision)
DRRM STRATEGIC PLAN 2014 2020
8/12/2019 Drrm-cca Lens Community Driven Projects
55/56
DRRM STRATEGIC PLAN 2014-2020
RESULTS
OUTCOME ACTIVITIES
Economic activities restored,
and if possible strengthened or
expanded
Release of Livelihood Assistance
Provision of shelter assistance to affected families
Immediate rehabilitation/repair and improvement of
damaged public infrastructures, road network and facilities
Relocation of affected communities