Detailed Working Procedure
Drill 24” Section to top of Jahrum
Drilling 24'' Hole to top of Jahrum.doc 1
Distribution:
…………….
Drill 24” Hole to Top of Jahrum
South Pars
SPD24A-05
PARADISE
Prepared By:
Saeed Ara
Approved by:
Behnam Mirshekari
7/17/2019 Drilling 24'' Hole to top of Jahrum.pdf
http://slidepdf.com/reader/full/drilling-24-hole-to-top-of-jahrumpdf 2/3
Detailed Working Procedure
Drill 24” Section to top of Jahrum
Drilling 24'' Hole to top of Jahrum.doc 2
Pitfalls!
If high torque during drilling or connection, sweep hi-vis pills and circ.
Spot hi-vis pill on all connection.
Pump/Spot pills and start up after connection with 800 GPM
Description Paralell act.
1.
Pick up enough 5” DP and HWDP to be able to drill to1200 m.
2. MU BHA:
MU bottom hole assembly according as following;
24” Tri cone Bit + BIT SUB / F.valve+ TOTCO ring +2 x 9 ½” DC
+24” S.Stab + 5 x 9 ½” DC + X/O + 6 x 8” DC + JAR + 3 x 8” DC
+ X/O + 15 X 5” HWDP
As per Work instruction No: GE 000-0000-DR-WI-9101-00
Insert tooth bit type:23.5"Bit
Use solid float
Verify condition of bit before RIH
3.
RIH with BHA to approx. 10 m above cement .(Shoe
depth 177 m)
Space out to be able to drill shoe and rat
hole without connection (btm of rat hole
@ 181 m)
4.
Wash down and tag cement at ……. m carefully while
pumping at 650-800 gpm & 50 RPM.As per Work instruction No: GE 000-0000-DR-WI-9105-00
Take caution to prevent falling through shoe withhigh WOB, 1-2 ton is enough to minimize weight
transferred to CP.
Continue like this until bottom of rat hole. Increase pump rate to max 800 gpm when below shoe.
Pump 60 bbls Guar Gum and BU.
Clean out rat hole carefully in steps (3m at the time).
Nobody on T Deck because of possible
H2S gas.
7/17/2019 Drilling 24'' Hole to top of Jahrum.pdf
http://slidepdf.com/reader/full/drilling-24-hole-to-top-of-jahrumpdf 3/3
Detailed Working Procedure
Drill 24” Section to top of Jahrum
Drilling 24'' Hole to top of Jahrum.doc 3
5. Drill down to approx. ±545 m TVD.
(Top of Asmari & Jahrum @± 545 m)
As per Work instruction No: GE 000-0000-DR-WI-9110-00
Recommended drilling parameters:
WOB: 0 – 20 ton (do not run the jar in neutral)
Max. WOB = 35 MT
RPM: 0 – 80, Back reaming: 30 -50.
Flow: 1000-1200 GPM
Torque limit set at: 15000 – 20 000 ft-lb
Pump 30 bbls Guar Gum every ½ Stand Drilled.
Spot 50 bbls PHG prior to Connection
If Partial Losses:
Pump 30 bbls GG at single drilled and 30 bbls PHB
on connection.
Before connection pick up the single to evaluate any
overpull tendency.
If overpull, Back Ream the Stand w/ 40 RPM.
STUCK PIPE ABOVE JAHRUM:
If hole pack off – DO NOT jar
Stop the pump and bleed off pressure
immediately.
As per Work instruction No: GE 000-0000-DR-WI-9133-00
‘Break’ the string free by applying
torque to the string and at the same
time move the pipe up and down close
to neutral weight – do not attempt to
circulate.
Rotate and move pipe upwards and
attempt to regain circulation (rack
back a stand if required).