DREDGING THE PASS

DREDGING THE PASS. 1999 Ten-Year Permit vs New Proposed Permit 1999 10-Yr Permit, Clam Bay Restoration and Management Plan The primary objective was environmental

Embed Size (px)

Citation preview

Page 1: DREDGING THE PASS. 1999 Ten-Year Permit vs New Proposed Permit 1999 10-Yr Permit, Clam Bay Restoration and Management Plan The primary objective was environmental

DREDGING THE PASS

Page 2: DREDGING THE PASS. 1999 Ten-Year Permit vs New Proposed Permit 1999 10-Yr Permit, Clam Bay Restoration and Management Plan The primary objective was environmental

1999 Ten-Year Permit vs New Proposed Permit

1999 10-Yr Permit, Clam Bay Restoration and Management Plan

The primary objective was environmental restoration of the ecosystem in particular the restoration of approximately 20 hectares of mangroves that died off in the northern end of the system along the strand road and upper clam bay

Today’s Proposed Permit, Clam Pass Maintenance Dredging

The primary objective is inlet maintenance to aid in flushing and improve environmental resources.

Page 3: DREDGING THE PASS. 1999 Ten-Year Permit vs New Proposed Permit 1999 10-Yr Permit, Clam Bay Restoration and Management Plan The primary objective was environmental

1996

Upper Clam Bay

Reminder of where we used to be…

Page 4: DREDGING THE PASS. 1999 Ten-Year Permit vs New Proposed Permit 1999 10-Yr Permit, Clam Bay Restoration and Management Plan The primary objective was environmental

Development Adjacent to Mangroves

Alteration of Natural

Hydrology

Change in Tidal Flow

Increased Freshwater

Runoff

Altered Hydroperiod Reduced Sheetflow

- Extended Surface Water Retention

- Surface Water Levels Increase

- Tidal Circulation in the Mangroves becomes stagnant

Prolonged Stress of

submerged aerial roots

Black Mangrove

Die-off

Below Ground Decay

Subsidence

Change in Avian Species UseDecline in Avian Populations

Decline in Benthic Invertebrate Community

Decline in Fisheries

Conceptual Model of a Black Mangrove Die-off

Page 5: DREDGING THE PASS. 1999 Ten-Year Permit vs New Proposed Permit 1999 10-Yr Permit, Clam Bay Restoration and Management Plan The primary objective was environmental

REMEMBER THIS

Page 6: DREDGING THE PASS. 1999 Ten-Year Permit vs New Proposed Permit 1999 10-Yr Permit, Clam Bay Restoration and Management Plan The primary objective was environmental
Page 7: DREDGING THE PASS. 1999 Ten-Year Permit vs New Proposed Permit 1999 10-Yr Permit, Clam Bay Restoration and Management Plan The primary objective was environmental
Page 8: DREDGING THE PASS. 1999 Ten-Year Permit vs New Proposed Permit 1999 10-Yr Permit, Clam Bay Restoration and Management Plan The primary objective was environmental

01-Aug-2002

02-Aug-2002

03-Aug-2002

05-Aug-2002

06-Aug-2002

08-Aug-2002

09-Aug-2002

10-Aug-2002

12-Aug-2002

13-Aug-2002

15-Aug-2002

16-Aug-2002

18-Aug-2002

19-Aug-2002

20-Aug-2002

22-Aug-2002

23-Aug-2002

25-Aug-2002

26-Aug-2002

27-Aug-2002

29-Aug-2002

30-Aug-2002

Rain

Rain

Full Moon

Rain

2"

6"

8"

(Reference) Surface Water Fluctuations During the Wet Season: Tidal Influence at a Station Situated Near the Gulf

01-Aug-2002

02-Aug-2002

04-Aug-2002

06-Aug-2002

08-Aug-2002

10-Aug-2002

12-Aug-2002

14-Aug-2002

16-Aug-2002

18-Aug-2002

20-Aug-2002

22-Aug-2002

24-Aug-2002

25-Aug-2002

27-Aug-2002

29-Aug-2002

31-Aug-2002

Full Moon

Rain Rain

1"

4"

7"

(Die-off) Surface Water Fluctuations During the Wet Season: Muted Tidal Signatures and Predominant Influence of Rain and Runoff

inch

esin

ches

Page 9: DREDGING THE PASS. 1999 Ten-Year Permit vs New Proposed Permit 1999 10-Yr Permit, Clam Bay Restoration and Management Plan The primary objective was environmental

Clam Bay 2002

Page 10: DREDGING THE PASS. 1999 Ten-Year Permit vs New Proposed Permit 1999 10-Yr Permit, Clam Bay Restoration and Management Plan The primary objective was environmental

NEED A COMPREHENSIVE PLAN TO PROTECT THE ESTUARY WHICH CONSISTS OF ENVIRONMENTAL RESOURCES THAT ARE FOUND IN THE PASS, BAYS AND TRIBUTARIES AND THE LANDWARD HABITATS INCLUDING THE MANGROVE FORESTS , SCRUB AND DUNES

Dredging Clam Pass Inlet ALONE is not answer to maintaining the health of the estuarine waterways and mangrove forest

Page 11: DREDGING THE PASS. 1999 Ten-Year Permit vs New Proposed Permit 1999 10-Yr Permit, Clam Bay Restoration and Management Plan The primary objective was environmental

When to Dredge?

Dredging should occur only when the hydrologic exchange between the Gulf and the Clam Bay estuary has been reduced to the point where the biological integrity of the entire system (water and forest resources) are at risk.

Clam Pass

1953

Clam Pass 1962

Page 12: DREDGING THE PASS. 1999 Ten-Year Permit vs New Proposed Permit 1999 10-Yr Permit, Clam Bay Restoration and Management Plan The primary objective was environmental

Cla

m P

ass

1995

Cla

m P

ass

2003

Inlet Dynamics are influenced by a variety of factors such as:

Inlet Current patterns driven by tides, waves, wind, severe weather, etc.

Constantly variable inlet hydrodynamics are influenced by tidal prism, channel and estuary morphology, slope, elevation, sediment type(s) and geological features, fresh water inflow, gross geometric variation, flow velocity, tidal phase and amplitude and phase, shoaling and scouring, etc…..

Page 13: DREDGING THE PASS. 1999 Ten-Year Permit vs New Proposed Permit 1999 10-Yr Permit, Clam Bay Restoration and Management Plan The primary objective was environmental

Clam Pass 2009

Clam Pass 2008

Circumstances that could necessitate dredging:

1)Pass completely closes due to a storm or other natural event

2)Inlet has lost hydraulic efficiency that is not recoverable through natural processes

Page 14: DREDGING THE PASS. 1999 Ten-Year Permit vs New Proposed Permit 1999 10-Yr Permit, Clam Bay Restoration and Management Plan The primary objective was environmental

Tide Gauges, Mangrove, Seagrass and other

Ecological IndicatorsMonitoring Plan

Purpose: To evaluate inlet characteristics and tidal dynamics within the entire Clam Bay system on a comprehensive long-term basis.

CLAM PASS

Page 15: DREDGING THE PASS. 1999 Ten-Year Permit vs New Proposed Permit 1999 10-Yr Permit, Clam Bay Restoration and Management Plan The primary objective was environmental
Page 16: DREDGING THE PASS. 1999 Ten-Year Permit vs New Proposed Permit 1999 10-Yr Permit, Clam Bay Restoration and Management Plan The primary objective was environmental
Page 17: DREDGING THE PASS. 1999 Ten-Year Permit vs New Proposed Permit 1999 10-Yr Permit, Clam Bay Restoration and Management Plan The primary objective was environmental

Proposed Dredging Template

Page 18: DREDGING THE PASS. 1999 Ten-Year Permit vs New Proposed Permit 1999 10-Yr Permit, Clam Bay Restoration and Management Plan The primary objective was environmental
Page 19: DREDGING THE PASS. 1999 Ten-Year Permit vs New Proposed Permit 1999 10-Yr Permit, Clam Bay Restoration and Management Plan The primary objective was environmental
Page 20: DREDGING THE PASS. 1999 Ten-Year Permit vs New Proposed Permit 1999 10-Yr Permit, Clam Bay Restoration and Management Plan The primary objective was environmental
Page 21: DREDGING THE PASS. 1999 Ten-Year Permit vs New Proposed Permit 1999 10-Yr Permit, Clam Bay Restoration and Management Plan The primary objective was environmental
Page 22: DREDGING THE PASS. 1999 Ten-Year Permit vs New Proposed Permit 1999 10-Yr Permit, Clam Bay Restoration and Management Plan The primary objective was environmental

HYDROLOGIC EFFICIENCY OF THE ENTIRE CLAM BAY

SYSTEM

ECOLOGICAL CONDITIONS OF

THE ENTIRE CLAM BAY SYSTEM

THERE IS NO CUT AND DRIED DECISION OF WHEN TO DREDGE

THE DECIESION SHOULD BE BASED UPON THE BEST SCIENTIFIC HYDROLOGIC AND ECOLOGIC DATA AVAILABLE AND BY WEIGHING THE BENEFITS OF DREDGING VS THE DETRIMENTS OF DREDGING IN

RELATION TO THE ENVIRONMENT