    DKK.03DRAWING ELECTRICAL ENGEENERING

    PURPOSE OF STUDY

    1. Know and Understand about tools of drawing

    2. Understand about normalisation andstandarisation of drawing3. Have Ability to draw by good and right

  • 8/2/2019 Drawing of Electrical Engeenering

    2/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

    Tools of drawing electrical engeenering

    MEJA GAMBAR

    PENGGARIS SIKU

    PENGGARIS T

  • 8/2/2019 Drawing of Electrical Engeenering

    3/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

    PENGGARIS LURUS

    JANGKA

    PENCIL

    MAL HURUF

  • 8/2/2019 Drawing of Electrical Engeenering

    4/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

    NORMALISATION AND STANDARISATION OF DRAWING

    SIZE OF PAPER DRAWING

  • 8/2/2019 Drawing of Electrical Engeenering

    5/32

    Standar Lebar(mm)

    Panjang

    (mm)Tepi kiri

    (mm)Tepi lain

    (mm)A0 841 1189 20 10A1 594 841 20 10A2 420 594 20 10A3 297 420 20 10A4 210 297 20 5A5 148 210 20 5A6 105 148 20 5

    DKK.03DRAWING ELECTRICAL ENGEENERING

    TABLETable of size for drawing according to N 381

    Standar Lebar (mm) Panjang (mm) Tepi kiri (mm) Tepi lain (mm)

    A0 841 1189 20 10A1 594 841 20 10A2 420 594 20 10A3 297 420 20 10A4 210 297 20 5A5 148 210 20 5A6 105 148 20 5

  • 8/2/2019 Drawing of Electrical Engeenering

    6/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

    Columns etiket

  • 8/2/2019 Drawing of Electrical Engeenering

    7/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

    Standart font and numeric Hight of font and numeric Standarisation

  • 8/2/2019 Drawing of Electrical Engeenering

    8/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

    Electrical Symbols for Strong Flow Engineering

    Watch and learn carefully so that you can understand well,

    the symbols of a strong electrical current techniques inaccordance with Dutch normalization No. 227 s / d 280 asshown in Table 4.1.

    While electrical engineering equipment symbol ofstrong currents in accordance with General RequirementsElectrical Installation shown in Table 4.2 below.

  • 8/2/2019 Drawing of Electrical Engeenering

    9/32

    vDKK.03DRAWING ELECTRICAL ENGEENERING

    Table 41. Equipments Symbol of Elektro Strong Current Engineering

  • 8/2/2019 Drawing of Electrical Engeenering

    10/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

  • 8/2/2019 Drawing of Electrical Engeenering

    11/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

  • 8/2/2019 Drawing of Electrical Engeenering

    12/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

  • 8/2/2019 Drawing of Electrical Engeenering

    13/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

    Table 4.2. Equipments Symbols of Elektro Strong Current Engineering

  • 8/2/2019 Drawing of Electrical Engeenering

    14/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

  • 8/2/2019 Drawing of Electrical Engeenering

    15/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

    The terms point in the light Installation :

    1. installation is an electrical channel, including the tools thatwere installed in / or outside the buildings for the electriccurrent after manyalurkan / or in the back of the planeboundary / meter owned company (PLN).

    2. Electrical equipment is the planes, tools, motors, and whichcan be connected perlengkapanya or connected to theinstallation.

    3. Home delivery connection is below ground or above ground,

    including his tools up to the barrier plane / meter ownedcompanies that distribute electricity from low voltagedistribution network to the installation.

    4. Group is part of the installation in its own secured with astream of aircraft safety.

  • 8/2/2019 Drawing of Electrical Engeenering

    16/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

    5. Control aircraft is an aircraft that monitor usage and other units ofmeasure Volt, Ampere, Hertz and Cos .

    6. Barrier aircraft is an aircraft that restrict the use of electric current

    fuse antaralain-Automatic and a mini-circuit-breaker (MCB).

    7. Meter is a measuring aircraft and shows the number of electricity

    used, among others Watt-Hour, Volt-Ampere Hour (Var-Hour) and

    Volt-Ampere Hour.

    8. Current security is the securing of a plane installation and / or parts

    thereof, of more current and / or short circuit currents include

    miniature circuit-breaker and fuse.

    9. Installers is the Indonesian legal entities listed on the company and

    get approval and permission to work from the company to plan and

    work on a network installation or installation work within the

    company.

  • 8/2/2019 Drawing of Electrical Engeenering

    17/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

    Lamp switches in the light Installation

    Switches used to connect and disconnect the electricalcircuit.

    Switch must be installed such that:

    1. Moving parts are not stressed at the time the switch is open,

    2. The position of all switches in an installation shall be uniform as all

    switches connected in a state if the leg is pushed to the top or if the

    upper leg in the press,3. Connecting terminals on the switch and the contact box, should not

    be used for more than 1 core, except for those connecting terminals

    specially made also to connect.

  • 8/2/2019 Drawing of Electrical Engeenering

    18/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

    Terms of Use and Installation of Grid Contact:

    1. Box wall contact one phase must be such that the contact wasneutral on the right (PUIL 1987),

    2. Contact of the walls should be installed on the wall of at least 1.20m above the floor, except the contact box closed (PIL 1978, article

    2, paragraph 14c),3. Contact box mounted on the bottom of the gap should be a box-

    contact with the special construction (PIL 1978, article 2,paragraph 14d),

    4. Contact box with a security wall fitted with a safety delivery (PUIL1987),

    5. In a room equipped with a contact box with security contactsshould not be installed without any contact contact Kotal securityunless the contact box for low voltage for the separation of securityand safety (PUIL 1987), and

    6. The ability to contact the box at least according to the power toolconnected to him, but not be less than 5A (PUIL 1987).

  • 8/2/2019 Drawing of Electrical Engeenering

    19/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

    Single switch with 1 lamps

    60o

    90o

    F0

    Figure ChartImplementation Images

    Series switches with two incandescent lamps.

    F0

    Figure ChartImplementation Images

  • 8/2/2019 Drawing of Electrical Engeenering

    20/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

    Installation of Stop Contact at The Power Source

    Figure Chart Implementation Images

  • 8/2/2019 Drawing of Electrical Engeenering

    21/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

    Lighting Installation One Phasa One Group

  • 8/2/2019 Drawing of Electrical Engeenering

    22/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

    Lighting Installation One Phasa Two Groups

    Lighting installations with the number of group lots of 6

    (six), the number of points of light in a group of no more

    than 15 (fifteen) (PIL 1978, article 2, paragraph 4).

    An installation for lighting, where there is a box-contact

    with the number of points of light is less than 15 (fifteen), if

    possible divided into 2 (two) groups (PIL 1978, article 2,

    paragraph 6)

  • 8/2/2019 Drawing of Electrical Engeenering

    23/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

    Wiring Figure of lighting Installation 1 phase and two groups

    Source of power

  • 8/2/2019 Drawing of Electrical Engeenering

    24/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

    Main Provisions of lighting installation

    1. Installation of cables in the pipe, the pipe must be

    installed first, then followed the cable (RA-HIS) waspulled into the pipe

    2. To replace the cable, must be done without

    dismantling the pipes

    3. Provisions in number 2 above does not apply to cablewith 10mm2 cross section to the top, with a note of the

    wiring visible when viewed and easily accessible.

  • 8/2/2019 Drawing of Electrical Engeenering

    25/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

    4. Pipes may be used is a steel pipe from wear or no

    connection with the elongated screw or selorok connection

    and plastic pipes

    5. To make a steel pipe bends, the terms are as follows:- The max diameter of 16 mm 2 -radius = 4 x pipe

    - Diameter above 16 mm 2, the radius = 6 x pipe

    - For plastic pipe with a 3 x = pipe

    6. Withdrawal of the cable to pull through the box and thebox used to connect connector or pull by using the PA or

    lasdup isolation and / or the like

  • 8/2/2019 Drawing of Electrical Engeenering

    26/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

    7. Between the two pull boxes should be three things bends or

    straight pipes as far as 20 m. End of the pipe must be equipped

    with a safety ring (net) and maximum distance of the pipe

    clamp 1 m

    8. Use pipe connection using the following ways:

    On the horizontal pair, the connection must be under and in

    vertical pairs, the connection must be on the walls.

    9. Switches and contacts should be mounted as high as between

    1.2 m and 2 m from the floor;

    10.Cable types such as GRLL, NBEU and NYM, may be installed

    without the pipe and inside the walls;

  • 8/2/2019 Drawing of Electrical Engeenering

    27/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

    11.Installation setting inside the wall (Inbouw) works asfollows:1. Inside the concrete walls, pipes installed first before

    concrete casted, used pipe threads (chroefbuis) and

    should not be painted by meni. On the plasteredwalls, the holes and channels for planting a pipe andso on.

    2. Created and prepared after walls are finished. Usedpipe by selorok connection (schuifbuizen) andpainted by meni before plastered

    12.Installation of the contact box should be equipped witha safety contact, except if there is additional insulationto prevent safety hazards voltage;

  • 8/2/2019 Drawing of Electrical Engeenering

    28/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

    13. Pull connector the pivot (strekleiding) above the ceiling or

    plafond, the cable network is a transmission-transmission which

    pulled tight with the pivot (steupunt) using a roller insulator, with

    the following provisions:

    * The maximum cable distance between 3 cm;

    * The distance between the insolator as the most distant fulcrum

    (maximum) 1 meter;

    If the cable cross-section size of 4 mm or more is greater

    insulation (clop-insulator) with a maximum distance of 6 meters;

    Branching at strekleiding should be made free of traction.

    Cable for minimum light-sectional area 0.5 mm2;

  • 8/2/2019 Drawing of Electrical Engeenering

    29/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

    14.Fitting Edison should only be used for lamps with a

    power of 300 watts, and above 300 watts to 1500

    watts used Galihath fittings.15.Each installation must be equipped with the house

    fuse and main switch;

    16.Each box of contacts (stop contak) only allowed forsingle channel or contact toothpicks.

  • 8/2/2019 Drawing of Electrical Engeenering

    30/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

    Table 43Cable Characteristic NYA/RA At Installation

  • 8/2/2019 Drawing of Electrical Engeenering

    31/32

    DKK.03DRAWING ELECTRICAL ENGEENERING

    Payload Summary PictureInstallation of Lighting and Energy 3 Phasa 4 Group