39
ELECTRICAL DRAWING MECHANICAL BLOCK (JIGME NAMGYEL ENGINEERING COLLEGE, DEWATHANG, SAMDRUP JONGKHAR)

ELECTRICAL DRAWING · 2020. 2. 11. · ELECTRICAL DRAWING MECHANICAL BLOCK (JIGME NAMGYEL ENGINEERING COLLEGE, DEWATHANG, SAMDRUP JONGKHAR) SPECIFICATIONS FOR ELECTRICAL WORKS 1)

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

  • ELECTRICAL DRAWING

    MECHANICAL BLOCK (JIGME NAMGYEL ENGINEERINGCOLLEGE, DEWATHANG, SAMDRUP JONGKHAR)

  • SPECIFICATIONS FOR ELECTRICAL WORKS

    1) GENERAL SPECIFICATIONS:

    DESCRIPTION OF THE GENERAL SPECIFICATIONS

    All the light point wiring shall be with 2C 1.5 sq.mm PVC insulated, strandedcopper conductor cable 1.1 KVG in Ø25mm recessed HDPE conduit pipe.

    1

    All the light circuit wiring shall be with 2C 2.5 sq.mm PVC insulated, strandedcopper conductor cable 1.1 KVG in Ø25 mm recessed HDPE conduit pipe, unlessotherwise specified in the drawing. (Refer Load Distribution chart for wire sizedetails).

    Sl.NO.

    All the power point socket outlet shall be located at 0.3 meters from the finishedfloor level.

    All the power point wiring shall be with 2C 4 sq.mm PVC insulated, strandedcopper conductor cable 1.1 KVG in Ø25 mm recessed HDPE conduit pipe.3

    4

    2

    5

    6

    The power point socket outlet for kitchen and toilet shall be located at 1.2 metersfrom the finished floor level.

    All the wall mounted fixture shall be located at 2.75 meters from the finished floorlevel.All the light switch board shall be located at 1.25 meters from the finished floorlevel, 0.3 meters away from the door and edges of the wall.9

    All the non-current carrying conductor should be connected to the common ground.

    During execution no phase difference is allowed in the same conduit, refer thedesign drawing.

    7

    8

    10

    2) THE FOLLOWING TEST SHOULD SATISFY THE INSTALLATION:

    The height of the main control panel board and distribution board shall be 1.5meters from finished floor level or as per the site condition.

    11

    Earth polarity test1

    Earthing test

    2

    Sl.NO.DESCRIPTION OF THE

    TEST

    Insulation test

    4 Earth continuity test

    3

    3) SPECIFICATIONS FOR TELEVISION NETWORK:

    Test result must not be less than 1mega ohm.

    Test result must be within 5-8 ohms.

    All switches must be on live conductor.

    Low voltage test result should satisfythe installation.

    REMARKS OF THE TEST

    1

    DESCRIPTION OF THE SPECIFICATIONS

    The telephone cable duct must be separated by 0.5 meters awayfrom the electrical cable duct and must be in recessed.2

    Sl.NO.

    The television cable duct shall be with HDPE pipe of 25mm dia inrecessed.

    The television coaxial socket outlet shall be located at 0.25 metersfrom the finished floor level.

    The televison network wiring shall be with RG6 (solid) 75 ohm microsatcom coaxial cables in HDPE pipe.

    4

    3

    NOTE:

    The height of the television divider box shall be located as per thesite conditon, refer design drawing.

    All the earth wire shall be 8 & 14SWG copper conductor cable 1.1 KVG for A.Csocket &16A socket respectively, 14SWG copper wire for light points ifnecessary, 8SWG bare copper conductor for SDB earthing.

    5

    All the A.C power point wiring shall be with 2C 6 sq.mm PVC insulated, strandedcopper conductor cable 1.1 KVG in Ø25 mm recessed HDPE conduit pipe.

    Refer the " Specification of Electrical Works 2018" approved by BSB (BhutanStandards Bureau), MoWHS & IS standard code of practice for more details.

    12

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/01

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: i OF iiDATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • 1.

    SYMBOLS.N REMARKS

    3.

    11.

    Light Switch Box.

    MDB

    Sub-Distribution Box.

    SHORTFORM.

    PP-N

    Telephone Terminal Cabinet.

    Data outlet socket numbering.TV-1...

    2.

    LEGENDS FOR ELECTRICAL WORKS

    DESCRIPTION OF SYMBOLS MAKE

    4.

    5.

    6.

    7.

    8.

    9.

    10.

    S.N

    SBSDB

    Main Distribution Box, main utilitypower source supply from BPCgrid power.

    Television socket numbering.Power Point.

    D-1...

    READ AS/FULL-FORM

    TTC

    3.

    1.2.

    4.

    ABBREVIATIONS

    6.5.

    7.

    CEILING FAN (1200MM SWEEP, 1400 RPM)

    EXHAUST FAN (80W, 300MM SWEEP, 900 RPM)

    Linear DLX 20WLEDSURFACE MOUNTED LED TUBELIGHT 20W

    CrownSURFACE MOUNTED (ROUND) LED DOWNLIGHT 12W Note: All the light switches in SBshall be silver aluminum switch.

    16A POWER SOCKET (2000W)

    TELEPHONE & INTERNET COMBINE SOCKET

    12.

    Havells orequivalent.

    Pluto PanelSURFACE MOUNTED LED PANEL (SQUARE) 34W

    IN INTERNET SOCKET

    Havells orequivalent.

    Havells orequivalent.

    Havells orequivalent.

    Havells orequivalent.

    Havells orequivalent.

    16A/32A THREE PHASE POWER SOCKET Havells orequivalent.

    Havells orequivalent.

    16A, POP-UP TYPE POWER SOCKET (2000W)

    16A POWER SOCKET (2000W)Havells orequivalent.

    SPLIT TYPE AC

    25°C

    SPLIT TYPE AIR CONDITIONER (2000W)Havells orequivalent.

    Havells orequivalent.

    Havells orequivalent.

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/02

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: ii OF iiDATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • BASEMENT FLOOR PLAN

    exit/entry

    wc

    wc

    wc

    wc

    wc

    wc

    urinals

    washbasin

    FILTER

    RAMP

    UP

    ELECTRICAL ROOM(UPS ROOM/MAIN POWER SUPPLY/MCB/SWITCH BOXES)

    UP

    shaft door

    STORE

    STORE

    STORE

    STORE

    SBs to Light Fittings Conduit Layout Plan

    SB-4SB-3SB-2SB-1

    SB-2

    4SB

    -23

    SB-2

    2

    SB-5

    SB-6

    SB-7

    SB-8

    SB-9

    SB-12

    SB-13

    SB-14

    SB-10

    SB-11

    SB-1

    5SB

    -17

    SB-1

    6

    SB-18

    SB-20

    SB-21

    SB-19

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/03

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 01 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • BASEMENT FLOOR PLAN

    exit/entry

    wc

    wc

    wc

    wc

    wc

    wc

    urinals

    washbasin

    FILTER

    RAMP

    UP

    ELECTRICAL ROOM(UPS ROOM/MAIN POWER SUPPLY/MCB/SWITCH BOXES)

    UP

    shaft door

    STORE

    STORE

    STORE

    STORE

    SBs to Light Fittings Wiring Layout Plan

    SB-4SB-3SB-2SB-1

    SB-2

    4SB

    -23

    SB-2

    2

    SB-5

    SB-6

    SB-7

    SB-8

    SB-9

    SB-12

    SB-13

    SB-14

    SB-10

    SB-11

    SB-1

    5SB

    -17

    SB-1

    6

    SB-18

    SB-20

    SB-21

    SB-19

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/04

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 02 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • BASEMENT FLOOR PLAN

    exit/entry

    wc

    wc

    wc

    wc

    wc

    wc

    urinals

    washbasin

    FILTER

    RAMP

    UP

    ELECTRICAL ROOM(UPS ROOM/MAIN POWER SUPPLY/MCB/SWITCH BOXES)

    UP

    shaft door

    STORE

    STORE

    STORE

    STORE

    SDB to SBs Conduit Layout Plan

    SB-4SB-3SB-2SB-1

    SB-2

    4SB

    -23

    SB-2

    2

    SB-5

    SB-6

    SB-7

    SB-8

    SB-9

    SB-12

    SB-13

    SB-14

    SB-10

    SB-11

    SB-1

    5SB

    -17

    SB-1

    6

    SB-18

    SB-20

    SB-21

    SB-19

    SDB

    -1

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/05

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 03 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • BASEMENT FLOOR PLAN

    exit/entry

    STORAGE/SERVICES

    FEMALE TOILET

    MALE TOILET

    wc

    wc

    wc

    wc

    wc

    wc

    urinals

    washbasin

    washbasin

    FILTER

    RAMP

    UP

    ELECTRICAL ROOM(UPS ROOM/MAIN POWER SUPPLY/MCB/SWITCH BOXES)

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    UP

    shaft door

    STORE

    STORE

    STORE

    STORE

    SDB to PPs Conduit Layout Plan

    PP-1/R

    PP-2/R

    PP-3/R PP-4/R

    PP-5/R

    PP-6/R

    PP-18/B PP-17/B

    PP-16/B PP-15/B

    PP-14/B

    PP-12/B

    PP-11/Y

    PP-13/B

    PP-10/Y

    PP-9/Y

    PP-7/Y PP8/Y

    SDB

    -1

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/06

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 04 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • BASEMENT FLOOR PLAN

    exit/entry

    STORAGE/SERVICES

    FEMALE TOILET

    MALE TOILET

    wc

    wc

    wc

    wc

    wc

    wc

    urinals

    washbasin

    washbasin

    FILTER

    RAMP

    UP

    ELECTRICAL ROOM(UPS ROOM/MAIN POWER SUPPLY/MCB/SWITCH BOXES)

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    UP

    shaft door

    STORE

    STORE

    STORE

    STORE

    Telephone & Internet Conduit Layout Plan

    TTC

    D/T-1

    D/T-2

    D/T-3D/T-4D/T-5

    D/T-6

    D/T-7

    D/T-8D/T-9

    D/T-10

    D/T-11

    D/T-12

    D/T-13

    D/T-14

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/07

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 05 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • COMPUTER LAB 1(25 COMPUTERS)

    LAB 2LAB 3

    LAB 4

    LAB 5

    LAB 6

    LAB 7

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Staircase 2

    RAMP

    LAB/STORE/CLASS

    UP

    GROUND FLOOR PLANSBs to Light Fittings Conduit Layout Plan

    SB-5

    SB-6

    SB-1 SB-2

    SB-4

    SB-A

    SB-3

    SB-1

    SB-3

    SB-4

    SB-2

    SB-6

    SB-5

    SB-7

    SB-8

    SB-9

    SB-8

    SB-7

    SB-11

    SB-9

    SB-10

    SB-B

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/08

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 06 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • COMPUTER LAB 1(25 COMPUTERS)

    LAB 2LAB 3

    LAB 4

    LAB 5

    LAB 6

    LAB 7

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Staircase 2

    RAMP

    LAB/STORE/CLASS

    UP

    GROUND FLOOR PLANSBs to Light Fittings Wiring Layout Plan

    SB-5

    SB-6

    SB-1 SB-2

    SB-4

    SB-A

    SB-3

    SB-1

    SB-3

    SB-4

    SB-2

    SB-6

    SB-5

    SB-7

    SB-8

    SB-9

    SB-8

    SB-7

    SB-11

    SB-9

    SB-10

    SB-B

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/09

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 07 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • COMPUTER LAB 1(25 COMPUTERS)

    LAB 2LAB 3

    LAB 4

    LAB 5

    LAB 6

    LAB 7

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Staircase 2

    RAMP

    LAB/STORE/CLASS

    UP

    GROUND FLOOR PLAN

    SB-5

    SB-6

    SB-1 SB-2

    SB-4

    SB-A

    SB-3

    SB-1

    SB-3

    SB-4

    SB-2

    SB-6

    SB-5

    SB-7

    SB-8

    SB-9

    SB-8

    SB-7

    SB-11

    SB-9

    SB-10

    SDB to SBs Conduit Layout Plan

    SB-B

    SDB-2

    SDB

    -3SD

    B-4

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/10

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 08 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • COMPUTER LAB 1(25 COMPUTERS)

    LAB 2LAB 3

    LAB 4

    LAB 5

    LAB 6

    LAB 7

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Staircase 2

    C O R R I D O R

    C O R

    R I

    D O R

    RAMP

    LAB/STORE/CLASS

    UP

    GROUND FLOOR PLANSDB to PPs Conduit Layout Plan

    PP-3/R PP-5/R

    PP-6/RPP-4/R

    PP-12/B

    PP-11/B

    PP-8/YPP-7/Y

    PP-20/B

    PP-19/B

    PP-21/B

    PP-22/Y

    PP-2/RPP-1/R

    PP-11/YPP-12/R

    PP-2/R

    PP-1/R

    PP-9/YPP-10/Y

    PP-7/R

    PP-8/Y

    PP-14/YPP-13/Y

    PP-23/Y

    PP-24/B

    PP-17/B

    PP-16/B

    PP-18/B

    PP-15/B

    SDB-2

    SDB

    -3SD

    B-4

    PP-1/R PP-2/R

    PP-4/R

    PP-5/R PP-3/R

    PP-6/Y

    PP-9/Y

    PP-10/Y

    PP-14/B

    PP-15/B

    PP-13/B

    250x200 mmCable Duct

    16 A-Pop up Power Socket150x100x5 mmMS Cable Channel

    PP-3/RPP-4/RPP-5/RPP-6/R

    PP-7/R

    PP-8/Y PP-9/Y PP-10/Y PP-11/YPP-12/Y

    PP-13/Y

    PP-14/YPP-15/YPP-16/BPP-17/BPP-18/R

    PP-19/B

    PP-20/BPP-21/B PP-22/B PP-23/B PP-24/B

    PP-25/Y

    PP-26/B

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/11

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 09 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • COMPUTER LAB 1(25 COMPUTERS)

    LAB 2LAB 3

    LAB 4

    LAB 5

    LAB 6

    LAB 7

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Staircase 2

    C O R R I D O R

    C O R

    R I

    D O R

    RAMP

    LAB/STORE/CLASS

    UP

    GROUND FLOOR PLANSDB to ACs Conduit Layout Plan

    SDB

    -5

    SPLIT TYPE AC

    25°C

    SP

    LIT

    T

    YP

    E A

    C

    25°C

    SPLIT TYPE AC

    25°C

    SPLIT TYPE AC

    25°C

    SP

    LIT

    T

    YP

    E A

    C

    25°C

    SPLIT TYPE AC

    25°C

    S

    P

    L

    I

    T

    T

    Y

    P

    E

    A

    C

    2

    5

    °

    C

    S

    P

    L

    I

    T

    T

    Y

    P

    E

    A

    C

    2

    5

    °

    C

    SPLIT TYPE AC

    25°C

    SPLIT TYPE AC

    25°C

    SPLIT TYPE AC

    25°C

    SPLIT TYPE AC

    25°C

    SPLIT TYPE AC

    25°C

    SPLIT TYPE AC

    25°C

    SP

    LIT

    T

    YP

    E A

    C

    25°C

    SP

    LIT

    T

    YP

    E A

    C

    25°C

    AC-1/Y

    AC-7/B

    AC-8/B

    AC-9/B

    AC-6/B

    AC-2/Y

    AC-3/Y AC-4/Y

    AC-5/Y

    AC-11/R

    AC-12/R

    AC-13/R

    AC-14/R

    AC-16/R

    AC-10/B

    AC-15/R

    OU

    TDO

    OR

    UN

    IT

    OU

    TDO

    OR

    UN

    IT

    OU

    TDO

    OR

    UN

    IT

    OU

    TDO

    OR

    UN

    IT

    OU

    TDO

    OR

    UN

    IT

    OUTDOORUNIT

    OUTDOORUNIT

    OUTDOORUNIT

    OUTDOORUNIT

    OUTDOORUNIT

    OU

    TDO

    OR

    UN

    IT

    OUTDOORUNIT

    OUTDOORUNIT

    OUTDOOR

    UNIT

    OUTDOOR

    UNIT

    OUTDOORUNIT

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/12

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 10 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • COMPUTER LAB 1(25 COMPUTERS)

    LAB 2

    LAB 3

    LAB 4

    LAB 5

    LAB 6

    LAB 7

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Staircase 2

    C O R R I D O R

    C O R

    R I

    D O R

    RAMP

    LAB/STORE/CLASS

    UP

    GROUND FLOOR PLANMDB to Three Phase Power Point Conduit Layout Plan

    32A/PP(3P)-2

    32A/PP(3P)-3

    32A/PP(3P)-1

    32A/PP(3P)-6

    32A/PP(3P)-5

    32A/PP(3P)-4

    MD

    B

    From BasementElectrical Room

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/13

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 11 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • COMPUTER LAB 1(25 COMPUTERS)

    LAB 2LAB 3

    LAB 4

    LAB 5

    LAB 6

    LAB 7

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice

    Lab in-charge'sOffice Lab in-charge's

    Office

    Staircase 2

    C O R R I D O R

    C O R

    R I

    D O R

    RAMP

    LAB/STORE/CLASS

    UP

    GROUND FLOOR PLANTelephone & Internet Conduit Layout Plan

    D/T-2 D/T-1

    D/T-3

    D/T-4

    D/T-6

    D/T-5

    IN

    IN

    IN

    IN

    IN

    IN

    IN

    IN

    IN

    IN

    IN

    IN

    IN

    I

    N

    I

    N

    D-1

    D-4

    D-5

    D-6

    D-7

    D-3

    D-2

    D-15

    D-14

    D-12

    D-13

    D-11

    D-10

    D-9

    D-8

    IN

    D-20

    IN

    D-31

    IN

    D-32

    IN

    D-33

    IN

    IN

    IN

    IN

    D-25

    D-26

    D-38

    D-39

    250x200 mmCable Duct

    IN

    IN

    IN

    IN

    IN

    IN

    IN

    IN

    IN

    IN

    IN

    IN

    IN

    IN

    IN

    IN

    D-34 D-35 D-36 D-37

    D-30 D-29 D-28 D-27

    D-21 D-22 D-23 D-24

    D-19 D-18 D-17 D-16TTC

    150x100x5 mmMS Cable Channel

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/14

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 12 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • CLASSROOM 4(capacity:40stds)

    down

    DRAWING HALL(capacity:60stds)

    CIRCULATION SPACE

    Staircase 2

    CLASSROOM 2(capacity:40stds)

    CLASSROOM 3(capacity:40stds)

    CLASSROOM 5(capacity:40stds)

    CLASSROOM 6(capacity:40stds)

    wc

    wc

    wc

    wc

    wc

    wc

    urinals

    washbasin

    washbasin

    washbasin

    -300mm floor level

    DWN

    MAIN DOOR

    UP

    UP

    FIRST FLOOR PLANSBs to Light Fittings Conduit Layout Plan

    SB-5

    SB-4

    SB-2

    SB-1

    SB-1

    SB-3

    SB-3SB-6

    SB-2

    SB-4

    SB-7

    SB-8

    SB-9

    SB-11

    SB-10

    SB-15

    SB-11

    SB-1

    4SB

    -12

    SB-13

    SB-9

    SB-7

    SB-6

    SB-5

    SB-8SB-1

    0

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/15

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 13 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • CLASSROOM 4(capacity:40stds)

    down

    DRAWING HALL(capacity:60stds)

    CIRCULATION SPACE

    Staircase 2

    CLASSROOM 2(capacity:40stds)

    CLASSROOM 3(capacity:40stds)

    CLASSROOM 5(capacity:40stds)

    CLASSROOM 6(capacity:40stds)

    wc

    wc

    wc

    wc

    wc

    wc

    urinals

    washbasin

    washbasin

    washbasin

    -300mm floor level

    LANDING

    DWN

    MAIN DOOR

    UP

    UP

    FIRST FLOOR PLANSBs to Light Fittings Wiring Layout Plan

    SB-5

    SB-4

    SB-2

    SB-1

    SB-1

    SB-3

    SB-3SB-6

    SB-2

    SB-4

    SB-7

    SB-8

    SB-9

    SB-11

    SB-10

    SB-15

    SB-11

    SB-1

    4SB

    -12

    SB-13

    SB-9

    SB-7

    SB-6

    SB-5

    SB-8SB-1

    0

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/16

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 14 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • CLASSROOM 4(capacity:40stds)

    down

    DRAWING HALL(capacity:60stds)

    CIRCULATION SPACE

    Staircase 2

    CLASSROOM 2(capacity:40stds)

    CLASSROOM 3(capacity:40stds)

    CLASSROOM 5(capacity:40stds)

    CLASSROOM 6(capacity:40stds)

    wc

    wc

    wc

    wc

    wc

    wc

    urinals

    washbasin

    washbasin

    washbasin

    -300mm floor level

    DWN

    MAIN DOOR

    UP

    UP

    FIRST FLOOR PLANSDB to SBs Conduit Layout Plan

    SB-5

    SB-4

    SB-2

    SB-1

    SB-1

    SB-3

    SB-3SB-6

    SB-2

    SB-4

    SB-7

    SB-8

    SB-9

    SB-11

    SB-10

    SB-15

    SB-11

    SB-1

    4SB

    -12

    SB-13

    SB-9

    SB-7

    SB-6

    SB-5

    SB-8SB-1

    0

    SDB-6

    SDB

    -7

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/17

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 15 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • CLASSROOM 4(capacity:40stds)

    down

    DRAWING HALL(capacity:60stds)

    ENTRANCE LOBBY level+150mm

    C O R R I D O R

    FEMALE TOILET

    MALE TOILET

    CIRCULATION SPACE

    Staircase 2

    CLASSROOM 2(capacity:40stds)

    CLASSROOM 3(capacity:40stds)

    CLASSROOM 5(capacity:40stds)

    CLASSROOM 6(capacity:40stds)

    wc

    wc

    wc

    wc

    wc

    wc

    urinals

    washbasin

    washbasin

    washbasin

    -300mm floor level

    LANDING

    DWN

    MAIN DOOR

    UP

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    UP

    FIRST FLOOR PLANSDB to PPs Conduit Layout Plan

    PP-8/B PP-4/Y PP-4/R PP-3/R

    PP-6/Y

    PP-1/Y

    PP-7/B PP-5/Y PP-3/Y

    PP-2/Y

    PP-1/R

    PP-2/R

    PP-10/B PP-9/B

    PP-11/R

    PP-12/R

    PP-14/R

    PP-13/R

    PP-15/RPP-16/R

    PP-5/B

    PP-6/B

    PP-8/B PP-9/R

    PP-12/R

    PP-7/B

    PP-11/R

    PP-10/R

    PP-13/R

    SDB-6

    SDB

    -7

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/18

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 16 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • CLASSROOM 4(capacity:40stds)

    down

    DRAWING HALL(capacity:60stds)

    ENTRANCE LOBBY level+150mm

    C O R R I D O R

    FEMALE TOILET

    MALE TOILET

    CIRCULATION SPACE

    Staircase 2

    CLASSROOM 2(capacity:40stds)CLASSROOM 3

    (capacity:40stds)

    CLASSROOM 5(capacity:40stds)

    CLASSROOM 6(capacity:40stds)

    wc

    wc

    wc

    wc

    wc

    wc

    urinals

    washbasin

    washbasin

    washbasin

    -300mm floor level

    LANDING

    FILTER

    DWN

    MAIN DOOR

    UP14

    25[4'-

    8"]

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    UP

    FIRST FLOOR PLANSDB to PPs Conduit Layout Plan

    IN

    D-9

    IN

    D-2

    IN

    D-1

    IN

    D-8

    IN

    D-4

    IN

    D-3IN D-5

    IN

    D-7

    IN

    D-6

    IN

    D-10

    IN

    D-11

    I

    N

    D-12

    I

    N

    I

    N

    I

    N

    D-13

    D-14

    D-15

    IN

    D-21

    IN

    D-19

    IN

    D-17

    IN

    D-18

    IN D-20

    IN D-16

    TTC

    850

    [2'-9"]

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/19

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 17 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • PANTRYOFFICE

    HOD'S OFFICE

    CONFE

    RENCE

    HALL ca

    pacity:

    40-45

    ppl

    wc

    wc

    wc

    wc

    wc

    wc

    urinals

    washbasin

    washbasin

    washbasin

    Staircase 2

    ALUMINIUM PARTITION(refer section for heights)

    SLIDINGDOOR

    SLIDINGDOOR

    CUBICLES

    CUBICLES

    CUBICLES

    CABIN

    UP

    -300mm floor level

    -300mm floor level

    DWN

    SECOND FLOOR PLANSBs to Light Fittings Conduit Layout Plan

    SB-10

    SB-9

    SB-1

    SB-2SB-3SB-4

    SB-A

    SB-5

    SB-7

    SB-6

    SB-8

    SB-1

    1

    SB-9

    SB-7

    SB-6

    SB-5

    SB-8

    SB-11

    SB-1

    2SB

    -14

    SB-1

    3

    SB-1 SB-2 SB

    -3

    SB-4

    SB-1

    0

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/20

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 18 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • PANTRYOFFICE

    HOD'S OFFICE

    CONFE

    RENCE

    HALL ca

    pacity:

    40-45

    ppl

    wc

    wc

    wc

    wc

    wc

    wc

    urinals

    washbasin

    washbasin

    washbasin

    Staircase 2

    ALUMINIUM PARTITION(refer section for heights)

    SLIDINGDOOR

    SLIDINGDOOR

    CUBICLES

    CUBICLES

    CUBICLES

    CABIN

    UP

    -300mm floor level

    -300mm floor level

    DWN

    SECOND FLOOR PLANSBs to Light Fittings Wiring Layout Plan

    SB-10

    SB-9

    SB-1

    SB-2SB-3SB-4

    SB-A

    SB-5

    SB-7

    SB-6

    SB-8

    SB-1

    1

    SB-9

    SB-7

    SB-6

    SB-5

    SB-8

    SB-11

    SB-1

    2SB

    -14

    SB-1

    3

    SB-1 SB-2 SB

    -3

    SB-4

    SB-1

    0

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/21

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 19 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • PANTRYOFFICE

    HOD'S OFFICE

    CONFE

    RENCE

    HALL ca

    pacity:

    40-45

    ppl

    wc

    wc

    wc

    wc

    wc

    wc

    urinals

    washbasin

    washbasin

    washbasin

    Staircase 2

    ALUMINIUM PARTITION(refer section for heights)

    SLIDINGDOOR

    SLIDINGDOOR

    CUBICLES

    CUBICLES

    CUBICLES

    CABIN

    UP

    -300mm floor level

    -300mm floor level

    DWN

    SECOND FLOOR PLAN

    SB-9

    SB-7

    SB-6

    SB-5

    SB-8

    SB-11

    SB-1

    2SB

    -14

    SB-1

    3

    SB-10

    SB-9

    SB-1

    SB-2SB-3SB-4

    SB-A

    SB-1

    SB-2 SB

    -3

    SB-4

    SB-5

    SB-7

    SB-6

    SB-8

    SB-1

    0

    SB-1

    1

    SDB to SBs Conduit Layout Plan

    SDB

    -8

    SDB

    -9

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/22

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 20 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • PANTRY

    OFFICE

    HOD'S OFFICE

    CONFE

    RENCE

    HALL

    capacit

    y:40-4

    5 ppl

    FEMALE TOILET

    MALE TOILET

    wc

    wc

    wc

    wc

    wc

    wc

    urinals

    washbasin

    washbasin

    washbasin

    Staircase 2

    ALUMINIUM PARTITION(refer section for heights)

    SLIDINGDOOR

    SLIDINGDOOR

    CUBICLES

    CUBICLES

    CUBICLES

    CABIN

    UP

    -300mm floor level

    -300mm floor level

    DWN

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    SECOND FLOOR PLANSDB to PPs Conduit Layout Plan

    PP-1/Y

    PP-14/Y

    PP-13/R

    PP-12/R

    PP-10/R

    PP-11/R

    PP-9/R

    PP-8/R

    PP-6/Y

    PP-7/Y

    PP-5/Y

    PP-4/Y

    PP-2/Y

    PP-3/Y

    PP-15/R

    PP-19/BPP-18/B

    PP-17/B

    PP-16/R

    PP-20/B

    PP-25/B

    PP-22/B

    PP-26/B

    SDB

    -8

    PP-24/B

    PP-23/B

    SDB

    -9

    PP-21/R

    PP-6/

    PP-5/Y

    PP-3/Y

    PP-7/

    PP-4/Y

    PP-12/

    PP-11/

    PP-13/

    PP-10/

    PP-16/

    PP-15/

    PP-17/

    PP-14/

    PP-9/

    PP-18/

    PP-2/Y

    PP-1/Y

    PP-8/

    250x200 mmCable Duct

    150x100x5 mmMS Cable Channel

    250x200 mmCable Duct

    150x100x5 mmMS Cable Channel

    150x100x5 mmMS Cable Channel

    14285[46'-9"]

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/23

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 21 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • PANTRY

    OFFICE

    HOD'S OFFICE

    CONFE

    RENCE

    HALL

    capacit

    y:40-4

    5 ppl

    FEMALE TOILET

    MALE TOILET

    wc

    wc

    wc

    wc

    wc

    wc

    urinals

    washbasin

    washbasin

    washbasin

    Staircase 2

    ALUMINIUM PARTITION(refer section for heights)

    SLIDINGDOOR

    SLIDINGDOOR

    CUBICLES

    CUBICLES

    CUBICLES

    FILTER

    CABIN

    UP

    -300mm floor level

    -300mm floor level

    DWN

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    SECOND FLOOR PLANSDB to ACs Conduit Layout Plan

    SP

    LIT

    T

    YP

    E A

    C

    25°C

    AC-1/

    OU

    TDO

    OR

    UN

    IT

    S

    P

    L

    I

    T

    T

    Y

    P

    E

    A

    C

    2

    5

    °

    C

    S

    P

    L

    I

    T

    T

    Y

    P

    E

    A

    C

    2

    5

    °

    C

    AC-2/

    AC-3/

    OUTDOOR

    UNIT

    S

    P

    L

    I

    T

    T

    Y

    P

    E

    A

    C

    2

    5

    °

    C

    AC-4/

    OUTDOOR

    UNIT

    OUTDOOR

    UNIT

    SDB

    -9

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/24

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 22 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • PANTRY

    OFFICE

    HOD'S OFFICE

    CONFE

    RENCE

    HALL

    capacit

    y:40-4

    5 ppl

    FEMALE TOILET

    MALE TOILET

    wc

    wc

    wc

    wc

    wc

    wc

    urinals

    washbasin

    washbasin

    washbasin

    Staircase 2

    ALUMINIUM PARTITION(refer section for heights)

    SLIDINGDOOR

    SLIDINGDOOR

    CUBICLES

    CUBICLES

    CUBICLES

    FILTER

    CABIN

    UP

    -300mm floor level

    -300mm floor level

    DWN

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    EXHAUSTFAN

    SECOND FLOOR PLANTelephone & Internet Conduit Layout Plan

    D/T-4

    D/T-5

    D/T-6

    D/T-2

    D/T-3

    D/T-1

    IN

    D-1IN

    D-13IN

    D-10IN

    D-9IN

    D-6IN

    D-5IN

    D-2

    IN

    D-3IN

    D-4IN

    D-7IN

    D-8IN

    D-11IN

    D-12

    TTC

    IN

    D-18

    IN

    D-19

    IN

    D-17

    IN

    D-16

    IN

    D-22

    IN

    D-23

    IN

    D-21

    IN

    D-20

    I

    N

    D-14

    I

    N

    D-15

    250x200 mmCable Duct

    150x100x5 mmMS Cable Channel

    250x200 mmCable Duct

    150x100x5 mmMS Cable Channel

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/25

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 23 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • SEMINAR HALL

    DEPARTMENTAL LIBRARY

    LOBBY

    UP

    SB-2

    SB-1

    SB-4

    SB-3

    JAMTHO FLOOR PLANSBs to Light Fittings Conduit Layout Plan

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/26

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 24 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • SEMINAR HALL

    DEPARTMENTAL LIBRARY

    LOBBY

    UP

    SB-2

    SB-1

    SB-4

    SB-3

    JAMTHO FLOOR PLANSBs to Light Fittings Wiring Layout Plan

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/27

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 25 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • SEMINAR HALL

    DEPARTMENTAL LIBRARY

    LOBBY

    UP

    SB-2

    SB-1

    SB-4

    SB-3

    JAMTHO FLOOR PLANSDB to SBs Conduit Layout Plan

    SDB

    -10

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/28

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 26 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • SEMINAR HALL

    DEPARTMENTAL LIBRARYLOBBY

    UP

    PP-6/ PP-5/

    PP-7/

    PP-8/ PP-9/

    PP-4/

    PP-1/

    PP-2/

    PP-3/

    SDB

    -10

    JAMTHO FLOOR PLANSDB to PPs Conduit Layout Plan

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/29

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 27 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • SEMINAR HALL

    DEPARTMENTAL LIBRARYLOBBY

    UP

    SPLIT TYPE AC

    25°C

    AC-2/

    OU

    TDO

    OR

    UN

    IT

    SPLIT TYPE AC

    25°C

    AC-1/

    OU

    TDO

    OR

    UN

    IT

    SPLIT TYPE AC

    25°C

    AC-3/

    OU

    TDO

    OR

    UN

    IT

    SPLIT TYPE AC

    25°C

    AC-4/

    OU

    TDO

    OR

    UN

    IT

    SDB

    -10

    JAMTHO FLOOR PLANSDB to ACs Conduit Layout Plan

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/30

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 28 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • SEMINAR HALL

    DEPARTMENTAL LIBRARYLOBBY

    UP

    IN

    D-4

    IN

    D-3

    IN D-5

    IN

    D-1

    IN

    D-6

    IN

    D-2

    TTC

    JAMTHO FLOOR PLANInternet Conduit Layout Plan

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/31

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 29 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • 630A, 415V,70KA, TPN

    MCCB.

    312C 630 SQ.MM PVC INSULATED, ARMOURED AL.UG CABLE.

    BUSBAR- 4 strips,1350mm bars, 800A

    SDB-1

    EM

    4C, 25 S

    Q.M

    M P

    VC IN

    SULA

    TED

    ARM

    ORED

    AL.

    CABLE

    .

    63A,415V,

    TPN MCB.

    MDB-DETAILS

    SDB-2

    4C, 25 S

    Q.M

    M P

    VC IN

    SULA

    TED

    ARM

    ORED

    AL.

    CABLE

    .

    63A,415V,

    TPN MCB.

    SDB-3

    4C, 25 S

    Q.M

    M P

    VC IN

    SULA

    TED

    ARM

    ORED

    AL.

    CABLE

    .

    63A,415V,

    TPN MCB.

    SDB-4

    4C, 16 S

    Q.M

    M P

    VC IN

    SULA

    TED

    ARM

    ORED

    AL.

    CABLE

    .

    40A,415V,

    TPN MCB.

    SDB-5 SDB-6

    4C, 25 S

    Q.M

    M P

    VC IN

    SULA

    TED

    ARM

    ORED

    AL.

    CABLE

    .

    63A,415V,

    TPN MCB.

    SDB-7 SDB-8

    4C, 25 S

    Q.M

    M P

    VC IN

    SULA

    TED

    ARM

    ORED

    AL.

    CABLE

    .

    63A,415V,

    TPN MCB.

    SDB-9

    4C, 25 S

    Q.M

    M P

    VC IN

    SULA

    TED

    ARM

    ORED

    AL.

    CABLE

    .

    63A,415V,

    TPN MCB.

    SDB-10

    4C, 10 S

    Q.M

    M P

    VC IN

    SULA

    TED

    ARM

    ORED

    AL.

    CABLE

    .

    32,415V,

    TPN MCB.

    4C, 16 S

    Q.M

    M P

    VC IN

    SULA

    TED

    ARM

    ORED

    AL.

    CABLE

    .

    40A,415V,

    TPN MCB.

    4C, 16 S

    Q.M

    M P

    VC IN

    SULA

    TED

    ARM

    ORED

    AL.

    CABLE

    .

    40A,415V,

    TPN MCB.

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/31

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 29 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • SDB-1 DETAILS

    4C, 25 S

    Q.M

    M P

    VC IN

    SULA

    TED

    ARM

    ORED

    ALU

    MIN

    UM

    CABLE

    .

    FROM MAIN DISTRIBUTIONBOARD

    16A, SP,B-TYPE MCB

    2X4

    SQ

    MM

    PVC

    CU

    WIR

    E

    63A, 415V,TPN RCCB.

    SDB-2 DETAILS

    FROM MAIN DISTRIBUTIONBOARD

    63A, 415V,TPN RCCB.

    L-1

    6A, SP,B-TYPE MCB

    2X2

    .5 S

    Q M

    M P

    VC

    CU W

    IRE

    L-18 L-2 PP-1 PP-2 PP-3 PP-18

    4C, 25 S

    Q.M

    M P

    VC IN

    SULA

    TED

    ARM

    ORED

    ALU

    MIN

    UM

    CABLE

    .

    SMDB-1 ACRYLIC DOOR (DOUBLEDOOR),12 WAYS, TPN-DB

    12+36, IC+OGRESPECTIVELY

    B TYPE, 6A MCB= 18 NosB TYPE, 16A MCB= 18 Nos

    SMDB-2 ACRYLIC DOOR (DOUBLEDOOR),12 WAYS, TPN-DB

    12+36, IC+OGRESPECTIVELY

    B TYPE, 6A MCB= 08 NosB TYPE, 16A MCB= 24 Nos

    8 S

    WG

    CU E

    ARTH

    WIR

    E

    8 S

    WG

    CU E

    ARTH

    WIR

    E

    EARTH LINK EARTH LINK

    16A, SP,B-TYPE MCB

    2X4

    SQ

    MM

    PVC

    CU

    WIR

    E

    L-1

    6A, SP,B-TYPE MCB

    2X2

    .5 S

    Q M

    M P

    VC

    CU W

    IRE

    L-8 L-2 PP-1 PP-2 PP-3 PP-24

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/32

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 30 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • SDB-3 DETAILS

    4C

    , 2

    5 S

    Q.M

    M P

    VC

    INSULA

    TED

    ARM

    ORED

    ALU

    MIN

    UM

    CABLE

    .FROM MAIN DISTRIBUTION

    BOARD

    16A, SP,B-TYPE MCB

    2X4

    SQ

    MM

    PVC C

    UW

    IRE

    63A, 415V,TPN RCCB.

    SDB-4 DETAILS

    FROM MAIN DISTRIBUTIONBOARD

    40A, 415V,TPN RCCB.

    PP-5PP-26 PP-4 PP-3 PP-2 PP-1

    4C

    , 1

    6 S

    Q.M

    M P

    VC

    INSULA

    TED

    ARM

    ORED

    ALU

    MIN

    UM

    CABLE

    .

    SMDB-3 ACRYLIC DOOR (DOUBLEDOOR),12 WAYS, TPN-DB

    12+36, IC+OGRESPECTIVELY

    B TYPE, 16A MCB= 26 Nos

    SMDB-4 ACRYLIC DOOR (DOUBLEDOOR),8 WAYS, TPN-DB

    8+24, IC+OGRESPECTIVELY

    B TYPE, 6A MCB= 09 NosB TYPE, 16A MCB= 15 Nos

    8 S

    WG

    CU E

    ARTH

    WIR

    E

    8 S

    WG

    CU E

    ARTH

    WIR

    E

    EARTH LINK EARTH LINK

    16A, SP,B-TYPE MCB

    2X4

    SQ

    MM

    PVC C

    UW

    IRE

    L-1

    6A, SP,B-TYPE MCB

    2X2

    .5 S

    Q M

    M P

    VC

    CU W

    IRE

    L-9 L-2 PP-1 PP-2 PP-3 PP-15PP-6

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/33

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 31 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • SDB-5 DETAILS

    4C, 16 S

    Q.M

    M P

    VC IN

    SULA

    TED

    ARM

    ORED

    ALU

    MIN

    UM

    CABLE

    .FROM MAIN DISTRIBUTION

    BOARD

    40A, 415V,TPN RCCB.

    SDB-6 DETAILS

    FROM MAIN DISTRIBUTIONBOARD

    63A, 415V,TPN RCCB.

    4C, 25 S

    Q.M

    M P

    VC IN

    SULA

    TED

    ARM

    ORED

    ALU

    MIN

    UM

    CABLE

    .

    SMDB-5 ACRYLIC DOOR (DOUBLEDOOR),6 WAYS, TPN-DB

    6+18, IC+OGRESPECTIVELY

    B TYPE, 16A MCB= 16 Nos

    SMDB-6 ACRYLIC DOOR (DOUBLEDOOR),12 WAYS, TPN-DB

    12+36, IC+OGRESPECTIVELY

    B TYPE, 6A MCB= 10 NosB TYPE, 16A MCB= 16 Nos

    8 S

    WG

    CU E

    ARTH

    WIR

    E

    8 S

    WG

    CU E

    ARTH

    WIR

    E

    EARTH LINK EARTH LINK

    16A, SP,B-TYPE MCB

    2X4

    SQ

    MM

    PVC

    CU

    WIR

    E

    L-1

    6A, SP,B-TYPE MCB

    2X2

    .5 S

    Q M

    M P

    VC

    CU W

    IRE

    L-10 L-2 PP-1 PP-2 PP-3 PP-16

    16A, SP,B-TYPE MCB

    2X4

    SQ

    MM

    PVC

    CU

    WIR

    E

    AC-5AC-16 AC-4 AC-3 AC-2 AC-1AC-6

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/34

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 32 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • SDB-7 DETAILS

    4C, 16 S

    Q.M

    M P

    VC IN

    SULA

    TED

    ARM

    ORED

    ALU

    MIN

    UM

    CABLE

    .

    FROM MAIN DISTRIBUTIONBOARD

    16A, SP,B-TYPE MCB

    2X4

    SQ

    MM

    PVC C

    UW

    IRE

    40A, 415V,TPN RCCB.

    SDB-8 DETAILS

    FROM MAIN DISTRIBUTIONBOARD

    63A, 415V,TPN RCCB.

    L-1

    6A, SP,B-TYPE MCB

    2X2

    .5 S

    Q M

    M P

    VC

    CU W

    IRE

    L-12 L-2 PP-1 PP-2 PP-3 PP-13

    4C, 25 S

    Q.M

    M P

    VC IN

    SULA

    TED

    ARM

    ORED

    ALU

    MIN

    UM

    CABLE

    .

    SMDB-7 ACRYLIC DOOR (DOUBLEDOOR),12 WAYS, TPN-DB

    12+36, IC+OGRESPECTIVELY

    B TYPE, 6A MCB= 12 NosB TYPE, 16A MCB= 13 Nos

    SMDB-8 ACRYLIC DOOR (DOUBLEDOOR),12 WAYS, TPN-DB

    12+36, IC+OGRESPECTIVELY

    B TYPE, 6A MCB= 10 NosB TYPE, 16A MCB= 26 Nos

    8 S

    WG

    CU E

    ARTH

    WIR

    E

    8 S

    WG

    CU E

    ARTH

    WIR

    E

    EARTH LINK EARTH LINK

    16A, SP,B-TYPE MCB

    2X4

    SQ

    MM

    PVC C

    UW

    IRE

    L-1

    6A, SP,B-TYPE MCB

    2X2

    .5 S

    Q M

    M P

    VC

    CU W

    IRE

    L-10 L-2 PP-1 PP-2 PP-3 PP-26

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/35

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 33 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • SDB-9 DETAILS

    4C, 25 S

    Q.M

    M P

    VC IN

    SULA

    TED

    ARM

    ORED

    ALU

    MIN

    UM

    CABLE

    .

    FROM MAIN DISTRIBUTIONBOARD

    16A, SP,B-TYPE MCB

    2X4

    SQ

    MM

    PVC

    CU

    WIR

    E

    63A, 415V,TPN RCCB.

    L-1

    6A, SP,B-TYPE MCB

    2X2

    .5 S

    Q M

    M P

    VC

    CU W

    IRE

    L-10 L-2 PP-1 PP-2 PP-3 PP-23

    SMDB-9 ACRYLIC DOOR (DOUBLEDOOR),12 WAYS, TPN-DB

    12+36, IC+OGRESPECTIVELY

    B TYPE, 6A MCB= 10 NosB TYPE, 16A MCB= 23 Nos8 S

    WG

    CU E

    ARTH

    WIR

    E

    EARTH LINK

    SDB-10 DETAILS

    FROM MAIN DISTRIBUTIONBOARD

    32A, 415V,TPN RCCB.

    4C, 10 S

    Q.M

    M P

    VC IN

    SULA

    TED

    ARM

    ORED

    ALU

    MIN

    UM

    CABLE

    .

    SMDB-10 ACRYLIC DOOR (DOUBLEDOOR),6 WAYS, TPN-DB

    6+18, IC+OGRESPECTIVELY

    B TYPE, 6A MCB= 04 NosB TYPE, 16A MCB= 13 Nos

    8 S

    WG

    CU E

    ARTH

    WIR

    E

    EARTH LINK

    16A, SP,B-TYPE MCB

    2X4

    SQ

    MM

    PVC

    CU

    WIR

    E

    L-1

    6A, SP,B-TYPE MCB

    2X2

    .5 S

    Q M

    M P

    VC

    CU W

    IRE

    L-4 L-2 PP-1 PP-2 PP-3 PP-13

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/36

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 34 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

  • 1200.01200.0

    120.0

    40.0

    300.0

    2800.0

    Ø20.0 G.I PIPEFOR WATERING

    WIRE MESH

    Ø6.0 M.S ROD

    C.I FRAME

    CEMENT CONCRETE (1:4:8)

    600

    Ø15.0 G.I PIPE1500 MIN3000 MAX

    3600.0

    600.0

    A

    600x600x3.0CU PLATE

    (OR)600x600x6.0G.I PLATE

    ALTERNATE LAYER OF SALTAND CHARCOAL OR COKE

    EARTH LEAD FOREARTH CONNECTIONIN G.I PIPE

    2400.0

    2400.0

    3600.0

    Ø15.0 G.I PIPE

    EARTH LEAD

    EARTH ELECRODE

    ENLARGED DETAILS OF A

    NOTE:1. BOLT, NUTS, CHECK NUT AND WASHER TO BE OF G.I FOR G.I PLATE AND TI24ED BRASS FOR

    COPPER PLATE ELECTRODE.

    2. EARTH RESISTANCE SHALL NOT BE GREATER THAN 5Ω AND IN ROCKY SOILS MAY BE UP TO 8Ω.

    3. EARTHING LEAD SHALL BE OF G.I. WIRE (6 SWG)/G.I. STRIP (25 MM X 4 MM), IN CASE OF G.I. PLATEEARTH ELECTRODE AND COPPER WIRE (8 SWG)/COPPER STRIP ( 20MM X 3MM) IN THE CASE OFCOPPER EARTH ELECTRODE.

    4. PROTECTION PIPE SHALL BE BURIED WITHIN THE GROUND AT LEAST 50CM DEEP. IN CASE OFROAD CROSSING AND PAVEMENTS SHALL BE BURIED 0.6 TO 0.7M.

    5. AN EARTH ELECTRODE SHALL NOT BE SITUATED LESS THAN 1.8 M FROM ANY BUILDING.

    6. MINIMUM DISTANCE BETWEEN TWO EARTH PIT SHALL NOT BE LESS THAN 5M.

    7. THE SIZE OF EARTH CONTINUITY WIRE SHALL BE NOT LESS THAN 1.5 SQ.MM (16SWG) AND 2.5SQ.MM (14SWG) BARE COPPER WIRE FOR LIGHT AND POWER CIRCUIT RESPECTIVELY.

    C.I COVER HINGED TO C.IFRAME

    GROUNDLEVEL

    600.0

    RIV0

    LOCATION: DEWATHANG, SAMDRUP JONGKHAR

    PROJECT: MECHANICAL BLOCK DRAWING NO.:JNEC/ELE/37

    DRAWING TITLE.: As mention above.

    SCALE: NTS SHEET NO.: 35 OF 35DATE:

    ALL DIMENSIONS ARE IN MILLIMETER

    CLIENT: JIGME NAMGYEL ENGINEERINGCOLLEGE

    ASH BAHADUR SUBBAELECTRICAL ENGINEER

    APPROVED BYCHECKED BYDESIGNED/DRAWN

    MODIFICATIONDATE

    REVISION5

    4 CONSTRUCTION

    3

    2

    1 APPROVAL

    RECORD

    INFORMATION

    ISSUED FOR:

    AutoCAD SHX TextPLATE EARTHING DETAILS

    Sheets and ViewsMECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-CPMECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-SPECIFICATIONSMECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-LEGENDSMECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (2)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (3)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (4)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (5)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (6)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (7)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (8)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (9)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (10)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (11)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (12)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (13)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (14)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (15)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (16)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (17)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (18)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (19)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (20)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (21)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (22)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (23)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (24)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (25)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (26)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (27)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (28)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (36)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (29)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (30)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (31)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (32)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (33)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (34)MECHANICAL BLOCK (ELECTRICAL DWG For SITE IMPLEMENTATION) JNEC.-1 (35)